INFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6).

Similar documents
City Department: 1. Project Name: 2. Project/Job Number: 3. Reporting Period: 4. Project Street Address: 5. City & County (if not in SF):

Salt Lake City Corporation CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLAN

Construction and Demolition (C&D) Debris Re-use and Recycling Program

Construction Waste Management Plan (CWMP)

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

BUILDING DEMOLITION REQUIREMENTS

City of South San Francisco Construction and Demolition Waste Management Plan Information for the Applicants

CITY OF RIO VISTA Construction and Demolition Waste Management Plan and Disposal Report

CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT Building and Safety Division Construction Waste Management Plan (CWMP) (Provide During Plan Review)

CONSTRUCTION AND DEMOLITION PERMIT APPLICATION PACKAGE

City of Tustin Construction and Demolition Debris Recycling Requirements

- SUPPLEMENT HISTORY TABLE Title 15 - BUILDINGS AND CONSTRUCTION. Chapter RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS

City of San Clemente Building Permit Applicants. Construction & Demolition Debris Recycling Requirements

City of Brisbane Construction and Demolition Debris Recycling and Waste Reduction Plan

CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form:

CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS

Construction and Demolition WASTE REDUCTION AND RECYCLING PACKET

ORDINANCE NO. IT IS ORDAINED by the City Council of the City of San Carlos as follows:

CITY OF ALISO VIEJO CONSTRUCTION AND DEMOLITION DOCUMENTATION

Construction / Demolition (C&D) Recycling Program

Technical Services Division 1660 Mission Street San Francisco CA Office (415) FAX (415)

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: MARCH 30, 2004 CMR:166:04

CONSTRUCTION AND DEMOLITION (C&D) DIVERSION REQUIREMENTS

WASTE MANAGEMENT & DIVERSION GUIDE

Construction and Demolition Debris Recycling and Reuse Requirements. Steps For Meeting Ordinance Requirements

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105

A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE

1. Have you attached a copy of the site plan including the location and design of the recycling and trash enclosure(s)? X Yes No (4.1 4.

TITLE I SWA CODE DEFINITION OF TERMS

DOCUMENT CONSTRUCTION WASTE MANAGEMENT

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:

Construction Waste Management

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.

ADMINISTRATIVE BULLETIN

CITY OF ALISO VIEJO CONSTRUCTION AND DEMOLITION PERMIT

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Construction and Demolition (C&D) Waste Management Plan Program Requirements

RE-ROOFING & CALIFORNIA RESIDENTIAL COMPLIANCE REQUIREMENTS FOR COOL ROOFS

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL)

Business Models for Deconstruction and Building Materials Salvage

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

COST ESTIMATE FORM FOR ESTIMATING THE PREVAILING COST OF RESIDENTIAL ADDITIONS AND REMODELING

COST ESTIMATE FORM FOR ESTIMATING THE PREVAILING COST OF RESIDENTIAL ADDITIONS AND REMODELING

1. Division 01 Section General Requirements Temporary Facilities and Controls.

CONSTRUCTION WASTE MANAGEMENT PLAN

Wood-Frame Seismic Retrofit Program

CITY OF ROCK SPRINGS FLOODPLAIN DEVELOPMENT PERMIT APPLICATION

APPLICATION FOR DEMOLITION PERMIT

WOODFORD COUNTY BUILDING & ZONING DEPARTMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION FORM OWNERS NAME & ADDRESS: PHONE #:

MANDATORY COMMERCIAL RECYCLING DIVISION 7. CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD

Construction & Demolition Waste Management Plan Resource Guide for Contractors

Construction & Demolition Waste Management Plan Resource Guide for Contractors

Proud of its Heritage, Preparing for its Future

CmDv Demolition Services Bid Packet #1804

SECTION (SECTION 01351) CONSTRUCTION WASTE MANAGEMENT

Demolition Permits Checklist

COMPLIANCE ASSISTANCE BULLETIN July Revised July ASBESTOS REQUIREMENTS for DEMOLITION and RENOVATIONS SUMMARY

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT

Land Reclamation Site Siting and Application Guidelines

~lamance <tount!' 9'~UUJ ;i)epwdment 124 We6t ElmStltm (j,taluun,.ncjjdli &vwfina 27253!Jefepfwae(336) :Jax(336)

FOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Construction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016)

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Demolition Permit Requirements

Site Specific Hazardous Material Abatement Work Plan

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

Section 34 Brieser Construction SH&E Manual

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

CITY OF BILLINGS BUILDING & SAFETY DIVISION

2016 SAN FRANCISCO EXISTING BUILDING CODE AB-110 ADMINISTRATIVE BULLETIN. Building Façade Inspection and Maintenance

DEMOLITION OF BUILDINGS

Commercial Remodel Permit

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

DEMOLITION OF BUILDINGS

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

Demolition Waste Management Plan Guidelines

WORK INSTRUCTIONS COLORADO SPRINGS NNO FACILITY EQUIPMENT SALVAGE PLAN VERIZON WIRELESS PROJECT MANAGER PATRICK SKILLEN PREPARED FOR:

6.20 UTILITIES SOLID WASTE

ALVARADO STREET SAN FRANCISCO, CA VARIANCE APPLICATION

SAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION:

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

Construction Waste Management and Disposal

Solicitation Number: FA B-A001 Project Numbers: RKMF Demo Base Gymnasium & RKMF Demo Pool Facilities.

Standard for notification prior to demolition or renovation.

DATE OF DECLARATION PROPERTY OWNER(S) ASSESSOR PARCEL NUMBER

ACCESSIBLE BUSINESS ENTRANCE PROGRAM (ABE) Overview of Required Forms and Technical Infeasibility & Unreasonable Hardship Process

ADMINISTRATIVE BULLETIN. TITLE : Collection and Storage of Trash, Recycling, and Compostable Materials

Transcription:

City and County of San Francisco Department of Building Inspection Edwin M. Lee, Mayor Tom C. Hui, S.E., C.B.O., Director INFORMATION SHEET NO. 5-04 DATE CATEGORY SUBJECT : June 22, 2015 Structural Demolition Permits PURPOSE : To carry out the safety requirements of the Building Code and to expedite processing of permit applications for the demolition of buildings. REFERENCE San Francisco Building Code Sections 106A.3.2.2, 1705.18 and 3303 AB-032 Site Permit Processing AB-036 Special Inspection for Demolition Work Ordinance No. 27-06: Construction and Demolition Debris Recovery Program DBI Cost Schedule DISCUSSION (AI General Procedures To demolish the entire building to the foundation will require a demolition permit (Form 6). To demolish part of the building will not require a demolition permit, but will require a building permit (Form 3/8). For a site permit to remodel an existing building, no demolition permit is required. For a site permit to construct a new building on a vacant space of a lot, no demolition permit is required. Site permit application to construct a new building on a space occupied by an existing building and demolition permit shall be filed at the same time, unless both new and existing buildings are nonresidential or mixed use. (Note: Mixed use is a project combining nonresidential and residential uses) For nonresidential or mixed use projects, site permit application to construct a new building on a space occupied by an existing building may be issued if demolition permit had been filed. However, no addenda for construction of a new building on a space occupied by an existing building shall be issued unless the demolition permit had been issued. For residential projects, site permit application to construct a new building on a space occupied by an existing building needs to be issued at the same time as demolition permit. Page 1 of 7 Technical Services Division 1660 Mission Street - San Francisco CA 94103 Office (415) 558-6205 - FAX (415) 558-6401 - www.sfdbi.org

INFORMATION SHEET S-04 (B) Demolition Plans - Details Except for buildings oftype V construction and Type I, II, III and IV buildings less than 3 stories or 25 feet in height shall provide Items 1, 2 and 3 as set forth herein below prior to approval of any application for demolition permit. 1. Applicant shall submit two sets of detailed plans showing the following : (a) The sequence of operation floor by floor, (b) Location of standpipes, (c) Location and details of protective canopy, (d) Location of truck crane during operation, (e) Any necessary fence or barricade with lights, (f) Any floor or wall left standing, and (g) Schedule of the days when the demolition will be done; i.e., on weekdays or on Sundays. 2. Applicant shall designate the party responsible for repairing any structural sidewalk slabs that may be damaged during operation. 3. Applicant shall designate the responsible registered Civil Engineer or Architect who will supervise the demolition work. 4. Applicant shall secure appropriate permits for use of street space, at the time of filing the demolition permit. 5. Any wall or other construction to be left standing must be certified for structural stability by a registered Civil Engineer, and must be so shown on submitted plans. 6. Demolition contractor shall notify the District Building Inspector at least two days prior to the commencement of demolition operation. Demolition contract shall also notify SFE at (415)355-3700. 7. A registered Civil Engineer or Licensed Architect shall continuously and personally supervise the demolition work and shall submit progress reports to the Director of the Department of Building Inspection in writing. 8. Any of the aforementioned requirements may be waived only upon the written approval of the Director of the Department of Building Inspection after receiving certification by the registered Civil Engineer or record that the safety requirements of the Building Code are not lessened. (e) Demolitions Permit Processing Contractors seeking approval for demolition shall, in addition to other City department sign-ofts, provide the following: 1. BAAQMD "J" number (obtained by calling 771-6000, ext. 217) 2. Asbestos/RACM survey supported by preparer's CAL OSHA certification 3. Form 3/8 application completed by licensed asbestos handling contractor when survey indicates the presence of asbestos Page 2 of 7

INFORMATION SHEET S-04 4. Two sets of mailing list for demolition to CPB to comply with the notification requirement per San Francisco Building Code Section 103A3.2.2.1 (due upon filing of demolition permit). Applications not complying with items 1-4 above shall not be accepted for review without prior arrangements. 5. Demolition Debris Recovery Plan (DDRP) approved by the San Francisco Department of Environment (SFE). NOTES: (a) The DDRP shall be prepared by person conducting demolition and shall demonstrate how the project will divert Construction & Demolition (C&D) debris material from landfill. (b) Applicant shall submit the DDRP to SFE for review after Planning approved the Site Permit. (c) Demolition permit application number needs to be on the DDRP. No demolition permit should be issued without an approved DDRP for that permit number, as required by Ordinance 27-06. Note: Link to SFE's Construction & Demolition webpage is http://www.sfenvironment.org/c&d Page 3 of 7

INFORMATION SHEET S-04 DEMOLITION PERMIT PROCESSING FLOW CHART (See Section C): (Exception applies to unsafe building per San Francisco Building Code Section 102A.16) Demolition Permit Application Received Form #6 FINAL INSPECTION Pending Special Inspection clearance letter Re: Asbestos cleanup and completion of RACM removal under Form 3 permit BAAQMD "JII Process Received DCP Approval Received DDRP Approval Received Asbestos Report Received "RACM" Asbestos Report Indicates No "RACM" Route to CPB for Issuance Asbestos Report Indicates (fracm" Form #3/8 for IIRACM" Removal Under Special Inspection or Report "RACM" - Regulated Asbestos Containing Materials Page 4 of 7

INFORMATION SHEET 8-04 (D) Demolition Cost 1. BLDG Form 6: Application for Demolition Permit Applicant shall write the estimated cost of demolition of building on the form. Plan Reviewer would verify the cost by the following procedures. 2. Building Volume = Length of Building X Width of Building X Height of Building = Ground Floor Area X Height of Building Height of Building ---- ------ -----------~,,, ''',, '''.. " Ground Floor Area Length of Building Width of Building 3. Average Unit Cost of Demolition of Building: For average unit cost per cubic yard of building volume, see latest OBI Cost Schedule. 4. Cost of Demolition of Building = Building Volume X Unit Cost Other conditions will be evaluated on a case-by-case basis by the Supervisor or Manager, subject to written approval by Planning if required. 1M'e rjc- ( L Tom C. Hui, S.E., C.B.O. Director Department of Building Inspection t/--vv/lf 7 I Date This Information Sheet is subject to modificat ion at any time. For the most current version, visit our website at http://www.sfdbi.org Page 5 of 7

INFORMATION SHEET SF Environment Our t.om.. 0... elry. Our plo"... DEMOLITION DEBRIS RECOVERY PLAN WORKSHEET Constmction and Demolition (C&D) Debris Recovery Program City and County of San Francisco Environment Code Chapter 14; Ordinance No. 27-06; SFE Regulations 06-05-CDO PLAN TYPE: o NEW PERMIT APPLICATION o FINAL REPORT DATE DEMO COMPLETED General Instructions: Demolition Debris Recovety Plan (DDRP) WORKSHEET must be completed by person conducting demolition and submitted to San Francisco's Department of Environment (SFE) for all Department of Building Inspection (OBI) Full Demolition Permit applications (Form #6). Submit to SFE at address or fax at bottom of this page. The DDRP must demonstrate that the demolition project will achieve a minimum of 65% diversion from landfill. Mixed C&D debris material taken to a San Francisco Registered C&D Facility will be credited at 65% diversion. No C&D debris material can be taken directly to landfill or be put in garbage. After SFE approves the DDRP, it will be returned to you to submit to OBI before issuance of the Demolition Permit. Detailed instructions for completing a final report will be included with the approved DDRP. Demolition permits will not be issued by OBI without an approved DDRP. A FINAL REPORT MUST BE SUBMITTED WITHIN 30 DAYS AFTER COMPLETION OF DEMOLITION. Demolition Permit Application No. Permit Application Date S-04 Project Address Project BlocklLot# _ Demolition Permit Applicant Phone ( ) Demolition Permit Applicant Address _ ContactName Phone <--J Contact Address Fax L) (ifdifferelllji"olll abo-ve-,,y- ----------------- '------------ - E-Mail _ Describe building being demolished: Type Square Footage _ Complete the Diversion Rate Table on the reverse side of this worksheet indicating the disposition by material type of all project materials. See www.sfenvironment.orglc&d for possible facilities or markets to take materials. For new permit applications, provide ESTIMATED tons. For final reports, provide ACTUAL tons based on receipts you have received from facilities. Information included in the final repolt is subject to verification by SFE. Instmctions for completing the table on the reverse side of this worksheet; all materials are repoited in TONS Column I - This is the total tons of materials generated lioln this project listed by material type; Column 2- Materials that will be separated on site in usable condition taken to a salvage facility for reuse. Also includes materials reused on site such as wood folms, and inerts used as backfill, etc. Column 3 - Materials separated on site that will be taken to a facility to be reprocessed into a new product. This includes source separated materials such as wood, metal, cardboard, drywall, landscape debris, etc. Column 4 - Materials that are not source-separated on site and are taken to a San Francisco Registered C&D Facility that will process mixed C&D materials for recovery. Mixed C&D materials taken to a SF-Registered C&D Debris Facility will be credited with 65% diversion. A list of Registered Facilities can be found at sfenvironment.orglc&d Column 5- SOIted, Non-Recyclable, Non-Compostable Debris hauled to landfill; MUST DESCRIBE. Column 6 - Name of facility(s) you intend to use for reuse, recycling or disposal of each material generated from the project. Submittal Instructions: Submit this completed and signed form to: Department of the Environment, 1455 Market Street, #1200., San Francisco, CA 94103. Attention: C&D Demolition Debris Recovery Plan. Fax: 415.554.6393 For questions, please call SFE at (415) 355-3700 or see www.sfenvironment.org/c&d Page 6 of 7.

INFORMATION SHEET 8-04 Diversion Rate Table (See Instructions on. the front side of this form for column descriptions). 3 4 Material I 2 Recycling MixedC&D 5 6 Type (Toils) Total Tons Salvage or (source- Debris to Landfill Facility or Destillation Generated Reuse separated Registered Disposal material) Facility * Example: Wood 50 5 45 Building ResourceslSFR&D Wood, Pallets & Lumber (clean & unpainted, no pressure treated wood) Cabinets, Fixtures, Doors, Windows, Equipment Metal Carpet Carpet Padding Cardboard Ceiling Tile Drywall (used and painted) Green Waste Concrete Asphalt Brick, Masonry, Tile RocklDirtiSoil MlXED DEBRIS Other (please specify) Sorted, NOli-Recyclable, Non-Compostable Debris (please describe) TOTALS A 13 C D* D Calculate Yom' Diversion Rate using the following formula: ~ + ~ + I D X,65 (DR» I ~D Divide ~ ~ I~O L-YO_lf_D_iv_er_ Sio_"_R._,e-, % [* Mixed C&D material designated for process ing at a SF-Registered Mixed Debris Facility will be considered diverted at 65% diversion rate (pursuant to Ordinance No. 27-06).] If Your Diversion Rate is less that 65%, provide justification why the project cmmot meet the 65% diversion requirement List haulers removing material off site (use extra page ijnecessmy). Use only Registered Transporters for Mixed Debris. I) 2) 3) J AGREE TO SUBMIT A FINAL REPORT for this Demolition Permit WITHIN 30 DAYS AFTER COMPLETION OF THE DEMOLITION PROJECT; FINAL REPORT MUST VERIFY TH E ACTUAL DIVERSION ACHIEVED & INCLUDE ALL RECEIPTS FROM FACILITIES, ESTIMATED DATE OF COMPLETION: Submitted by (signalufc): ----------------~Date.-------------~ Print Name Title. ~ FOR OFFICIAL CITY USE ONLY DATE PLAN/REPORT RECEIVED BY SFE APPROVED NOT APPROVED ~ DATE COMMENTS APPROVED BY NAME & TITLE, Page 7 of 7