Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Similar documents
SECTION EROSION AND SEDIMENTATION CONTROLS

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Town of Fortville Utility Street Standards

Erosion & Sedimentation Control Policy

SECTION EROSION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

D EROSION AND SEDIMENT CONTROL. Table of Contents

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

CCSD#1 Stormwater Standards

New Administration Building

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Single Family Residential Construction Erosion/Sediment Control Standards

SECTION EROSION AND SEDIMENTATION CONTROL

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

SECTION 903 EROSION CONTROL

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

Please print or type.

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION SOIL EROSION, SEDIMENTATION CONTROL AND LANDSCAPING TABLE OF CONTENTS

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

October 2016 CDRPC Workshop

Blue Book Update Overview

Construction Inspection Checklists

SUDAS Revision Submittal Form

Figure Inlet protection (Source: Minnesota DOT)

VILLAGE OF HODGKINS 8990 LYONS STREET, HODGKINS, ILLINOIS OFFICE: FAX:

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

Division of Water Quality (701)

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

APPENDIX I. Plan Reviewer Checklist

E & S Plan Approved. Not required but may be a municipal requirement** Not required but may be a. municipal. requirement** Not required but may be a

Stormwater Pollution Prevention Plan Engineering Department Requirements

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

JASON COTE-WONG RESIDENTIAL SUBDIVISION AND STORMWATER PERMITTING EAST MONTPELIER, VERMONT JUNE 21, 2017 OWNER: JASON COTE-WONG

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Construction Site Inspections

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

SECTION 10 - SEEDING Related requirements specified in other Sections of the Specifications. A. Section 7 - General Construction Standards

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Storm Water Pollution Prevention Plan (SWP3) Checklist

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Soil erosion and resulting sedimentation from developing areas are leading sources of water quality degradation.

WAKULLA SITE PLANNING

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

A. Each Contractor shall comply with the requirements outlined in these documents.

Performance Standards Compliance Checklist

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

City of Glendale Stormwater Management Plan Checklist

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

1.2 REGULATORY REQUIREMENTS

LAND DISTURBANCE PERMIT

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR VPDES CONSTRUCTION ACTIVITIES

GRADING, EROSION AND SEDIMENTATION CONTROL

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

Planning & Building Department. Requirements for Erosion and Sediment Control

Regulatory Requirements

Tips with Creation of your Erosion and Sediment Control Plan

ITEM 706 PIPE SLOPE DRAIN

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

The Construction General Permit and Erosion Prevention and Sedimentation Control

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Ordinance No NOW THEREFORE, be it hereby ordained by the Glasgow City Council as follows:

SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

EROSION CONTROL AND GRADING PERMIT APPLICATION

SECTION TRENCHING & BACKFILLING

BMP No. 2 Vegetative Establishment of Silviculturally Disturbed Areas

Building Better Storm Water Quality

SECTION 10 - TRENCHING AND BACKFILLING

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Homeowner Incentive Program

Best Management Practice (BMP) Guidance Manual

City of El Centro. Erosion and Sediment Control Plan Review Checklist. Reviewer: Review Date:


SECTION TRENCHING, BACKFILL AND COMPACTION

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

SECTION EROSION CONTROL DEVICES

GRASS-LINED CHANNEL (acre) CODE 840

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

Chapter CONSTRUCTION SITE EROSION CONTROL

Transcription:

CHAPTER 3 EROSION AND SEDIMENT CONTROL

CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with State and Town erosion and sediment control requirements and adhere to all requirements within the Town of Essex Storm Water Ordinance, Chapter 10.20. Whether a project requires a State or Town erosion control permit and/or plan, or not, the Town will require the Developer s Contractor to be responsible for preventing or minimizing soil erosion of disturbed land and preventing the discharge of sediment and other construction related pollutants to waters of the State, and any violations will be immediately addressed by the Developer s Contractor. The Town shall accept a State of Vermont General Permit for construction site runoff as evidence of meeting Town erosion and sediment control permit requirements for those projects which fall under the jurisdiction of the State requirements of 1.0 acre and above. If a state permit is accepted as evidence of compliance with the Town Ordinance, a separate Town application will not be required and Town storm-water permit fees shall be waived. For all projects that have over 0.5 acres of disturbance but under 1.0 acre, a Town Permit will be required. Furthermore, if the total new impervious disturbance is between 0.5 1.0 acres, the Developer will be required to provide a Storm Water Management Plan. Additional requirements regarding both documents can be found in the current version of the Town of Essex Storm Water Ordinance, Chapter 10.20. Development or construction plans shall include detailed information on limits and locations of soil disturbance, topsoil stockpiles, construction staging areas, and the proposed methods for erosion control. Appendix A of this document contains standard details for erosion and sediment control that should be incorporated into all Development projects constructed within the Town of Essex. Boundaries for any undisturbed riparian buffer zone shall be clearly established on the construction plans, and on site. No work shall be started in areas which are highly susceptible to erosion, as indicated by the Town, or within existing drainage channels until the methods of erosion control to be employed on the project have been approved. The Town Engineer has the authority to limit the surface area of erodible earth material exposed by excavation, borrow and fill operations and to order the 26

Contractor to provide immediate erosion control measures to prevent contamination of adjacent streams or other watercourses, and areas of water impoundment. These measures shall include but not be limited to; silt fence, stone check dams, hay mulch and matting. As the excavation proceeds, cut slopes shall be seeded and mulched to the extent considered desirable and practicable by the Town. The exposure of uncompleted cut slopes and embankments to the elements shall be as short as practicable. Seeding, mulching, installation of erosion control shrubbery or other designed treatment should be initiated promptly, and concurrently with the other work. If and when conditions develop that will suspend construction operations for any appreciable length of time, the excavation and embankment areas shall be shaped in such a manner that the runoff of water may be intercepted and diverted to points where least erosion shall result. Slope drains shall be installed as soon as possible to assist in carrying this runoff. If these preventative measures should fail and an appreciable amount of material begins to erode into a river, stream or impoundment, the Contractor shall act immediately to correct and prevent further erosion. Erosion control measures shall be continued until the permanent drainage facilities have been constructed and until grass on seeded slopes or specially installed shrubbery is established sufficiently to be an effective deterrent against erosion. Unless otherwise approved in writing, mechanized equipment shall not be operated in live streams except as may be required to construct changes in channel and permanent or temporary structures. Rivers, streams and impoundments shall, as soon as construction will allow, be cleared of all false work, piling and debris caused by the construction operations. Section 310 Regulations and Permits The Project Developer or the Town of Essex, as applicable, shall be responsible for all the necessary State and Town permits as required by each project. The Contractor shall be responsible to adhere to permit requirements throughout the duration of the project. It shall be the responsibility of the Project Developer to verify the need of a State Permit. For Town projects, the Town of Essex will obtain all necessary State permits for construction. It shall be the responsibility of the Project Developer to verify his or her project has been designed and constructed in accordance with the Town of Essex Storm Water Ordinance, Chapter 10.20 of the municipal code for the Town of Essex. 27

Section 320 Project Conditions The Contractor shall sequence all construction activities to minimize the extent of disturbed soils left exposed to erosion at any given time. A construction-phasing plan shall be submitted to the Project Engineer for review of conformance with any erosion and sediment control permits and this document. The Contractor shall schedule earthwork completion, site stabilization, and establishment of perennial cover and installation of other protection measures no later than September 15. If the Contractor s site construction activities extend beyond September 15, the Contractor shall limit exposure of soils and minimize additional earthworks. All work between September 15 and October 15 shall be temporarily restored until final restoration can be performed the following spring. The Contractor shall be required to develop a special winter erosion and sediment control plan if construction activities are planned between October 15 and April 15th. This plan must be filed with, and approved by the appropriate permitting authority by September 15. If it is determined by the permitting authority, Project Engineer, or the Town Engineer that winter construction would have adverse effects on the environment, the Contractor shall stabilize the entire site and implement a winter shut down. Discharges of any material other than stormwater, such as equipment maintenance spills, equipment fuel, wash water, construction debris, wet concrete, (including wash out water from concrete trucks), and all other substances are strictly prohibited. Failure to promptly abate the discharge of sediment or any other waste which cause a visible discoloration of surface waters, including wetlands, or is found to exceed water quality standards based on monitoring is prohibited. The disposal of sediment in a wetland, or any sediment removal from a wetland due to a discharge is strictly prohibited. The Contractor shall carry out all direction regarding the maintenance of erosion control measures by the Project Engineer or the Town Engineer in a prompt and professional manner. Section 330 Construction Sequence As construction progresses, implement temporary erosion controls as shown on the contract plans including temporary slope drains, temporary channel linings, seeding and mulching, stone check dams, sediment settling structures, silt fence and inlet protection. Appendix A of this document contains standard erosion and sediment control details that shall be referenced, and implemented throughout 28

the project construction. The State of Vermont s Low Risk Site Handbook may be referenced for all projects under 0.5 Acres. The Contractor shall sequence construction activities to minimize the extent of disturbed soils left open to erosion at any given time as detailed in the erosion and sediment control plans. During site clearing operations, the Contractor shall dispose of all stumps, excess soils, collected sediment and other pollutants, in a manner that will not result in sediments and pollutants entering waters of the State. The Contractor shall dispose of the above referenced material in the location designated on the erosion and sediment control plans or as directed by the Project Engineer and the Town Engineer. Upon the completion of work, the Contractor shall restore any areas used as access roads, staging areas, material stock piling, and all other areas disturbed by construction activities. All final erosion and sediment controls shall be installed to stabilize the site, i.e., channel linings, slope drains, stone check dams, and outlet protection. The Contractor shall remove all temporary erosion and sediment control measures upon project completion or final site stabilization as approved by the Project Engineer and the Town Engineer, whichever occurs last. Section 340 Installation of Erosion Control Measures The Contractor shall install all erosion and sediment control measures in accordance with the contract plans, these specifications, and all permits issued by local, and state regulatory agencies. Appendix A, Series 500, Erosion and Sediment Control Details, provide the Contractor with the preferred alternatives for erosion and sediment control measures, and instructions on their installation. 341.0 Installation 1. Seeding and Mulching a. General: All disturbed areas shall be seeded and mulched within 48 hours of being stripped or backfilled and graded. Stockpiles of excess or stockpiled material shall be mulched if they will not be disturbed for more than 48 Hours. b. Temporary seeding Procedures: Lime shall be spread evenly over the soil surface at a rate of 75 to 100 pounds per 1,000 square feet. Fertilizer shall be spread in the same manner with an application rate of 30 pounds per 1,000 square feet. Both the lime and fertilizer shall be thoroughly incorporated into the upper 2 inches of soil. 29

Temporary seed mixture shall be applied to treated soil at a rate of 2 pounds per 1,000 square feet, and surface shall be rolled. 2. Mulching Procedures: Apply mulch material promptly or within 24 hours after seeding operation in accordance with the following table. Material Hay or Straw Wood Chips Hydraulic mulch Rolled Erosion Control Products Application Rate 1.5 to 2.0 tons per acre (80 100% coverage) 2 to 6 inches deep (tree/shrub planting) 1.0 to 1.5 tons per acre (80 100% coverage) Single layer or as directed 3. Silt Fence: Construction detail 500.06 provides direction on the proper installation of this erosion and sediment control measure. 4. Sediment Containment Bag: Sediment bags shall be placed on a 6 inch thick bed of washed ¾ stone. Construction detail 500.03 provides direction on the proper installation of this erosion and sediment control measure. 342.0 Materials 1. Mulch Material a. Straw Shall be dry, free from rot and mold, and come from wheat or oats, free from weeds, twigs and debris. b. Hay - Shall be dry, free from rot and mold, and consist of mowed and properly cured grass or legume mowing's, free from weeds, twigs, and debris. c. Wood or Bark Chips Shall be dry, free of soil and other foreign debris. 2. Mulch Netting Shall be made of paper, twine, plastic, or plastic and wood fiber. 3. Rolled Erosion Control Product Shall be dry, and made of straw or hay, coconut and related fibers, wood excelsior, jute, polypropylene, nylon, or and approved combination of different materials. 4. Fertilizer Shall be a commercial fertilizer, (10-20-10 Grade). 5. Lime Shall be ground limestone containing not less than 95% calcium and magnesium carbonates. 6. Seed Mixture a. Temporary (Conservation Mix) 30

Kind of Seed Lbs. Per Acre Red Fescue 76 Tall Fescue 54 Annual Rye Grass 33 Perennial Rye Grass 26 Kentucky Bluegrass 22 White Clover 7 b. Permanent (Green Mountain Special Mix) Kind of Seed Lbs. Per Acre Creeping Red Fescue 70 Perennial Rye Grass 70 Kentucky Blue Grass 35 c. Or as approved for a specific project due to non-standard conditions. 7. Silt Fence Geosynthetic filter fabric material a minimum of 24 in height above grade. 8. Sediment Containment Bag Geosynthetic filter bag with sewn in spout. Bag shall be Dirt Bag as manufactured by SI Geosolutions or approved equal. 9. Inlet Protection For projects involving existing or proposed storm catch basins, inlet protection devices shall be installed in accordance with the details in Appendix A. Section 350 Inspection The Contractor shall inspect all erosion and sediment control measures, at least once every seven (7) calendar days, and no later than 24 hours after any storm event, which generates a discharge of stormwater runoff from the construction site, to ensure they are operating correctly. The Contractor shall submit copies of reports to the Project Engineer and the Public Works Director/Town Engineer once a month. A copy of an erosion and sediment control inspection report has been provided in Appendix C of this document. The following items should be inspected on a regular basis. 1. Inspect all sites that have been temporarily or finally stabilized. 2. Inspect channel linings, embankments, and channel beds daily for any sign of erosion. 31

3. Inspect all discharge points daily to visually assess whether erosion control measures are effective in preventing impacts to waters of the State. 4. Inspect for evidence of, or the potential for, sediment leaving from all disturbed areas or construction staging areas. Section 360 Maintenance The Contractor shall keep all seeded areas watered and in good condition until a uniform growth is established over the entire area seeded. All erosion and sediment control measures that have been determined to be failing, or not functioning as designed, shall be repaired by the Contractor within 24 hours of being notified of deficiency. The Contractor shall remove all accumulated sediment and debris from erosion containment systems and other sediment control measures as required. All damage to erosion and sediment control measures by soil erosion or construction equipment shall be repaired by the Contractor, at the end of each workday. Section 370 Corrective Actions The Project Engineer and Town Engineer shall be notified within 24 hours by the Contractor of any evidence of measurable amounts of sediment or sedimentladen water leaving the construction site or any visible discoloration of surface waters, (including wetlands). The Contractor shall document and take immediate action to correct the discharge, including halting or reducing construction activities as necessary until the discharge and/or the condition is fully corrected. The Town Engineer shall reserve the right to stop construction, if proper erosion and sediment control measures are not utilized. Section 380 Violations The Contractor shall carry out all corrective measures issued by the Project Engineer and/or the Town Engineer. If the Contractor fails to respond to any request for corrective action, the Town of Essex will issue a Stop Work Order as specified under section 10.20.111 of the Town of Essex Storm Water Ordinance. The Town will provide the Contractor the opportunity to take all corrective actions to bring the site into compliance. The Town of Essex can collect fines from any person or Contractor that is in violation of the Town s Stormwater Ordinance. Section 10.20.112 Violation and Penalty, of the ordinance states: Any person violating any of the provisions of this Ordinance or a permit issued hereunder shall be subject to a civil penalty of Five Hundred Dollars ($500.00) for each violation of this Civil Ordinance. 32

It is the Project Developer and Contractor s responsibility to review and understand the Town s stormwater ordinance. A copy can be found on the Town Website at www.essex.org, or a hard copy can be acquired at the Town of Essex Public Works Office, at 5 Jericho Road, Essex Junction, Vermont. 33

34