Instructions for 12 IGT system

Similar documents
Instructions for 12 and 15 IGT systems (12 pictured)

IMPORTANT. Use of safety surfacing (wood mulch) in compliance with ASTM specification F1292 is required. WARNING

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

FITNESS PLAYGROUND ITEM NO: 8010

WARNING- THIS EQUIPMENT IS DESIGNED FOR ADULTS ONLY. ONLY HEALTHY PEOPLE AGES 13 AND UP SHOULD USE THE EQUIPMENT.

Model # BARK /26/2012 Page 1 of 5

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Premier Railroad Grade Crossing Installtion Guide PREMIER RAILROAD GRADE CROSSING INSTALLTION GUIDE GUIDE GROUNDED IN STRENGTH

PYZIQUE FRESTANDING & RETAINING WALL

Rough-in frame and flush-mount panel installation instructions

EASY RIDER (MUSTANG) EASY RIDER (PONY) EASY RIDER (ZEBRA) EASY RIDER (BRONCO)

ACO DRAIN Site Installation Manual

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

Gravity Wall. A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

Installation Manual. Foundations. Version 2

EASY RIDER (MUSTANG) EASY RIDER (PONY) EASY RIDER (ZEBRA) EASY RIDER (BRONCO)

Cedar Flooring Rounds

GroundTrac. Installation Manual

ROOF MOUNT KIT OWNERS MANUAL

MODEL # MSC-4120-BM. Spring Breeze with Me and My Toddler Metal Swing Chair OWNER S MANUAL

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

INSTRUCTION MANUAL.

Cornerview Shower Enclosure & Base

ROOF MOUNT KIT OWNERS MANUAL

Liner Replacement Instructions:

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual

Glass Care. Frame Cleaning

General Brick Installation Instructions

Installation Instructions

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

Magnetic Treadmill OWNER S MANUAL. Item #1000

KEEP FOR FUTURE REFERENCE MRT FORKLIFT ADAPTER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

Five Stone System. Trench Depth Compactible Rock. Foundation. 57 lbs 41 lbs 31 lbs 47 lbs. Patent Pending. Approximate Weight

INSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP

Playground Review and Maintenance Process

Installation Instructions

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Freedom Barrier Free Shower Pan Installation Instructions

Freedom Barrier Free Shower Pan Installation Instructions

Magnetic Treadmill OWNER S MANUAL

DESCRIPTION SAFETY: WARNINGS ORDERING INFORMATION T01-B INSTALLATION INSTRUCTIONS DROP-IN AND FREESTANDING BATH K-11343T / K-11344T

Prime Shower Enclosure & Base

RETAINING WALL SIGMA WALL 6 AND 8 SIGMA. cambridgewallsupport.com cambridgepavers.com FIND MORE DETAILS AT

INSTALLATION INSTRUCTIONS HD MODERN TRIPOD SWING Please read the entire manual before beginning installation.

Signature Series MicroFalls Filter

BESTMOVE STANDING TRANSFER AID

INSTRUCTIONS FOR THE ASSEMBLY AND INSTALLATION OF THE VORTOX LIQUID SAMPLER

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

Bravo Platform Unpacking Guide

Freedom One-Piece Barrier Free Showers Installation Instructions

POOL STEP INSTRUCTIONS (NE1087WH)

General Guidelines. Tools Required. Steel Folding Scooter & Wheelchair Carrier Instructions for Part # SC400-V2. Safety

Prime Shower Enclosure & Base Kit

InstallatIon. Guidelines. Relax More. A C T G L O B A L. C O M / X T R E M E L A W N E M A I L : X T R M E L A W A C T G L O B A L.

Model # 815P-VCA3. 3/31/2011 Page 1 of 10

General Guidelines. Tools Required. Safety. Deluxe Steel Folding Scooter & Wheelchair Carrier Instructions for Part # SC500-V3

Appendix 4. Bills of Quantities

Model # 362S-RDP. 9/17/2012 Page 1 of 12

2004 Specifications CSJ SPECIAL SPECIFICATION DIRECT FIXATION TRACK CONSTRUCTION

BESTMOVE STANDING TRANSFER AID

Model # 338S-RDP. 7/31/2012 Page 1 of 13

A DIVISION OF INSTALLATION. Guide. Relax More.

PLATON FOUNDATION WRAP

JUNGLE CONTAINED PLAY INSTALLATION INSTRUCTIONS 1

4 EXTREME FOUNDATION PANELS

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

Multi-Gard PVC Assembly/ Field Cuts

Table of Contents. 1 Introduction. 2 Description. 3 Tools and materials. 4 Footings or slabs. 5 Coursing placement. 6 Reinforcing steel

Model # PR /21/2018 Page 1 of 10

Mbrico Tile Rooftop/Raised Floor Installation Guidelines

VERsacourt LED Light System Installation Instructions

assembly and installation guide

When I started tiling, we didn t do our own shower pans that BATHS

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

SYSTEM 600 GENERAL MAINTENANCE AND ADJUSTMENT GUIDE

Porcher Solutions Wall Mount, Pedestal and Above Counter Lavatories

GUIDELINE FOR PLANTED INFILL INSTALLATIONS. Please read prior to installation, and have proper equipment and safety precautions in place.

N Scale Double Track Lift Bridge v1.2

28 BELGIAN WEDGE FIRE RING

12'W x 20'L x 10'H Run-in-Shed Assembly Instructions

12x24x8 Instant Shelter

Model # 338S-PR. 5/1/2014 Page 1 of 12

Model # 338S-P. 7/31/2012 Page 1 of 13


STP Mount Series. Installation Manual. STP-LSCR-MAN 2017 Edition v1.0. For models: STP-SCR/045 STP-SCR/060 STP-SCR/070 STP-LCR/090 STP-LCR/120

TITAN Quadcopter Assembly Instructions 1

Natural Balance Beam, Straight #7014

CPT 60 Powerfloat. User & Safety Instructions

SECTION STORM DRAINAGE

INSTALLATION MANUAL. All Types F Series Rev G

QUOTE Quote Process City Of Taylor

Overturning Forces. 12 times 300 lbs = 3,600 lbs of shear force along top of wall. Shear Wall

Model # BARK-358-RDP

3.2 SuperTie 50K Installation Guide

Transcription:

Instructions for 12 IGT system Step 1: IGT Site Preparation Site Location Several factors must be considered when choosing the site for your new In-Ground Trampoline (IGT) system. Since local soil and weather conditions vary greatly from region to region, it is recommended that a local landscape expert be consulted for placement of the system. A minimum of 12 feet of overhead clearance and 5 feet of clearance from the trampoline to other objects on the ground is recommended for the jumpers protection. Using impact-absorbing ground cover such as grass, sand or bark chips is recommended for 4-6 feet around the trampoline. Drainage Drainage is not a problem with our In-Ground Trampoline system. It is recommended to leave 2-4 inches of the trampoline above the final grade and gradually berming the soil up to the edge of the trampoline. This will keep water from flowing into the pit in the event of heavy rain. Depending on local soil conditions you may consider adding 4 to 6 inches of rock into the bottom of the pit, creating a sump effect to prevent standing water. You will need to excavate the center of the pit deeper at the same depth as the rock you intend to add. Extreme conditions may require additional drainage methods or the use of a sump pump. It is always a good idea to consult a local landscaper regarding local soil conditions and drainage for your area. The Pit The IGT system is designed to be installed partially or completely recessed in the ground. Either way, the pit will need to be excavated to a diameter of at least13 feet. If the IGT system must be assembled in the pit due to size constraints of the yard, a 14 foot pit is recommended for easier access to assembly hardware. For a completely recessed system we recommend the excavation of the pit depth be 29-31 inches deep. See below for Pit Dimensions. The system is a total of 33 inches tall so this allows for the trampoline to remain at least 2-4 inches above the grade as recommended in the Drainage section. For a partially recessed system, the dirt excavated from the pit can be used to build up the area around the installation. Excavating the pit to a depth of 18 inches leaves 15 inches of the system exposed. This method eliminates the need for removing excavated soil from the property.

Very Important Instruction Tips For Proper Installation -The IGT system must be set above the grade of the yard to prevent water from collecting in the trampoline pit. -The IGT frame must be completely level and round before and during the backfilling process. -Soil compaction must be done evenly during backfill process. -Backfill to the top of the IGT frame. Do not allow wall panels to be exposed. Details on Trampoline Installation Depth The IGT system is a total of 33 inches tall. Excavation to a depth of 29-31 inches will leave the frame 2-4 inches above the yard grade. This will keep water out of the IGT system. In order to have the trampoline appear to be flush in the yard, simply use excavated soil to create a berm up to the edge of the frame. See diagram.

Step 2: Lay Out Parts Parts list Quantity 12 Foot Description 12 Top Frame Segments (with spring holes) 12 Bottom Frame Segments (without spring hole) 24 Wall Panels 24 Rubber Edge Protector Strips 1 Pad Set 1 Jumping Surface 96 Springs 48 Bolts 48 Nuts 96 Washers 12 Screws 24 Protective Plastic Bolt Caps 1 Tool Kit

Lay Out Parts for Easy Installation Lay out parts as shown to simplify assembly of the frame. Use one of the shipping boxes to separate all the hardware. Step 3: Frame Assembly Tips - Use the assembled lower frame ring as a template to help locate and mark for pit excavation. - Assembly should occur next to the excavated pit. If there is no room for assembly close to the pit, it can be assembled in the pit however it is recommended to excavate the diameter of the pit to 14 feet for easier access to the hardware. - Be sure the spring holes on the top frame tube segments are facing up. - Leave all bolts loose to allow movement of the components during assembly for easier bolt hole alignment. - Unless you are on a perfectly level surface for assembly, some holes may be difficult to line up. Use a long screwdriver to help locate and align holes

Step A: Assemble lower frame ring section. Assemble lower ring (frame tubes without spring holes) using the 12 lower frame tube segments using the machine screws provided to hold the sections together. Step B: Join 3 wall panels with one top frame segment. Lay 3 wall panels on the ground overlapping each other so the holes are aligned. Attach the top holes of the panel (holes closest to the edge with the protector strip) to the upper frame tube segment using a bolt and washer on the panel side and a nut and washer on the frame side as shown in the photo below right. Make sure the spring holes are facing up on the top frame segment. Do not tighten the bolts at this time.

Step C: Join the 3 wall panels and upper segment to the lower frame ring. To make assembly easier, use the shipping boxes to support the lower frame ring about 6 inches off the ground while attaching the wall panels. Attach the assembly from step 2 to any place on the lower frame ring using a bolt and washer on the panel side and a nut and washer on the frame side. Do not tighten bolts at this time. Step D: continue adding wall panels and upper frame segments. Attach 1 wall and 1 upper frame segment at a time starting with lower bolts first. Use the Allen wrench to help push the bolts through the holes.

Step E: Complete the frame assembly. The final wall panel and upper segment installation may require lifting and/or shifting the frame. This is why the bolts should be left loose until the frame is completed. Be sure all edge protectors are properly seated prior to tightening the hardware. When all components and hardware are in place, tighten all bolts. Place the protective plastic caps onto all the exposed bolt threads. The Frame is now complete

Step 4: Position Frame Assembly into Pit Install The frame can now be placed into the excavated hole. The completed frame weighs 235 lbs. (12 ) and will require 3 to 4 adults to position the frame into the pit. Do not force the frame into a pit that is not excavated to spec. This could cause the frame to take on an oblong shape. If the frame does not fit into the pit without touching the pit walls the frame must be removed and the pit must be reshaped to allow the frame to be placed into the pit without force. Level Frame and Check for Roundness Very Important! A level and round frame is important for best performance and safe trampoline use. The best way to level the frame is with a laser level or transit. A string level can be used as well. We recommend you using at least 4 strings to get the frame as level as possible. Shims can be used under the edge of the frame to help level the trampoline until backfill process is compete. You can use scraps of wood, tile or bricks as shims. Small squares of plywood work great. It is critical that the frame is round. Measure the diameter at every other bolt to make sure it is as round as possible. Make sure there is no more that 1 ½ inches of variance. You can push and pull on the frame to adjust the shape.

Backfill Backfill the frame assembly using the excavated soil. Try to use loose dirt free of large clumps. It is critical to back fill evenly. For best results add 8-10 inches of dirt all the way around the frame and compact. Check for roundness during the backfill process to make sure the frame stays good and true. Keep evenly adding layers of dirt and compacting until the dirt is flush with the top of the frame. The final landscape can be finished at this point if desired or later. It is important to have the final surface, whether it is grass or mulch etc, at the same level as the top of the frame. The wall panels should not be exposed. For a good flush look, you may need to start the backfill up to the edge of the frame from 2-3 feet away from the trampoline gradually sloping up from the existing yard grade up to the top of the frame.

Step 5: Install Jumping Surface Attach Every 4 th Spring Using the provided spring tool, start at any point attaching every 4 th spring from the frame to the rings on the jump mat, skipping 3 holes on the frame and 3 rings on the mat. The spring has a tight hook and an open hook. (See photo) Make sure the tight hook is attached to the jump mat first and then using the spring tool, pull the open hook and attached to the frame. It is very important to attach springs in the correct pattern. Be sure the D ring on the jump mat is oriented properly. NO!

Attach middle springs Attach the springs in the middle of the first round of springs Attach all remaining springs Make sure the springs already attached are correct. There will be a frame hole and mat ring for each spring. After the pattern is confirmed correct, attach the rest of the springs to the frame and mat.

Step 7: Attach pad Edge protector Before installing pads, make sure the Edge Protector is properly in place Install pad Join the two pad halves together and lay the pad out on the perimeter of the trampoline. At this point you must lie down on top of trampoline jump surface and lift up the edge of the pad to gain access to the straps located on the bottom side of the pad. An easy way to make sure the pad is properly fitted to the trampoline with the straps evenly spaced is to secure the straps around the frame tube to the right of every other frame bolt. Secure the pad by slipping one of the tie straps down between the tube frame tube and the wall panel and tying the two straps together securing them around the top frame tube. Make sure the straps are tied tight so the pad does not shift. Use a bow knot (like shoe laces) so the straps can be untied for servicing the trampoline in the future.

You are now finished with the IGT installation!!

Let!them!Fly,!Keep!them!Safe!!!!! Falling!off!a!trampoline!is!the!number!one!cause!of!injury!on!trampolines.!Instead!of!falling!3!to!4!feet!off!of!your! trampoline,!with!our!patent!pending!inaground!trampoline!you!literally!step!off!on!to!your!grass!or!other!impact! absorbing!surface.!! We!recommend!a!grass!or!soft!wood!chipped!surface!around!the!trampoline.!Any!impact!absorbing!surface!will!help!to! keep!you!safe!in!the!event!that!you!fall!off!of!the!trampoline.!! We!also!recommend!that!only!one!person!be!allowed!to!jump!on!the!trampoline!at!a!time.!When!two!people!are!on!the! trampoline!at!once!they!can!catapult!each!other!or!bump!into!each!other.!with!two!people!on!the!trampoline!the!users! cannot!bounce!in!the!middle!of!the!trampoline!where!the!safety!margin!is!maximized.!!!!!!!!!!!!!!!!!!the!area!around!the!trampoline!should!be!clear!of!all!objects.!trampolines!should!not!be!placed!near!fences,!trees!etc.!! IGT Care and Maintenance Thank you for purchasing your IGT system. Your new In-Ground trampoline will provide many years of fun and fitness but your system does need regular cleaning, inspection and occasional maintenance. Failure to provide the care your system needs could affect the warranty. Please read the following recommendations for cleaning and maintenance. Cleaning and Protecting Regular cleaning and conditioning of the trampoline pad and mat will extend the looks and life of your IGT system. We recommend more frequent cleaning and conditioning if the IGT system is in contact with sprinkler systems. Use a mild soap and warm water to clean the pad and jump mat. Dish soap works well. We recommend using a soft brush to scrub off as much dirt as possible. Rinse with water and dry with a towel. We recommend using 303 Aerospace Protectant, a conditioner and UV protectant, on the pad and jump mat. Simply spay on and wipe off with a clean dry towel. Please refer to their website for additional details and locations where this product is sold. www.303products.com Varying soil and hard water conditions in different areas can have an effect on how long the components will last. Inspection and Maintenance A routine inspection of the trampoline components is essential to ensure your IGT system is safe to use. We recommend inspecting the condition of the springs, jump mat and pad. You should check for loose or missing springs, which can indicate worn out springs, or failing jump mat. Eventually the jump mats will wear out from use or UV and moisture exposure. It is important to check the jump mat D rings for corrosion and the D ring straps for fraying or tearing. Springs should be checked for corrosion and good tension. Pad should be checked to make sure the straps that hold the pad in place are tight so the pad doesn t shift exposing the springs or frame. The pad will need to be replaced if the vinyl cover or the foam has deteriorated. Any component that is worn or broken should be replaced before continuing use of the trampoline. It is important to check the surface surrounding the IGT system. Over time, the soil or impact-absorbing surface surrounding the IGT system can settle exposing the top of the IGT frame. The surrounding surface should always be flush with the top of the frame.!