The Permitting Dilemma: Groundwater Recharge Wetlands for Treated Wastewater Disposal

Similar documents
The Springs and. Aquifer System of Florida. Debra Segal, M.S. Volunteer for the Howard T. Odum Florida Springs Institute. Rock Springs, Orange County

Nitrate Nitrogen Control Efforts in Floridan Aquifer Springs

O R A N G E C I T Y S INTEGRAT E D W AT E R R E S O U R C E S M A N A G E M E N T & R E S I L I E N C Y P L A N

Water Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director

Altamonte Springs FDOT I-4 Storm water Capture and Reclaimed Water Project Phase I

It has been over two years since numeric nutrient

Partnerships Changing Water Management Challenges & Strategies. David MacIntyre Parsons Brinckerhoff

Division of Environmental Assessment and Restoration

Basin Management Action Plan Suwannee River

Impairment Issues in the Ichetucknee Springs Basin Potential Research Questions and Hypotheses

Potential Effects of Reclaimed Water options on Nitrogen Loading to Tampa Bay. Tampa Bay in the 1970s

Florida Ocean Outfall Legislation: What it Means for Utilities and What They Are Doing to Comply

Importance of Reclaimed Water in Florida

CHAPTER 4.2 ENVIRONMENTAL ELEMENT

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

Watereuse Los Angeles. Central Basin Municipal Water District April 11, 2017

A Path to Resilient Water Resources

Spray Irrigation of Treated Wastewater. A Sensible Approach to Wastewater Management. Promoting Beneficial Reuse of Reclaimed Water

Michael Weatherby, P.G., MWH, Tampa, FL

Florida Springs Protection and Restoration: Legislation, Projects and Prospects

Dr. Larry R. Parsons. Reclaimed Water A Sustainable Source for Florida s Growing Water Demands. Citrus Research & Education Center Lake Alfred, FL

Reclaimed Water ASR Permitting

Water Supply and Water Quality Issues in Suwannee River Basin and Awareness within the Ag Community

Treatment Wetlands: Facilitating the Beneficial Use of Reuse

South Orange County Watershed Management Area Stakeholder Workshop. April 30, 2013

WATER QUALITY STATUTORY AND REGULATORY COMPLIANCE OVERVIEW

POLK CITY. CITY COMMISSION WORKSHOP Polk City Government Center 123 Broadway Boulevard SE AGENDA

South Orange County Watershed Management Area Public Workshop. September 19, 2012

Reclaimed Water. While the number and capacity of reclaimed water facilities is increasing, much of the potential as a resource remains underutilized.

Santa Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives

CURRENT AND FUTURE PERSPECTIVES ON SUSTAINABLE WATER REUSE PRACTICES IN THE ARAB REGION. Pr. Redouane Choukr-Allah IAV Hassan Agadir, Morocco

Northwest Florida Water Management District. Water Policy Advisory Council 2013

Palm Beach County Water Utilities Making of a Green Utility

Water Consortium Overview

Summary of Florida s Indirect Potable Reuse Regulations Part V

Florida Water Environment Association Utility Council

Spray Irrigation : RIBs Spray

High-level political forum on sustainable development

Coachella Valley Regional Water Management Group (CVRWMG)

CHAPTER 10 NATURAL GROUNDWATER AND AQUIFER RECHARGE ELEMENT

SANITARY SEWER ELEMENT

MARION COUNTY COMPREHENSIVE PLAN 2035

Restoration of Florida's Iconic Springs: Legislative and "Turn Dirt" Solutions

Stakeholder Identification Plan

Rehoboth Beach Effluent Disposal Study. Evaluation of Wastewater Discharge Alternatives. Center for the Inland Bays STAC Meeting January 13, 2006

The Next Generation of Stormwater Management and Site Design. Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers

Stabilizing and Restoring an Aquifer and Springs Managed Aquifer Recharge in the Walla Walla Basin

Environmental Protection Division. Wekiwa Spring and Rock Springs Basin Management Action Plan (BMAP) Status Update

2016 Reuse Inventory ii

Recommendations for Changes to the Requirements of Section (9), Florida Statutes - Domestic Wastewater Ocean Outfalls

FEMA s Mitigation Support for Resiliency: Innovative Drought and Flood Mitigation Projects

Section 1: Introduction

Managed Aquifer Recharge - NZ

NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT

Wakulla County Comprehensive Plan July 2013 GOALS, OBJECTIVES AND POLICIES

A Springs Protection Initiative for NE Florida: Reversing the Fate of Florida's Iconic Springs via Science, Projects and Enlightened Management

Drought Issues and Challenges in South Florida Terrie Bates South Florida Water Management District September 26, 2007

Presentation Overview

Overview of Truckee Meadows Water Resources

CFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting

Groundwater in the Santa Rosa Plain

City of Tallahassee, Florida

Region C Water Planning Group Meeting. TRA Central Wastewater Treatment Plant October 6, 2003

Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water

Onsite Wastewater Treatment and Disposal Systems in Florida s Springsheds

Aquifer Storage and Recovery Using Reclaimed Water: Successful Applications and Critical Opportunities

CHAPTER 6. EFFLUENT DISCHARGE/REUSE ALTERNATIVES

A10. Cost and Benefits Summary

Stormwater Treatment Wetlands

OVERVIEW OF WATER RESOURCE ISSUES IN THE CARSON RIVER WATERSHED EDWIN JAMES, P.E. CWSD GENERAL MANAGER 2016

California s Sustainable GW Management Act and the Orange County Groundwater Basin

Water Quality Evaluation and Mitigation Alternative Study Town of Dennis, Massachusetts

Community Workshop October 17, 2015

Soquel Creek Water District s Groundwater Recharge Feasibility Study. Lydia Holmes

The City of Cocoa (City) is located in east

Summary of Outstanding Florida Springs Basin Management Action Plans June 2018

A. POTABLE WATER AND GROUNDWATER RECHARGE WATER SUB-ELEMENT

SEWRPC Staff Memorandum RESPONSE TO REQUESTS BY THE CITY OF NEW BERLIN TO DELINEATE THE 20-YEAR PLANNED WATER SUPPLY SERVICE AREA FOR THE UTILITY

CONFERENCE SCHEDULE - Wednesday September 20, 2017

Progress Report. August 2000 Report No Purpose. 1 Section 11.45(7)(f), F.S. 2 Review of the Reuse of Reclaimed Water, OPPAGA Report

Constructed Wetlands

Relationships Between Discharge And Water Quality In Florida Springs

Rapid Infiltration System for Enhanced Removal of Nitrate from Middletown Secondary Effluent. Min Ho, Maeng

San Diego IRWMP Public Meeting. Agenda. Morning Agenda

Orange Creek Basin Lakes Public Meeting

A. POTABLE WATER SUB-ELEMENT GOAL I-1: STRIVE TO PROVIDE HIGH QUALITY POTABLE WATER TO CURRENT AND FUTURE RESIDENTS AND VISITORS.

Urban Sprawl Implications on Water Resources

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Effluent polishing in constructed wetlands in the United States

University Curriculum Development for Decentralized Wastewater Treatment. Water Reuse

Notice of Public Hearing. Notice of Public Hearing

EAST TORRANCE SOIL AND WATER CONSERVATION DISTRICT. LONG RANGE PLAN July 1, 2009 June 30, 2019

Jordan River Basin. Planning for the Future. Salt Lake County Watershed Symposium (August 11, 2011) Todd Stonely Utah Division of Water Resources

UWMP Standardized Tables. Dominguez District Urban Water Management Plan Appendix H

Framework for Water Resilience in Long Island. Samudyatha Mysore Subbarama

Overview of the Draft 2010 Water Supply Assessment Report. Suwannee River Water Management District

Realizing the Potential of Potable Water Reuse

U.S. Geological Survey (USGS) Florida Water-Use Program

THE ROLE OF AGRICULTURAL LANDS IN WATER SUPPLY FOR MUNICIPAL NEEDS UPPER DESCHUTES BASIN, OREGON

ELEMENT 13 CONSERVATION ELEMENT

Transcription:

The Permitting Dilemma: Groundwater Recharge Wetlands for Treated Wastewater Disposal Debra Segal, Wetland Solutions, Inc. Nicole Wulff, US Forest Service Natural Resources Leadership Institute - Class X Practicum Presentation April 15, 2011

Why this project? Natural Resource Perspective Concern about widespread springs degradation due to high nitrogen loading in spring-sheds Need to dispose of treated wastewater in a more environmentally protective manner

Why this project? Personal Perspectives Addresses a professional interest of Wetland Solutions; springs protection and treatment wetland technology Addresses a local environmental issue and provides an opportunity to learn more about groundwater quality and springs protection

Current WW Treatment Methods Conventional land application of treated wastewater (WW) are sprayfields and Rapid Infiltration Basins (RIBs) These methods are not always protective of water quality (WQ) in springs or groundwater (GW)

Wastewater Disposal: Sprayfields Small-scale Wastewater Sprayfields City of Tallahassee s 2000-acre sprayfield

Wastewater Disposal: Rapid Infiltration Basins (RIBs) RIBs in Orlando RIBs at Okaloosa County Water Reclamation Facility

Groundwater Recharge Wetland An Alternative WW Disposal Option A treatment wetland that removes nutrients and pollutants from the water and infiltrates water into the GW Vierra; 200-acre Treatment Wetland

Groundwater Recharge Wetland Green Cay 50-acre Groundwater Recharge Wetland West Palm Beach, FL

What are the advantages of Groundwater Recharge Wetlands? Provide additional nitrogen removal through denitrification, thereby minimizing nutrient inputs to GW and connected springs Recharge the aquifer with lower nitrogen wastewater Less expensive to construct than traditional tertiary wastewater treatment facilities Provide wildlife habitat and public use amenities.

Additional Advantages of GRWs Require less maintenance and expense to operate than sprayfields Require less land area than RIBs Reduce groundwater nitrate contamination cost effectively

Existing Barriers There is not a recognized permitting framework for GRWs as a WW disposal option. Therefore, municipalities and WW consultants are reluctant to design GRWs for WW disposal.

Overall Goals: GRWs will be permitted by FDEP as a wastewater reuse option for treated WW in a manner comparable to permitting other land application methods. Municipalities will consider GRWs as an alternative WW disposal method.

Practicum Goals: 1. To discuss the permitting barrier with FDEP and to encourage development of an applicable framework to permit GRWs as a WW disposal option. 2. To meet with the SRWMD and encourage the District to promote GRWs to municipalities within their springs-rich District.

NRLI Tools: Situation/Stakeholder Assessment Meeting Planning Process Agenda Facilitation Techniques Listening Skills Negotiating

FDEP Meeting on 1/18/11 24 FDEP staff attended meeting Delivered presentation on environmental and economic benefits of GRWs, examples of GRWs, and discussed perceived permitting barrier Facilitated an interactive discussion after the presentation

Results of the FDEP Meeting FDEP noted that the existing WW Rule allows for alternative methods for WW disposal FDEP will provide clarification and a Guidance Memo to all regional offices for permitting GRWs under existing rule FDEP will correspond with the SRWMD to encourage use of GRWs within their district

Letter from FDEP to SRWMD

Results of SRWMD Meeting- 03/10/11 District s highest priority is to use treated WW for irrigation to offset GW pumpage SRWMD will promote GRWs to municipalities as an alternative to sprayfields and RIBs SRWMD will consider cost-sharing for GRWs in the future as funds become available

Successes Invited the right people to the meeting Planned the meetings early and followed-up Involved technical experts Asked for two specific action items from FDEP they agreed to both and have produced one

Lessons Learned Confirm number of remote attendees Lengthen meeting with a large number of attendees Don t assume the meeting must end on time Don t assume there will be conflict

Special Thanks To: Bob Knight Technical Expert Chris Keller Technical Expert Bruce Delaney NRLI Facilitation Expert

Questions?