Warehouse & Distribution Services Procedure

Similar documents
Service Orders Procedure

Limited Shelf Material Control Procedure

Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410)

Mechanical & Electrical Product Workmanship Standards Procedure

ISO General Requirements for Competence of Testing Laboratories Procedure

Packaging and Shipping Procedure

Nonconforming Material System Procedure

OPW Engineered Systems

Internal Audits Procedure

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

DRAWING NUMBER REVISION TITLE REV DATE PAGE

Quality Manual ISO 9001:2000

EVANS CAPACITOR COMPANY

Quality Management System Manual

CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

Clauses applicable only when specified by Q-number on the purchase order.

Quality Assurance Audit Checklist

ISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

TURBO MACH A DIVISION OF VT SAA

Rosen Aviation Supplier Quality Assurance Requirements

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

QUALITY SYSTEM MANUAL

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

INS QA Programme Requirements

Medtronic XOMED. Top Level Procedure for Handling, Storage, Preservation and Movement of Inventory

This procedure covers evaluating and analyzing supplier for addition to the Approved Supplier List (ASL) and performance evaluation.

Quality Manual ISO 9001:2008 ISO 9001:2015

2. GENERAL REQUIREMENTS

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

KLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution.

Medtronic XOMED. Top Level Procedure for General Inspection and Testing

QUALITY ADMINISTRATIVE PROCEDURE

ASA-100 QUALITY MANUAL

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Work Instruction PUI Supplier Request for Nonconforming Material (Rev 1)

Responsibilities and Procedures. 5.1 Quality Loop

Feed Quality Assurance and Certification Programs. Representing the Total Feed Industry

Quality Management System

Supplier Assessment Questionnaire Audit Date : On-Site Audit Self Assessment Audit

QUALITY MANUAL QM0492 ISO SUPPLEMENT III

Documenta tion and Records

Work Instruction PUI Supplier Request for Nonconforming Material (Rev 2)

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

QUALITY SYSTEM PROCEDURE PRESERVATION OF PRODUCT QSP-04-07

Trident Precision Manufacturing

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.

Langham Creek Machine Works, Inc.

QUALITY ASSURANCE / QUALITY CONTROL POLICY

Page 1 / 11. Version 0 June 2014

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Executive Instruments Inc.

Tooling Ranir Responsibility... 4 Supplier Responsibility... 4

UNCONTROLLED DOCUMENT

SNAP-ON INCORPORATED STANDARD ON FACILITY SPECIFIC REQUIREMENTS

Wilson-Hurd ATF Quality Manual

Quality Flow-Down Requirements to Suppliers

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

Railroad Friction Products Corporation

Supplier Quality Manual

QUALITY SYSTEM MANUAL

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Supplier Quality Requirements

Texas International Oilfield Tools, Ltd.

12. Inventory - Receiving & Shipping

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016

Quality Flow-Down Requirements to Suppliers

Janitorial QA/QC Manual Sample

Quality Code Matrix Appendix A for 8.4.3

NQA-1 Graded Approach, 55-Gallon Drum Summary

SUPPLIER QUALITY SYSTEM SURVEY

Supplier Quality Manual

PRINTED COPY IS NOT CONTROLLED

Supplier Resource Guide

STANDARD QUALITY REQUIREMENTS FOR SUPPLIERS F05-QP008 Rev A Dated 08/12/2010

Issued by: Chris Abrey Eff. Date: 10/1/13 Rev: A Cover QUALITY MANUAL

Supplier Quality Requirements Master List

Visual Controls : Applying Visual Management to the Factory

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

CURTISS WRIGHT Actuation Systems 201 Old Boiling Springs Rd Shelby, NC SUPPLIER QUALITY REQUIREMENTS SQR-100. Rev. L.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

Shipping & Handling Best Practices Checklist

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

Mantor Aviation Company

D. All distributors shall be reviewed and approved as per company procedure.

Supplier Quality Requirements

Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11

CORPORATE QUALITY MANUAL

Working Party on Control of Medicines and Inspections. Final Version of Annex 16 to the EU Guide to Good Manufacturing Practice

Altech Machining, Inc. Terms and Conditions

Supplier Quality Requirements Manual

QUALITY MANUAL. Revision K. JADE PRECISION MEDICAL COMPONENTS, LLC 3063 B Philmont Avenue Huntingdon Valley, PA 19006

Supplier Quality Manual

Quality Honeycomb Supplier Quality Requirements

DRAWING NUMBER REVISION TITLE REV DATE PAGE

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

PMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016

SUPPLIER QUALITY REQUIREMENTS

Transcription:

Page: 1 of 10 Warehouse & Distribution Services Procedure

Page: 2 of 10 1.0 PURPOSE AND SCOPE 1.1 Purpose 1.1.1 The purpose of this procedure is to define methods for Warehouse & Distribution Services process at our Company. 1.2 Scope 1.2.1 The scope of this procedure is applicable to personnel performing the activities described in this document and where a customer requires the activities to be performed. 2.0 APPLICABLE DOCUMENTS The following documents are applicable to the extent as specified here in: Industrial/Commercial/Government Documents ISO 9001 Quality Management System - Requirements Internal Document(s) ATS-CGP-1001 ATS-DCP-1001 ATS-HRP-1001 ATS-PGP-1001 ATS-PGP-3001 ATS-QAP-1004 ATS-QAP-1005 ATS-QAP-1008 ATS-QAP-1010 ATS-QAP-1011 ATS-QAP-1017 ATS-SOP-1002 ATS-SOP-1006 ATS-SOP-1007 ATS-SOP-1010 ATS-SOP-1017 Form(s) FORM ATS11-1069 Contracts Documentation System Document Control Training and Certification Purchasing System Receiving Inspection Quality Records Nonconforming Material System Internal Audits Validation of Processes Analysis of Data Customer Property Safety Precautions and Hazards Prevention Materials Handling and Preservation Limited Shelf Life Material Control Material Control Product Identification and Traceability Defect Report Material

Page: 3 of 10 3.0 RESPONSIBILITIES 3.1 General 3.1 General 3.1.1 Production Operations management/technical Management is also responsible for preparing and maintaining this procedure. In addition, shall support the process as defined in this procedure. 3.1.2 Operator s (Technician; Assembly & Test and Inspection personnel) shall be responsible for supporting the process as defined in this procedure. 3.1.3 Warehouse/ Personnel shall be responsible for supporting the process as defined in this procedure. 3.1.4 Quality Assurance shall be responsible for supporting the process as defined in this procedure. 4.0 PROCEDURE 4.1 General 4.1.1 The Warehouse & Distribution Services approach is defined as the process of managing and performing Warehouse and Distribution Center processes in an effective manner to ensure the timely distribution of need parts/materials/products to fill Customer orders. 4.1.2 The standard "best practices" applied to Warehouse & Distribution Services by Production Operations (Receiving, Receiving Inspection, and others) personnel at our company are as follows: Purchasing & Inventory Re-Order Points - Ensure timely and proactive ordering of required parts/materials/products to prevent delays to user's when the items are needed; establish minimum inventory levels and re-order points for items requiring frequent use or have long purchasing lead times that may impact customer services per ATS-SOP-1010, Material Control and ATS-PGP-1001, Purchasing System Cleanliness and Organization - Maintain Warehouse Stock and Floor Stock location(s) in a clean and organized manner per ATS-SOP-1010, Material Control Safety & Hazards - Maintain Warehouse Stock and Floor Stock location(s) in safe and hazard free environment. Avoid stacking or storing items in a manner where they can fall causing injury or damage. Avoid picking up parts/materials/products in a manner where personal safety is an issue per ATS-SOP-1002, Safety Precautions and Hazards Prevention

Page: 4 of 10 Preservation - Ensure Warehouse Stock and Floor Stock parts/materials/products are stored in a manner to prevent damage and degradation per ATS-SOP-1006, Materials Handling and Preservation. Ensure parts/materials/products are not placed directly on the floor, avoid direct stacking of complex and/or expensive items, avoid placing items with surface finish requirements (i.e. painted or placed surfaces, etc.) directly on metal or other surfaces that may cause damage Identification & Traceability - Ensure Warehouse Stock and Floor Stock parts/materials/products are identified (i.e. marked, labeled or tagged) with item part number or unique description and other information as required by ATS-SOP-1017, Product Identification and Traceability and Customer order. Where traceability information (i.e. PO #, Date Code, Lot Code, etc.) is required by Customer order, the item's placed in stock shall also be identified with this information. The Identification and Traceability also applies to item(s) being picked/pulled from stock and issued to users Limited Shelf Life Material Control - Ensure Warehouse Stock and Floor Stock parts/materials/products that perishable (i.e. epoxy, paints, brake values, air brake hoses, batteries, etc.) are identified, processed and maintained in accordance with ATS-SOP-1007, Limited Shelf Life Material Control. Inventory Accuracy & Cycle-Counting - personnel measure Inventory Accuracy by conducting Cycle-Counts as described in per ATS-SOP-1010, Material Control. The Goal for Inventory Accuracy is 98.5% average minimum. It is preferred to Cycle Count all stock locations once per year. Cycle Counting includes the concept of ranking inventory such as A = Expensive (over $10K) or High use Items, B = Intermediate Less than $10K and greater than $1K) expense or medium use, and C = Low cost (Less than $1K) or low use. The results of Cycle Counting are maintained by Production Operations management/warehouse/ person using the Cycle Count Summary form. The Cycle Count data is collected by the Warehouse/ person using the printed Inventory Location sheets (i.e. Excel Spreadsheet or equivalent) with "stock location", "part number " and "quantity in stock" information where the Warehouse/ person records the actual results and submits to Production Operations management/warehouse/ person to update the Cycle Count Summary form. Production Operations management person plans the frequency of Cycle Counting as required - it is preferred that cycle counting be conducted weekly. On-Time Delivery; - personnel shall ensure all requests for parts/materials/products that are standard inventory items maintained in the stockroom are "picked/pulled from stock" and "delivered to the user" the same day when received before 12:00 PM noon daily. High use and low cost items are made available via planned Floor Stock locations ready for use by Production Operations personnel. The Goal for On-Time Delivery is 95% average minimum for standard inventory items maintained.

Page: 5 of 10 4.1.3 Parts/Materials/Products stored in Warehouse Stock and Floor Stock areas are identified as a minimum with the item's part number or unique stocking ID unless otherwise directed by the Customer's order. It is preferred that an Inventory Tag form or equivalent be used as follows: 4.1.3.1 The identification tag, label or marking shall including the following information: Part #: Required Description: Optional, but preferred PO #: Optional, but preferred Location: Optional, but preferred 4.1.3.2 When deemed necessary by Production Operations management, personnel may apply different color stickers to inventory identification tags for tracking annual inventory counting efforts (what has and has not been counted). Examples:

Page: 6 of 10 4.1.4 The Warehouse & Distribution Services process steps are as follows: Step Process Activity 1 Program Management - Assign Production Operations management/technical Management person manages the Warehouse and Distribution process. 2 Requirements Validation & Planning - Examine Customer order requirements for managing the Warehouse & Distribution Services per ATS-CGP-1001. Hire and/or assigned qualified personnel per this procedure. 3 Purchasing - Purchasing ensure item's required by the Customer order are purchased in accordance with ATS-PGP-1001, Purchasing System. Inventory levels and re-order points - Production Operations management/technical Management person establish minimum inventory levels and re-order points for items requiring frequent use or have long purchasing lead times that may impact customer services. Input from the customer is utilized when provided or requested. The minimum inventory levels and reorder points information is periodic updated and maintained as required by the Customer order and/or ATS Production Operations management/technical Management person. 4 Receiving Inspection - Warehouse/ personnel shall receive and conduct Receiving Inspection per ATS-PGP-3001, Receiving Inspection. 5 Management - Warehouse personnel shall place "Accepted" Receiving Inspected items in to the stockroom per ATS-SOP-1010, Material Control. Inventory Accuracy & Cycle Counting - Warehouse/ personnel shall perform Cycle Counting as directed by ATS-SOP-1010, Material Control and paragraph 4.1.2 of this procedure. Best Practices - Warehouse/ personnel shall comply with Best Practices as directed by ATS-SOP-1010, Material Control and paragraph 4.1.2 of this procedure. 6 Issuing Items from Stock - Upon receipt of the Customer order or Other Request, person shall pull the correct part number and quantity items specified per ATS-SOP-1010, Material Control. General Admin./Purchasing/ person shall arrange shipping and preparing required Packing Slip/Invoice for the order. 7 Shipping Inspection - person or other trained person shall perform Shipping Inspection per ATS-QAP-1406. 8 Packaging and Shipping - person performs Packaging and Shipping in accordance with ATS-SOP-1020, Packaging and Shipping. 9 Retain Project documentation as Quality Records per ATS-QAP-1104

Page: 7 of 10 4.2 Measurement 4.2.1 The Warehouse & Distribution Services product and process measurements that are used for monitoring, measurement and controlling the delivery of products to our customer are defined in this section. 4.2.2 Shipping Inspection a trained Shipping Inspection person shall conduct a Shipping Inspection in accordance with ATS-QAP-1406, Shipping Inspection. 4.3 Records 4.3.1 The records prepared, approved, retained and maintained by Production Operations Department personnel to support the Warehouse & Distribution Services process are considered Quality Records and shall be controlled as defined in ATS-QAP-1004, Quality Records. 4.3.1.1 The following Warehouse & Distribution Services records are considered Quality Records and shall be retained and maintained: Item No. Quality Record Type Minimum Retention Period Responsible Function and Retention Location 1 Shipping Inspection Evidence; Packing Slips/Invoices 3 years Production Operations/QA/Gen. Admin. 2 Corrective Action Request (CAR) 3 years QA forms (as applicable) 3 Defect Report - Material 3 years Production Operations/QA 4.4 Support Resources 4.4.1 Our Production Operations management/technical Management person ensures the appropriate amount of support resources is applied to satisfy customer order and expectation requirements. Our Quality Assurance, Production Operations, Program Management, Document Control and other necessary support functions are responsible for providing timely, efficient, dependable and qualified support services when required by Customer order or requested by Production Operations management. 4.4.1.1 When additional project plans, procedures, instructions or forms are necessary to be used by Production Operations or other support functions, the information shall be documented, assigned a unique document number and revision, approved, controlled and maintained per ATS-DCP-1001, Document Control.

Page: 8 of 10 5.0 QUALITY ASSURANCE 5.1 General 5.1.1 Quality Assurance shall ensure this process is audited as scheduled per ATS-QAP-1008, Internal Audits.

Page: 9 of 10 Figure 1 - Typical Warehouse & Distribution Services Process Photos Figure 1.1 - Warehouse Figure 1.2 - Warehouse ; Forklift Figure 1.3 - Warehouse Figure 1.4 - Warehouse Figure 1.5 - Warehouse Figure 1.6 - Warehouse ; Lift Equipment Figure 1.7 - Warehouse Figure 1.8 - Warehouse Figure 1.9 - Warehouse

Page: 10 of 10 Figure 1 - Typical Warehouse & Distribution Services Process Photos Continued Figure 1.19 - Warehouse ; Inventory Tag Figure 1.20 - Warehouse ; Inventory Tag Figure 1.21 - Warehouse ; Inventory Tag Figure 1.22 - Warehouse ; Inventory Tag Figure 1.23 - Warehouse ; Inventory Tag Figure 1.24 - Warehouse ; Inventory Tag