REQUEST FOR COUNCIL ACTION

Similar documents
LOW IMPACT DEVELOPMENT ( LID ) STANDARDS

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Post-Development Stormwater Runoff Performance Standards

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

TRAVIS COUNTY WATER CONTROL AND IMPROVEMENT DISTRICT 17 STORMWATER MANAGEMENT PROGRAM TPDES PHASE II MS4 GENERAL PERMIT (TXR040000)

CITY OF MIDDLETOWN STORM WATER UTILITY ADJUSTMENT AND CREDIT POLICY

ENCROACHMENT PERMIT APPLICATION INSTRUCTIONS

SURFACE WATER UTILITY FEE

City of Beverly Hills Low Impact Development (LID) Fact Sheet

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed

S.O.P. No. HMD

What is a stormwater utility fee?

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

CHAPTER 10: SURFACE WATER MANAGEMENT

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

Ordinance No Lot Surface Drainage

Final Environmental Impact Report BARTON PLACE

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

Checklist for 2013 Draft NH Small MS4 General Permit Requirements

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Redevelopment Introduction

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

Good Housekeeping. Phones Weather related emergencies Breaks and facilities. Introductions

CHAPTER 10: SURFACE WATER MANAGEMENT

Stormwater Utility Manual City of Racine, Wisconsin

APPLICATION FOR A SITE CONSTRUCTION PERMIT

Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update. City of Fairmont March, 2018

REPORT TO MAYOR AND COUNCIL

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

WATER QUALITY BASED REQUIREMENTS...1 REQUIREMENTS TO MEET WATER QUALITY STANDARDS...1 DISCHARGES TO IMPAIRED WATERS...2

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

Project Priority List scoring worksheet - stormwater Guidance document

STORM WATER MANAGEMENT STANDARDS DRAFT

SENIOR CONSTRUCTION INSPECTOR

PRESENTATION OUTLINE

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

What's new in the 2018 Construction Stormwater General Permit

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer.

CRWP NERRS Science Collaborative Site Selection Criteria & Scoring System CHAGRIN RIVER WATERSHED PARTNERS, INC.

CHAPTER 10: SURFACE WATER MANAGEMENT

City of Charlottesville Water Resources Protection Program

2014 Whatcom County Stormwater Management Program

WHAT IT TAKES TO PROTECT 10,000 LAKES

Stormwater Management Practices and Design Manual. Clemson University

Stormwater Management Standards

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

3.0 Planning and Submittal Requirements

REPORT TO MAYOR AND COUNCIL

3F. Hydrology and Water Quality

G. HYDROLOGY Existing Conditions

Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017

BMP Description: The GSWMD will work with NIRPC and local groups to mark existing storm sewer structures.

STORMWATER AND EROSION CONTROL PERMIT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

STORMWATER AND EROSION CONTROL PERMIT

SECTION A-4, LEGAL AUTHORITY A-4.0 LEGAL AUTHORITY A-4.1 INTRODUCTION

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887

REQUEST FOR COUNCIL ACTION

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

Stormwater Management The District exercises regulatory authority for Stormwater Management in the City of Edina.

Best Management Practices for Stormwater Quality Treatment in Urban Settings. Lower Mississippi River WMO September 2017

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Menominee County Zoning and Building Permitting Requirements

Appendix A Stormwater Site Plan Report Short Form

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT

I. STREET CONSTRUCTION AND RECONSTRUCTION

City of Oak Creek, Wisconsin

Single Family Residential Construction Erosion/Sediment Control Standards

Prior Lake Stormwater Management & Flood Mitigation Study

South Washington Watershed District. Stormwater Pollution Prevention Plan (SWPPP)

CCSD#1 Stormwater Standards

The Maine Stormwater Law and Rules: Some Basic Concepts

Minnesota Pollution Control Agency requires that the City of Brainerd develop written procedures for

Guide for the draft 2018 NPDES/SDS Construction Stormwater General Permit

SECTION R-MH - MANUFACTURED HOUSING RESIDENTIAL DISTRICT.

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

UNIVERSITY OF MARY WASHINGTON FREDERICKSBURG, VIRGINIA CHESAPEAKE BAY TMDL ACTION PLAN VPDES PERMIT NO.: VAR PROJECT NO.

3.3 Acceptable Downstream Conditions

Design Handbook. Low Impact Development Best Management Practices

LANCASTER COUNTY Act 167 Frequently Asked Questions (FAQs)

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

Stormwater Pollution Prevention Plan Engineering Department Requirements

NPDES - PCSM. National Pollutant Discharge Elimination System Post Construction Stormwater Management Permit Preparation

City of Tacoma Stormwater Management Program Assessment. Attachment B3

APPROVAL/INTENT TO ISSUE A DISCRETIONARY APPEALABLE COASTAL DEVELOPMENT PERMIT (CDP)

Chapter 21 Stormwater Management Bylaw

Stormwater Utility. Frequently Asked Questions. January 2019 CITY OF NORTH RIDGEVILLE Avon Belden Road North Ridgeville, Ohio 44039

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

Wakefield Stormwater and Erosion Control Bylaw Final Draft

APPENDIX A EXCERPTS FROM THE PERMIT

CITY COUNCIL AGENDA MEMORANDUM

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

Applications of GIS for Stormwater Management in the City of Dallas. By Takele Dinka (PhD) GIS Analyst, City of Dallas

STORMWATER OPERATION AND MAINTENANCE AGREEMENT

Transcription:

REQUEST FOR COUNCIL ACTION Date: May 22, 2017 Item No.: 7.c Department Approval City Manager Approval Item Description: 1681 Rice Street Non-Residential Stormwater Impact Fee Appeal 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 BACKGROUND The property owner at 1681 Rice Street (the parcel in the northwest corner of the intersection of Rice Street and Larpenteur Avenue) has appealed the required Non-Residential Stormwater Impact Fee which is being levied against them in lieu of actual required on-site stormwater mitigation. City Code and the City s Surface Water Management Plan require any development/redevelopment that exceeds 5,000 square of new or reconstructed impervious surface and/or 10,000 square feet of total land disturbance, to mitigate stormwater on site with the construction of a stormwater Best Management Practice (BMP) device, such as a rain garden, filtration basin, underground storage vault, etc. The vast majority of properties in Roseville are able to meet this requirement by fully infiltrating on site or draining a filtration device into the public storm sewer system. Staff has been working with this property owner and their engineer since February of 2016 when we first received communications about the potential redevelopment of this site. At that time, it was first recognized that the ability to do on-site stormwater mitigation is severely limited due to the lack of accessibility to the public stormwater infrastructure. Specifically, the property owner would have to run new storm sewer at least 200 feet along Rice Street to tie into the public stormwater system as an outlet for any new stormwater BMP installed on site. Due to the former use of the site (gas station) and the soils on site, it was determined that infiltration was also not an option. Recognizing this dilemma and also realizing we had no way to allow a property owner to meet the requirements through some other method beyond on site mitigation, staff began to develop and propose a Stormwater Impact Fee program for these types of scenarios. Staff scheduled a presentation of this proposal to the City Council in August of 2016. In the meantime, staff communicated to the property owner s engineer in July of 2016 that we were working to establish this program and that staff would be recommending a fee of $15 per cubic foot of required stormwater mitigation, but all of this was subject to approval by the City Council. Staff presented this proposed program to the City Council on August 8 th. The Council was open to the concept but felt that the proposed $15 per cubic foot fee did not adequately represent future maintenance costs of building or expanding a BMP in the public space which the City would be responsible to maintain. Therefore, staff returned to the Council on September 12, 2016 with a revised proposed fee of $22.50 per cubic foot. This was approved by the Council and this fee was added to the 2017 Fee Schedule as adopted by the City Council. When the applicant officially applied for the permits in 2017, they were informed of the final stormwater mitigation fee that they would be subject to per the adopted 2017 Fee Schedule and the Page 1 of 3

33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 required mitigation of 1,707 cubic feet of detention/filtration. This increased the cost they were expecting from $25,605 (using $15 per cubic foot) to $38,407 (using $22.50 per cubic foot). The property owner was surprised by this increase and is appealing the final cost, requesting that at the very least they be subject to the originally proposed $15 per cubic foot fee. Further, the property owner is requesting that if the result of the appeal is a fee of any amount, that the City allow the property owner to pay this fee via special assessments. The City does allow property owners to assess certain utility related fees in hardship cases. Historically this has been allowed for senior citizens on fixed, low incomes, but the Council has also approved payments via special assessments for other mitigation costs such as transportation improvements around retail sites. If Council allows the payment via special assessment, staff would recommend a 10 year term with a 5% interest rate. The property owner will be at the meeting to speak to the Council and provide more information and/or answer questions. POLICY OBJECTIVE The City of Roseville has developed specific requirements that apply to development and redevelopment projects. These standards are intended to help achieve the water resource goals of the City s Surface Water Management Plan (SWMP) and help the City maintain compliance with the National Pollutant Discharge Elimination System (NPDES) municipal permit program. These standards highlight important aspects of the requirements for stormwater quality, discharge rate and volume control, erosion control, and illicit discharge. The Non-Residential Stormwater Impact Fee policy was developed to provide options for developments that cannot feasibly meet the City s Stormwater Requirements. FINANCIAL IMPLICATIONS If the City Council sees fit to approve the appeal by the property owner to reduce the stormwater impact fee, the City would not be subsidizing any actual costs by the City. It would limit the size of the additional detention/filtration volume that the City would construct in the future, likely in conjunction with the reconstruction/modification of Rice Street. Once the device is constructed, it could be argued that the City is subsidizing the maintenance of said device if we constructed the full 1,707 cubic feet that would be required for this property s mitigation. If the City Council agrees to allow the applicant to pay off this fee via special assessments, the City is still not fronting money until an opportunity presents itself to construct the stormwater device as part of another stormwater/roadway project. In the meantime the property owner would be paying assessments and would essentially be building up a credit for the future expense. There may be a gap between the actual construction of said device, and therefore an expenditure on the City s part, and the full payment of the assessment. STAFF RECOMMENDATION Staff recommends the City Council receive the appeal from the property owner and then take one of the following actions: 1. Deny the appeal and require the full payment of $38,407 prior to the final inspection being approved. 2. Reduce the impact fee to the original estimated amount of $25,605, or any other agreed upon reduced rate, and require the full payment of this amount prior to the final inspection being approved. Page 2 of 3

76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 Further, the City Council has the option of allowing the property owner to pay the impact fee via special assessments. Staff requests that if the Council requires a stormwater mitigation fee in any amount that they also vote on allowing the fee to be paid via special assessment with the condition that the applicant enter into an Assessment Agreement with the City. REQUESTED COUNCIL ACTION Consider the property owner s appeal and take one or more of the following actions: 1. Motion to deny the appeal for a reduction of the Non-Residential Stormwater Mitigation Fees at 1681 Rice Street. 2. Motion to approve the appeal for a reduction of the Non-Residential Stormwater Mitigation Fee to an amount of $ (amount to proposed by motioner staff recommends reduction to $25,605 if the Council feels a reduction is warranted). If Council approves a version of Option 2 above, the Council has the further option of approving the following motion: 3. Motion to approve the payment of the Non-Residential Stormwater Mitigation Fee via special assessment over a period of 10 years at an annual interest rate of 5%, with the condition of the property owner entering into an Assessment Agreement as drafted by the City and approved by the City Council. Prepared by: Attachments: Marc Culver, Public Works Director A: Area Map B: Site Plan C: Non-Residential Stormwater Impact Fund Policy Page 3 of 3

^ 1681 Rice Street Prepared by: Engineering Department May 17, 2017 Data Sources and Contacts: * Ramsey County GIS Base Map (5/4/17) * City of Roseville Engineering Department For further information regarding the contents of this map contact: City of Roseville, Engineering Department, 2660 Civic Center Drive, Roseville MN DISCLAIMER: This map is neither a legally recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to 0 200 400 600 800 Feet be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 651-792-7075. The preceding disclaimer is provided pursuant to Minnesota Statutes 466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to mapdoc: 1681RiceStreet.mxd defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which map: 1681RiceStreet.pdf arise out of the user's access or use of data provided.

LEGEND EXISTING SANITARY SEWER EXISTING WATERMAIN PROPERTY LINE RIGHT-OF-WAY EXISTING SIGN EXISTING HYDRANT EXISTING POWER POLE MATCHLINE TREE PROPOSED CONCRETE DRIVEWAY PROPOSED CONCRETE PAVEMENT FOUND IRON MONUMENT EXISTING STREET SIGNAL EXISTING LIGHT POLE FILE: P:\2016\16-007 - 1681 Rice St\Dwg\16-007_SITEPLAN.dwg LAYOUT: 1 SCALE: 50 DATE/TIME: Feb 25, 2016-11:27am USER: acarrell XREF(s): 16-007_TBLK.dwg 16-007_SURV.dwg 16-007_SITE.dwg HANSEN THORP PELLINEN OLSON, Inc. 7510 Market Place Drive Eden Prairie, MN 55344 952-829-0700 952-829-7806 fax PROJECT NO. 16-007 DRAWN BY ADC DESIGN BY ADC CHECKED BY AKC DATE XX-XX-XX X ISSUES / REVISIONS I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. AARON K. CARRELL LIC. NO. 47494 DATE: XX-XX-XX STATE AID PROJECT NO. STATE PROJECT NO. COUNTY PROJECT NO. CITY PROJECT NO. CLIENT PROJECT NO. 14071 PRELIMINARY - NOT FOR CONSTRUCTION SITE PLAN 1681 RICE STREET ROSEVILLE, MN SHEET 5 X OF SHEETS

Stormwater Impact Fund: Non-Residential This policy applies to all properties that are not zoned low density residential. The City of Roseville has developed specific requirements that apply to development and redevelopment projects. These standards are intended to help achieve the water resource goals of the City s Surface Water Management Plan (SWMP) and help the City maintain compliance with the National Pollutant Discharge Elimination System (NPDES) municipal permit program. These standards highlight important aspects of the requirements for stormwater quality, discharge rate and volume control, erosion control, and illicit discharge. These standards do not replace or supersede City ordinances, watershed district regulations, state and federal rules or permits required for the project. For a more detailed listing of requirements see the specific policies of the City s SWMP and the applicable City ordinances, or consult with City staff on your specific project. To accomplish the goals of the SWMP, it is important to the City to have consistent approaches to evaluating proposed development and redevelopment projects. Therefore, all hydrologic, hydraulic and water quality analysis must be prepared and submitted in a format that will allow for a timely and efficient review by City staff. For permitted sites that cannot feasibly meet the City s Stormwater Requirements through Alternative Stormwater Compliance Sequencing, permittees shall have the option to pay into the City s Stormwater Impact Fund. The amount paid to the City will be based on a $/cubic-foot for the required volume. The $/cubic-foot will be approved by the City Council annually, and can be found within the City s Fee Schedule. 1) Alternative Stormwater Compliance Sequencing: The alternative compliance sequencing process includes three steps that must be followed in order to meet the volume reduction standard. The sequencing steps to be followed are: a. First, the applicant shall comply or partially comply with the volume reduction standard to the fullest extent practicable on-site through alternative volume reduction methods. See the questions below for more information. b. Second, the applicant shall meet the volume reduction standard at an offsite location or through the use of qualified banking credit. c. Third, as a last alternative, the applicant shall pay into the City s Stormwater Impact Fund at a $/CF rate. The dollar amount will be approved by the City Council and will be found within the City s Fee Schedule. 2) Mitigation Provisions: a) Stormwater requirements met through the Stormwater Impact Fund will be mitigated as close to the permitted site as possible, dependent on site constraints and project feasibility. The City will follow the hierarchy below to implement a project to offset the volume requirements. Projects will be sited: 1. Within the same storm sewer drainage district, or 2. Within the same drainage area to the same receiving water body, or 3. Within the same watershed district, or Page 1 of 2 Approved: 12-Sep-16

4. Within the City limits b) Mitigation projects must involve the creations of new structural stormwater BMP s or the retrofit of existing structural stormwater BMP s, or the use of a properly designed regional structural stormwater BMP. c) Routine Maintenance of structural stormwater BMP s already required by this permit cannot be used to meet mitigation requirements. d) Mitigation projects implemented by an applicant shall be completed within 24 months after the start of the original construction activity. 1) Mitigation projects implemented by the City through the use of Stormwater Impact Funds shall be used when a Regional Stormwater Project is identified and as funding is available. e) The applicant shall determine, and document, who will be responsible for long-term maintenance on all mitigation projects of this part. f) If the applicant receives payment from the owner and/or operator of a construction activity for mitigation purposes in lieu of the owner or operator of that construction activity meeting the conditions for post-construction stormwater management, the applicant shall apply any such payment received to a public stormwater project, and all projects must be in compliance with Part III.D.5.a(4)(a)-(e) of the City of Roseville s Stormwater Pollution Prevention Plan (SWPPP) Permit. Page 2 of 2 Approved: 12-Sep-16