AMP 5 Excellence in Health & Safety Awards Excellence in Health and Safety Innovation

Similar documents
Roles and Responsibilities

TRAFFIC MANAGEMENT SUBCONTRACTOR INFORMATION PACK

SITE - HEALTH & SAFETY COLD EYE S REVIEW

Health and safety objectives.

Our Health and Safety Strategy Making a Difference by Taking Care. Author: HS&E Team 1 March 2019 Public

Annex H: Effective worker engagement for health and safety

BEHAVIOUR ON SAFE SITES

ZERO HARM NEW ZEALAND TRANSPORT AGENCY STRATEGIC PLAN

Solihull Metropolitan Borough Council. Corporate Health and Safety Policy For Core Council Staff. September 2015

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Scotland s Resource Sector Commitment. Health & Safety Standards. A guide to the resource management sector commitment health & safety

POSITION DESCRIPTION Property Operations Manager

WORK SAFE, GO HOME SAFE WORK SAFE, GO HOME SAFE. Dear Colleague

Catch22 policy Health and Safety

berkeley group Proud to be Safe

The following is a description of the type of work that our Company undertakes:

75% reduction in lost time incidents over the last 15 years. Health & Safety Matters

Health and Safety Management System Manual

Health & Safety. Report 2011/12

WORK HEALTH AND SAFETY AUDIT STANDARD

HEALTH AND SAFETY POLICY AND PROCEDURES

Health, Safety & Welfare Policy. Version 8

Quality, Health Safety & Environment Code: 2013

HEALTH & SAFETY POLICY STATEMENT OF INTENT (HSP001 V1.6)

Design and Build Guidance

Corporate Aviation Safety Management System

Manufacturing Domain Health and Safety Manual

Annex I: Summary of duty holders

Health & Safety Matters 46% reduction in lost time incidents over the last 3 years

HEALTH & SAFETY POLICY

Health and Safety Policy Statement. LONDONGUILD Ltd ELECTRICAL CONTRACTORS. The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG

SECTION 1: APPLICANT INFORMATION. 1. Have you contacted your local Chapter regarding their established submission process or procedure?

Contractor Guidance. Less than five employees. Health and Safety

Contractor Guidance. Five or more employees. Health and Safety

Gormley Stone Marble & Granite Ltd

Manual Handling Policy

Highways England Awards. Celebrating excellence in safety, customer and delivery

HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015)

GUIDANCE ON THE MANAGEMENT OF THIRD PARTY COMPETENCE FOR SAFETY CRITICAL POSITIONS OFFSHORE

Establish health and safety requirements

ENVIRONMENT, HEALTH & SAFETY POLICY Up date

A-one+ Supply Chain Standards

Our health and safety policy objective is that no person will come to harm while working, studying or visiting UNSW.

Health and Safety Training and Consultancy Services

Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation

Test Before You Touch MJEC HSSE PLAN 2014

Approved By H&S Forum

HEALTH & SAFETY POLICY

PASO ROBLES PUBLIC SCHOOLS INJURY AND ILLNESS PREVENTION PLAN. REVVISED Approved by Safety Committee

Health and Safety Policy and Management Arrangements

Health and Safety Toolkit

Health, safety and wellbeing corporate strategy.

3.1 River Learning Trust Health and Safety Management System Manual

SENIOR PROJECT MANAGER

TARMAC WEST REGION MAINTENANCE STRATEGY 1. Case metadata

PABIAC STRATEGIC OBJECTIVE 2: SAFETY MANAGEMENT SYSTEMS. A self assessment tool for SMEs.

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

OCCUPATIONAL HEALTH & SAFETY POLICY

HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015

External Supplier Control Obligations

General Rights and Responsibilities

Position Description: Site Supervisor Reports to: Site Manager/Project Manager

The BEST Framework EDF Group s Expectations for Managing Health and Safety. The EDF Group BEST Framework

Health and Safety Management Profile (HASMAP)

Involve your team in continuous improvement: Content guide

Occupational Health and Safety Management Manual v2.2

Designer and CDM Co-ordinator Guidance

ALE Global Health, Safety, Quality and Environmental Report for the year ended 31st December 2015.

Principal Designer Guidance

Health, Safety & Wellbeing Absolute Rules

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

Health, Safety and Wellbeing Strategy And Health, Safety and Wellbeing Annual Plan

GUIDELINES FOR DEVELOPING AND IMPLEMENTING A WORKPLACE HEALTH AND SAFETY POLICY

Health, Safety and Environmental Management Systems Audit Report

Work Health and Safety Management Systems and Auditing Guidelines

Designer Guidance. Five or more employees. Health and Safety

Awards Submission Guide

Designer and CDM Co-ordinator Guidance

All Employees Temporary Workers (including Resource Solutions Staff)

Metropolitan Police Service (MPS) Health and Safety Policy Version 4.1 Summary

Lone/Remote Working Policy

Starting a Safety Conversation. Why they re important and how to have them.

Health & Safety Policy

Improving Your Organization's Health & Safety Performance with an OHS Management System.

INTRODUCTION... 2 CHIEF EXECUTIVE FORESTRYSA EXECUTIVE... 3 Executive level engagement... 3 MANAGER / COORDINATOR / SUPERVISOR...

Workplace Safety and Health Guidelines Contractor Management

Safety Matters. September Safe by choice.not by chance

TOTAL SAFETY LEADERSHIP FROM ACCIDENTS TO ZERO

The Warwick School. Staff Job Profile

CHAS Assessment Standards

Everything You Need To Train You And Your Staff

Risk Assessment Policy

SMS0045 Construction Health and Safety Policy and Procedures

Phase Three and Beyond. Working towards a major improvement in the health and safety performance of the ceramics industry

FARNCOMBE CONSTRUCTION. Health & Safety Policy, Organisation and Arrangements

Health and Safety Management Standards

Transport Sector Portfolio

Combined Health and Safety Policy

Volume 15 Number 6 - June 2015

Transcription:

AMP 5 Excellence in Health & Safety Awards 2011 Excellence in Health and Safety Innovation

Table of Contents Introduction...3 1. Tangible Benefits to Health and Safety, Including Cost and Risk Reduction...4 2. Originality...5 3. Employee Involvement...6 4. Leadership Commitment...8 5. Ease of Use...8 6. Attachments...9 2 of 10

Introduction GBM is a joint venture working for Thames Water as a framework design and build contractor. A critical part of the GBM culture is its focus on Health and Safety: it will be a priority at every stage of the delivery process from design through to commissioning and handover. Our Health and Safety vision is to achieve a zero incident target based on continuous improvement in behaviours encouraged by consistent leadership, high performance targets and the promotion of best practice with all stakeholders. A robust safety management system, comprising of a Health and Safety Policy, together with Standards, Procedures, Checklists and ProFormas, provides guidance on how GBM and its sub contractors will undertake their work in accordance with all relevant statutes. This is supported by a behavioural based Safety Training Programme aimed at producing a thorough and shared understanding of the health and safety risks. This has proven to increase awareness of health and safety responsibilities and lead to better performance. GBM s commitment to improved Health & Safety is led by a team of Safety Advisers, supported by Senior Managers, who form the Safety Advisory team. They review audits, implement training and develop initiatives which are endorsed by the Senior Leadership Team and Board Members. Comments and feedback are encouraged from all quarters and we are pleased that so many employees are keen to input best practice from their own background in order to enhance the procedures we have set down. GBM not only seek to incorporate best practice set by industry standards and other companies, but also to be innovative and lead by example; creating solutions which can be adopted by others to make the construction industry a safer place to work. Safety is of paramount importance to GBM and working with suppliers, contractors and client to seek out new working methods and equipment will deliver solutions that benefit us all. GBM review accident investigations, AFR, HSE accident statistical data, near miss and hazard identification trends to determine where innovative measures are required to reduce the risk of harm. 3 of 10

1. Tangible Benefits to Health and Safety, Including Cost and Risk Reduction. GBM have implemented the following innovations that not only reduce the health and safety risks to an acceptable level but, in their application are reasonable, practicable and of benefit to users: Hand Arm Vibration (HAV) Meters GBM have trialled HAV meters from Speedy who are the framework contractors for plant. HSS, the framework suppliers for small tools and equipment, were apprehensive when first approached regarding the use of Speedy s HAV monitoring equipment being used on their tools. However, once they saw the support for the proposal from the Thames Water Health and Safety Forum, the Client and other contractors agreed for the HAV monitors to be attached to their equipment. The HAV monitors easily attach to the equipment and have a green (ok to use), amber (approaching exposure limit) and red (limit reached/exceeded). This is extremely user friendly and more reliable than relying on general information supplied by the manufacturer. There is no need for users and managers to complete written logs as the software automatically saves the information until it is downloaded on a computer to give graphical easily readable information, each users information is saved and acts as a source of reference for review and setting controls, and occupational health records. This system has already proved its worth; the immediate result after the first download in January 2011 demonstrated its effectiveness whereby one operative was found to have been using a tool an excessive amount and the tool proved to be defective giving greater vibration readings than standard. (1) The software costs approximately 1000.00 per licence and the hire of the meters is minimal, compared to the ill health effects of hand arm vibration system and the unreliability of other control measures. GBM have deemed the HAV monitoring as being reasonably practicable in its implementation as it saves time and money and working practices become more efficient and productivity can be maximised. Service Identification Tags (1) Service identification tags are attached to exposed, unidentified service cables by site operatives. Once the service has been indentified then a tag can be made out stating what the service is and attached to give warning to everyone. The tags are 2.50 each and reduce the risk of contact with live electrical and other services which can not only result in major injuries but can also lead to failure of critical plant and equipment. The tags are durable and can be reused. 4 of 10

Reverse Parking All sites operate a reverse parking only policy, unless it is deemed impractical through risk assessment. The majority of incidents involving vehicles on site happen within the first five minutes of driving, making it safer to reverse park at the end of your journey when you are more likely to have been driving for more than 5 minutes, than at the beginning of your journey. The costs are minimal as signage can be reused. There is no additional cost for entry on to the traffic management plan and inclusion into the site inductions. Quick Hitch GBM believe that one of the greatest initiatives to be adopted by themselves in the past 12 months is the implementation of the quick hitch control measures which are an effective control in preventing buckets detaching from excavators whilst been operated. In line with HSE recommendations and prevention of incidents, GBM do not permit the use of semi-automatic quick hitches and have adopted a series of control measures to help prevent human error occurring during the change of attachments to excavators (control measures are explained in the next section). The booklet, signage and recommendations have a minimal print cost, negligible against the cost of a fatality or major injury of which there have been numerous within the industry. 2. Originality The fundamental reason behind the implementation of innovations is to ensure a reduction in the number of health and safety related accidents. GBM believe they are the creators of the following innovations: Quick Hitch Booklet and Supporting Materials In order to control the use and reduce the risk to health involved with the use of quick hitches on excavators. GBM have developed and rolled out across their site a Quick Hitch Booklet which machine operators have to complete every time they change the bucket/attachment. Slinger/signallers/ banksman have to countersign the sheet to verify that the relevant checks have been completed (2). GBM have produced posters to promote the safe use of excavators (2), and have devised a sheet of recommendations which is briefed out to all operators of excavators, Site Managers and Supervisors and slinger/signallers/banksman. (2) On starting work at site, operators have to prove their competence through visual assessment as well as having a CPCS card of competence and log of experience. GBM also work to the HSE recommendations made following several incidents throughout the industry and do not allow the use of semi-automatic quick hitches on any of their sites. 5 of 10

Site Signage As part of the standard site signage, sent out with the site start-up pack, is the hazard of the day board (2). The boards are updated daily to reflect the foreseeable hazards on site They include an aerial map of the site and briefings are often delivered in front of the board. The Hazard of the Day boards are conveniently situated where all the workforce have to pass them on leaving the compound to their areas of work. 3. Employee Involvement GBM believes that face to face communication, particularly for the introduction of innovative measures in Health and Safety, is critical and a cascade system has been introduced to ensure that everyone understands why the measures are being introduced and their importance in securing their health and safety on site as well as giving them an opportunity to give us feedback. Face to face communication is then re enforced through leaflets, posters and booklets. Employee involvement was critical in securing take up of the following innovative measures:- Trial of HAV meters/feedback Site Management and operatives have been fully involved in the training of the use of and the trial of the HAV monitoring equipment and have been co-operative and forthcoming with feedback on its use. (3) Quick Hitch Controls Machine operators and banksman have been compliant in completing of the booklet, ensuring the right control measures and safe working practices have been implemented. Operators are all aware of the fatalities and major injuries which have been caused through the operation of excavators and realise that control measures are a necessity in the safe operation of excavators. In addition, GBM is always seeking behavioural innovation which can improve health and safety standards on site. The Tap on the Shoulder is proving to be particularly effective: Tap on the shoulder Polite reply Included in the induction (3) which is given to everyone on site is Tap on the Shoulder concept which comes in to play if you see a hazard, some one working unsafely or an unsafe condition. 6 of 10

Just tell the person involved, and if someone approaches you, even if their concerns are unwarranted, reply politely. This is further endorsed in the behavioural safety briefings (3) and promoted by management on site. When asked, persons said they were wary of approaching persons, especially when they were of a different discipline even when they believed that person to be working unsafely; this was down to the fact that they are unfamiliar with their work and the associated risks and controls, do not know the person and fear the response. Monthly Safety Advisory Groups (SAG) Safety Advisory Groups are being introduced to ensure workforce inclusion and engagement. They are to be held on a monthly basis chaired by a nominated person (not site management) and attended by key representatives throughout the supply chain. They primarily work at removing any communication barriers and encourage feedback and input on all health and safety matters. This has evolved so that there is now collaboration on all aspects of work undertaken on site. This ensures that there is two-way communication for all companies working on site and they feel free to come up with health and safety challenges and solutions. GBM have plans to introduce the following innovations after consulting the workforce: Safe Plan of Action Extension of the start of the shift briefing where hazards in the direct working environment are identified. It references the Safe System of Work (SSOW) for the job being completed ensuring that the agreed method of work remains fresh in the mind of operatives. It also identifies a change of operatives in the team and any change in conditions from the previous day. Safe Game Plan This covers activities on site which may not be covered by a method statement e.g. moving a bag of cement to and from a storage area. It identifies hazards associated with the task and the environment and suggests control measure which should be adopted prior to the task commencing. Job Safety Analysis For every job done on site a SSOW is completed; Job Safety Analysis is a two way audit of the safe system of work against what is actually happening on site, checking that all operatives have signed the SSOW, that the correct tools and equipment are being used and that all other controls in the SSOW have been put into practice. The Job Safety Analysis also allows the operatives to voice better ways of doing the job and any suggestions they may have. This tool will hopefully encourage operatives to keep to the agreed method of work thus reduce accidents on site. 7 of 10

4. Leadership Commitment GBM Health and Safety Forum The GBM Health and Safety Forum reviews accidents, hazard identification trends, suggestions, alerts, legislation amendments or additions, best practices and audit results. From these areas for improvement are identified. Trial results and feedback such as the HAV meter trials are fed back into the forum where the decision to adopt across all sites is determined and agreed by the Contract Director. GBM Safety Leadership Team Comprises of the Health and Safety Manager, the Health and Safety Advisors, a Construction Manager and 2 Senior Works Managers. The team works on producing innovations to the industry which exceed other controls used for the same challenges, and implementing other standards which are deemed reasonably practicable where improvement has been identified as being required. GBM are focused on leading the way and incorporating the highest standards and raising the bar in health and safety. All the innovations in this submission have been produced through the Safety Leadership Team. 5. Ease of Use HAV Monitoring (1) The HAV monitors easily attach to the equipment and have a green (ok to use), amber (approaching exposure limit) and red (limit reached/exceeded). This is extremely user friendly and more reliable than relying on general information supplied by the manufacturer. There is no need for users and managers to complete written logs as the software automatically saves the information until it is downloaded on to a computer to give graphical easily readable information, Each users information is saved and acts as a source of reference for review and setting controls, and occupational health records. Service Identification Tags.(1) Service tags act as a visual reminder and warning of the identified service; they are constructed of durable material and can be reused many times. They are sent out to all sites in the start up pack so they are readily available. They are easily attached using cable ties. Aerial Maps (1) Large aerial maps of the site are on the hazard of the day board and on the table and wall of the induction room; they act as a visual aid to assist inductees in locating first aid provisions, fire assembly points, traffic management, working areas and major hazards. 8 of 10

Hazard of the Day Board (1) An effective way of delivering information on a daily basis, it involves site management writing key hazards, the area where they are present and the control measures required. Site Signage Site signage is ordered in packs according to the site size. Extra signs can be ordered to tailor to the sites individual needs. The site health and safety boards (5) have plastic holders and hold all essential health and safety information and can be easily accessed by everyone on site. There is a signage catalogue (5) available and handed out in the start-up packs along with the standard pack of signage. The signage can be reused and is labelled with the GBM logo. 6. Attachments File Document Evidence of (1) Benefits to H&S (2) Originality HAV Manager HAV pricing Hav meter reports Hav Meter instructions Service tag Complete hazard of the day board Hazard of the day Quick hitch check Quick hitch poster Quick hitch recommendations Results of use shows users and exposures Costs of implementation Daily exposure levels User guide Photograph of service tag in use Photo of one at site Blank board as in sign catalogue Check list used by operators printed in duplicate booklet Poster of information Rules for safe use of excavators briefed to operators and banksman 9 of 10

(3) employee Involvement (4) Leadership Commitment (5) Ease of use BBS 2 Slide 13 Slide 60,61,62 induction Safe plan action Safe Game Plan GBM SAG GBM H&S Meeting Euroscreens Hazard of the day board Service tag H&S Board Site map Slide 13 of the briefing shows the promotion of informing people if they are working dangerously and giving a polite response Slide 60,61,62 of the induction shows the promotion of informing people if they are working dangerously and giving a polite response Future release control measure directly prior to starting work at the workface covers activities on site where there is no method statement e.g sweeping Minutes of meeting reporting positive response to the trial of the havs meters Evidence of meeting involving top management. Site signage catalogue start up packs and extra Evidence that boards are in use Photos evidencing service tags in use Photo of H&S board with different slots and all labelled so that correct information is available to everybody. Laminated maps on fencing showing TWOSA/TOCOP areas. 10 of 10