SAE AS9100 Revision C Requirements beyond ISO 9001:2008 UPDATING YOUR MANAGEMENT SYSTEM

Similar documents
AS 9100 Rev C Quality Systems Manual AS-050C-QM

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)

Reference Paragraphs. Appendix B AQS Auditor Handbook

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Vendor Qualification Survey

Infinity Precision Inc. Quality Manual

Objective Evidence Record (OER)

Supplier Quality System Survey

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

AVNET Logistics & EM Americas. Quality Manual

List of Documented Information (Document & Records)

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK

Comparison of Requirements ISO/TS vs. AS9100 and ISO 13485

CERTIFICATE OF REGISTRATION

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

Supplier Quality Requirements SQR-1.0 Rev. 3

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

SUPPLIER SURVEY FORM Instructions

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein.

Quality Procedure QP-843 Information for External Providers

Plasma Ruggedized Solutions

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No

Supplier Quality Manual

SUPPLIER QUALITY PROGRAM Procurement Standard

Control Of Non-conforming Material

Harmony Castings LLC Aluminum V-Process Castings Quality Manual Section: Page 1 of 27

SUPPLIER QUALITY REQUIREMENTS

Quality Systems Manual Rev. NC Issued July 9 / 2018

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

SUPPLIER QUALITY SYSTEM SURVEY

Correlation Matrix & Change Summary

ISO 9001:2015. Quality Management System. Manual

Engenharia e Tecnologia Espaciais ETE Engenharia e Gerenciamento de Sistemas Espaciais CSE Métodos e Processos na Área Espacial

KEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100

Issued by ISO Management Representative Signature/Date: Ken Hicks 11/09/06 GOWANDA. Electronics. PO Box 111 One Magnetics Parkway Gowanda NY, 14070

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Machined Integrations, LLC

PRECISE INDUSTRIES INC. Quality Manual

Quality Management System

Supplier Quality Requirements Document (SQRD)

Supplier Self Survey

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

PURCHASING QUALITY CLAUSES

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

QUALITY MANUAL. Conforming To AS9100D and ISO9001:2015. QM-001 Page 0 of 36 Revision 24:

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

QUALITY SYSTEM MANUAL

Quality Assurance Audit Checklist

ANCHOR ISO9001:2008 RPR-002 MARINE SERVICES REQUIRED PROCEDURE RECORDS CONTROL

Supplier Quality Terms & Conditions

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

Medical QMS Quality Manual

SUPPLIER QUALITY MANUAL

Supplier Quality Clauses

UPGRADE ASSESSMENT CHECKLIST

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio

Wilson-Hurd ATF Quality Manual

Quality Management System Manual

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10

Quality Assurance Policy and Procedures

Brumund Foundry Inc.

CMI Guidance Document

ISO 9001:2008 Quality Manual

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

AUNA Supplier Quality Manual

HACCP audit checklist

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

QMS-002. Quality Management System Manual. Conforms to ISO 13485

NATO STANDARD AQAP-2110 NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

Transitioning from ISO/TS 16949:2009 to IATF 16949:2016 Presented by Brandon Kerkstra Revision: 10/24/2016

QUALITY CONTROL INSTRUCTION

QUALITY POLICIES HANDBOOK

CHAPTER 8 INTEGRATION OF QMS AND LMS

Integrated Flow Solutions Reynolds Road Tyler, TX Phone: (903) Fax: (903) UNCONTROLLED COPY

Pressure Piping Construction Requirements QMS written description verification CHECKLIST AB-518b

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

AERO GEAR, INC. SUPPLIER QUALITY MANUAL

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

QUALITY MANUAL QM0492 ISO SUPPLEMENT III

Awareness to ISO 9001:2000

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Transcription:

3 Terms and Definitions Ensure awareness and understanding of: Risk Special Requirements Critical Items Key Characteristic 4.1 Include process(es) that deploy(s) requirements from: Customers Applicable Laws Applicable Regulations 4.2.1 Personnel are aware of procedures and have access to the QMS documents 4.2.4 Bring supplier records under control via QMS or contractually w/suppliers 4.2.4 Specify contractual rights to retrieve legible records from suppliers 5.2 Measure product conformity and on-time performance and take action of not achieved per 8.3, 8.2.3 and 8.5.2 5.5.2d Authorize Management Representative to resolve quality management issues 7.1e Determine configuration management appropriate to your product(s) 7.1f Determine the resources to support use and maintenance of the product(s) 7.1.1 Establish and use project management process 7.1.2 Establish and use risk management process FOR USE BY: 1 of 7

7.1.3 Establish configuration management or justify exclusion of this clause 7.1.4 Establish and use work transfer process or justify exclusion of this clause 7.2.2d Determine any special product requirements 7.2.2e Identify risks associated with the transaction before committing to meet the requirements (see 7.1.2) 7.3 Design and development of products 7.3.1 Project manage (see 7.1.1) design as well 7.3.1 Plan design for ability to produce, inspect, test and maintain product 7.3.1 Input safety and functional objectives of product 7.3.3e Identify critical items, their key characteristics and specific actions to be taken on these items 7.3.3 Design output to include information necessary for product to be identified, manufactured, verified, used and maintained 7.3.4c Who authorizes release from each design stage? 7.3.6.1 Plan, document, use and record verification and validation tests (such as prototyping) 7.3.6.2 Ensure test records demonstrate that the design results in a product that meets requirements of all identified operational conditions FOR USE BY: 2 of 7

7.3.7 Control design change per configuration management process (see 7.1.3) 7.4.1 Your company is responsible for all purchased product 7.4.1a Must have list of approved suppliers indicating what they are approved to supply (incl. verifications) 7.4.1b Relate the degree of control specified in purchase order to evals. of supplier performance 7.4.1c Define actions to correct supplier nonconformity 7.4.1d Specify in PO the use of customer-approved sources of special processing 7.4.1e Authorize someone to change approval status and stop use of suppliers 7.4.1f Determine and manage purchasing risks per 7.1.2 7.4.2d Identify the revision status of the documents that describe the processes, goods & services ordered 7.4.2e Specify design, verification and any statistical requirements for critical items/key characteristics 7.4.2f Specify requirements for obtaining, identifying, preserving and delivering any test specimens 7.4.2g Supplier notification of nonconforming product 7.4.2g ABC accepting nonconforming material FOR USE BY: 3 of 7

7.4.2g 7.4.2g 7.4.2h 7.4.2i Supplier notification of changes to process/product for ABC approval Suppliers to deploy requirements to their suppliers Specify supplier record retention requirements Provide right of access to suppliers facilities/records 7.4.3 Keep track of incoming product not known to conform (per 7.5.3) 7.4.3 Maintain a log of verification requirements delegated to suppliers (see 7.4.1a) 7.5.1g 7.5.1h 7.5.1i 7.5.1j Name person accountable for conforming/ nonconforming product during its manufacture Record that all steps and checks have been made Prevent/detect and remove foreign objects Reliable supply of compressed air and other utilities 7.5.1k Maintain standards and samples to communicate acceptance criteria to technicians 7.5.1 Ensure production plan or quality plan (see 7.1) covers critical items and specifies process controls for key characteristics 7.5.1 Plan and conduct verifications while it can be done before assembly for example FOR USE BY: 4 of 7

7.5.1.1 Verify conformity to process and product acceptance criteria (FAI) 7.5.1.2 Control changes to production processes 7.5.1.3 Control production hardware and software 7.5.1.4 Control service operations unless excluded 7.5.3 Identify any differences in actual and specified configuration 7.5.3 Prevent unauthorized use of approval devices 7.5.5a Provide cleaning 7.5.5b Prevent/detect and remove foreign objects 7.5.5c Provide special handling of sensitive products 7.5.5d Provide marking, labeling and warnings 7.5.5e 7.5.5f Control stock Provide special handling of hazardous materials 7.6 Keep list of device type, ID, location, check frequency and methods, device recall method, device acceptance criteria and environmental conditions 8.2.1 Monitor: Product conformity OTD performance Customer complaints SCARs and take corrective action per 8.5.2 8.2.3a 8.2.3b Take action to correct a nonconforming process Evaluate if process nonconformity has led to product nonconformity FOR USE BY: 5 of 7

8.2.3c Determine if process nonconformity has impacted other processes or products 8.2.3d Control nonconforming product per 8.3 8.2.4 Document product acceptance measurement requirements (see 7.1c) 8.2.4a Specify acceptance criteria 8.2.4b When to perform conformity verifications 8.2.4c Records to be kept 8.2.4d Measurement devices to be used and instructions for use 8.2.4 Ensure accompanying test certificates/records are present at delivery 8.3 Include product returned by customer and process for approving personnel authorized to disposition nonconforming product 8.3 Ensure procedure for control of NC product authorizes competent people (see 6.2.1) for dispositioning of said NCs 8.3 Use-as-is and repair dispositions require OEM/designer approval unless conforming to OEM specifications 8.3 Use-as-is and repair dispositions require customer approval if deviating from contract 8.3 Error-proof removal of scrap and render unusable FOR USE BY: 6 of 7

8.5.1 Monitor and evaluate implementation of improvements 8.5.2g Involve suppliers in removing the root causes of nonconformity 8.5.2h Expedite/escalate 8.5.2i corrective action Investigate extent of other nonconforming products 8.5.3 Consider use of FMEAs during product or process design to manage risk and drive preventive actions For information on leading, developing, auditing and improving your management system please visit www.aworldofquality.com early and often! FOR USE BY: 7 of 7