29'-0" SQUARE FOOTAGE 6'-0" PORCH 3'-0" 6'-0" 2'-0" 3'-6" 8'-0" 2'-4" 3'-8" 6'-7" 3'-11" BCD3756-2 BCA2420T 3-0 9LITE BATH WOOD STOVE 10'-0" 2-4 15'-10 1/2" 3'-11" 6'-0" 11'-9 1/2" 15 R. @ 7 5/8" 14 T. @ 10" BCC3648SA3624T 11'-5 1/2" 2'-4" 2'-4" 11'-5 1/2" BEDROOM 4-2X4 POST WITH SCREW JACK ASSEMBLY TYP @ 3 LOCATIONS CABINET ABOVE GREAT ROOM 5-0 PANTRY 6-0 CLOSET CRAWL SPACE ACCESS 6X12 BEAM DECK 3'-11" 6'-0" 4'-0" 7'-9 1/2" 27'-7" CLOSET 6-0 6X12 BEAM 6-0 SLIDER 6-0 SLIDER MAIN FLOOR PLAN 6'-7 1/2" 2'-11 1/2" 4'-1 1/2" 4'-9" 34'-10" BEDROOM 8'-6" 9'-1 1/2" BATH 18'-3 1/2" 9'-3 1/2" LINE OF LOFT KITCHEN LINE OF LOFT DINING 5'-0" 10'-3 1/2" 9'-3" 6'-3" 11'-10" DW BCC3648SA3624T 3'-8" 21'-8" 3'-8" 0" BCD3756 BCA2430T BCA3630 BCD3756-2 2'-6" 6'-7" 4'-9" 3'-4" 3'-10" 2'-4" 7'-3" 3'-5" 5'-0" 39'-0" HEATED AREAS: FIRST FLOOR... 1108 SECOND FLOOR... 636 HEATED TOTAL... 1744 UNHEATED AREAS: DECK/PORCH AREA... 583 CRAWL SPACE... 1108 NOTE: 1) ALL REPRESENTATIONS OF FIXTURES, EQUIPMENT, MATERIALS, ELECTRICAL, PLUMBING, FASTENERS, ETC. ON CLIENTS DESIGN ARE NOT INCLUDED WITH CLIENT'S PACKAGE PURCHASED FROM TENNESSEE LOG HOMES. ONLY ITEMS SPECIFICALLY NOTED IN TENNESSEE LOG HOMES PURCHASE AGREEMENT WILL BE INCLUDED IN THE MATERIALS LIST AND SUPPLIED TO THE CLIENT. 2) CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE BEGINNING CONSTRUCTION. 3) ALL INTERIOR STUD WALLS ARE NON-LOAD BEARING. 4) ALL DOOR AND WINDOW ROUGH OPENINGS TO BE VERIFIED AS LOGS ARE BEING STACKED. OPENINGS MAY NEED TO BE ADJUSTED BY ADDING OR DELETING DOOR AND WINDOW BUCKS OR BY CUTTING LOGS. 5) EXTREME CARE IN PRE-CUTTING LOG OPENINGS HAS BEEN TAKEN. THE OWNER/CONTRACTOR IS RESPONSIBLE FOR CHECKING AND ADJUSTING OPENINGS WHEN STACKING LOGS. RESPONSIBILITY OF THE BUILDER/OWNER THESE DRAWINGS ARE IN PART DIAGRAMMATIC AND DO NOT SHOW IN DETAIL HOW WORKMANSHIP, MATERIALS AND INSTALLATION OF THE MATERIALS INCLUDING THE FIXTURES AND EQUIPMENT ARE TO BE BROUGHT TOGETHER TO COMPLETE THE "WHOLE" STRUCTURE. IT IS THE RESPONSIBILITY OF THE BUILDER/OWNER TO BUILD THE STRUCTURE TO COMPLY WITH ALL APPLICABLE NATIONAL, STATE, COUNTY AND CITY CODES AS THEY APPLY TO EACH COMPONENT BUILDING GREEN: 1) WHERE POSSIBLE, USE COMPACT FLUORESCENT LIGHTING. 2) USE DURABLE ROOF COVERINGS SUCH AS STEEL OR FIBER CEMENT TO REDUCE THE NECESSITY FOR FUTURE ROOF COVERING REPLACEMENTS. 3) THE USE OF FACTORY BUILT COMPONENTS REDUCES THE AMOUNT OF JOB SITE CUTTING FURTHER REDUCING WASTE. 4) CHOOSE ENERGY STAR RATED APPLIANCES WHENEVER POSSIBLE. 5) USE NATIVE PLANTS DURING LANDSCAPING TO REDUCE THE NEED FOR WATERING AND FERTILIZING. 6) IN ROOF SYSTEMS AND EXTERIOR STUD WALLS, USE THE HIGHEST R-VALUE POSSIBLE. 7) USE LOW-E WINDOWS TO REDUCE HEAT TRANSFER BOB NEAL 14C 8x8 V-V LOG DOVETAIL CORNERS 06/11/10-MESB 08/26/10-MESB 08/30/10-MESB 08/31/10-MESB
12'-6" 16'-5" BCC3756 BCC3756 6'-6" 14'-8" 6'-6" APP. 5' HEAD CLEARANCE LOW CLOSET & STORAGE H/W 3046 3046 13'-6 3/4" 8'-4 3/4" 5'-8" 15 R. @ 7 5/8" 14 T. @ 10" 17'-10" SUPPORT POST TO RIDGE MASTER BEDROOM VAULTED CEILING DN WALK-IN CLOSET BATH 6'-6" 14'-8" 6'-6" HVAC LOFT AREA 8'-5 3/4" 12'-0" 6'-1" 4'-0 3/4"X 4'-0 3/4" 2-BCA4824T 3'-0" 15'-7" 18'-7" SHED DORMER TABLE R1001.17 CRICKET DIMENSIONS ROOF SLOPE 12/12 8/12 6/12 4/12 3/12 NOTE: H 1/2 OF W 1/3 OF W 1/4 OF W 1/6 OF W 1/8 OF W 1) ALL REPRESENTATIONS OF FIXTURES, EQUIPMENT, MATERIALS, ELECTRICAL, PLUMBING, FASTENERS, ETC. ON CLIENTS DESIGN ARE NOT INCLUDED WITH CLIENT'S PACKAGE PURCHASED FROM TENNESSEE LOG HOMES. ONLY ITEMS SPECIFICALLY NOTED IN TENNESSEE LOG HOMES PURCHASE AGREEMENT WILL BE INCLUDED IN THE MATERIALS LIST AND SUPPLIED TO THE CLIENT. 2) ALL SECOND FLOOR STUD WALLS CONSTRUCTED TO CEILING HEIGHT. (TYP) 3) BOX IN FLOOR JOISTS WHERE PLUMBING LINES ARE LOCATED AFTER PLUMBING IS INSTALLED. 4) CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE BEGINNING CONSTRUCTION. CANTILEVER SECOND FLOOR JOISTS FOR LOFT 5) ALL DOOR AND WINDOW ROUGH OPENINGS TO BE VERIFIED DURING FRAMING OF GABLES AND DORMERS. CHIMNEY CRICKET SUPPLIED BY OTHERS OPEN TO AREA BELOW RAILING INSTALLED AS PER LOCAL CODES SECOND FLOOR JOISTS SIT ON TOP COURSE OF LOGS PREMIER PORCH ROOF 4X8 DF @ 32" O.C. HOUSE ROOF 2PLY 11 7/8" TJI 210 @ 16" O.C. 5/8" ROOF SHEATHING PREMIER SECOND FLOOR SYSTEM 4X8 DF @ 24" O.C. 5 1/8"X24" GLU-LAM RIDGE BEAM RECOMMENDED FIXED GLASS FIXED GLASS FIXED GLASS SECOND FLOOR PLAN
CONTINUOUS RIDGE VENT () 4X8 DF TRUSS TO BE CUT ON THE JOBSITE 12 12 12 4.625 FRAMING WITH LOG SIDING CRICKET SUPPLIED BY OTHERS CORNER CAPS 5 12 6X10 PORCH PLATE 6X6 PORCH POST RAILING NOTE: GRADE CONDITIONS TO BE VERIFIED ON SITE FRONT ELEVATION
FINISHED ROOFING () CONTINUOUS RIDGE VENT () RAILING LEFT ELEVATION NOTE: GRADE CONDITIONS TO BE VERIFIED ON SITE STEPS TO GRADE PER SITE CONDITIONS
REAR ELEVATION
CONTINUOUS RIDGE VENT () CORNER CAPS RAILING LOG SIDING AT SUBFLOOR NOTE: GRADE CONDITIONS TO BE VERIFIED ON SITE RIGHT ELEVATION