Evaluation of Total Quality Management Implementation as Engineering Practices in Jordanian Construction Projects

Similar documents
The Extent of Using the Target Costing Technique by Jordanian Industrial Shareholding Companies

Education Management: Perception of TQM and Its Effect on Attractiveness of Place of Study

ijcrb.webs.com INTERDISCIPLINARY JOURNAL OF CONTEMPORARY RESEARCH IN BUSINESS MAY 2014 VOL 6, NO 1

TOTAL QUALITY MANAGEMENT IN EDUCATION: PROSPECTS, ISSUES AND CHALLENGES

European Journal of Business and Management ISSN (Paper) ISSN (Online) Vol.7, No.36, 2015

A REVIEW ON QUALITY MANAGEMENT OF CONSTRUCTION INDUSTRY

Does Information Technology affect Improvement of Human ResourcesDirectorate s Performancein a Selected Organization in the Kingdom of Bahrain?

Academy of Accounting and Financial Studies Journal Volume 22, Issue 5, 2018

Study of Material Management Techniques on Construction Project

Customer Satisfaction: A Comparative Study of Public and Private Sector Banks in Bangladesh

SSRG International Journal of Economics and Management Studies (SSRG-IJEMS) volume2 issue5 May 2015

SHORT ANSWER QUESTIONS (KEY) UNIT- I

Firas A. N. Al-Dalabih. Irbid National University, Jordan

The relationship between empowerment and job satisfaction: Applied study on Jordanian Textile Companies

The Impact of Transactional Leadership on the Marketing Creativity in Jordan Commercial Banks

Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U.A.E

Abstract Keywords: 1. Introduction

THE ROLE OF HUMAN RESOURCES TOWARDS JORDANIAN COMMERCIAL BANKS PERFORMANCE

Khawaldeh, Faleh Obeidallah 1

Quality management in construction projects

Mr. Shaban E. A. Salem 1, Dr. Shabana Mazhar 2

INTERNATIONAL JOURNAL OF ebusiness AND egovernment STUDIES Vol 3, No 1, 2011 ISSN: (Online)

THE EFFECT OF COMMITMENT TO THE PRINCIPLES COSO CONTROL IN REDUCING THE CONTROL RISK

The Relationship between Corporate Social Responsibility and Employees Performance in Al Manaseer Group - Jordan

The Impact of Human Resource Management Functions in Achieving Competitive Advantage Applied Study in Jordan Islamic Bank

Aligarh Muslim University, Aligarh (U.P.) 3

The Impact of 5S Implementation on Industrial Organizations Performance

CONSTRUCTION PROFESSIONALS PERCEPTION ON THE CAUSES AND EFFECTS OF PROJECT DELAY IN LUSAKA, ZAMBIA

An Assessment of Factors Affecting Implementation of Procurement Plans at County Government of Nakuru, Kenya

Understanding Key Bidding Factors Considered by Top Jordanian Contractors

THE ROLE OF COSO FRAMEWORK IN ACHIEVING STRATEGIC OBJECTIVES IN IRANIAN COMPANIES

Factors Influencing the Implementation of Management Accounting Systems in Small and Medium Sized Enterprises in Dubai

IMPACT OF TOTAL QUALITY MANAGEMENT PRACTICES ON THE PROFITABILITY AND SERVICE QUALITY OF PUBLIC SECTOR COMMERCIAL BANKS

The Weaknesses of OSHA 1994 Implementation in Malaysian Construction Industry

Internal Audit and its Impact on Risk Management at the Islamic Banks Listed in Amman Stock Exchange

The Importance of Internal Company Communication

Keynotes RLGA. QA and QC: Are They Different?

TOTAL QUALITY MANAGEMENT AND LIBRARIES AND INFORMATION CENTERS

International Business & Economics Research Journal December 2009 Volume 8, Number 12

TQM in Taiwan's computer and its peripheral industry

Analysis of Challenges to Total Quality Management Implementation in FGEIs (C/G) in Pakistan

Ayad AL-RAWASHDEH¹ Ghazi AL-BADAINAH²

GSR Management System - A Guide for effective implementation

IMPROVING SUBCONTRACT CONDITIONS TOWARDS SUCCESSFUL INFRASTRUCTURE PROJECTS IN GAZA

SUGGESTIONS FOR IMPROVING THE EFFICIENCY AND EFFECTIVENESS OF QUALITY MANAGEMENT IN THE BUSINESS PRACTICE IN SLOVAKIA

BARRIERS TO TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION IN THE MAURITIAN FOOD INDUSTRY

THE EFFECT OF ACCOUNTING PERFORMANCE ON ACCOUNTING INFORMATION SYSTEMS, PLANNING AND CONTROLLING IN JORDANIAN COMMERCIAL BANKS - SURVEY STUDY

Supporting Strategies for Organizational Innovation and Their Impact on the Achieving Competitive Advantage in Jordanian Islamic Bank

HUMAN AND INSTITUTIONAL CAPACITY-BUILDING FOR CONFLICT MITIGATION

RELATIONSHIP BETWEEN HUMAN FACTORS AND ENTERPRISE RESOURCE PLANNING SYSTEM IMPLEMENTATION

A STUDY OF TQM ORGANISATIONAL CULTURE IN A MICROFINANCE INSTITUTION OF WEST BENGAL

Obstacles to Applying Total Quality Management to Sport Clubs in Al-Jouf, Saudi Arabia

The Role of Work Teams Empowerment in Crisis Management: A Case Study of Jordanian Electricity Distribution Company- Karak Governorate

EVALUATION OF INFRASTRUCTURE INFORMATION TECHNOLOGY GOVERNANCE USING COBIT 4.1 FRAMEWORK

INVESTIGATE ON THE EFFECTS OF SOCIAL MEDIA ON E- ENTREPRENEURSHIP

Namakkal, Tamilnadu, India

Relationship between Quality Planning and Innovation

Analyzing Farm Accounting Skills Related to Financial Performance of Dairy Industry: An Evidence from Jordan

Analysis of Improper Material Management Affecting Cost in Construction Projects

Lean Accounting Techniques and their Impact on Total Quality in Peace University

Applicated Pricing Strategies in Jordanian Medicine Scoter and There Effects On Customer Satisfaction (View Point Of Mangers)

Analysis of Causes of Delay and Time Performance in Construction Projects

In this unit we are going to speak about quality management in organizations.

Critical Factors Influencing Quality Performance in Construction Projects

The Effect of Promotion Strategy in the Jordanian Islamic Banks on a Number of Customers

An Evaluation of the Effectiveness of E-recruitment Practices for SMEs in Malaysia

ijcrb.webs.com INTERDISCIPLINARY JOURNAL OF CONTEMPORARY RESEARCH IN BUSINESS JANUARY 2014 VOL 5, NO 9

S. Fomichov, A. Banin, I. Skachkov, V. Lysak, O. Gaievskiy, N. Yudina. Quality Management System. Standard. Management Systems

The impact of the internal audit function to improve the financial performance of commercial banks in Jordan

Chapter Two: Literature Review

Saudi Journal of Humanities and Social Sciences. DOI: /sjhss. ISSN (Print)

The Extent of Jordanian External Auditor Commitment in Applying ISA 240 and its Effect in Reducing Fraud in Financial Statement

Performance Appraisal amongst Contractors in Construction Project in Malaysia Siti Hafiza Mat Yahya 1, a and Syuhaida Ismail 2,b

Key Performance Indicators for Maintenance Management Effectiveness of Public Hospital Building

Assessing the Implementation of Total Quality Management in Education Administration Institutions in Central Province, Sri Lanka.

Managers Concern Regarding Employee Empowerment in Jordanian Public Hospitals

Business ethics and environmental strategies of large companies in Colombia.

Introduction to Quality Management. BPF 2123 Quality Management System

What is ISO 9001 QMS? Business Beam

CGEIT Certification Job Practice

STUDY OF TOTAL QUALITY MANAGEMENT PRACTICES IN THE CONSTRUCTION INDUSTRY

THE ROLE OF MANGER EXPERIENCE AND FORMAL METHODOLOGY IN SOFTWARE DEVELOPMENT

LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS

TQM and Reliability Engineering

Quality Control Introduction to Quality

Upgrade the Saudi Arabian Procurement System Delivery Method. Ahmed Alofi

Trend and Business. Business and Quality Management

JIT in the Jordanian Industrial Companies

BATTLE OF VALUES: A GAP BETWEEN ORGANIZATIONAL AND IDEAL TQM CULTURE IN LITHUANIA AND TURKEY

ABC Employer Guide. for Diversity. and Inclusion

Humanities and Social Sciences

Business Process Management Introduction. Marek Zborowski PhD.

ISO 9001 Auditing Practices Group. Aligning the QMS with the achievement of organizational and business success

CORPORATE QUALITY MANUAL

THE IMPACT OF ORGANIZATIONAL CULTURE ON JOB PERFORMANCE AMONG EMPLOYEES OF THE COLLEGE OF ADMINISTRATIVE SCIENCES AT NAJRAN UNIVERSITY

RANKING OF KEY QUALITY FACTORS IN THE INDIAN CONSTRUCTION INDUSTRY

THE EXTENT TO WHICH HUMAN RESOURCES MANAGERS IN THE KUWAITI INSURANCE SECTOR ARE RECOGNIZING THE MODERN ROLES OF HUMAN RESOURCES MANAGEMENT

Critical Determinants of Public Construction Tendering Costs

TPM IMPLEMENTATION CAN PROMOTE DEVELOPMENT OF TQM CULTURE: EXPERIENCE FROM A CASE STUDY IN A MALAYSIAN MANUFACTURING PLANT

Quality Management in Korean National Statistical Systems Focused on Quality Assessment

Transcription:

IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 1 Ver. II (Jan- Feb. 2015), PP 57-65 www.iosrjournals.org Evaluation of Total Quality Management Implementation as Engineering Practices in Jordanian Construction Projects Jumah M.Th. Al-Dulaimy 1, Faithy Alkhazraji 2, Rami H. ALHadeethi 3, Jamal O. Sameer 4 1Department of planning, Education Ministry, Al-anbar, Iraq 2Isra University,Amman, Jordan 3Al-hashimya University,Amman, Jordan 4Universiti Tenaga Nasional, Kuala Lumpur, Malaysia Abstract:The construction sector is one of the most important business fields in Jordan and this sector is suffering from many problems in Management and quality. Total quality management (TQM) process is considered as a modern system in the field of quality. The purpose of this paper is to evaluate TQM implementation as engineering practices in different construction projects phases. In order to achieve this objective, literature review has been carried out to identify the two main factors influencing the implementation of TQM factors in the construction process: (continuous improvement, customer satisfaction). And by examining the four ISO 9001-2008 requirements to achieve important TQM factors in construction process. In this study, the data was collected by a questionnaire survey, the survey analyzed by statistical software SPSS. More than 204 questionnaire forms were distributed, 177 was responded which was represented 86 % of the total spread questionnaire forms, the respondents were engineers only(civil, Mechanical, Electrical and Architectural). By analyses of results, the study showed that TQM implementation level in all construction projects phases was moderate in Jordanian construction process. Key words: Total quality management, ISO 9001-2008,Customer Satisfaction, Continues Improvement. I. Introduction: The main attention of total quality management (TQM) and its application in construction projects to establishment of high-quality facilities and Raise the performance level in construction Process.TQM appears to be a very important concept which is difficult to summarize in a short definition. TQM is a process lead by senior management to obtain involvement of all employees in the continuous improvement of the performance of all activities. Therefore, this studyevaluated the two main TQM factors in construction project (customer satisfaction and continuous improvement) by examining the apply of four ISO 9001-2008 requirement during different project phases. Because of instability in the Middle East, especially wars in Iraq, Syria, Lebanon, Palestine, has resulted in an increased immigration percentage in the recent years to Jordan. This big number of people has increased the demand to develop the country infrastructure, in addition to the necessary needs such as, houses, hospitals, hotels, schools and entertainment places. So it's important to adopt TQM concept which affecting positively on the entire construction industry and company reputations, with a result that caused a rapid rise in the quality scale to the highest level (Bani Ismail,2012). Despite the international adoption of the TQM concept, it has not been developed within the Arab area, as a result from the lack of basic knowledge of TQM and low level of organization readiness for change(haffar,2010). II. Literature Review: TQM is one of most important techniques to improve quality, which many organizations and companies are using to reach success. thewide implementation for TQMall through the world in different sectors andindustries. The positive results appeared in these sectorsandindustries because of TQM implementation (Bhat and Rajashekhar, 2009). The purpose or function of TQM is to provide a high quality product to the customers, in turn increase the productivity also customer satisfaction,furthermore decrease the cost With lower price anda higher quality DOI: 10.9790/1684-12125765 www.iosrjournals.org 57 Page

product, TQM is approach of managing different industries to improve the quality of product (Kumar, et al., 2011). And its show Establish strategic goals, mission and vision based on the concept of TQM and bind all parties together including subcontractors of these goals. The Organizations need to follow continuous improvement while maintaining a long-term Perspective. The improvement will have to be made both in the processes and the organizational system in order to make the TQM program successful(al-tayeb Mustafa,2008) (TQM) Total quality management is defined as both a management of quality philosophy and group of guiding principles that promoteculture in organizations and all members participation in organization aiming to achieve longtermsuccessprocess through continuous improvement and customer satisfaction of products, and the benefits for all society members (Juran et al., 1999; Rampersad, 2001;Besterfield et al., 2003) III. Definitions of Total Quality Management The Asian Institute of Technology (AIT), define TQM as a philosophy that strengthens and support the culture to foster continuous organizational improvement through integrated, systematic, consistent and reliable effort involving everything and everyone, focusing primarily on total satisfaction of internal and external customers, where employees work together in teams with process ownership, guided by a committed top management, which takes a practical participation (Nukulchai,2003). Also, according to the British Quality Association defines TQM as an all-agreement business management philosophy focusing on completely fulfilling customer requirements with a maximum of effectiveness and efficiency" (Wessel, 2004). According the previous definitions, define the TQM as a philosophy but the different point of view. British Standard(BS) described the TQM as the management philosophy aimed to achieve organization objectives. While, the (AIT), defined the TQM as the philosophy aiming to satisfy the customers. Out of above definitions, aneasy definition of TQM is a get-together of external and internal customer requirements, and the difference between quality and TQM is that the quality expression generally focuses on a temporary process. In construction project for example, in order to achieve a good strength for concrete according to the specifications, the concrete should be cured by water for(3-4)days, to reached for the required quality, so this is a temporary process, while TQM is a long term process and adopts a strategic dimension, to lead each financial, production, marketing and managerial plan in the path which support the strategic dimension. From the previous definitions, the researcher conclusion was that the definition of TQM is an old concept, but in last years it appears as an official job. Basics of TQM Principles in construction projects: The concept of TQM is modern in construction projects. It was only applied to industrial projects, the construction companies in the United States applied (TQM) after the noticed the great success of industrial companies by the application of the concept of TQM which is based on the achieving the basic principles: customer satisfaction, continuous improvement. These principles will be defined and clarified and how they will be applied in construction projects. (Gamld D. Oberlender 2000,) Customer Satisfaction: The basic function of the construction industry is to provide customers projects, facilities and services ready to use, and meet their requirements. Any construction company must be completed its work at a competitive cost to guarantee continuous work. TQM is a management philosophy based on identifying customer needs and requirements exactly and work to make suitable environment and working conditions suitable to achieve the needs and requirements at the lowest possible cost, by quality control at every stage of the construction process. While the construction project is an idea to close out and ready for use, this quality of the final product will be satisfy the customer needs. Continues Improvement: To Continues Improvement we have to: -Continuous improvement for current methods and procedures and to keep existed improvements during the product processing control. -Concentrate on achieving technological development in construction and engineering process during innovation and creation. The construction project consists of a group of activities so we want to develop, innovate and create in each activity to achieve quality and fulfill customer satisfaction. During each activity implementation we have to reduce gap between the customer requirements and current status, during the use of problem analysis process by using Deming cycle "Plan-do-check-act", which its DOI: 10.9790/1684-12125765 www.iosrjournals.org 58 Page

considered as a procedure for continuous improvement by concentrate on correction procedure and defect prevention. Deming cycle contain four process Occur every time and constantly repeated and apply it in each process as show in Figure(1),and Table (1) show Eight steps for each Deming cycle process. Figure (1)Eight steps for each Deming cycle process Table (1) shows Eight steps for each Deming cycle process. Plan Do Check Act -Identify the problem and improvement aim. -Analyze the current status -Determine the root causes and its affect -Develop plans for corrective works -Apply the plan and its implementation. -Document the implementation plan result to compare it with main plan aim. -Create the criteria for the necessary steps to avoid problem repeated -Reprocess and take in consecration rest of problems or suitable improvement in the next plan stage. ISO 9001-2008 ISO 9001:2008 it s the last version sets out the criteria for a quality management system and conceder only standard in the family that can be certified. It can be used by large or smallorganization, regardless of its field of activity. Moreover, the ISO 9001:2008 is implemented by over one million companies and organizations in over 170 countries (ISO technical committee.2008) There are four ISO 9001-2008 requirements to Achieve TQM important factors in construction projects. (The continuous improvement and customer satisfaction) as shown in Figure (2):(International standard ISO 9001, 2008). 1. Management responsibility. 2. Resource management. 3. Product realization. Each of The four ISO(9001-2008)requirements includes a number of elements 4. Measurement, analysis and improvement. DOI: 10.9790/1684-12125765 www.iosrjournals.org 59 Page

Figure (2) Questionnaire design Questions in a questionnaire were formulated based on the literature review as main sources to get the initial form of questionnaire; the Figure ( 3 ) shows the questionnaire development process. Figure (3) Questionnaire design Results of factor analysis: The result of the output obtained in this research could be presented as followed:the items in the survey were made on a five points likert scale where 5 implied strongly agree, and 1 Indicated the respondent strongly disagree with the statements. The item of the questionnaire was conducted by using SPSS package version 16.0 to detect the factor structure in the variable and Table ( 2 ) show the mean, Standard deviation and Skewnessvalues for all project phases: St. Dis. M.R R.M P.R M&A Overall Study M 3.33 3.13 3.48 3.03 3.24 Sd 0.64 0.72 0.55 0.81 0.55 Sk -0.02-0.04-0.20-0.09-0.11 Design M Sd 3.17 0.69 3.24 0.76 3.38 0.77 3.38 0.75 3.29 0.61 Sk -0.12 0.05-0.27-0.44-0.29 Contract document M Sd Sk 3.15 0.82-0.22 3.16 0.72 0.04 3.18 0.81-0.18 3.25 0.74-0.10 3.19 0.70-0.05 DOI: 10.9790/1684-12125765 www.iosrjournals.org 60 Page

St. Dis. M.R R.M P.R M&A Overall Contractor Selection M Sd Sk 2.86 0.79 0.20 3.17 0.74 0.21 3.27 0.70-0.25 3.27 0.69 0.18 3.14 0.55 0.30 Implementation M Sd 3.13 0.68 3.09 0.73 3.26 0.75 3.00 0.66 3.12 0.63 Sk -0.16-0.09-0.36 0.09-0.18 Table ( 2 ) Statically descriptive for different project phases Close out M Sd 3.21 0.83 3.14 0.75 3.19 0.84 3.15 1.01 3.17 0.75 Sk -0.21 0.39-0.07-0.18 0.09 Evaluation of TQM Implantation as engineering practice The stages were divided in the questionnaire to six phases. In addition to that, the classifications for mean values in the upcoming Tables will be based on the following criteria as suggested by researcher as shown in Table (3): Table (3) Evaluation level Category Weak Moderate High Mean < 3 3 4 <4 TQM factors were then analyzed according to six construction projects phases as in the following: - Study phase conclude from Figure(4) that all mean values are moderate in all ISO requirments (management responsibility and product realization) but in resources management there are two values under the mean (weak evaluation),at which There was a shortage in work invironmental analysis and resources procurement. In (Measurement and alanlyisis) there was no study review and check by any neutral part. Figure(4)Current state of TQM in study Phase In general the overall TQM implementation factors in study phase is moderate. 3.9.2 Design phase According to Figure(5), that all mean values are moderate in all ISO requirments (resources management, product realization and measurement and analysis ) but in Management Responsibility there are three values under the mean (weak evaluation) at which insufficient responsibility and Authorization,lack communucation and design change approval. DOI: 10.9790/1684-12125765 www.iosrjournals.org 61 Page

Figure(5) Current state of TQM in designphase. In general the overall TQM implementation factors in design phase is moderate. 3.9.3 Contract documentsphase According to Figure(6), that all mean values are moderate in all ISO requirements (management responsibility,resources management, product realization and measurement and analysis). Figure(6)Current state of TQM in contractdocumentsphase In general the overall TQM implementation factors in contract documants phase are moderate Contractor selection phase According to Figure(7) that all mean values are moderate in all ISO requirments (resources management, product realization and measurement and analysis) but in management responsibility there are three values under the mean (weak evaluation) at which the contractor was sellected according to financial categories rather than experience and insufficient responsibility and Authorization. DOI: 10.9790/1684-12125765 www.iosrjournals.org 62 Page

Figure(7)Current state of TQM in contractor selection phase In general the overall TQM implementation factors in contractor sellection phase is moderate. Implementation phase conclude from Figure(8),that overall mean value for management responsibility is moderate but four values are considered (weak) due to improper cash flow, no detailed project's budget, lack of communication among project parties and lack of commitment inproject duration.that overall mean value for resources management is moderate but there are five values considered (weak) mean value. Such as poor raw material quality,there is no technical staff,inappropriate labor wages,shortage in site mobilization and poor safety procedures.the overall mean value for product realization is moderate but there is one low value(weak)at which no control and analysis for construction test.the overall mean value for measurement and analysis has a moderate mean value but there are two values with low mean value (weak) at which there is a lack in check and test to diagnose the defects,and no preventive procedures. DOI: 10.9790/1684-12125765 www.iosrjournals.org 63 Page

Figure(8) Current state of TQM in implementation Phase In general the overall TQM implementation factors in implementation phase is moderate. Close out phase According to Figure (9) that all mean values are moderate in all ISO requirements (management responsibility, product realization and measurement and analysis) but resources management has one value under the mean (weak evaluation) at which the there is a lack in staff training. Figure(9) Current state of TQM in close outphase In general the overall TQM implementation factors in close out phase is moderate. IV. Conclusion: 1) TQM factors applied in the Jordanian construction projects are classified as a moderate level because some of (four ISO requirement) in the project phases are weak. 2) In study phase found that there a huge weakness in the analysis of work environment, there is no third or other neutral part are checking the Study, and the owner satisfaction is adopting as criterion of effective performance criteria in quality management system. 3) In design phase there is a big weakness because of authorizing some responsibilities and authorities from top Management to the designer to ensure work efficiency, also lack in coordination between the owner and designer will affect the project completion according to the requirements, but the designdocumentswere clear and suitable for requirements. 4) Contract documents phase was the best among the different phases, where the documents are approved before concluding the contract; also take advantage of previous contracts to develop the final form of the contract. 5) There is a large shortage of management responsibility in contractor selection phase, found that the contractor selection was not according to experience, efficiency and price, contractor select was according to the lowest total price only, but the feature of this phase is there are a third party to resolving disputes if there. 6) The implementation phase was the worst among the other phases where : a) There is huge weakness in the four ISO requirements to apply TQM factors application in this phase. b) Also found that no interest of using high quality raw materials. c) There is no enough coordinate to information exchange and Periodic meetings between the project parties (owner, designer and executer). d) The working staff wagesare not appropriate with the assigned to it works to ensure quality, also weakness in health and safety standards in the projects. e) Weak in monitoring and analyzing construction tests to measure the conformity with the specifications and lack in the preventive procedures to guarantee avoiding the no confirm occurring. DOI: 10.9790/1684-12125765 www.iosrjournals.org 64 Page

7) In close out phase the training sessions are not available for the working staff to improve their qualifications, there is a concern to make the contractor to repair the diagnosed defects before the facility occupied, impose discounts when found nonconforming product for the owner requirements. Refrence [1]. Bani Ismail, Loiy (2012), An evaluation of the implementation of Total Quality Management (TQM) within the construction sector in the United Kingdom and Jordan, Doctoral thesis, University of Huddersfield [2]. Haffar, Mohamed (2010),The Influence of Organizational Culture on Total QualityManagement Implementation in Syrian Public Manufacturing Organizations, BrunelUniversity. [3]. Bhat, K.S. and J. Rajashekhar, 2009. " An empirical study of barriers to TQM implementation in Indianindustries", The TQM Magazine, 21(3): 261-272. [4]. Das, A., V. Kumar and U. Kumar, 2011. "The role of leadership competencies for implementing TQM(Anempirical study in Thai manufacturing industry) ", International Journal of Quality & Reliability Management,28(2): 195-219. [5]. Al-Tayeb,Mustafa (2008), Critical Success Factors of TQM Implementation on Construction Projects in Gaza Strip. Master thesis, The Islamic University Gaza. [6]. Nukulchai, W. K. (2003), Towards Total Quality Management in Higher Education: The Experience of Asian Institute of Technology. Asian Institute of Technology. [7]. Wessel,G, and Burcher,P.(2004), Six Sigma for Small and Medium-Sized Enterprises. The TQM Magazine, volume 16 No.4, pp.264-272. [8]. Oberlender, Garold D. (2000),PROJECT MANAGEMENT FOR ENGINEERING AND CONSTRUCTION..Oklahoma State University. [9]. Juran, J. and Godfrey, A. (eds.) (1999). Juran s Quality Handbook, 5th edition. New York: McGraw-Hill. [10]. Rampersad, H. (2001). Total Quality Management: an Executive Guide to Continuous Improvement. New York: Springer. [11]. Besterfield, D., Besterfield-Michna, C., Nesterfield, G. and Besterfirld-Sccre, M. (2003). Total Quality Management, 3rd Edition. New Jersey: Prentice Hall. [12]. Internet Articles based on print sourceiso technical committee, (2008), (TC) ISO/TC 176, sub-committee, from web site: http://www.iso.org/iso/iso_9000 DOI: 10.9790/1684-12125765 www.iosrjournals.org 65 Page