System Effects and electricity generation costs in low-carbon electricity systems

Similar documents
The impacts of nuclear energy and renewables on network costs. Ron Cameron OECD Nuclear Energy Agency

Nuclear Energy: Combating Climate Change

Nuclear New Build: Institutional and regulatory conditions for gaining in efficiency into financing and project management

Integration des Europäischen Strommarktes: Herausforderungen und Lösungsperspektiven

Cost Entropy: The End of Cost-Reflective Prices and Tariffs in Electricity Markets

Levelling the Playing Field for Nuclear Make or Break

Nuclear Energy and Renewables: System Effects in Low carbon Electricity Systems

The Power of Transformation Wind, Sun and the Economics of Flexible Power Systems

Market Stabilisation Analysis: Enabling Investment in Established Low Carbon Electricity Generation

Roadmap for Solar PV. Michael Waldron Renewable Energy Division International Energy Agency

Low Carbon Energy Technology Roadmap and Nuclear New Build

Capacity reserves until 2025: declining, but sufficient

Future Design of Renewable Energy Markets

TECHNICAL AND ECONOMIC ANALYSIS OF THE EUROPEAN ELECTRICITY SYSTEM WITH 60% RES

Agenda Short and medium term impact of the German moratorium Longer term challanges: maintaining supply security during decarbonization

Integration of wind and solar in power systems. Cédric Philibert Renewable Energy Division International Energy Agency

Nuclear-renewable hybrid energy systems for non-electric applications

Methodology for calculating subsidies to renewables

Renewable Technologies in the Future NEM

Integrating variable renewables: Implications for energy resilience

Integration of variable renewable energy in power grid and industry Cédric Philibert, Renewable Energy Division, International Energy Agency

Contribution of Renewables to Energy Security Cédric PHILIBERT Renewable Energy Division

Europe s Coming Challenges in Meeting Decarbonisation Objectives

TECHNICAL AND ECONOMIC ANALYSIS OF THE EUROPEAN ELECTRICITY SYSTEM WITH 60% RES EDF R&D

Renewable energy: regulatory and market issues

Source: Shell Extended Policy Scenario and IEA historical data Source: Shell The Role of Electricity in a Lower CO 2 World In a world where lower emis

Figure ES.1: LCOE ranges for baseload technologies (at each discount rate) 3% 7% 10%

Advanced Power Plant Flexibility

The Costs of Decarbonisation:

Medium and long-term perspectives for PV. Dr. Paolo Frankl Division Head Renewable Energy Division International Energy Agency

Long-term Market Analysis Nordics and Europe Executive summary

Table of contents. 1 Introduction System impacts of VRE deployment Technical flexibility assessment of case study regions...

Projected Costs of Generating Electricity 1

European Power sector s perspective on the role of the EU ETS

The Future of Electricity: A Market with Costs of Zero? Marginal

Executive Summary... 2

Asgeir Tomasgard, Kjetil Midthun & Christian Skar

Profound changes underway in energy markets Signs of decoupling of energy-related CO 2 emissions and global economic growth Oil prices have fallen pre

The Optimal Approach to Firming Windpower

The Future of Electricity: A Market with Costs of Zero? Marginal

(How) can the European power market be decarbonized to 2050, without CCS? Lasse Torgersen CenSES årskonferanse Oslo 7/

Pacific Northwest Low Carbon Scenario Analysis

How can renewable energy help optimise energy systems?

Risk managing cost-effective decarbonisation of the power sector in Germany

Whole-system cost of variable renewables in future GB electricity system

Power system flexibility: Vertically integrated systems

ALL ISLAND GRID STUDY STUDY OVERVIEW. January 2008

Regulatory challenges in developed markets

Solving Climate: The Need for Zero Carbon On-Demand Power

Optimizing the Generation Capacity Expansion. Cost in the German Electricity Market

Commercialisation of Energy Storage in Europe. Nikolaos Lymperopoulos, Project Manager

The energy system is undergoing a radical transformation which goes far beyond renewables integration. Basing the analysis of system integration on

Modelling Transitions to Robust High-VRE Systems

Whole-system cost of variable renewables in future GB electricity system

National Council on Electricity Policy Annual Meeting & Workshop Denver, CO. May 8, Jeff Bladen Executive Director Market Development

COMPETITIVENESS OF NUCLEAR ENERGY AN INTERNATIONAL VIEWPOINT. Nuclear Power Plants for Poland, Warsaw 1-2 June 2006

Energy Technology Perspectives 2014 Harnessing Electricity s Potential

Making the Electricity System Work

Nuclear Power and Sustainable Development

Renewables after COP-21 A global perspective. Dr. Fatih Birol Executive Director International Energy Agency

V MW

System Integration of renewables Focus on electrification

The European Power System in 2030: Flexibility Challenges and Integration Benefits An analysis with a regional focus on the Pentalateral Energy Forum*

Lesson learned about the integration of large amount of volatile Renewable Energy Resources

[R]enewables 24/7 EXECUTIVE SUMMARY

Power Perspectives 2030

Auctions in power systems with high shares of renewables. Dr. Paolo Frankl, Head, Renewable Energy Division, IEA AURES, Brussels - 20 November 2017

Review The Social Costs of Electricity Generation Categorising Different Types of Costs and Evaluating Their Respective Relevance

CCS and Its Economics

Energy Transition and Renewable Energy in Korea

Negative electricity market prices in Central Western Europe

John Gale General Manager IEA Greenhouse Gas R&D Programme

End of the load? Challenging power technology assumptions

Energy Technology Perspectives 2017 Catalysing Energy Technology Transformations

Are Sustainable Urban Energy Systems Essential for a New Deal on Energy Access for Africa? By Dave Turk, Head of IEA Energy Environment Division

Capacity market design for demand-side participation: EMR proposals

Electricity Generation

Large-Scale Integration of Variable Renewable Energy: Key Issues and Emerging Trends. Jessica Katz 29 March 2018

Realizing the Flexibility Potential of Industrial Electricity Demand: Overview of the H2020 Project IndustRE

Role of Nuclear Cogeneration in a Low Carbon Energy Future?

A SYSTEMIC APPROACH TO EVALUATE PV ECONOMICS AND PV POLICY STRATEGIES

POWER CHOICES Pathways to carbon-neutral electricity in Europe by 2050 Nicola Rega Advisor Environment and Sustainable Development Policy

Decarbonization pathways and the new role of DSOs

FAST Tool and Exercise

IEA WORK ON FUTURE ELECTRICITY SYSTEMS

RENEWABLE POWER GENERATION COSTS IN 2014

POWER-SYSTEM-WIDE ANALYSIS OF THE BENEFITS OF RESERVE PROVISION FROM SOLAR PHOTOVOLTAICS IN SOUTH AFRICA

Smart energy systems and the role of Power-to-Gas

Insights from Germany s Energiewende

Norway s role as a flexibility provider in a renewable Europe

IS BALANCING FROM HYDROPOWER A FEASIBLE IDEA

Medium Term Renewable Energy Market Report Michael Waldron Senior Energy Market Analyst Renewable Energy Division International Energy Agency

Engaging consumers in a decarbonized world with the right pricing

MODELLING THE MARKET IMPACT OF BATTERY STORAGE IN ASIA-PACIFIC ELECTRICITY MARKETS

First Principles, Market Failures and Endogenous Obsolescence

GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February

Transmission Infrastructure Investment Requirements in the Future European Low-Carbon Electricity System

DSR follow on final presentation

PÖYRY POINT OF VIEW - NOVEMBER Solar in the Middle East - How to realise the benefits

Integrating High Levels of Variable Renewable Energy Sources

Transcription:

System Effects and electricity generation costs in low-carbon electricity systems Marco Cometto, CFA Nuclear Energy Analyst, OECD/NEA Division of Nuclear Development

Outline of the presentation A. COP 21 and decarbonisation scenarios B. Main findings from the NEA study on System Effects C. Coexistence of nuclear and variable renewables: technical challenges D. Coexistence of nuclear and variable renewables: economic challenges E. Take away messages

Energy sector post COP 21 Indicative global energy sector emissions for different decarbonisation pathways Source: IEA, WEO 2016 NDCs are not sufficient to achieve climate objectives, leading to a 2.7 C increase. Challenges to achieve 2 C are immense, road to 1.5 C goes to uncharted territories. Colossal investments Seminar on Electricity for energy Systems within sector: the energy 40 trillion transition, USD Brussels, + 35 19 in November energy 2016 efficiency (2 C).

Power sector almost completely decarbonised in the IEA 2DS Global electricity production and technology shares in the IEA 2DS 68% fossil fuels 22% renewables 11% nuclear Source: IEA, ETP 2016 17% fossil fuels 67% renewables 16% nuclear 533 gco 2 /kwh 40 gco 2 /kwh A complete reconfiguration of the electricity generation system is needed by 2050. Trends: rise of nuclear, a complete phase-out of coal and oil, a decrease of gas, large development of CCS and a massive increase of renewable energies. Coexistence of 40% of VRE, 40% of low-c dispatchable capacity, 20% of hydro. 4

IEA 2DS: role of nuclear Source: IEA, ETP 2016 Current nuclear capacity of 390 GW to more than double by 2050 to reach over 900 GW, share of nuclear electricity would increase from 11% to 16%. China sees largest increase in installed capacity and becomes largest nuclear power producer. Formidable challenge: multiply current capacity by 2.3 in 35 years and increase investments in nuclear up to USD 110 billion/year over the period 2016-2050 (21 USD billion in 2015). o IEA WEO sees a nuclear capacity for 2040 of 600 GW (NewPolicies Scenario) and 820 GW (450 ppm scenario). Seminar IAEA on Electricity says 385 Systems or 632 within GW the by energy 2030 transition, (low or high Brussels, growth). 19 November 2016 5

Outline of the presentation A. COP 21 and decarbonisation scenarios B. Main findings from the NEA study on System Effects C. Coexistence of nuclear and variable renewables: technical challenges D. Coexistence of nuclear and variable renewables: economic challenges E. Take away messages

Background Share of intermittent sources (solar and wind) in OECD countries generation Iberia Ireland Italy & UK EU USA Japan Source: IEA Electricity monthly reports 7

OECD NEA System Effects Study: An overview 1. Interaction between variable renewables, nuclear power and the electricity system 2. Quantitative estimation of system effects of different generating technologies o Costs imposed on the electricity system above plantlevel costs. o Total system-costs in the long-run. o Impact of intermittent renewables at low-marginal cost on nuclear energy and other generation sources. 3. Institutional frameworks, regulation and policy conclusions to enhance the sustainability, flexibility and security of supply of power generation and enable coexistence of renewables and nuclear power in decarbonising electricity systems. It was the first large quantitative study on SE Uncertainties in the results. 8

Analysis Tech and Eco Introduction Recent fast deployment of subsidised Variable Renewable Energy (VRE) had a significant impact on the whole electricity systems in many OECD countries. o Increasing needs for T&D infrastructure, challenges for balancing. o Significant impacts on the mode of operation and flexibility requirements of conventional power plants in both the short- and long-run. o Large effects on the electricity markets (lower prices, higher volatility) and on the economics of existing power plants. o Interconnected power systems yields effects that cannot be explained by considering its components in isolation. o Need to look at the electricity system as a whole and not at each component. o Traditional metrics such as the LCOE are not sufficient anymore to adequately characterise and compare different generation sources. Increasing attention has been given to the definition, analysis and quantification of system effects and costs in the scientific literature and in the policymaking areas. 9

Characteristics and Challenges of VRE Source: courtesy of Lion Hirth (Neon) o Grid-level system costs are very difficult to model and estimate. Also there is not an all-inclusive model. o System costs are country-specific, strongly inter-related and depend on penetration level. Different cost categories influence each others. o System effects can be understood and quantified only by comparing two systems. 10

Demand and residual load [GW] Impact on the Residual Demand Load Quantitative analyses performed by IER Stuttgard based on German electricity system 100 50% Renewables scenario (35% of VRE) 80% Renewables scenario (62% of VRE) 80 60 40 20 0-20 -40-60 -80 Demand load Residual load 0 1000 2000 3000 4000 5000 6000 7000 8000 Hour [h] Significant number of hours in which Renewables fully meet the demand. Residual demand load is determined more by the production of VRE than by demand. Residual demand load loses its characteristics seasonal and daily patterns. More difficult to plan a periodic load-following schedule. Loss of predictable peak/off-peak pattern (ex: impact of PV on hydro-reservoir economics). Need for more flexibility in the system (generation, electricity storage, 11

Short-term Long-term Assessing System Effects: The Short-Run and the Long-Run Crucial importance of the time horizon, when assessing economical cost/benefits and impacts on existing generators from introducing new capacity. Two scenarios describe the time effects of the introduction of new generation. o The introduction of new capacity occurs instantaneously and has not been anticipated by market players. o In the short-term physical assets of the power system cannot be changed. Investment occurred are sunk. o New capacity is simply added into a system already capable to satisfy a stable demand with a targeted level of reliability. No back-up costs for new VRE capacity. o The analysis is situated in the future where all market players had the possibility to adapt to new market conditions. o In the long-run, the country electricity system is considered as a green field, and the whole generation stock can be replaced and re-optimised. o VRE due to its low capacity credit requires dedicated back-up. Issue for investors and researchers: when does short-run become long-run? Impacts of VRE deployment depends on the degree of system adaptation and thus the Seminar speed on of Electricity their deployment Systems within the as energy well transition, as on evolution Brussels, 19 of November electricity 2016 demand. 12

Short-run impacts In the short-run, renewables with zero marginal costs replace technologies with higher marginal costs, including nuclear as well as gas and coal plants. This means: 100 100 90 90 80 80 70 70 60 60 Gas (OCGT) Gas (CCGT) Gas (OCGT): Lost load Gas (CCGT): Lost load Coal Coal: Lost load Reductions in electricity produced by dispatchable power plants (lower load factors, compression effect). Reduction in the average electricity price on wholesale power markets (merit order effect). 50 40 40 30 20 20 10 10 0 0 0 1000 2000 3000 4000 5000 6000 7000 8000 Utilisation time (hours/year) Load losses 30% Penetration level Wind Solar Gas Turbine (OCGT) -54% -40% -87% -51% Gas Turbine (CCGT) -34% -26% -71% -43% Coal -27% -28% -62% -44% Nuclear -4% -5% -20% -23% Gas Turbine (OCGT) -54% -40% -87% -51% Gas Turbine (CCGT) -42% -31% -79% -46% Coal -35% -30% -69% -46% -24% -23% -55% -39% -14% -13% -33% -23% Nuclear Electricity price variation Residual load 50 30 Profitability losses 10% Penetration level Wind Solar Nuclear: Lost load Yearly Load Power (GW) Capacity (GW) Nuclear Together this means declining profitability especially for OCGT and CCGT (nuclear is less affected). No sufficient economical incentives to built new power plants. Security of supply risks as fossil plants close. 13

Capacity (GW) Capacity (GW) Capacity (GW) Capacity (GW) 100 Long-run impacts on the 90 optimal generation mix Renewables Capacity Credit 100 Renewables Gas (OCGT) 80 Capacity Credit Gas 90 (CCGT) 100 Gas (OCGT) Coal Renewables 70 80 Gas (CCGT) Nuclear Capacity Credit 90 Coal 100 70 Gas 60 (OCGT) Nuclear Gas (CCGT) 100 80 90 70 90 60 50 Coal 80 Nuclear 80 40 50 60 70 70 30 40 60 5060 50 30 20 4050 40 20 10 40 30 Yearly load Residual load: wind at 30% penetration 30 0 30 10 Dispatchable 20 Dispatchable Renewables 20 20 0 Without VaRen With VaRen 10 10 Dispatchable Dispatchable 10 Renewables Without VaRen With 0 0 VaRen 0 Dispatchable Dispatchable Renewables 0 Dispatchable 1000 2000 Dispatchable 3000 Renewables 4000 5000 6000 7000 8000 Utilisation time (hours/year) Without VaRen With VaRen Without VaRen With VaRen New investment in the presence of renewable production will change generation structure. Renewables will displace base-load on more than a one-to-one basis, especially at high penetration levels: base-load is replaced by wind and gas/coal (more carbon intensive). Cost for residual dispatchable load rises as technologies more expensive per MWh are used. No change in electricity prices for introducing VaRen at low penetration levels. These effects (and costs) increase with the penetration level. 14

Power (GW) Quantification of profile costs We compare two situations: the residual load duration curve for a 30% penetration of fluctuating wind (blue curve) and 30% penetration of a dispatchable technology (red curve). 100 90 80 70 Wind surplus Wind shortage Load duration curve Residual load curve - wind Residual load curve - dispatchable 60 50 40 30 20 81.8 USD/MWh Δ = +3.7 USD/MWh Residual 10 85.5 USD/MWh Δ = +8.7 USD/MWh Wind 0 0 1 000 2 000 3 000 4 000 5 000 6 000 7 000 8 000 Utilisation time (hours/year) 15

Electricity value (% of a flat band) Auto-correlation and declining market values of VRE The auto-correlation of VRE production reduces the its effective contribution to the system and thus its market value at increasing penetration level. Self-sustaining, market-based finance of VRE even bigger challenge than for nuclear. 100% 90% 80% 70% Dispatchable Wind The marginal value should be taken into account in investment decision making! 60% 50% Electricity value - dispatchable 40% Electricity value - wind Solar Marginal electricity value - wind 30% Electricity value - solar Marginal electricity value - solar 20% 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% Penetration level (%) Will VRE always need to be subsidised? Is their LCOE declining faster than their value? 16

A study from EdF on VRE integration Very detailed study at an European scale performed by the French utility EdF. Scenario with high VRE penetration: 60% RES and 40% VRE (700 GW) and 85 GW of nuclear. Looking at technical and economic feasibility of large deployment of Wind & Solar. Key results o Geographical diversity helps, but there is still significant variability at EU level. o Operational requirements on NPP are not different from those currently achieved in France. o Despite large VRE capacity, the system needs back-up capacity for security of supply. The conventional mix requires less conventional base-load units and more peaking. o Also VRE will have to contribute to balancing (downward flexibility), ancillary services and provide new services such as fast frequency response (synthetic inertia). o The system need increased operating margins to handle exposure to climate conditions. o The average carbon emission is 125 gr/kwh (73 gr/kwh if gas replaces coal). Full decarbonisation can only be achieved with a significant share of carbon free base-load. o Above a certain share of VRE, the marginal efficiency on CO 2 reduction decreases, and the marginal cost of these reductions increases. o Integrating large share of VRE requires a coordinated development of RES and network. o The pace of RES deployment should be optimised to limit total system costs and curtailment. 17

The NEA is undertaking a new study on the interaction between VRE, nuclear and the whole electricity system: Dealing With System Costs In Decarbonising Electricity Systems: Policy Options. o Review and synthesise literature that has been published since 2012 o o Calculate on the basis of rigorous cost optimisation model the total system costs for electricity systems with a common carbon constraint but different shares of variable renewables, nuclear and other generating technologies; Discuss the policy instruments available to internalise system costs. Estimate the system costs of electricity systems with identical demand and carbon emission target in scenarios with different shares of VRE and nuclear. o o o o A new NEA study: Dealing with System Costs (mid 2017) A CO 2 emissions target is fixed at 50 gr/kwh. Provide a realistic representation of a large, well interconnected power system, with abundant hydro resources and flexibility options (DSM, storage). Analysis performed with state-of the art modelling tools by team from MIT. Additional analysis to look at the impact of a system with (i) less interconnections, (ii) lower flexible hydro resources and (iii) more flexible nuclear capacity. Final publication is expected for mid-2017.

Outline of the presentation A. COP 21 and decarbonisation scenarios B. Main findings from the NEA study on System Effects C. Coexistence of nuclear and variable renewables: technical challenges D. Coexistence of nuclear and variable renewables: economic challenges E. Take away messages

80 Flexibility of nuclear 70 power plants: 60 an example from France 40 In some countries (France, Germany, Belgium) significant flexibility is required from NPPs: o Primary and secondary frequency control. 20 10 o Daily and weekly load-following. 50 30 Power history of a French PWR reactor 0 11/07/2008 30/08/2008 19/10/2008 08/12/2008 27/01/2009 18/03/2009 07/05/2009 26/06/2009 15/08/2009 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 0 11/07/2008 30/08/2008 19/10/2008 08/12/2008 27/01/2009 18/03/2009 07/05/2009 26/06/2009 15/08/2009 100 90 80 70 60 50 40 Whole cycle Courtesy of Électricité de France (EDF) For 2/3 of the cycle the load fluctuates between 85% and 100%, while in the last third of the cycle the plant is operated in a base load mode. Daily load following, with power reductions up to 35%-40% of nominal power. Stretch can be observed in the last few days of operation. 0 18/12/2008 19/12/2008 20/12/2008 21/12/2008 22/12/2008 23/12/2008 24/12/2008 25/12/2008 26/12/2008 27/12/200 10-day period around Christmas 20

Contribution to reduce system effects: flexibility of nuclear power plants Flexibility of nuclear power plants has constantly improved over time. o Several Gen II plants were already built with sufficient manoeuvring capabilities or have been already upgraded o Strong flexibility is required by utilities and already implemented in the design of new Gen III NPPs Start-up Time Maximal change in 30 sec Maximum ramp rate (%/min) Open cycle gas turbine (OGT) 10-20 min 20-30 % 20 %/min Combined cycle gas turbine (CCGT) 30-60 min 10-20 % 5-10 %/min Coal plant 1-10 hours 5-10 % 1-5 %/min Nuclear power plant 2 hours - 2 days up to 5% 1-5 %/min Economic impact of significant flexibility from NPPs o No proven impacts on fuel failures and major components. o Studies have shown correlation between load following and increased maintenance needs, but were unable to quantify the related costs. o EdF has observed a reduction in availability factor due to extended maintenance (1.2-1.8%). o The main economic consequence of load following is the reduction in load factor. 21

Outline of the presentation A. COP 21 and decarbonisation scenarios B. Main findings from the NEA study on System Effects C. Coexistence of nuclear and variable renewables: technical challenges D. Coexistence of nuclear and variable renewables: economic challenges E. Take away messages

Generation cost structure for nuclear: at 7% Discount Rate Nuclear energy is capital intensive o 70% capital costs (up-front) o 20% of which are interests. o 85% of Fixed Costs 15% of Variable Costs o Decommissioning costs are negligible (discounting). Impact of discount rate o Capital costs represent: o 50% at 3% discount rate. o 80% at 10% discount rate. o o o The cost structure of all low carbon technologies is very similar (high CAPEX, low OPEX), and they have similar economic characteristics. Economics strongly depends on total investment costs (overnight, lead time, discount rate). All capital intensive technologies are highly sensitive to discount rate (project risk). Variable costs of low-c electricity production are low, stable and well predictable over time.

Financing new generation capacity under current market conditions o Electricity wholesale prices are very low in Europe, well below long-term average generation cost for all technologies. o Several power plants in Europe are unable to recup variable generation costs: Peaking and mid-load plants (OCGT and CCGT). More surprisingly also capital intensive plants. o The financial situation of several utilities has strongly deteriorated, jeopardising their ability to take on new investments. o Utilities are not perceived anymore as part of a low-risk business (low β, favourable ratings, low cost of capital). o Under these conditions, no Power Plant can be financed on a pure market basis. o Still need to finance a large electricity infrastructure: Generation infrastructure is ageing Need to go toward a low-c generation mix Transmission and Distribution 24

Current electricity markets and challenges ahead Electricity markets in many OECD countries are based on marginal cost pricing : o Successfully enhanced competition and effectiveness in the electricity sector. o Effective in providing appropriate signals for short-term dispatch. o Does not provide appropriate long-term investment signal ( missing money and SoS) and implicitly favour carbon intensive fossil fuel technologies. Current market designs are not well suited for investments in capital intensive technologies and won t deliver a low-c mix. Forcing low carbon technologies on a pure market basis would require very high CO 2 prices and entail some risk for SoS. o A low-carbon mix with large quantity of VRE, will inevitably lead to high variability of electricity prices, with a high number of hours at VOLL and 1000s of hours at zero price, with a very skewed distribution of revenues for all generation capacities. o Electricity price will be strongly dependent on annual weather conditions (high/low wind production, high/low hydro production), with large fluctuations for VRE and base-load. o Electricity market risk (and political risk) will have an impact on the cost of capital. o Decreasing value of VRE generation and increased market risk will make full market finance for solar and wind very challenging. 25

New Market design for low-c technologies 1. High levels of low-carbon investments will need new market arrangements and a robust CO 2 price. 2. Low-Carbon technologies need a long-term price signal: price stability can be provided through long-term power purchase agreements (PPAs), feed-in premiums (FIP) or feed-in-tariffs (FITs) / contracts-for-difference (CfDs). o This does not mean the end of competition. However, it means proceeding from competing on marginal costs to competing on average costs through competitive auctions. o Regulated markets have their own challenges but provide the price and revenue stability that low carbon technologies require. 3. Flexibility provision through demand response, storage and improved interconnections are part of the new market design. 4. The system costs of all technologies must be allocated fairly and transparently: o Back-up power and increased profile costs o Balancing needs o Connection and reinforcement of transport and distribution costs 26

Outline of the presentation A. COP 21 and decarbonisation scenarios B. Main findings from the NEA study on System Effects C. Coexistence of nuclear and variable renewables: technical challenges D. Coexistence of nuclear and variable renewables: economic challenges E. Take away messages

Key points and takeaway messages o Decarbonising the energy sector is an immense challenge for all OECD countries. o Achievement of climate targets inevitably requires the full-decarbonisation of electricity sector by 2040/2050. Electrification of transport. Complete reconfiguration of the generation mix, with the coexistence of all available low-c sources. Massive investments are needed on generation, transmission and distribution. o New market design are needed to achieve this transition at the lowest cost. o Increasing attention is given on the topic of system effects Work at the IEA on the integration of VRE; NEA is undertaking a follow-up of the System Cost study. An in-depth analysis of the large VRE integration at an EU scale from the French utility EdF. o Key points on the integration of VRE Different effects in the short-run and the long-run System costs are country-specific, strongly interrelated and depend on penetration level The value of VRE generation decreases drastically with penetration level. System costs are large and need to be appropriately accounted for and internalised. 28

Thank you For your attention The NEA reports are available on-line System Cost Nuclear new built Load Following http://www.oecd-nea.org/ndd/pubs/2012/7056-system-effects.pdf http://www.oecd-nea.org/ndd/pubs/2015/7195-nn-build-2015.pdf http://www.oecd-nea.org/ndd/reports/2011/load-following-npp.pdf The EdF study http://www.energypost.eu/wp-content/uploads/2015/06/edf-study-for-download-on-ep.pdf Contacts: Marco Cometto and Jan Horst Keppler Marco.Cometto@oecd.org and Jan-Horst.Keppler@oecd.org 29

Economics of Nuclear Energy (1) LCOE is the constant unit price of output ($/MWh) that would equalise the sum of discounted costs over the lifetime of a project with the sum of discounted revenues. LCOE (USD/MWh) for dispatchable baseload technologies Source: NEA/IEA 2015 Note: Assumes region specific fuel prices for US, Europe, Asia; 85% load factor; CO2 price of 30 USD/tonne o Nuclear is the lowest cost options for all countries at 3% discount rate. o Median cost of nuclear is slightly lower than coal or gas at 7% discount rate, but is higher at Seminar 10% on Electricity Systems within the energy transition, Brussels, 19 November 2016

Economics of Nuclear Energy (2) LCOE (USD/MWh) for wind and solar technologies Source: NEA/IEA 2015 o Cost of Renewables (in particular solar PV) has declined substantially since the last EGC and they are no longer cost outliers. Further cost reductions are expected. o Plant-level costs are becoming of lesser importance. What is needed is the ability to ensure secure and cost-efficient supply at the system level.

Methodology and Challenges in defining and quantifying system costs Grid-level system costs are difficult to quantify (externality) and are a new area of study. o o o o o There is not yet a clear definition, nor a common methodology used and accepted internationally. Knowledge and understanding of the phenomena is still in progress. Each study makes its own assumptions, specific objectives and has a different level of detail. Modelling and quantitative estimation is challenging and there is no all-inclusive model. Strong difference between short-term and long-term effects and difficulties in seeing it recognised and acknowledged in the studies. Grid-level costs are country-specific, strongly inter-related and depend on penetration level. Different cost categories influence each others: o Larger balancing areas: o More flexible mix, storage : balancing costs, cheaper optimal generation mix; balancing costs, generally is more expensive. What we observe in electricity markets results from many factors, not only system effects. System effects also create demand for new markets and services (capacity, flexibility ). However, a consensus is emerging for considering as System Costs: o Grid cost (including distribution and transmission). o Balancing costs. o Utilisation costs (profile costs or back-up costs) including adequacy. o Still connection costs are substantial and should be considered. 32

Another approach: the market value of variable renewables Courtesy of Lion Hirth Different methodologies robust findings: value drops Wind value factor drops from 1.1 at zero market share to about 0.5 at 30% (meritorder effect) Solar value factor drops even quicker to 0.5 at only 15% market share Existing capital stock interacts with VRE: systems with much base load capacity feature steeper drop 33

System Value of VRE Production [%] System Value of VRE generation: Consistent with findings from SC1 Electricity value (% of a flat band) 100% Value of the average MWh generated by VRE Value of the 'marginal'* MWh generated by VRE 80% No interconnections 60% 40% 100% 90% 20% 80% 70% 0% 0% 10% 20% 30% 40% 50% 60% 70% 80% VRE Net Penetration level [%] 60% 50% 40% Electricity value - dispatchable Electricity value - wind Marginal electricity value - wind 30% Electricity value - solar Marginal electricity value - solar 20% 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% Penetration level (%) 34

Total cost [USD/MWh] Estimating System Effects System effects can be understood and quantified only by comparing two different systems. Grid-level system costs are difficult to quantify (externality) and are a new area of study. o o o There is not yet a common methodology as understanding of the phenomena is still in progress. Modelling and quantitative estimation is challenging and there is no all-inclusive model. Difference between short-term and long-term effects, often not acknowledged in the studies. What we observe in electricity markets results from many factors, not only system effects. Grid-level costs depend strongly on country, context and penetration level Grid-level costs for variable renewables at least one level of magnitude higher than for dispatchable technologies o Grid-level costs are in the range of 15-50 USD/MWh for renewables (wind-on shore lowest, solar highest) o Average grid-level costs in Europe about 50% of plant-level costs of base-load technology (33% in USA) o Nuclear grid-level costs 1-3 USD/MWh o Coal and gas 0.5-1.5 USD/MWh. 400 300 200 100 0 Grid-level system costs Plant-level costs 10% 30% 10% 30% 10% 30% 10% 30% 10% 30% 10% 30% Nuclear Coal Gas On-shore wind Off-shore wind Solar 35

Risk is function of technology and time Nuclear Large uncertainty in the construction phase Once a NPP is operating, rather stable and predictable production costs Risk premium of different power plants once operating Power plant with high cost of operation Power plant with low cost of operation During operation, the revenues risk of a NPP is lower than that of a power plant with higher operational costs (CCGT, coal), and of a Variable Renewable Plant (solar, wind). Pure financial product: electricity swap Seminar on Electricity Systems within the energy Source: transition, John Parsons Brussels, and Fernando 19 November de Sisternes 2016, MIT 36