STUDY OF SHAPE OF INTERMEDIATE SILL ON THE DESIGN OF STILLING BASIN MODEL

Similar documents
Design of Stilling Basin Model with Impact Wall and end Sill

EXPERIMENTAL STUDY OF EFFECT OF END SILL ON STILLING BASIN PERFORMANCE

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

International Journal of Civil Engineering and Technology (IJCIET), ISSN (Print), INTERNATIONAL JOURNAL OF CIVIL ENGINEERING

International Journal of Civil Engineering and Technology (IJCIET), ISSN (Print), INTERNATIONAL JOURNAL OF CIVIL ENGINEERING

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

DETERMINING THE ADEQUATE CREST HEIGHT OF SUPPRESSED RECTANGULAR BROAD CRESTED WEIRS UNDER SUB- CRITICAL FLOW CONDITIONS

IMPACT AND PUNCTURING OF JARI TUNNEL AND ENLARGEMENT OF EXISTING TAPPINGS FOR ADDITIONAL WATER SUPPLY AND POWER GENERATION

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26

Objective Questions:-

Flow Measuring Structures

UNIT I: UNIFORM FLOW PART B

Hydraulic Jumps. CIVE 401: Fall Team 10: Yalin Mao, Natalie Pace, Kyle Nickless. November 19, 2014

Pawana Dam Energy Dissipation A Case Study

Stilling basin design for inlet sluice with vertical drop structure: Scale model results vs. literature formulae

Development of transition mat scour protection design methodology and comparison to the state-of-the-practice

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER

Advances in Environmental Biology

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS

Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1

water ISSN

THE CHANGES OF FLOW PROFILE DUE TO THE CONSTRUCTION OF CYLINDRICAL STRUCTURE AS A HYDRAULIC CONTROL STRUCTURE IN OPEN CHANNEL

North Domingo Baca Extension at Barstow

Analysis of Side Sluice in Trapezoidal Channel

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

INVESTIGATION OF FLOW CHARACTERISTICS DOWNSTREAM RADIAL GATES OF NAGA HAMMADI BARRAGES PHYSICAL MODEL

Energy Dissipation within In-Ground Stilling Basin

Effective Analysis by Arrangement of Multi-Baffle at Weir Downstream

Design Modification of Sedimentation Tank Ashutosh Kumar Mall 1, Dr. ShriRam 2

Energy Dissipation over Stepped Gabion Weir

DETERMINATION OF DISCHARGE COEFFICIENT AND HEAD-DISCHARGE RELATIONSHIPS OF DIFFERENT HYDRAULIC STRUCTURES

Chapter 10. Conduit Outlet Structures Introduction General Layout Information

Hydraulics of Jinnah Barrage; Existing Structure and Rehabilitation Alternatives

Basic Design of Replogle Flumes

of the Crump weir Modelling of composite type variation

7.0 ENERGY DISSIPATION DESIGN

C-3-1. Inlet Flumeat Gate. BoxCulvert (Open Flow) MainCanal(C 1) km Outlet Flume. BoxCulvert (OpenFlow) WL m. WL.40.

3D JET FLOW BEHAVIOUR AROUND A PILE IN A SCOUR HOLE

Anti-vortex structures at hydropower dams


Open Channel Flow. Ch 10 Young, Handouts

Outlet Flow Velocity in Circular Culvert

15.4 Outlets and Modules

Factors Affecting Air Entrainment of Hydraulic Jumps within Closed Conduits

INFORMATION ON CAPACITY OF THE INSTITUTE FOR WATER AND ENVIRONMENTAL ENGINEERING (IWEESU)

UNIVERSITY OF BOLTON WESTERN INTERNATIONAL COLLEGE FZE BENG (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016

Lateral Outflow from Supercritical Channels

Drop Height For Channel Erosion Control

Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge

Effect of Wedge Shape Deflector on Dissipating Energy in Triangular Flip Buckets

Contents Page. Foreword... xi. 9.8 Pump intake design Introduction Purpose Scope...1

Influence of Supply-Channel Velocity on Farm Delivery Meter Gate Flow Measurement

Water Control Structures Selected Design Guidelines Alberta Environment Page 13-1

CVE 372 HYDROMECHANICS OPEN CHANNEL FLOW I

EVALUATION OF THREE ENERGY DISSIPATORS FOR STORM DRAIN OUTLETS

A Hybrid Approach to Improve the Design of Stilling Basin

Improving Concrete Containment Structures Associated With Fixed-Cone Valves

A techno-economical view on energy losses at hydropower dams (case study of Karun III Dam and Hydropower Plant)

Irrigation Structures 2. Dr. M. R. Kabir

South Diversion Channel Project

Impacts of Tailwater on the Design of Several Stilling Basins in the USA

iv) Alberta fish weirs

HYDRAULIC DEMONSTRATION CHANNEL

Lab #3 Conservation Equations and the Hydraulic Jump CEE 331 Fall 2003

Physical models application of flow analysis in regulated reservoir dams

Oxygen Transfer and Energy Dissipation by Nappe and Skimming Flow over Stepped Weir Structure

Water Conveyance System

Lab #3 Conservation Equations and the Hydraulic Jump CEE 331 Fall 2004

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Effect of the Entrance Zone on the Trapping Efficiency of Desilting Tanks in Run-of-River Hydropower Plants

Lab 3: Conservation Equations and the Hydraulic Jump

Application of pressure fluctuations on Stilling Basin

NUMERICAL ANALYSIS AND INVESTIGATION OF PIPING IN AN EARTH DAM FOUNDATION BY SOFTWARE SEEP / W (CASE STUDY OF KERMANSHAH EZGELEH EARTH DAM)

Chapter 9 Hydraulic Structures

Experimental and Numerical Study of the Effect of Flow Sepration on Dissipating Energy in compound Bucket

LOCAL SCOUR AROUND SPUR DIKES

OPEN CHANNEL FLOW CHARACTERISTICS USING GABION WEIR

Pressure Fluctuations On The Slabs Of Stilling Basins Under Hydraulic Jump

Piano Key Weir Research: State-of-the-art and Future Challenges

Irrigation System. BWCDD Zanjero Training 2/13/2008

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

Engineering Standard Minimum Checklist

Sediment Basin. Fe= (Depends on soil type)

ENVIRONMENTAL ENGINEERING-I

APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945

SEISMIC RESPONSE OF A MID RISE RCC BUILDING WITH SOFT STOREY AT GROUND FLOOR

Chapter 4 Bridge Program Drawings

CE 6403 APPLIED HYDRAULIC ENGINEERING (REG -2013)

Heat Exchanger Design Modification for Performance Optimization Using CFD Tools

Effect of RC Shear Wall on Seismic Performance of Building Resting on Sloping Ground

DIVIDE CUT DRAINAGE STRUCTURES TENNESSEE-TOMBIGBEE WATERWAY MISSISSIPPI AND ALABAMA

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology

Measuring flow in open channels (weirs)

Air pocket removal from downward sloping pipes

A COMPARATIVE STUDY OF HEAT EXCHANGER EFFECTIVENESS FOR DOUBLE HELICAL AND STRAIGHT CIRCULAR GEOMETRY

RBC flume. All it takes for environmental research. Contents. 1. Introduction. 2. The flumes of Eijkelkamp Agrisearch Equipment

EFFECT OF NANO-CEMENT IN REDUCING THE VALUE OF ROUGHNESS COEFFICIENT

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal.

Design and Development of Fish Passage Facilities for Shortnose Sturgeon at a Northeast Hydropower Project

MILL CREEK FISH PASSAGE CONCEPTUAL DESIGNS FINAL REPORT

Transcription:

STUDY OF SHAPE OF INTERMEDIATE SILL ON THE DESIGN OF STILLING BASIN MODEL H. L. Tiwari 1, Avinash Panwar 2, Bharat Gehlot 3, Jalam Singh 4 1 Department of Civil Engineering, Maulana Azad National Institute of Technology, Bhopal, Madhya Pradesh, India 2 Department of Civil Engineering, Maulana Azad National Institute of Technology, Bhopal, Madhya Pradesh, India 3 Department of Civil Engineering, Maulana Azad National Institute of Technology, Bhopal, Madhya Pradesh, India 4 Department of Civil Engineering, Maulana Azad National Institute of Technology, Bhopal, Madhya Pradesh, India Abstract The stilling basins are used to dissipate the energy of flowing water and protect the downstream structures like spillways, canals, etc. from the scouring. The aim of the present experimental investigation is to design the new stilling basin models for non circular pipe outlet using intermediate sill of different shapes having height equal to the diameter of pipe outlet. The experimental study was carried out for three Froude numbers namely 3.85, 2.85 and 1.85 for pipe outlet. Scour index (SI) has been used to evaluate the performance of stilling basin models with different shapes of intermediate sill, tested using same sand base material and test run time. The scour pattern was measured for each test run and flow pattern was also observed. After twelve tests runs, it was found that scour process were reduced for a shaped of intermediate sill having height equal to the diameter of pipe outlet at a particular location of intermediate sill combined with end sill of particular size and shape along with impact wall. Performance of this model having square shaped intermediate sill was found to be much better than USBR VI impact basin model for similar flow conditions. Keywords: Model, Performance, pipe outlet, stilling basin, Scour index. -----------------------------------------------------------------------***----------------------------------------------------------------------- 1. INTRODUCTION Stilling basins with appurtenances like impact wall, intermediate sill, end sill, etc. can be used effectively in dissipating the excessive energy downstream of hydraulic structure like over flow spillway, sluices, pipe outlets, etc. The effect of sill on the flow depends upon the configuration of the sill, its shape and the flow regime [1]. Various types of recommended stilling basin models for pipe outlets are by Bradely and Peterka [2], Fiala and Maurice [3], Keim [4], Vollmer and Khader [5], Verma and Goel [6 &7], Goel [8], Tiwari et al. [9,10, &11], Tiwari and Gahlot [12] and Tiwari [13 &14]. Appurtenances play an important role in the minimization of energy of flowing water in the stilling basin. A stilling basin for a pipe outlet consists of different appurtenances like impact wall, intermediate sill and an end sill, etc. The sill height, configuration and position have great impact on the formation and control of hydraulic jump and ultimately leading to the dissipation of energy of flowing water. The present research paper concentrates on the improvement of the performance of stilling basin model by using different shape of intermediate sill of same height equivalent of diameter of pipe outlet along with end sill and impact wall. Performance of stilling basin models is compared with Scour index (SI). Lower value of SI indicates better performance of the model. 2. MATERIALS AND METHODS 2.1. Experimental Arrangement The experiments were conducted in a recirculating laboratory flume in hydraulics lab. of MANIT Bhopal. The width of flume was reduced to 58.8 cm by constructing a brick wall along the length for keeping ratio of width of basin to equivalent diameter of rectangular outlet equal to 6.3 as per design of Gardes et al. [15]. The exit of pipe was kept above stilling basin by one equivalent diameter (1d =9.3cm). To observe the scour after the end sill of stilling basin an erodible bed was made of coarse sand passing through IS sieve opening 2.36 mm. and retained on IS sieve opening 1.18mm. The maximum depth of scour (dm) and its distance from end sill (ds) was measured for each test after one hour run time. The depth of flow over the erodible bed was maintained equal to the normal depth of flow. The discharge was measured by a venturimeter installed in the delivery pipe. After one hour the test run, the value of maximum depth of scour (dm) and its location from the end sill (ds) were noted. USBR VI model was tested with impact wall and end sill and then again models were tested with three different intermediate sills. All tested models with appurtenances are shown in Figures 1to 2. All the testing was performed for three Froude numbers namely, 3.85, 2.85 and 1.85. Further scouring pattern was observed by using intermediate sill of same height with different shapes, kept at the distance of 4d from the exit of the pipe, thus total 12 test Volume: 03 Issue: 04 Apr-2014, Available @ http://www.ijret.org 133

runs were performed to design the stilling basin model using intermediate sill. Scheme of Experimentation is shown in Table 1. Table 1 Scheme of Experimentation Design of Models with different shape of Intermediate Sill along with Triangular End Sill (1V:1H) of height 1d for Basin Length 8.4d S.N. Model Name Impact Wall with hood Size Bottom gap with basin floor Location from outlet exit Intermediate sill Shape Height Width 1 MSM-1 1d 2.2d 1d 3d - - - - 2 MSM-2 1d 2.2d 1d 3d Triangular with vertical 1d 1d 4d face D/S 3 MSM-3 1d 2.2d 1d 3d Rectangular 1d 0.2d 4d 4 MSM-4 1d 2.2d 1d 3d Square 1d 1d 4d Location from outlet exit 3. CRITERIA FOR PERFORMANCE EVALUATION OF STILLING BASIN The performance of a stilling basin model was tested for different Froude number (Fr) which is a function of channel velocity (v), the maximum depth of scour (d m ) and its location from end sill (d s ). A stilling basin model that produces smaller depth of scour at a longer distance is considered to have a better performance as compared to another stilling basin which results in a larger depth of scour at a shorter distance when tested under similar flow condition, Verma & Goel (2003) as illustrated in Figure3. A non dimensional scour index (SI = 2d m /d s ), as proposed by Goel & Verma (2001), has been considered for comparison of performance of stilling basin models. A smaller value of scour index shows better performance of stilling basin models. The value of scour indices for various runs on each model for different Froude numbers are given in Table No. 2. MSM-1(USBR VI Impact basin model) Volume: 03 Issue: 04 Apr-2014, Available @ http://www.ijret.org 134

MSM-2 Fig 1 Models, MSM-1 and MSM-2 with triangular intermediate sill along with impact wall and end sill MSM-3 MSM-4 Fig 2 Models MSM-3 & MSM-4 with rectangular and square intermediate sill along with impact wall and end sill Volume: 03 Issue: 04 Apr-2014, Available @ http://www.ijret.org 135

Fig- 3 Assumed Scour Pattern 4. RESULTS AND DISCUSSIONS To study the effect of geometry of intermediate sill on the performance of stilling basin models for pipe outlet, five models, were tested for three Froude numbers, namely 1.85, 2.85 and 3.85. The data pertaining to depth of scour and its location from end sill were collected for each model and reported in table2 to evaluate their performance by using performance index. First of all USBR VI model (MSM-1) was tested and values of SI was computed as 0.609, 0.706 &0.893 for Fr=1.85, 2.85 and 3.85 respectively. In continuation of the investigation of the geometry of intermediate sill, the performance of the basin models were tested with intermediate sill of sloping, rectangular and square with same height along with impact wall located at 3d and sloping end sill fixed at 8.4d. In models MSM-2 vertical face of the sloping end sill was downstream, with 1d. Further models MSM-3 and MSM-4 were tested with rectangular and square intermediate sill with same height of 1d. It was found that model with square intermediate sill produces higher values of SI (0.322, 0.352 &0.372) as compared to other tested models as shown in Table2. S. No. Model name Table -2 Scour index for different models tested with ES, IW and IS Fr = 1.85 Fr = 2.85 Fr = 3.85 dm ds SI dm ds SI dm ds SI 1 MSM-1 3.2 10.5 0.609 4.4 12.5 0.706 4.6 15.5 0.893 2 MSM-2 1.4 7.9 0.354 2.4 11.8 0.406 3.1 13.4 0.462 3 MSM-3 0.8 5.1 0.313 1.5 8.2 0.366 2.2 11.1 0.396 4 MSM-4 0.3 3.1 0.322 0.6 3.4 0.352 0.8 4.3 0.372 Fig-4 Comparision of performance for different models Volume: 03 Issue: 04 Apr-2014, Available @ http://www.ijret.org 136

It is also shown in bar chart in Fig.4. After analysis, it was found that by changing the shape of intermediate sill, there is improvement in the performance of the basin. It is so because of impact action, a reduction of energy is more, thereby improvement of the basin performance. Intermediate sill of square shape promotes the dissipation of energy in the basin by lifting high velocity filaments from the bed. No doubt performance of the stilling basin models improves with the inclusion of intermediate sill, which also confirms the findings of Negm [1]. Similar finding was also reported by Tiwari & Tiwari [16]. Table 2 and Fig.4 clearly indicates that for all tested Froude numbers values of scour indices are reduced in designed model M4 as compared to USBRV I model (M-1). Comparison of these models is given in Table 3. This comparison shows that there is improvement in performance from 47.2% to 58.3% in newly designed model over USBR VI model by simply inserting square shaped intermediate sill. Table 3 Comparison of new designed model with USBR VI model Name of model SI for Fr = 1.85 SI for Fr = 2.85 SI for Fr = 3.85 Remark M-4 0.322 0.352 0.372 Developed model M-1 0.609 0.706 0.893 USBR VI model Improvement of performance for all Froude Numbers % improvement in performance of designed model over USBR VI model 47.2% 50.1% 58.3% Much improved performance for all Froude numbers 4. CONCLUSIONS An experimental investigation was conducted to study the effect of Shape of inter mediate sills along with impact wall and end sill. Three intermediate sills of different shape were tested. The scouring is significantly reduced there by reducing the scour index for square intermediate sill of height d and base width d, placed at the distance of 4d from the exit of pipe outlet. It is found that intermediate sill of square cross section used in model MSM-4, produces lower scour indices and thus performs better as compared to all other tested models for all Froude numbers tested. Based on the results of experimental studies on stilling basin models, it can be concluded that the shape of intermediate sill greatly affect the performance of a stilling basin. Efficient stilling basin model (MSM-4) has been evolved by experimentation as compared to USBR VI stilling basin model. Similar reporting was observed in [17]. REFERENCES [1] Negm, A.M. (2004), Effect of sill arrangement on maximum scour depth DS of abruptly enlarged stilling basins. Proc. of Int. Conf. Hydraulics of Dams and River Hydraulics, 26-28 April, Tehran, Iran. [2] Bradley, J.N., Peterka, A. J. (1957), Hydraulic Design of Stilling Basins, Journal of A.S.C.E. Hydraulic Engg,, 83(5), 1401-1406. [3] Fiala, J. R. and Maurice, L. A. (1961), Manifold Stilling Basins, Journal of A.S.C.E., Hydraulic Div.. 87(4), pp.55-81. [4] Keim, S. R. (1962), Contra Costa Energy Dissipator. Journal of A.S.C.E., Hydraulic Division, 3077, March,, pp. 109-122. [5] Vollmer, E., Khader, M.H.A. (1971), Counter Current Energy Dissipator for Conduit Outlets, International J. of Water Power, 23(7), 260-263. [6] Verma, D.V.S, Goel, A. (2000), Stilling Basins for Outlets Using Wedge Shaped Splitter Blocks, ASCE Journal of Irrigation and Drainage Engineering126 (3), 179-184, [7] Verma, D.V.S. Goel, A.( 2003), Development of Efficient stilling basins for Pipe Outlets, ASCE Journal of Irrigation and Drainage Eng..129(3), 194-200. [8] Goel, A. (2008), Design of Stilling Basin for Circular Pipe Outlet. Canadian Journal of Civil Engineering, 35 (12), pp. 1365-1374. [9] Tiwari, H.L., Goel, A. and Gahlot, V.K. (2011), Experimental Study of Sill Controlled Stilling Basins for Pipe Outlet, International Journal of Civil Engg. Research, 2(2),pp. 107-117. [10] Tiwari, H.L., Goel, A. and Gahlot, V.K. (2011), Experimental Study of effect of end sill on stilling basin performance, International Journal of Engg. Sci. and Technology, 3(4), pp.3134-3140. [11] Tiwari, H.L, Gahlot, V.K. and Tiwari Seema, (2013), Reduction of Scour depth downstream of stilling basin, International Research Journal of Engineering Sciences. 2(7), pp.20-25. [12] Tiwari, H.L.and Gahlot, V. K. (2012), Experiments on new Stilling basin for Pipe outlets, STM, AISECT University, 2(2), pp. 17-20. Volume: 03 Issue: 04 Apr-2014, Available @ http://www.ijret.org 137

[13] Tiwari, H.L.( 2013), Design of Stilling Basin with Impact wall and End sill, International Research Journal of Resent Sciences, 2(3), pp.59-63. [14] Tiwari, H.L. (2013), Analysis of Baffle wall gap in the Design of Stilling Basin Models, International Journal of Civil Engineering and Technology, 4( 4), pp.66-71. [15] Garde, R.J., Saraf, P.D., Dahigaonkar, D.J. (1986), Evolution of Design of Energy Dissipator for Pipe Outlets, J. of Irrigation & Power, 41(3), pp.145-154. [16] Tiwari, H.L. and Tiwari Seema (2013), Design of Stilling Basin Models with Intermediate sill, Journal of Science, Technology and Management, 2(4), pp.66-71. [17] Tiwari, H.L, Gahlot, V.K. and Sharma Abhay, (2014), Effect of intermediate sill on the perforformance of stilling basin models, International J. of Sc. Engg. & Tech. 3 (6), pp.414-417. Volume: 03 Issue: 04 Apr-2014, Available @ http://www.ijret.org 138