Wind Power Transmission Case Studies Project National Wind Coordinating Committee

Similar documents
ELECTRIC TRANSMISSION 201: Markets, ISO/RTOs and Grid Planning/Operations

Midwest ISO EIM Start-up and Exiting Issues Todd Ramey, Executive Director Market Administration. March 7-8, 2011

Regional Transmission Organizations. D. William VanderLaan Illinois Commerce Commission January 30, 2014

FERC & Electric Industry Restructuring

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

ELECTRIC TRANSMISSION 101: Regulation. Jeff Dennis Office of Energy Policy and Innovation Federal Energy Regulatory Commission

PROPOSALFOR INCLUSION OF A TRANSCO INCLUDING ENTERGY WITHIN THE SPP RTO

Federal Energy Regulatory Commission/RTO Training Session

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

The Virtues of A Virtual RTO

SPP at a Glance. Located in Little Rock. Approximately 600 employees

Draft Whitepaper to Platte River Board of Directors

Energy Markets - The Basics

The Honorable Travis Kavulla President, National Association of Regulated Utility Commissioners 1101 Vermont Avenue, NW Suite 200 Washington, DC 20005

Exploring the Impacts of California s Renewable Portfolio Standard

CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION

US ISO Governance. Summary & Observations. HEPG March 2016

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket No. ER

Benefits of Demand Response

Illinois State Institute for Regulatory Policy Studies Conference

Closer Look At EPA Proposed Rule 111D: Utility Perspective

The Role of the ISO/RTO in Today s. Robert B. Burke Principal Analyst ISO New England Inc.

APPENDIX B PLANNING FRAMEWORK. This Appendix B describes the process to be used by the Midwest ISO in planning

For purposes of this response, "State Regulators" and "state(s)" shall include the Council of the City of New Orleans.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Collaboration Assessment Guide and Tool

Definitions O - P. Open Access Same-Time Information System (OASIS) or PJM Open Access Same-time Information System:

2010 RTO Metrics Report: NESCOE Data Summary

PROJECT NO Remarks of Dr. Michael Giberson on ERCOT Planning and System Costs Associated with Renewable Resources and New Large DC Ties 1

NEW YORK INDEPENDENT SYSTEM OPERATOR

New England Power Sector Overview

Leveraging the Natural Advantages of the Electric Utility: A 51 st State Roadmap

PJM Interconnection, L.L.C. ( PJM ) submits hereby submits its responses to the United

20 Nov IEEE Chapters Seminar Grid Energy Storage: Policies. John Martin, AESO

DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST

Policy Direction for Alberta s Capacity Market Framework

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION POST-TECHNICAL CONFERENCE COMMENTS OF SOUTHERN CALIFORNIA EDISON COMPANY

Seminar on African Electrical Interconnection. Module 7 - Market Operational Structures

NEW REG: TOWARDS CONSUMER-CENTRIC ENERGY NETWORK REGULATION

PJM Wind Integration Initiatives

Southern California Public Power Authority Position Description

Introduction to RRG Drafting Team Proposal

A BASIC ELECTRICITY PRIMER

Green Power Newsletter Number 8, July 2001

Expanding Hydropower and Pumped Storage s Contribution to Grid Resiliency and Reliability RFI#: DE-FOA

Specific topics covered in this brief include:

Copyright 2017, Ontario Energy Association

ESD 126 Energy Systems and Economic Development

ISO/RTO Metrics Initiative

IN THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

PJM Overview: PJM Structure and Cross-Border Examples PJM 2010

Regional Resource Adequacy Stakeholder Meeting on Straw Proposal

UC Core Competency Model

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

RE: Request for Stakeholder Comments - Expanding Clean Energy Standard Eligibility to Include Existing Clean Energy Generation

PROPOSAL OF INDEPENDENT POWER PRODUCERS OF NEW YORK, INC. FOR INTEGRATING CARBON PRICING INTO THE WHOLESALE ENERGY MARKET

QUICK GUIDE TO INTEGRATING PUBLIC-PRIVATE DIALOGUE SCOPING MISSION. Investment Climate l World Bank Group. In partnership with

INTERSTATE TRANSMISSION VISION FOR WIND INTEGRATION

Regional Cooperation of US States on Electric Transmission Issues

Transmission Workgroup History and Accomplishments

BACKGROUNDER on the first fully functioning regional transmission organization in the United States: PJM Interconnection

2018 CAISO Policy Initiatives Roadmap

Appendix 1 PRELIMINARY DELIVERABILITY BASELINE ANALYSIS STUDY REPORT

THE AEP INTERSTATE PROJECT FAQs

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

THE NEED FOR GREEN-E CERTIFICATION AND VERIFICATION IN AN ERA OF RENEWABLE ENERGY TRACKING SYSTEMS

Capturing the Price of Opposition

Approaches to Generation Dispatch in Transmission Planning

Operating Reserve / Revenue Sufficiency Guarantee Alignment Joint and Common Market Initiative. Joint Stakeholder Meeting October 5, 2007

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Energy Imbalance Market Overview

Load Response. NARUC Energy Regulatory Partnership Program

PV Focus Group Report Executive Summary

Business Practices for. Schedule 21-ES. (Modifications Issued on August 11, 2016)

Revenues from Ancillary Services and the Value of Operational Flexibility

Advancing Renewable Alternatives

North American Energy Standards Board

Regional System Planning

Contents. DRAFT Capacity Deliverability Fact Finding Summary Report

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Integration of Variable ) Docket No. RM Energy Resources )

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

PUBLIC SERVICE COMMISSION OF THE DISTRICT OF COLUMBIA

EXPLORING THE UTILITY OF THE FUTURE IN PENNSYLVANIA

EIM Governance Review Issue Paper & Straw Proposal

Competitive Markets 1

Capacity Energy Markets: A view from Germany and the United States. by Rebecca Bertram

The Ability of Current U.S. Electric Industry Structure and Transmission Rules to Accommodate High Wind Energy Penetration

CAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments

th St., NW, 12 th floor Washington, D.C., 20005

Strategic approach to payment system reform: the South African experience

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southern California Edison ) Docket No. ER Company )

Overview of Issues at the Western Electricity Coordinating Council (WECC)

Examining Hydroelectricity s Potential Role in the Alberta Market:

U.S. Faster Payments Council Draft Operating Vision

Open Access Transmission Tariff ATTACHMENT K

TODAY S ORGANIZED MARKETS A STEP TOWARD COMPETITION OR AN EXERCISE IN RE-REGULATION?

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017

Maintaining Baseload Generation Capacity

Transcription:

National Wind Coordinating Committee Wind Power Transmission Case Studies Project National Wind Coordinating Committee September 2000

Wind Power Transmission Case Studies Project National Wind Coordinating Committee September 2000 Contents: Transmission Case Studies Conclusions Summary Appendix 1: Appendix 2: Appendix 3: Appendix 4: Case One: Transmission Policy and Pricing in Texas Case Two: Virtual Wheeling Case Three: Transmission System Improvements Regional Transmission Organization Principles document About These Documents The NWCC Transmission Case Studies Conclusions Summary includes brief summaries of three NWCC Wind Transmission Case Studies and their conclusions, along with discussions of the opportunities for progress to be made on issues raised in the case studies within Regional Transmission Organization (RTO) development processes. The conclusions summary was formally approved as a Consensus Document of the NWCC. Consensus is defined as all can live with. The NWCC RTO Principles document is a consensus document of the NWCC. The full Wind Transmission Case Studies are Resource Documents of the NWCC. The cases were prepared and reviewed by members of the NWCC. Changes were made to accommodate views of different members. The final cases were not formally submitted to the NWCC for consensus review and are being released as educational resource documents. All documents are available on the NWCC website at www.nationalwind.org National Wind Coordinating Committee c/o RESOLVE 1255 23 rd Street, NW. Suite 275 Washington, DC 20037 888.764.9463

The NWCC Transmission Case Studies Conclusions Summary: Opportunities for Wind in RTO Development Processes Prepared by the National Wind Coordinating Committee. Revised by Steve Wiese and Terry Allison In the spring of 1999, the Utility Wind Interest Group (UWIG), with the cooperation of the National Wind Coordinating Committee (NWCC) 1, conducted a forum on transmission issues associated with the production of energy from wind. As a result of this forum, a number of issues were identified which, if successfully resolved, could help reduce barriers to the future expansion of wind power. The NWCC, being a multi-stakeholder group, was in an ideal position to conduct follow-up activities among a cross-section of the interested parties. The follow-up activities took the form of three case studies in the areas of interest identified by forum participants: Transmission policy and pricing; Virtual wheeling arrangements; and, Transmission system improvements The case studies provide an interesting snapshot in time dealing with a range of issues associated with scheduled or planned regulatory and restructuring proceedings related to energy transmission. The NWCC Transmission Subcommittee and the UWIG reviewed early drafts of the case studies in November 1999. The case studies were conducted through a questionnaire and interview process with interested parties. In writing each case study, NWCC staff attempted to identify all stakeholder groups with an interest in each topic and solicit their input. While all parties do not agree on every issue presented, a serious effort has been made to present all views in an unbiased fashion. At the end of each case study, relevant conclusions are drawn and recommendations for next steps are provided where appropriate. The original intent in creating these case studies was twofold: To inform the NWCC s broad membership on complex and important issues associated with the changing transmission situation in the deregulated environment, along with potential impacts on wind power expansion; and, To offer the experience developed in the case studies to the regions and the people dealing with these issues, in the hope of providing information and insights that might be useful in resolving outstanding transmission issues related to increased utilization of wind power. 1 The NWCC is a consensus-based collaborative endeavor formed in 1994 that includes representatives from electric utilities and their support organizations, state legislatures, state utility commissions, consumer advocacy offices, wind equipment suppliers and developers, green power marketers, environmental organizations, and local, state, tribal, regional, and federal agencies. The NWCC identifies issues that affect the use of wind power, establishes dialogue among key stakeholders, and catalyzes activities to support the development of an environmentally, economically, and politically sustainable commercial market for wind power. More than 2,500 individuals from diverse sectors and wind resource areas across the country have participated in the NWCC's collaborative efforts. The National Wind Coordinating Committee Transmission Case Studies Page 1 of 6

The case studies take on more significance in the light of a recently issued federal order favoring independent regional governance of electric power transmission systems. In December 1999, the Federal Energy Regulatory Commission (FERC) issued Order 2000, which requires all public utilities that own, operate or control interstate electric transmission to file a proposal addressing the utility s participation in a Regional Transmission Organization (RTO). Public utilities already in a FERC-approved RTO must file with FERC how the RTO does or does not comply with Order 2000, and offer any amendments or changes to comply with Order 2000. Under Order 2000, RTOs must have the four minimum characteristics and perform Box A. Regional Transmission Organizations (RTOs) Minimum Characteristics 1. Independence from market participants; 2. Appropriate scope and regional configuration; 3. Possession of operational authority for all transmission facilities under the RTO s control; and, 4. Exclusive authority to maintain short-term reliability. Required Functions 1. Tariff administration and design; 2. Congestion management; 3. Parallel path flow; 4. Ancillary services; 5. OASIS and total transmission capability (TTC) and available transmission capacity (ATC); 6. Market monitoring; 7. Planning and expansion; and, 8. Interregional coordination. Source: FERC Order 2000. the eight functions listed in Box A.. FERC has said well-designed RTOs could improve transmission grid management; improve grid reliability; eliminate discriminatory transmission practices; improve market performance; and help provide for light-handed regulation. Prior to Order 2000, FERC had required in Order 888 2 that interstate transmission owners, typically utility companies that also owned generation, provide open access to their transmission facilities to other generation owners. Order 888 was intended to promote competition in the generation sector, and although utilities developed open access policies (tariffs, interconnection rules, etc.) that satisfied the requirements of Order 888, many independent generators still viewed these policies as being insufficient to promote competition. In particular, critics objected to the fact that utilities still exercised full control over the governance and operation of their transmission systems. In addition, distributed and intermittent resources would have difficulty taking advantage of open access transmission tariffs because of various terms and conditions designed more for larger-scale generation resources. Critics also objected to the fractured governance and operation of the transmission system that continued after Order 888, and to the existence of utility-by-utility tariffs that required independent generators to pay multiple transmission fees to multiple transmission owners in order to transport power through or within a small region. In response to this criticism, FERC issued Order 2000 to regionalize transmission governance and operation and to functionally separate it from transmission ownership. 2 Issued April, 1996. The National Wind Coordinating Committee Transmission Case Studies Page 2 of 6

Many wind energy advocates believe that RTOs can become a forum in which they have increased opportunities to participate in the development of transmission system policies alongside traditional players such as electric utilities. RTO development processes are important to wind stakeholders generally, and to the wind stakeholders discussed in the transmission case studies in particular. As they are formed, RTOs will be responsible for developing ground rules on many issues important to wind development, including the issues of RTO governance, transmission pricing policies, system planning, and interconnection requirements for generators, among others. FERC has also stated that Independent System Operators (ISOs) are an acceptable form of RTO. ISOs are already established in Texas, California, New England, and other regions, and are currently under development in the Midwest, the Pacific Northwest, the Desert Southwest and the Mountain West. Following are brief summaries of the case studies and their conclusions, along with discussions of the opportunities for progress to be made on issues raised in the case studies within RTO development processes. Current working drafts of the case studies are attached. Case 1. Transmission Policy and Pricing in Texas The NWCC has identified transmission planning and pricing issues as being of critical importance to wind development. Some areas of the country have established ISOs to handle planning and pricing issues. The ERCOT-ISO governs the transmission system that serves most of Texas and provides a unique example of solutions to transmission planning and pricing issues. The ERCOT-ISO is one of only five fully operational RTOs in the U.S. 3 As such, it is ahead of many regions in developing a regional, independent agency to control transmission. The efforts that went into developing the ERCOT-ISO transmission policies can provide a model for other regions needing to set up their own RTOs. Case 1 draws the following conclusions about how the wind community can position itself in RTO development processes to encourage favorable, or at least equitable, outcomes for wind: 1. Have a strong presence, seek a level playing field, and work for inclusive and transparent processes in RTO governance proceedings; 2. Do not seek special treatment for wind; 3. Find common interests with other participants and build alliances on broad issues to be more effective; 4. Promote a view of the transmission system as a common carrier operating in the public interest; 5. Use simplicity as a guiding principle to reduce the adversarial aspects of transmission issues; e.g., simplify the transmission reservation process. 3 The others, as of May 2000, are the California ISO, ISO New England, New York ISO, and the PJM Interconnection. The National Wind Coordinating Committee Transmission Case Studies Page 3 of 6

Since RTOs are required to be independent of market participants, wind interests and their allies have a new opportunity to participate in transmission decision-making proceedings alongside utilities, and to expect equitable treatment in these proceedings by a neutral authority. Wind interests may best be served by advocating for equitable, rather than special, treatment under new transmission rules during RTO development proceedings. To make the case for equitable treatment, wind interests will need to develop alliances with other interests, such as others seeking open competitive markets for transmission services. To date, the ERCOT-ISO rules have not discouraged wind development in Texas; ERCOT-ISO has received over 20 interconnection requests representing over 1,600 MW of proposed new renewable (primarily wind) generation since the rules went into place. 4 However, the driver for many, if not most, of these proposed projects is a Texas legislative mandate requiring development of 2000 MW of new renewable generation by 2009. Also, these proposed projects face serious transmission constraints that still need to be resolved. For regions in the formative stages of RTO development, it may be valuable to monitor how these forthcoming issues are resolved within ERCOT-ISO. Case 2. Virtual Wheeling It is often difficult to match the availability of wind energy with customer demand because of the distance, the lack of available transmission capacity between the generation and load, or because of differences in timing between when the energy is available and when it is needed. This problem can be addressed in several ways. At the local level, wind energy can be accommodated by backing off fossil generation when the wind energy is available and replacing the displaced energy at a later time. This concept can also include storage. At a regional level, this concept can be extended to include delivery of the energy at another place and time by the same entity that purchases the energy, or by another entity through the purchase of a green energy credit. At the national level, one can imagine a purely financial transaction in which green energy credits are bought and sold. The concept can be extended globally. Three examples of virtual wheeling are examined in this case study. The specific conclusions are that: 1. As states enact regulatory requirements for renewable energy, financial transactions can enable wind development to occur in the best wind resource areas while giving utilities flexible options to meet requirements in least-cost ways. 2. Opportunities for green marketing programs to utilize virtual wheeling face public perception challenges, as many customers are reluctant to pay a premium for green power while receiving energy delivered from local fossil generation. 4 Transmission Constraints, West Texas Renewable; presentation by Kenneth A. Donohoo, Senior Transmission System Engineer, ERCOT-ISO, available at http://www.puc.state.tx.us/rules/rulemake/22200/westtex.ppt, May 25, 2000. The National Wind Coordinating Committee Transmission Case Studies Page 4 of 6

3. Power exchanges involving fossil-based replacement power, particularly coal, can raise some issues of concern and can lead to misunderstandings if the nature of the transaction and net results are not clearly communicated. 4. Virtual wheeling transactions are not a panacea for wind energy nor do they obviate the need for new transmission. The examples in Case 2 offer illustrations of creative power transactions that enable wind projects to be developed in contexts where they might otherwise have been unsuccessful or less cost-effective. As new RTOs are formed in response to FERC Order 2000, they will need to be flexible enough to allow these types of transactions to occur. The RTO function of tariff administration and design will play an important role in determining whether virtual wheeling transactions are facilitated both within and between regions. This primarily involves determining whether wheeled energy will pay a flat rate for delivery within the region (the postage stamp model) or a variable charge that reflects the distance between generation and load. To the extent that virtual wheeling arrangements are proposed between regions, the RTO function of interregional coordination will play an important role as well. Even where technical and economic challenges to virtual wheeling are overcome, there is still the challenge of convincing energy consumers that abstract financial transactions deliver real value. Critics of such transactions point to the need for fossil backup of intermittent resources and distant environmental benefits as serious obstacles to widespread consumer acceptance of green power. RTOs, being independent of market participants, are in a unique position to speak with credibility on these issues and to create policies that may contribute to consumer confidence in green power products. Case 3. Transmission System Improvements Electrical transmission facilities connecting windy areas and load centers are sometimes non-existent or minimal. Even in cases where a good wind resource has nearby transmission, that transmission often has limited capacity to transport additional energy. In fact, transmission facilities throughout much of the country are strained, and this problem is acute at specific points of congestion. The expansion of wind power is hampered by this situation, but the associated problem is not confined to wind. Instead it is a general problem of concern to many in the electric power sector. Transmission system improvements have been proposed, are being considered, or have been carried out in several regions of the country. The experience with transmission planning issues in the Upper Midwest and Great Plains contains lessons that could prove instrumental in dealing with transmission needs associated with wind power expansion nationally. The stakeholder responses documented in this case study suggest several conclusions that address the transmission issues covered. They are: 1. Stakeholder groups have different perspectives that lead to conflicting conclusions on the need for new transmission. Additional education and dialogue on transmission issues would be beneficial to fostering common understanding The National Wind Coordinating Committee Transmission Case Studies Page 5 of 6

among diverse interests about both the impacts of the transmission infrastructure to society and its benefits. Utility respondents feel strongly that greater public understanding of functions provided by the transmission system is needed, as well as of the system s changing use after open access policies were mandated by FERC. 2. Current transmission planning processes are insufficient for bringing new transmission projects to fruition. A broader consensus is needed on energy policy objectives, environmental impacts, and economic benefits to help resolve the standoff on the need for improvements to the transmission system. An improved regional approach to resolving transmission planning disputes ultimately must be found. 3. Transmission system improvements that are needed in the Upper Midwest and Great Plains to serve the needs of wind development and other generation interests seem unlikely to occur without facing continued opposition from environmental and community advocate interests. A new approach that provides assurances that proposed transmission system improvements will produce renewable energy and environmental benefits, and will provide compensation for those along the transmission rights-of-way, may be required. Each of the conclusions presented in Case 3 highlights the potential benefits to transmission system planning processes that a regional, independent, multi-stakeholder forum could provide. It is possible that the evolving Midwest ISO could emerge as the forum needed in the Upper Midwest and Great Plains. RTO development proceedings in other regions also present promising opportunities to develop regional consensusbuilding alliances in support of needed transmission system improvements, and should be closely monitored. National Wind Coordinating Committee c/o RESOLVE 1255 23 rd Street, NW. Suite 275 Washington, DC 20037 888.764.9463 nwcc@resolv.org www.nationalwind.org The National Wind Coordinating Committee Transmission Case Studies Page 6 of 6