SEPTIC TANK CONSTRUCTION GUIDELINES

Similar documents
INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE

Section 10 Design Criteria: Components

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

TABLE OF CONTENTS

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

Commonwealth of Massachusetts Title 5 Official Inspection Form. Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

SPECIAL SPECIFICATION 3504 Septic Tank System

ON-SITE SEWAGE CONTRACTOR EXAMINATION STUDY GUIDE

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

Septic Systems. Presented by: Terry Davidson P. Eng.

Wastewater treatment for single houses. D. O Dowd

Mono County Health Department Construction Guide for Residential and Commercial On-Site Sewage Treatment & Disposal System I.

Today s Presentation: Septic System Basics. Common Domestic Pollutants. Goals of Treatment. What is an Onsite Wastewater Treatment System?

Septic System Basics. Today s Presentation:

Wastewater Collection. (Sewer Alternatives)

Section 4 Service Lines

3/23/2016. Happy Pi Day! What We Will Discuss. Best Practices for Precast Concrete Tank Inspections

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from METS is not the copyright owner.

San Joaquin County. Residential Onsite Systems Bulletin

Ellis County Environmental Office

Holding tank Interceptor Leaching Leaching bed Leaching bed fill Loading rate Pail privy Percolation time Portable privy Potable Pressurized

Klickitat County. On-Site Sewage System. Construction Manual

Common Septic System Installation Mistakes

I. Preconstruction Meeting and Site Preparation Date: Inspector: A. MDE Certified Installer Name

Site Plan: General: Common Omissions-Mistakes on Plans: Ohio EPA Southeast District Office Logan, Ohio November 22, 2005 Bruce Goff, P.E.

Procedures for Connecting to Central Sewer System

Because Lake Erie and the Ohio River Begin in Your Yard- You Need To Care for Your Septic Tank System

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

Table of Contents Introduction... 3

Technical Specification for Decentralized Wastewater Treatment System (DEWATS)

SECTION STORM DRAINAGE

Australia Design & Installation Manual

DRIP EMITTER SYSTEM STUDY GUIDE

Fabrication and Installation Table of Contents

Existing System Evaluation Report for Onsite Wastewater Systems

PRECAST CONCRETE ON-SITE WASTEWATER TANKS

Bulletin 4-2 Requirements and Recommendations Page 1

Onsite Sewage Treatment Program. Presented by: Ed Melzark SR Environmental Technician / Zoning Administrator Pine County

SCALE BAR 1:2500 RM OF WOODLANDS OVERALL PLAN - LOW PRESSURE SEWER MAIN. Certificate of Authorization JESSICA MANNESS ENGINEERING, INC. No.

STANDARD SPECIFICATIONS

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

Commonwealth of Massachusetts City/Town of Septic System Installation Checklist

SANDERS COUNTY ENVIRONMENTAL HEALTH PROPERTY OWNER SEPTIC INSTALLATION BOOKLET

Construction Inspection Checklists

SEWER SYSTEM DESIGN GUIDELINES

Akiki Engineering Est.

INSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL /

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

A.B.A. Well and Septic Services Inc. P.O. Box 35 Ivor, VA (757) A Homeowner s Guide to Septic Systems

Pump Tank and Pretreatment Inspection & Troubleshooting. Sara Heger University of Minnesota

GRAY WATER RECYCLING SYSTEMS

Septic Tank Guidelines

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

On-lot System Component Requirements

Woodford County Health Department 1831 S. Main Street, Eureka, IL Phone: (309) Fax: (309)

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc

Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA

Section 403. DRAINAGE STRUCTURES

SECTION SANITARY SEWER SYSTEM

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS - SANITARY DEPARTMENT DETAIL

Tank Functions. Solids removal by settling & floatation. Anaerobic digestion Storage of solids % solids removal

Complex Sewage Disposal Course 2017

INCORPORaTED. Septic System Owner s Guide. The following pages were obtained from the. Septic System Owner s Guide

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

SMALL WASTEWATER (SEPTIC SYSTEM) APPLICATION FREMONT COUNTY, WYOMING

Draft INTRODUCTION X-1 PUMP APPLICATIONS X-1 PUMP TANKS X-4 PUMP TYPES X-8 PUMP CONTROLS X-8. Draft

SV24. Submittal Special Precautions Specifications Installation. 12½" (31.8 cm) 12½" (31.8 cm) 12" (30.5 cm) 12" (30.5 cm) 12" (30.

ACTIVITY: Dewatering Operations AM 12

City of Malibu Stuart Ranch Road Malibu, California Phone (310) Fax (310)

Septic Tanks: The Primary Treatment Device of Conventional Septic Systems

Short title. This chapter may be cited as the "Kern County Plumbing Code."

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

Evolution of Conventional Septic Systems

Mason s Training Programme on Onsite Treatment Systems

MSU Extension Publication Archive. Scroll down to view the publication.

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description

FIELD GUIDE FOR MILLENNIUM MOUNDS CLERMONT CO. GENERAL HEALTH DISTRICT 2010

Massachusetts Design & Installation Manual

Beacon Hill Water & Sewer District Standard Specifications

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Section 9: Sand Mounds. 9. Sand Mounds

Onsite/Decentralized Treatment is Important Nationally

***************************************************************************************************************

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

A PUMPED SEPTIC TANK IS A HAPPY SEPTIC TANK!!

Guthrie County Board of Health Regulations

SUPPLEMENT EXISTING SEPTIC SYSTEM INSPECTION REPORT WHO IS QUALIFIED TO PERFORM AN INSPECTION?

T a b l e o f C o n t e n t s

Manual - Part 2 - Materials

PERMANENT PAVEMENT REPAIR NO SCALE

All vendors, distributors, and resellers must provide each purchaser of the System with copies of applicable Certification or Approval.

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

STORM DRAINAGE CHAPTER 11

Presby Maze Design and Installation Manual

Technical Data Sheet NEC/GRAN/95:01

Transcription:

SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic tank obtained in market in this region was not clear. Thus, the general contractor is given a choice of either proposing a septic tank available in market or design/build one on site by themselves. Consultant strongly recommends an in-situ concrete septic tank built at site based on the guidelines written here-under. If the general contractor choose the market available product, a professional engineer with certified credentials will be required to present the product to the Resident Engineer and the Consultant with necessary drawings/documents to obtain their approvals prior to the construction. The target values of the septic tank treatment shall be as follows; BOD elimination rate: 90% and over BOD of the treated water: 20mg/L and less General Provisions 1. There will be no structural failure or undue distortion under pressure when either full or empty and be protected from, or designed to withstand, loadings imposed by vehicles, buildings, soil and or ground waters and the internal loadings, 2. Septic tank will be watertight and retain structural integrity during transportation, installation and operation, 3. Septic tanks shall be divided into two chambers so that the effective capacity of the first chamber is twice that of the second chamber, 4. Length to width ratio is not less than 2:1 and a length to depth ratio of approximately 2:1, 5. Effective liquid depth is not less than 900mm, 6. Where required, the dividing partition wall shall be provided with transfer openings centrally located within the liquid depth and be equally spaced from the vertical axis centre line and the external wall, 7. Connections to the septic tank shall be such that they permit standard solvent welded joints or rubber ring joints and enable the inlet and outlet pipe to be installed at grade, 8. Connections for the inlet, outlet and inspection openings are integrally cast for concrete constructed septic tanks, and for plastic type materials the connections are to be mechanically and/or chemically sealed or bonded so as to be water-tight and have a strength equal to that of the parent material, 9. Where the inlet, outlet and inspection opening fittings for plastic type septic tanks are permitted to be installed at the place of installation they shall be provided with fixing mechanisms and clear instructions to prevent incorrect installation with regard to grade and reversal of the inlet and outlet fittings. 1

Design for cast in situ concrete septic tank 1. The tank shall be structurally sound, smooth internally, watertight and the concrete shall have a compressive strength of not less than 25 MPa (260kg/cm 2, FC=25) at 28 days. Approved construction details Effective tank capacity: Dimensions in mm: L: 6000, W: 3000, H: 2000 Reinforcement: Double 13mm dia. reinforcing steel bars @200mm for wall, cover and floor, additional diagonal reinforcement at all openings Concrete thickness mm: 200mm or more 2. Water level of the septic tank should be lower than the ground level by 900mm. 3. Rigid insulation should be applied to the top cover of the tank (made easy to remove for maintenance) if 900mm of the No.2 requirement, above, not to be incorporated 4. All reinforcement is placed centrally 5. Septic tank should not be subject to any vehicular traffic loading NOTE: For installation of cast in situ septic tanks not in accordance with the data above; or subject to vehicle loadings; approval is required from the Resident Engineer and will need to be supported with detail drawings, engineering calculations, material and construction specifications and comply with the general provision. Any plan must be presented by a registered professional engineer with the professional background accepted by the Resident Engineer prior to the presentation. Typical Two-Compartment Septic Tank PLAN VIEW ACCESS COVER WATER LEVEL OUTLET INLET INLET BAFFLE COMPARTMENT DIVIDER OUTLET BAFFLE INTERIOR BAFFLE CROSS SECTIONAL VIEW 2

Baffles are located at the inlet, compartment divider and outlet of a septic tank. The inlet baffle is designed to slow down the incoming wastewater and direct it downward. The interior baffle keeps most of the solid material in the first compartment and the outlet baffle retains the lightweight floating material, such as grease and wax, within the tank, keeping it out of the soil absorption field. A built-in vertical drop of approximately 80 mm between the inlet and outlet pipe is common. During installation, if the inlet and outlet ends of the septic tank are reversed, water will back up into the building sewer, stranding solids that could block the line. Septic tanks should be pumped when the sludge layer or floating scum layer exceeds 150 mm. The sludge and scum layer may be checked by using a clear plastic pipe with a foot valve. This pipe is dipped down into the tank and upon removal visually shows sludge and scum depths. Septic tanks must be periodically vacuum pumped. If septic tanks are not pumped periodically, accumulated sludge will overflow with the wastewater into the soil absorption field, resulting in premature failure of the field. The single most important maintenance item is to vacuum pump a septic tank every two years. Soil Absorption Design Soil absorption system must be designed based on site specific information. Required site information consists of: Sub surface soil conditions and percolation rate of the receiving soil Depth to the seasonal high ground water table Location of topographical features such as steep slopes, gullies, surface water and existing nearby sewer systems Location of all nearby drinking water wells and determining the well classification, whether Location of permafrost or impermeable soil bedrock Lot layout and any limitinig plat notes that may affect the type of onsite system allowed. Absorption Field Once an absorption system is put into operation, a clogging mat or zone forms at the infiltrative surface, which slows the movement of water into soil. Many factors, some of which can be prevented by taking proper precautions during construction, contribute to the development of a clogging mat. Compaction of the receiving soil and smearing of the infiltrative surface are probably the two most significant errors made during construction that leads to the development of the clogging mat. Construction machinery should not be driven over the infiltrative area. Beds and trenches should be excavated using a backhoe or similar apparatus, not using a dozer. If during the excavation process, the infiltrative surface becomes smeared, the surface should be raked or otherwise roughened, to remove the smeared soils. To overcome the smearing that naturally occurs when a backhoe bucket is drawn through soil, some 3

contractors have installed rakes on the side of their buckets. Figure under shows the reduction in fecal coliform bacteria under a typical absorption system. Absorption Field Cross Section WASTEWATER FROM SEPTIC TANK APPROX. 10,000,000 DEPTH IN FEET 1 2 LIQUID LEVEL 200 4,000,000 17,000 200 3 NATURE SOIL 1 4 DISTANCE FROM TRENCH SIDE Above members in organisms per 100ml 4

Sizing the absorption field After selecting the most appropriate type of absorption system for a given site, the infiltrative surface is sized based on soil conditions. Recognizing soil conditions and accurately rating the absorption capacity of the soils is vital to the design of a good system. At least two prospective areas should be investigated. Pump Station The original design does not include any pump station between the buildings and the septic tank. However, in the course of construction, there could be a chance of such a facility need might arise. Most septic systems rely on gravity to sustain flow through the system. This requires the septic tank inlet to be lower than the building drain and the absorption area to be lower than the septic tank outlet. Occasionally, site conditions prohibit a gravity flow installation, because either the septic tank or the absorption area must be placed higher than the building drain. In these cases, an appropriate pump must be used to lift the sewage or septic tank effluent to the required elevation. In cases where the septic tank must be higher than the building drain, a solids handling pump or a grinder pump, located in a pumping chamber (or sump) must be used to handle the solid material in domestic sewage. Sumps may be located in a basement or crawl space or outside the building foundation. Basement Sump INFLOW FROM BUILDING DRAIN DISCHARGE TO ONSITE SYSTEM CORROSION RESISTANT SUMP BASIN. SUMP PUMP WITH AUTOMATIC LEVEL CONTROLS AND HIGH 5

All components must be made from corrosion resistant material and have a sealed cover. All connections must be water-tight. Because raw sewage contains large solids, a submersible grinder pump or a properly sized solids handling centrifugal pump, capable of passing 50mm minimum or larger solids must be used. Grinder pumps may be used that has cutting blades that grind solids to a size not clogging the pump or piping. The liquid level in the basin is usually controlled by a float switch that automatically cycles the pump when a pre-set liquid level is reached. Many pump manufacturers offer a complete packaged basin with pump, controls and a high level alarm. A pump must be selected that is capable of meeting the total dynamic head requirements of the system (elevation change, pipe friction loss and energy losses). All pumping systems must conform to the requirements of the Uniform Plumbing Code and contain a high level alarm. Pumping systems handling raw sewage should be avoided whenever possible, by adjusting the house elevation or the onsite system elevation during the planning stages. Minimum Construction Requirements (Items to be discussed with Resident Engineer prior to the construction.) 1. Mechanical watertight couplings, such as Caulder coupling, Fernco coupling, or equivalent are required on the inlet, outlet, and cleanout (vent) pipes of septic tanks. Manhole covers must also be watertight. 2. The Wastewater Treatment and Disposal Regulations require that septic tanks have two compartments. 3. Solid pipe with no joints should span 3m from the inlet and outlet of septic tanks onto undisturbed earth. 6

4. Pressure distribution should be provided on all elevated bed and mound systems. Systems that employ pressure distribution must be designed by a registered Engineer and approved in writing by Resident Engineer prior to construction. 5. A barrier of geo-textile filter fabric is always required on top of the sewer rock to prevent soil backfill from migrating into the distribution rock. 6. 30 mm of approved insulation may be substituted for 360 mm of soil cover. If adequate insulation is used, the soil cover depth may be reduced to 600 mm. 7. When side walls have smearing (glazing) evident, an alternate strata should be used or a soil test by a professional engineer registered in Alaska can be performed to determine the soils absorption ability. 8. On sloping lots, leach lines should traverse the slope. 9. Avoid compaction of soil strata to be used for absorption. 10. A foundation cleanout is required by the Uniform Plumbing Code. 11. Perforated pipes in the absorption bed, septic tanks, trench, bed, and pit bottoms must be level. Septic tanks and solid piping must be laid on undisturbed or properly compacted soils. Soil in the pipe zone should be compacted to adequately protect the pipe from excessive deflections. 12. A cleanout is required ahead of the septic tank anytime a bend of 45 degrees or more is used. 13. Excavations should not be left open in order to prevent freeze-up or an unsafe situation. Design and Construction will be in line the below guidelines. www.aed.usace.army.mil/contracting/aed-design.pdf 7