FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

Similar documents
APPENDIX I. (See paragraph-6) FORM 1

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

Annex F Scoping Checklist

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I (See paragraph 6) FORM 1

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

APPENDIX I. (See paragraph 6) FORM 1

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

FORM 1 BASIC INFORMATION S.NO.

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

FORM-I for seeking clearance for project attracting CRZ notification

APPENDIX I (See paragraph 6) FORM 1

APPENDIX - I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

APPENDIX I (See paragraph - 6) FORM 1

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT

APPENDIX I (See paragraph 6) FORM 1

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

APPENDIX- I FORM- 1. (I) Basic Information:

Sri.T.N.Balasubramanya

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

Proposed Multiplex & Commercial Complex FORM I

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2,

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

FORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project

FORM-1. Sr. No. 1 Name of the Project Nahur Gaothan Shiv Shakti SRA CHS Residential Project under SRA Scheme 2 S. No. in the Schedule 8 (a)

RATNAAKAR SHELTER LLP

9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1.

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

APPENDIX I. (See Paragraph 6) FORM 1

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

FORM 1 (Application for Environment Clearance)

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

APPENDIX I (See paragraph - 6) FORM 1

M/S Overseas Min Tech Consultants, Jaipur 1

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

Haridarshan Residency ( Row Type House & School Building )

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

Revised FORM - I & PRE-FEASIBILITY REPORT

Application for Prior Environmental Clearance (EC) FORM 1

(I) Basic Information:

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

FORM 1 & 1A RESIDENTIAL DEVELOPMENT. Mumbai Suburban District situated at Somanigram in Oshiwara District Centre, Goregaon West.

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

(See paragraph 6) FORM - 1

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Application for Prior Environmental Clearance (EC)

FORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD.

EXPANSION OF SPORTS INJURY CENTRE AT SAFDARJUNG ENCLAVE, NEW DELHI

Expansion of Residential, Retail, IT &Commercial Form 1 FORM 1. Basic Information. Sr. No.

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification

FORM-I. Environmental Clearance (EC)

FORM Name of the project/s Amendment in Existing Environmental Clearance to

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

30 TPH Fertilizer Blending unit for Customized NPK Production at Zuarinagar, Sancoale, Marmugao, SouthGoa, Goa

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

FORM 1 Riverbed Sand Mining Project

FORM 1. Basic Information. Sl. No.

FORM I (OPENCAST LATERITE MINE ha)

FORM 1 Riverbed Sand/Morrum / Mining Project

FORM-I. Sector-16-B, GH Greater Noida, U.P.

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Expansion of MDI Complex, Plot No 25, Sector 16A, Noida, Uttar Pradesh

Form 1, Form 1(A) and Proposed ToR for Residential Project Pramukh Aura at Chala, Taluka: Vapi & District: Valsad, Gujarat.

JAI MAA SHARDA STONE CRUSHING

Transcription:

(I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total plot area: 38,881.58 m 2 handled/command area/lease area/ number of FSI area 2,06188.05 m 2 wells to be drilled n FSI area 301353.41 m 2 Total Construction area: 507541.49 m 2 4 New/Expansion/Modernization New Project The proposed project is a new project. 5 Existing Capacity/Area etc. Exiting mosque on site 6 Category of Project i.e. A or B A 7 Does it attract the general condition? If, t Applicable Please specify 8 Does it attract the specific condition? If yes, t applicable Please specify 9 Location Plot/Survey/Khasra. Plot Bearing C.T.S 525 Village Mazgaon Tehsil Mumbai District Mumbai State Maharashtra 10 Nearest railway station/airport along with distance in km. Mumbai Reay Road Station: 0.35 km Chhatrapati Shivaji International Airport: 12.94 km 11 Nearest Town, City, District Headquarters Mumbai along with distance in km. 12 Village Panchayats, ZillaParishad, Municipal Municipal Corporation of Greater Mumbai (MCGM) Corporation, Local body (complete postal addresses with telephone nos. to be given) 13 Name of the applicant M/s. Sumer Buildcorp Pvt Ltd 14 Registered Address 201/220, commerce house, fort, Mumbai 400 023 15 Address for correspondence: As above Name Mr.Kunal Goswami Designation(Owner/Partner/CEO) Director Address As above Pin Code 400023

E-mail Telephone. Fax. 16 Details of Alternative Sites examined, If any. Location of these sites should be shown on a topo sheet Till date alternative sites examines as the development is as per development plan 17 Interlinked Projects. 18 Whether separate application of interlinked t Applicable project has been submitted? 19 If yes, date of submission t Applicable 20 If no, reason t Applicable 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. The Forest (Conservation) Act, 1980? CRZ Clearance Obtained The Wildlife (Protection) Act, 1972? The C.R.Z. tification, 1991? 22 Whether there is any Government Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? Name of the Court/ Case./ Orders/directions of the Court, if any and its Relevance with the proposed project. * Capacity corresponding to sectorial activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area of mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.). 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data The proposal is for development under DCR 33 (7). The site has currently residential and industrial units which are identified as cessed structure. The plot is under the residential zone.

. Harbour Heights to local land use plan) 1.2 Clearance of existing land, vegetation and building? / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Trees cut before construction 1.3 Creation of new land uses t envisaged. 1.4 Pre-construction investigations Geo-Technical investigations have been carried e.g. bore houses, soil testing? out. 1.5 Construction Works? There will be construction of residential building Tenant Building : Gr + 3 floors + 16 habitable floors Retail building- Gr+ 6 floors Sale residential building - Tower 1- Gr+6P+ St +68 habitable floors Tower 2- Gr+6P+ St +56 habitable floors Tower 3- Gr+6P+ St +62 habitable floors Tower 4- Gr+6P+ St +67 habitable floors Club house -1-Gr Club house- 2- Gr +1 floor 1.6 Démolition Works? Existing dilapidated building to be demolished 1.7 Temporary sites used for t Applicable construction works or housing of construction workers? 1.8 Above ground buildings, There will be construction of residential building structures or earthworks Tenant Building : Gr + 3 floors + 16 habitable including linear structures, cut and fill or excavations. floors Retail building- Gr+ 6 floors Sale residential building - Tower 1- Gr+6P+ St +68 habitable floors Tower 2- Gr+6P+ St +56 habitable floors Tower 3- Gr+6P+ St +62 habitable floors Tower 4- Gr+6P+ St +67 habitable floors Club house -1-Gr Club house- 2- Gr +1 floor The maximum height of the building 303.80 m 1.9 Underground works including t Applicable mining or tunneling? 1.10 Reclamation works? t Applicable 1.11 Dredging? t Applicable 1.12 Offshore structures? t Applicable 1.13 Production and manufacturing Process? t Applicable

. 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Separate raw material storage yard will be provided which will be temporary. Construction Phase: Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. Operation Phase: Storage area for solid waste, Manure and Sludge will be provided. Sale - Quantity (Kg/day) Rehab- Quantity (Kg/day) Biodegradable waste 2856 171 n- Biodegradable 2184 137 waste E- Waste 173 1.6 Total 5213 309.6 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction of operation? Treatment & Disposal : The biodegradable waste will be treated in an OWC Manure obtained shall be used as manure for landscaping. n- Biodegradable waste will be handed over to recyclers. Sewage sludge will be used as manure for gardening. The quantity of wastewater 1217 KLD & 71 KLD generated from the project will be treated in STP (capacity for 259,205, 480, 273 KLD & 80 KLD rehab) and recycled water (527 KLD & 28 KLD) used for gardening and flushing purpose. Excess water will be released into sewer line t Applicable Access through 18.30 m wide road & 27.40 m wide road. There will be no new road and rail constructed. 1.18 New road, rail, air, waterborne or new Rail/road is required. The entire essential

. Harbour Heights other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data infrastructure already exists. There will be no diversion or closure of the existing transport routes and infrastructure. t Applicable impoundment, damming, culverting, realignment or other changes to the hydrology of surface water courses is envisaged. 1.22 Stream crossings? t Applicable 1.23 Abstraction or transfers of water from ground or surface waters? Water requirement in construction phase will be supplied from tanker. Total water requirement of Sale: 1373 KLD, Rehab: 79 KLD will be met from MCGM / recycled water. 1.24 Changes in water bodies or the land surface affecting drainage or run-off. 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? The project location is in well-developed urbanized area. SWD network is available around the project. SWD network designed for project shall be connected to the SWD provided by corporation. This will be in line with the natural drainage pattern of area and the same shall be approved by corporation. 18.30 m wide road& 27.40 m wide road will be utilized for the transportation of material. Workers required during peak hours will be deployed from local or nearby area. t Applicable t Applicable Construction Phase: There will be 500 labourers at site out of which 100 will be expected to house at site and 400 will be visiting..

. Harbour Heights / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Operation Phase: On completion of the project, there will be regular movement of residents, visitors, staff and related personals. Total population is expected to be Residential: 7880 s. Commercial/Retail: 8839 s. 1.29 Introduction of alien species? Indigenous species will be planted. 1.30 Loss of native species or genetic t applicable. diversity? 1.31 Any other actions? t applicable. 2. Use of Natural resources for construction or operation of project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply).. 2.1 Land specially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit KLD / Details thereof (with approximate quantities/ rates, Agricultural land not involved. Construction Phase: There will be 500 labourers at site out of which 100 will be expected to house at site and 400 will be visiting. The water demand will be met by water tankers. Operation Phase Total water demand of the project is expected to be Total water requirement Sale: 1373 KLD Rehab : 79 KLD Water requirement will be met by the MCGM /Recycled water. 2.3 Minerals (MT) -- 2.4 Construction material The construction materials will be procured from local stone, aggregates, dealer. and/soil (expected source-mt) 2.5 Forests and timber -- (source-mt) 2.6 Energy including Operation Phase :

. electricity and fuels (source, competing users) Unit: fuel (MT), energy (KW) 2.7 Any other natural resources (use appropriate standard units) / Details thereof (with approximate quantities/ rates, Max Demand Load: 32 MVA DG Sets are proposed as backup during power failure. HSD will be used as fuel to run standby D.G. sets. -- 1. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. / Details thereof (with approximate quantities/ rates, 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes t Applicable There will be negligible amount of Waste oil generated from the DG sets to be used as power back up source. Discarded containers of paints, solvents etc. during construction phase. They will be stored separately and will be handed over only to authorized processor for the facility Regular Pest control and adequate fumigation will be done will be done. The living conditions of the public of the nearby areas will not be affected due to upcoming of the project. The solid waste will be suitably treated, while the liquid effluent will be treated in the sewage treatment plant of adequate capacity. There are school and other infrastructures within 500 m radius area of the project. However traffic planning and waste management during construction and operation phase shall mitigate the adverse effect, if any.

4 Production of solid wastes during construction or operation or decommissioning (MT/month). / Details thereof (with approximate quantities/ rates, 4.1 Spoil, overburden or mine wastes t Applicable. 4.2 Municipal waste Sale - Rehab- (domestic and or Quantity Quantity commercial wastes) (Kg/day) (Kg/day) Biodegradable waste 2856 171 n- Biodegradable 2184 137 waste E- Waste 173 1.6 4.3 Hazardous wastes (as per hazardous waste management rules) 4.4 Other industrial process wastes Total 5213 309.6 Waste oil generated from D.G. shall be stored at separate location duly marked and will be send to the CPCB authorized recyclers. t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other Dried sludge from STP will be used as manure for the sludge from effluent plants. treatment 4.7 Construction or demolition wastes 4.8 Redundant machinery or equipment 4.9 Contaminated soils or other materials Construction waste will be used within project only. Unusable and excess construction debris will be disposed at designated places as per local permission. t Applicable t Applicable 5.Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr). 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources / Details thereof (with approximate quantities/ rates, Emission will be generated from vehicular transport to the project. Standby DG set will emit air pollutants (PM, SO 2 and NOx). DG set shall be installed as per CPCB guidelines and manufacturer's instructions to keep the emissions within limits of CPCB. Stack height shall be provided as per CPCB guidelines for adequate dispersion of released

. 5.2 Emission from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odors from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources / Details thereof (with approximate quantities/ rates, pollutants and to have negligible GLCs in the surrounding area. t Applicable Emissions will be generated while handling and transportation of materials like cement, sand etc. to site and will be temporary in nature. RMC shall be used preferably to reduce fugitive emissions due to material handling. Regular water sprinkling shall be done to reduce dust generation Transportation shall be done in covered trucks. The project may cause rise in dust level during construction phase. Precautions will be taken to reduce dust generation during construction phase. RMC use will eliminate the handling of cement, sand and concrete; thus dust emission will be minimized. Tarpaulins will be used to cover trucks carrying materials. Water sprinkling will be done at regular intervals to reduce dust generation. Net lawn will be used during construction. Dust generation will be controlled as described above proper ventilation will be provided around STP During operation phase, municipal solid waste shall be treated in OWC to produce manure. Sewage shall be treated in established technology like MBBR. t Applicable t Applicable t Applicable 6 Generation of ise and vibration, and emissions of Light and heat.

. 6.1 From operation of equipment e.g. engines, ventilation plant, crushers 6.2 From industrial or similar processes 6.3 From construction or demolition / Details thereof (with approximate quantities/ rates, ise generation from construction equipment s used for drilling, cutting operations. During Operation Phase, ise will be generated due to operation of DG sets. For control of noise following measures shall be adopted: Equipment s shall be regularly maintained High noise generating construction activities would be carried out only during day time. Personal Protective Equipment s (PPE) shall be provided to construction workers. Acoustic enclosure for DG Set with stack height as per norm will be provided. t Applicable 6.4 From blasting or piling t Applicable. The construction activities will include the following noise generating activities; 1. Excavation activities etc. 2. Concreting and mixing. 3. Heavy vehicle movement. Following precautions shall be taken to control noise pollution : High noise generating activities shall be carried out during day time only. Workers working near high noise machinery would be provided with ear muffs/ear plugs. Acoustic enclosure for DG Set will be provided. 6.5 From construction or operational traffic 6.6 From lighting or cooling systems During Construction Phase: There will be transport of materials for construction work. Precautions will be taken to reduce the impacts of the vehicular movement such as vehicular trips will be at peak traffic hours. During Operation Phase: The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion. Adequate tree plantation will also help to reduce the noise level and enhance air quality t Applicable

. / Details thereof (with approximate quantities/ rates, 6.7 From any other sources During power failure to mitigate the noise of D.G. sets while in operation D.G. sets will be enclosed in acoustic enclosures. 7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea. / Details thereof (with approximate quantities/ rates, 7.1 From handling, storage, Negligible quantity use or spillage of Environmental Management Plan for Hazardous Waste hazardous materials Generation is enclosed. 7.2 From discharge of The quantity of wastewater 1217 KLD & 71 KLD generated sewage or other effluents from the project will be treated in STP (capacity for to water or the land 259,205, 480, 273 KLD & 80 KLD rehab) and recycled (expected mode and place of discharge) water (527 KLD & 28 KLD) used for gardening and flushing purpose. Excess water will be released into sewer 7.3 By deposition of pollutants emitted to air into the land or into water line 7.4 From any other sources t Applicable 7.5 Is there a risk of long t Applicable term buildup of pollutants in the environment from these sources? Dust will be generated during construction phase from earthworks and movement of vehicles. Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. DG exhaust will be discharged at stipulated height by providing adequate stack height. 8. Risk of accidents during construction or operation of the project, which could affect human health or the environment. / Details thereof (with approximate quantities/ rates, 8.1 From explosions, During construction all construction workers will be spillages, fires etc from storage, handling, use or production of hazardous substances provided with suitable Personal Protective Equipment as required under the health & safety norms. Suitable firefighting measures will be provided to reduce damage due to fire-accidents.

8.2 From any other causes There is a risk of accident during construction however proper safety measures will be taken. 8.3 Could the project be This area falls under seismic zone III according to Indian affected by natural Standard Seismic zoning map. disasters causing environmental damage (e.g. floods, earthquakes, landslides, could burst etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. / Details thereof (with approximate quantities/ rates, 9.1 Lead to development of supporting, utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting and ancillary development will take place Supporting infrastructure (roads, power supply, waste or waste water treatment, etc) Housing development Extractive industries Supply industries Other 9.2 Lead to after use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Internal Roads, Rainwater Harvesting, STP etc. will be provided. The project provides a well-designed residential housing area for the occupants. t Applicable This will create job opportunity for support staff like security, maintenance, household workers etc. Impacts on water availability, storm water drainage, availability of electricity, traffic congestion etc. (iii) Environmental Sensitivity. Areas Name/ Identity Aerial distance (with 15 km) Proposed project location boundary

. Areas Name/ Identity Aerial distance (with 15 km) Proposed project location boundary 1 Areas protected under international conventions, national or local legislation for their t Applicable ecological, landscape, cultural or other related value 2 Areas which are Project site fall under CRZ-II important or sensitive of ecological reasons wetlands, water courses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, t Applicable important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. 4 Inland, coastal, marine or underground waters Arabian Sea ( 500 mt) 5 State, national The project is located within Municipal limits- MCGM boundaries 6 Routes or facilities used t Applicable by the public for access to recreation or other tourist, pilgrim areas 7 Defense installations t Applicable 8 Densely populated or built-up area Residential, Commercial and Industrial area all around the site. 9 Areas occupied by sensitive man made land Name Distance from Direction uses (hospitals, schools, project places of worship, (km) community facilities) Nearest Hospital Ahilyabai Holkar Municipal Maternity Nursing Home 0.28 SE Nearest Convent High 0.90 West

. Areas 10 Areas containing important, high quality or scarce resources (ground water resource, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Name/ Identity Aerial distance (with 15 km) Proposed project location boundary School School Nearest college t Applicable t Applicable M.H. Saboo Siddik College of Engineering 1.37 SW This area falls under seismic zone III according to Indian Standard Seismic zoning map.