FRENCH REGULATED LNG TERMINALS SCHEDULING FLEXIBILITY COMPETITIVE TARIFFS ACCESS TO BOTH MEDITERRANEAN AND ATLANTIC SHORES TARIFFS APPLICABLE AS OF 1 ST APRIL 2017
02/ MONTOIR-DE- BRETAGNE SPOT* /MWh $/MMBtu /MWh $/MMBtu Unloading (Med-Max) 457 500 0,92 0,29 365 500 0,73 0,24 Unloading (standard cargo) 825 000 0,83 0,27 641 000 0,64 0,21 Unloading (Q-Flex) 1 119 000 0,80 0,26 861 400 0,62 0,20 Unloading (Q-Max) 1 339 500 0,79 0,25 1 026 700 0,60 0,19 Pooling (unloading of standard cargo at Montoir-de-Bretagne, initially booked at Fos Cavaou) 90 000 *SPOT: cargoes unloaded during a given Month M, subscribed after the 20 th of Month M-1. www.elengy.com sales@elengy.com
03 MONTOIR-DE-BRETAGNE /MWh $/MMBtu Ship Reloading (standard cargo) 470 000 0,47 0,15 Truck Loading 596,43 /loading (2017) Ship or Pay: 100% of the reservation. Nota: Above terminalling tariffs excludes Gas Taken off, Port fees, Transmission network tariff (cf. GRTgaz). Dollar price is indicative, based on: 1 = 1,1 $ 1,00 /MWh = approx. 0,32 $/MMBtu OPTIONS: w Additional monthly dedicated storage capacity = 1,00 /MWh per month w Uniform send-out option (20 to 40 days) = 0,07 /MWh w LNG Inventory trading = 500 /month + 0,01 /MWh DETAILED TARIFF CONDITIONS
04/ FOS TONKIN SPOT* /MWh $/MMBtu /MWh $/MMBtu Unloading (Med-Max) 641 000 1,28 0,41 499 500 1,00 0,32 *SPOT: cargoes unloaded during a given Month M, subscribed after the 20 th of Month M-1. www.elengy.com sales@elengy.com
05 FOS TONKIN /MWh $/MMBtu Small Scale carrier Reloading (15 000 m 3 LNG) 100 000 1,00 0,32 Small Scale carrier Reloading (7 500 m 3 LNG) 75 000 1,50 0,48 Truck Loading 596,43 /loading (2017) Ship or Pay: 100% of the reservation. Nota: Above terminalling tariffs excludes Gas Taken off, Port fees, Transmission network tariff (cf. GRTgaz). Dollar price is indicative, based on: 1 = 1,1 $ 1,00 /MWh = approx. 0,32 $/MMBtu OPTIONS: w Uniform send-out option (20 to 40 days) = 0,07 /MWh w LNG Inventory trading = 500 /month + 0,01 /MWh DETAILED TARIFF CONDITIONS
06/ FOS CAVAOU SMART SPOT* /MWh $/MMBtu /MWh $/MMBtu Unloading (Med-Max) 771 500 1,54 0,50 603 500 1,21 0,39 Unloading (standard cargo) 1 443 000 1,44 0,47 1 107 000 1,11 0,36 Unloading (Q-Flex) 1 980 200 1,41 0,46 1 509 800 1,08 0,35 Unloading (Q-Max) 2 383 100 1,40 0,45 1 811 900 1,07 0,34 Pooling (unloading of standard cargo at Fos Cavaou, initially booked at Montoir-de-Bretagne) 364 500 *SPOT: cargoes unloaded during a given Month M, subscribed after the 20 th of Month M-1. www.fosmax-lng.com sales@fosmax-lng.com
07 FOS CAVAOU /MWh $/MMBtu Ship Reloading (standard cargo) 540 000 0,54 0,17 Small Scale carrier Reloading (15 000 m 3 LNG) 100 000 1,00 0,32 Ship or Pay: 100% of the reservation. Nota: Above terminalling tariffs excludes Gas Taken off, Port fees, Transmission network tariff (cf. GRTgaz). Dollar price is indicative, based on: 1 = 1,1 $ 1,00 /MWh = approx. 0,32 $/MMBtu OPTIONS: w Additional monthly dedicated storage capacity = 1,00 /MWh per month w Uniform send-out option (20 to 40 days) = 0,07 /MWh w LNG Inventory trading = 500 /month + 0,01 /MWh DETAILED TARIFF CONDITIONS
UPGRADED SERVICES BOOKED REGASIFICATION CAPACITIES GO WITH: w Direct Third Party Access: Access on any term (short-term, long-term) for any quantity, from the 1 st cargo, independently from other customers w Time Flexibility: LNG delivery reshaping: delivery date and quantity (+ vessel name, LNG quality) rescheduling (ADP, Monthly Program, Intra-Monthly re-scheduling) Intra annual make-up Weekly/daily send-out flexibility w Geographical Flexibility: Atlantic or Mediterranean shore Intra-monthly POOLING of capacities: reduced tariff to unload a cargo in a French regulated terminal, applicable to holders of unused Ship or Pay in another French regulated terminal w Dedicated storage capacity w Zero send-out at Montoir-de-Bretagne w Operational accessibility: vessel, LNG quality Upstream diversity and easy nautical access Quality specifications complying with EASEE gas and among the widest in Europe w Access to LNG hub services (subject to specific tariffs) Ship reloading LNG transshipment (berth-to-berth at Montoir, ship-to-ship at Fos Cavaou) LNG truck loading Gassing-up/cooling down LNG bunkering Follow us on twitter Download our Smart LNG App! @Elengy @FosmaxLNG DATA USED FOR ALL CALCULATIONS Med-Max = 500 GWh (approx. 75 000 m 3 LNG) Standard cargo = 1 000 GWh (approx. 150 000 m 3 LNG) Q-Flex = 1 400 GWh (approx. 215 000 m 3 LNG) Q-Max = 1 700 GWh (approx. 260 000 m 3 LNG) 1 = 1,1 $ 1,00 /MWh = approx. 0,32 $/MMBtu PUBLICATION ELENGY COMMUNICATIONS DPT / APRIL 2017 / PHOTO COPYRIGHTS ELENGY / C. HELSLY (COVER), C. DUPONT (P. 2-3), A. BRUNET (P. 4-5), G. LEIMDORFER (P. 6-7).