FRENCH REGULATED LNG TERMINALS

Similar documents
Evolution of the ATM5 offer Proposals from Elengy and Fosmax LNG

Operator of LNG terminals since 1965 PIONEERING THE LNG INDUSTRY

Operator of LNG terminals since 1965 PIONEERING THE LNG INDUSTRY

ELENGY. SPECIFIC CONDITIONS N [To be completed] TO THE FRAMEWORK CONTRACT PROVIDING ACCESS TO THE LNG TERMINAL OF. [MONTOIR-DE BRETAGNE or FOS TONKIN]

Executive Summary. Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin

Present: Philippe de Ladoucette, Chairman, Christine CHAUVET, Catherine EDWIGE, Hélène GASSIN, Yann PADOVA and Jean-Pierre SOTURA, Commissioners.

CALL FOR MARKET INTEREST NOTICE

LNG TERMINALLING PROGRAMME.

LNG TERMINALLING PROGRAMME

LNG TERMINAL IN ŚWINOUJŚCIE AS A LNG GATE TO THE BALTIC SEA

LNG TERMINALLING PROGRAMME.

OPEN SEASON second capacity enhancement. 03 february 2011

Discover a proven way! Arturas Drungilas. Marketing and Corporate Affairs Director

Removing LNG barriers on gas markets Preliminary findings

ZEEBRUGGE LNG TERMINAL: FROM REGAS TERMINAL TO VERITABLE LNG HUB IN NORTH-WESTERN EUROPE

TRF & PEG news. Prices and liquidity of the. Price and liquidity focus p.2-3. Network flows and limits. 2 days of red alert*, i.e.

LNG Hub in Klaipėda. Mindaugas Aleška Head of Business Development Division SC Klaipėdos Nafta 1

EFQM Good Practice Competition 2014

GRAIN LNG Challenges & benefits for the deployment of LNG in ports. October 2017 BPA Conference, Poole, UK

The Revithoussa LNG Terminal:

Shippers meeting Maintenance Schedule

The benefits and role of LNG in Europe. Providing Europe s Energy Today and in the Future

LNG ACCESS CODE FOR THE ZEEBRUGGE LNG TERMINAL. Based on version approved by CREG on December 14 th 2017 Applicable as of December 20 th /193

BURNING BRIGHTER, BURNING GREENER. Accenture capabilities for global gas and LNG organizations

Growth Leadership: Vopak s LNG growth strategy

LNG Terminal on the Island of Krk OPEN SEASON PROCESS PAPER BINDING PHASE

National Grid Grain LNG Ltd. Third Party Access Arrangements. Guide for prospective Secondary Capacity customers 2017/18

UPDATE OF THE AUTHORISATION OF A LNG CARRIER TO UNLOAD AT THE LNG TERMINAL IN PANIGAGLIA PANIGAGLIA LNG TERMINAL

LNG as a Bunker Fuel - LNGF (3 Days)

2019 LNG as a Bunker Fuel - LNGF (3 Days)

Christophe Liaud GLE Member, Gas Infrastructure Europe. Greece as a Southeastern Europe & East Med Energy Gas Hub, 27 September 2017 Athens, Greece

GNL Mejillones, GenCo oriented

DEVELOPMENT OF A REGIONAL GAS MARKET IN THE BALTIC AND CEE REGIONS

Small scale LNG developments from the perspective of an infrastructure player

LNG as Fuel - Bunkering

LNG Shipping: How Long Will The Good Times Last?

LNG for bunkering Prospects in Greece and Southeast Europe

THIRD PARTY ACCESS TO LNG TERMINALS. GIIGNL Commercial Study Group Topic 8

Tadas Matulionis LNG Terminal Director April 26th, 2017 THE TRANSFORMATIVE POWER OF LIQUID GAS

Removing LNG barriers on gas markets CEER report

Improving LNG logistics in Spain

INTEGRATION OF LNG TERMINAL IN THE LITHUANIAN GAS SYSTEM 22 ND MAY, Mantas Šabanas Project Analytics Manager

RECEIVING, STORAGE AND REGASIFICATION OF THE LNG

DHL GLOBAL FORWARDING

Stratégies d investissement et de portefeuille GNL Laurent Vivier Directeur du Gaz TOTAL

The general design of a LNG-terminal. Background

Large-scale and small-scale LNG infrastructure in Europe: Status and Outlook Wim Groenendijk, GLE President

GRTGAZ NETWORK TRANSMISSION CONTRACT

Regasification N. Atlantic

2016 CEF Synergy Call Actions selected for funding SYNERGY

Press release 11 May Interim statement. 1. Customer invoicing. Regulated information: interim statement

LNG IN EUROPE An Overview of LNG Import Terminals in Europe

Enabling LNG Infrastructure

The VTTV Oil Storage Terminal Cyprus

Klaipėda LNG Terminal a Game Changer in the Baltic Sea Region. Mantas Bartuska General manager SC Klaipėdos Nafta

Nauticor: Distribution Costs for the LNG Value Chain Jan Schubert, Senior Manager Sales & Business Development

LNG Bunkering introduction

Small Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell

Port of Los Angeles Emission Reduction Programs. Michael DiBernardo Deputy Executive Director November 1, 2018

INTEGRATED LNG VALUE CHAIN FOR THE BALTIC SEA REGION

LNG storage: a growth story? StocExpo Rotterdam commercial manager

Liquefied Natural Gas LNG

Paul Kyprianou. GLD Lines

Singapore s Import of LNG

LNG contribution to regional gas market

LNG: strategic challenge for the Mediterranean Shipping

Small-Scale LNG Market Trends in Europe

GRTGAZ NETWORK TRANSMISSION CONTRACT

Deliberation. I - The Context. 1. The European regulatory framework: Directive 2003/55/CE

LNG strategy and the outlook for global gas markets

THE LNG MARKET AND EUROPEAN SECURITY OF SUPPLY

The LNG Inventory Routing Problem with Pick-Up Contracts

Fluxys Belgium press release 26 September 2018 Regulated information

LNG Markets GDF SUEZ and its LNG activities

LNG in transport: The views of the European LNG terminal operators

INEA. Innovation and Networks Executive Agency. Making implementation happen. Motorways of the Sea Priority funding options

Changes in Dynamics and Pricing of LNG in the Atlantic Basin

INTEGRATED LNG VALUE CHAIN FOR THE BALTIC SEA REGION

THE PORT OF MARSEILLE FOS : Le FRENCH SMART PORT in Med

GREENCRANES AN OPPORTUNITY FOR STRENGTHENING A NEW STRATEGIC APPROACH FOR DEVELOPING THE LNG CHAIN IN THE PORT OF LIVORNO

Nerijus Strazdauskas Senior Coordinator Bergen, 2018 THE BUSINESS CASE OF KLAIPEDOS NAFTA

CP EDI 301 Guidelines Version CP EDI 301 Guidelines (Version 4010)

OLT Offshore LNG Toscana Alessandro Fino CEO

Co-financed by the European Union Connecting Europe Facility. LNG Rollout in Central Europe for a greener transportation sector

LNG INVESTMENT ASSESSMENT SCHEME

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

Erik Thun Our path towards climate smarter shipping Nautiska Föreningen, 27 November 2018

POSEIDON MED II &GAINN IT WORKSHOP GAINN4MOS and GAINN4SHIP INNOVATION: General Project Overview and Current Situation

Presentation by Cpt. George Karantonis HSQE & Vetting Manager DPA / CSO / MLC Rep EUROTANKERS INC.

Meeting intraday modulation needs. Supply and demand match in intraday flexibility Outlook study for

Coordination: CORE LNGas hive

Motorways of the Sea TEN-T Forum Environment. Brussels, 15 th of March 2016

George Polychroniou Poseidon Med II Project Manager Executive Director Strategy, Development, Administration & IT, DEPA S.A.

TRF : Maintenance Schedule 2019

Winter Outlook Released 24 October 2017

CORE LNGas hive PROJECT PRESENTATION. Coordination:

MixMoveMatch Making Moves Sustainable

CORE LNGas hive PROJECT PRESENTATION

Appendix 2 SHIP-RELATED PROCEDURES

Port Feeder Barge. Floating infrastructure for container ports.

Transcription:

FRENCH REGULATED LNG TERMINALS SCHEDULING FLEXIBILITY COMPETITIVE TARIFFS ACCESS TO BOTH MEDITERRANEAN AND ATLANTIC SHORES TARIFFS APPLICABLE AS OF 1 ST APRIL 2017

02/ MONTOIR-DE- BRETAGNE SPOT* /MWh $/MMBtu /MWh $/MMBtu Unloading (Med-Max) 457 500 0,92 0,29 365 500 0,73 0,24 Unloading (standard cargo) 825 000 0,83 0,27 641 000 0,64 0,21 Unloading (Q-Flex) 1 119 000 0,80 0,26 861 400 0,62 0,20 Unloading (Q-Max) 1 339 500 0,79 0,25 1 026 700 0,60 0,19 Pooling (unloading of standard cargo at Montoir-de-Bretagne, initially booked at Fos Cavaou) 90 000 *SPOT: cargoes unloaded during a given Month M, subscribed after the 20 th of Month M-1. www.elengy.com sales@elengy.com

03 MONTOIR-DE-BRETAGNE /MWh $/MMBtu Ship Reloading (standard cargo) 470 000 0,47 0,15 Truck Loading 596,43 /loading (2017) Ship or Pay: 100% of the reservation. Nota: Above terminalling tariffs excludes Gas Taken off, Port fees, Transmission network tariff (cf. GRTgaz). Dollar price is indicative, based on: 1 = 1,1 $ 1,00 /MWh = approx. 0,32 $/MMBtu OPTIONS: w Additional monthly dedicated storage capacity = 1,00 /MWh per month w Uniform send-out option (20 to 40 days) = 0,07 /MWh w LNG Inventory trading = 500 /month + 0,01 /MWh DETAILED TARIFF CONDITIONS

04/ FOS TONKIN SPOT* /MWh $/MMBtu /MWh $/MMBtu Unloading (Med-Max) 641 000 1,28 0,41 499 500 1,00 0,32 *SPOT: cargoes unloaded during a given Month M, subscribed after the 20 th of Month M-1. www.elengy.com sales@elengy.com

05 FOS TONKIN /MWh $/MMBtu Small Scale carrier Reloading (15 000 m 3 LNG) 100 000 1,00 0,32 Small Scale carrier Reloading (7 500 m 3 LNG) 75 000 1,50 0,48 Truck Loading 596,43 /loading (2017) Ship or Pay: 100% of the reservation. Nota: Above terminalling tariffs excludes Gas Taken off, Port fees, Transmission network tariff (cf. GRTgaz). Dollar price is indicative, based on: 1 = 1,1 $ 1,00 /MWh = approx. 0,32 $/MMBtu OPTIONS: w Uniform send-out option (20 to 40 days) = 0,07 /MWh w LNG Inventory trading = 500 /month + 0,01 /MWh DETAILED TARIFF CONDITIONS

06/ FOS CAVAOU SMART SPOT* /MWh $/MMBtu /MWh $/MMBtu Unloading (Med-Max) 771 500 1,54 0,50 603 500 1,21 0,39 Unloading (standard cargo) 1 443 000 1,44 0,47 1 107 000 1,11 0,36 Unloading (Q-Flex) 1 980 200 1,41 0,46 1 509 800 1,08 0,35 Unloading (Q-Max) 2 383 100 1,40 0,45 1 811 900 1,07 0,34 Pooling (unloading of standard cargo at Fos Cavaou, initially booked at Montoir-de-Bretagne) 364 500 *SPOT: cargoes unloaded during a given Month M, subscribed after the 20 th of Month M-1. www.fosmax-lng.com sales@fosmax-lng.com

07 FOS CAVAOU /MWh $/MMBtu Ship Reloading (standard cargo) 540 000 0,54 0,17 Small Scale carrier Reloading (15 000 m 3 LNG) 100 000 1,00 0,32 Ship or Pay: 100% of the reservation. Nota: Above terminalling tariffs excludes Gas Taken off, Port fees, Transmission network tariff (cf. GRTgaz). Dollar price is indicative, based on: 1 = 1,1 $ 1,00 /MWh = approx. 0,32 $/MMBtu OPTIONS: w Additional monthly dedicated storage capacity = 1,00 /MWh per month w Uniform send-out option (20 to 40 days) = 0,07 /MWh w LNG Inventory trading = 500 /month + 0,01 /MWh DETAILED TARIFF CONDITIONS

UPGRADED SERVICES BOOKED REGASIFICATION CAPACITIES GO WITH: w Direct Third Party Access: Access on any term (short-term, long-term) for any quantity, from the 1 st cargo, independently from other customers w Time Flexibility: LNG delivery reshaping: delivery date and quantity (+ vessel name, LNG quality) rescheduling (ADP, Monthly Program, Intra-Monthly re-scheduling) Intra annual make-up Weekly/daily send-out flexibility w Geographical Flexibility: Atlantic or Mediterranean shore Intra-monthly POOLING of capacities: reduced tariff to unload a cargo in a French regulated terminal, applicable to holders of unused Ship or Pay in another French regulated terminal w Dedicated storage capacity w Zero send-out at Montoir-de-Bretagne w Operational accessibility: vessel, LNG quality Upstream diversity and easy nautical access Quality specifications complying with EASEE gas and among the widest in Europe w Access to LNG hub services (subject to specific tariffs) Ship reloading LNG transshipment (berth-to-berth at Montoir, ship-to-ship at Fos Cavaou) LNG truck loading Gassing-up/cooling down LNG bunkering Follow us on twitter Download our Smart LNG App! @Elengy @FosmaxLNG DATA USED FOR ALL CALCULATIONS Med-Max = 500 GWh (approx. 75 000 m 3 LNG) Standard cargo = 1 000 GWh (approx. 150 000 m 3 LNG) Q-Flex = 1 400 GWh (approx. 215 000 m 3 LNG) Q-Max = 1 700 GWh (approx. 260 000 m 3 LNG) 1 = 1,1 $ 1,00 /MWh = approx. 0,32 $/MMBtu PUBLICATION ELENGY COMMUNICATIONS DPT / APRIL 2017 / PHOTO COPYRIGHTS ELENGY / C. HELSLY (COVER), C. DUPONT (P. 2-3), A. BRUNET (P. 4-5), G. LEIMDORFER (P. 6-7).