Lean Manufacturing Implementation in Malaysian Automotive Components Manufacturer: a Case Study

Similar documents
A Survey on Lean Manufacturing Implementation in Malaysian Automotive Industry

Organisational Change Management Framework for Lean Manufacturing Implementation

THE CHALLENGES TO THE IMPLEMENTATION OF LEAN MANUFACTURING

Culture and Lean Manufacturing: Towards a Holistic Framework

Lean TQM Automotive Factory Model System

Australian Journal of Basic and Applied Sciences. Critical Success Factors and Obstacles of Lean Implementation in Micro, Small and Medium Enterprises

Relevance of Kotter s Model for Change in Successfully Implementing Lean

Comparison of Quality Engineering Practices in Malaysian and Indonesian Automotive Related Companies

DEVELOPMENT OF TPM IMPLEMENTATION PLAN IN SWITCHGEAR & ENGINEERING COMPANY

Moud Nawawi, Mohd Kamal

Lean Manufacturing 1

A STUDY ON IMPLEMENTATION OF LEAN MANUFACTURING PRACTICES FOR AN AUTOMOBILE INDUSTRY

Just In Time (JIT) Quality and Reliability Engg. (171906) H I T. Hit suyo na mono O Iru toki iru dake Tasukuran

A framework for organisational change management in lean manufacturing implementation. Baba Md Deros, Dzuraidah Abdul Wahab and Mohd Nizam Ab.

CRANFIELD UNIVERSITY CHAY TICK FEI A BOTTOM-UP LEAN IMPLEMENTATION STUDY AT A MALAYSIAN AUTOMOTIVE PARTS MANUFACTURER SCHOOL OF APPLIED SCIENCES

The level of achievement of Lean Manufacturing Implementation status before and after the development of KPIs at an Aerospace Manufacturing Company

IMPLEMENTATION OF LEAN THINKING IN MANUFACTURING AND NON-MANUFACTURING SECTORS: A REVIEW

Leadership Role in Creating Lean Culture

Toyota s 14 Steps to Becoming Lean

Lean Manufacturing Implementation in Small and Medium Industry

Learning Objectives. 1. Explain how lean systems improve internal and supply chain operations

Organisational Change Framework for Lean Manufacturing Implementation

Glenn Uminger. Glenn Uminger

Business Process Management Introduction. Marek Zborowski PhD.

Training for Six Sigma

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY

Multi-Layer Stream Mapping applied to a productive system

Barriers to Adoption of the Lean Production System

APPLICATION OF LEAN CONCEPTS IN THE CONSTRUCTION INDUSTRY

Lean Principles and Applications

Using the Shingo Model for Operational and Quality Excellence

LEAN PRODUCTION AND AGILE MANUFACTURING NEW SYSTEMS OF DOING BUSINESS IN THE 21ST CENTURY

Challenges of implementing Sustainability in Malaysian Housing Industry

Testing performance measures within maintenance, through case study research into lean thinking activities

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

JUST IN TIME (JIT), LEAN, AND TOYOTA PRODUCTION SYSTEM (TPS)

OM (Fall 2016) Outline

MIT SCALE RESEARCH REPORT

Impact of Lean Strategies on Different Industrial Lean Wastes

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

VIEWING SUPPLIERS AS ONE THEY HAVE OUR SAME DESIRES

Introduction to the Toyota Production System (TPS)

An Investigation of Lean Manufacturing Implementation in Textile Industries of Pakistan

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

JIT and Lean Operations. JIT/Lean Operations

We stand firm! Motion, heat, cold, pressure and time constraints

Junshi: A Daily Kaizen activity of Lean Production Management

Lean Thinking - Doing More With Less

Simulation of Lean Principles Impact in a Multi-Product Supply Chain

Malaysia Needs of Industries in Malaysia. I. Project Outline

Lean Operations. PowerPoint slides by Jeff Heyl. Copyright 2017 Pearson Education, Inc.

Human Resources Development and Training

Lean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6

ENTRY PACK 2016/2017. Prime Minister s. Hibiscus Award

Relationship of TQM and Business Performance with Mediators of SPC, Lean Production and TPM

Lean Culture in a university how to assess it. The results of preliminary research. Justyna Maciąg Institute of Public Affairs

ANALYSIS OF A PRODUCTION SYSTEM WITH THE HELP OF LEAN MANUFACTURING TOOLS

RELATIONSHIP BETWEEN LEAN MANUFACTURING AND BUSINESS PERFORMANCE: A CONCEPTUAL MODEL BASED ON LIBYAN MANUFACTURING INDUSTRIES

BPIF SPECIALIST SERVICES PROCESS IMPROVEMENT

Key of Toyota management success By Yi Jiang

IJMT Volume 2, Issue 3 ISSN:

Chauhan Nareshkumar.D, Darji P. H, Qureshi M.N; International Journal of Advance Research, Ideas and Innovations in Technology.

UNDERSTANDING BUSINESS EXCELLENCE

Thorough Elimination Of Muri, Mura And Muda To Achieve Customer Satisfaction

Applying Lean to your Manufacturing Process. Keihin A Business Case on Lean Implementation

Lean Principles. Jerry D. Kilpatrick. This article was originally written for and published by MEP Utah in 2003 (

Lean production and willingness to change

An Analysis of the Impact of Total Quality Management on Employee Performance with mediating role of Process Innovation

Applying Cleaner Production Concepts in Improving Quality of Environment

Operations Management

Application of Continuous Improvement Process in Manufacturing Industry

Lean manufacturing implementation in reducing waste for electronic assembly line

Identification and Ranking the Key Dimensions of Lean Manufacturing using NEW Approach in Gas Industry

Effectiveness of quality management system audit to improve quality performance A conceptual framework

A Holistic Framework for Business Excellence

AUTOMATION FROM LEAN PERSPECTIVE-POTENTIALS AND CHALLENGES. Keywords: Lean automation, automation development, competitive manufacturing

SCM 302 OPERATIONS MANAGEMENT JIT

Competitive Production Systems KPP202. Course Overview. School of Innovation Design and Engineering (IDT) Division of Product Realization

Bandar Putra Kulai, Master of

A SUBCONTRACTOR S LEAN JOURNEY: A CASE STUDY ON ILYANG

PRODUCTIVITY IMPROVEMENT BY IMPLEMENTING LEAN PRODUCTION APPROACH

Manufacturing inventory performance enhancement using lean management

The Incredible Journey From Fat to Lean

SUPPLIER SEGMENTATION IN IRANIAN AUTOMOTIVE INDUSTRY

Master Thesis Lean principles in case management Research proposal. Bjorn Visser 02 March 2009

Strategies for the Implementation of JIT Purchasing

Lean first, then automate: an integrated model for process improvement in pure service-providing companies

Integrating Big Island Layout with Pull System for Production Optimization

LEAN IMPLEMENTATION IN ESTONIAN SMEs BASED ON THE EXAMPLE OF THE COMPANY NARVA TES PLUS

Available online at ScienceDirect. Procedia CIRP 22 (2014 )

THE TOYOTA WAY : Driving Continuous Improvement and Innovation The Toyota Way

Implementation of Just-In-Time in an Enterprise

International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING

Lean Manufacturing at Spirit

Application of the Lean Manufacturing principles to an Injection Moulding Industry

What is 5S principle? 5S Training of Trainers for Training Institutions Training material No. 13

Apply lean and Taguchi in different level variability of food processing system

Identification of Factors which are Affecting for Effective Implementation of 5S Technique in SMEs of Vadodara Region

Just-in-Time System. Dr S G Deshmukh

A Proposed Tool for Lean Healthcare Performance Improvement (LHPI)

Transcription:

, July 6-8, 2011, London, U.K. Lean Manufacturing Implementation in Malaysian Automotive Components Manufacturer: a Case Study Rasli Muslimen, Sha ri Mohd Yusof, Ana Sakura Zainal Abidin Abstract This paper presents a case study of lean manufacturing implementation in Malaysian automotive components manufacturer. Semi-structured interview and open-ended questionnaire were used to investigate on how to successfully implement lean manufacturing in Malaysia manufacturing industry. The interview was conducted at a case study company with two managerials who are familiar with lean manufacturing implementation projects. The case study company was selected due to its achievement as a Toyota Production System Model Company awarded by the Malaysia Japan Automotive Industries Cooperation. The finding shows that this case study company used the project approach in their early stage of implementing lean manufacturing projects. The project based is a small scale project where the focus of lean manufacturing implementation is to solve the problems at a small area. They form a team with five full-time members, determine a model line for lean manufacturing implementation project, and then did the continuous improvements effort with focus on reducing the level of inventory. By reducing the level of inventory, this case study company was able to reduce other form of wastes including over production, waiting times, excessive transportation, excessive processing, excessive motion, and defective products. In the project based approach the company, conducted continuous improvement efforts until saturated level of major improvement and achieving a stable condition for the model line. Through their efforts and achievements in implementing lean manufacturing, this case study company has become a reference and role model for the other manufacturing companies in Malaysia. Index Terms Lean manufacturing, automotive components manufacturer, Malaysia T I. INTRODUCTION HE lean manufacturing (LM) or Toyota Production System (TPS) was pioneered by a Japanese automotive company, Toyota, during 1950 s. Due to its global superiority in cost, quality, flexibility and quick respond, Manuscript received March 23, 2011; revised April 15, 2011. This work was supported in part by University Malaysia Sarawak and Ministry of Higher Education Malaysia. Lean Manufacturing Implementation in Malaysian Automotive Components Manufacturer: a Case Study. Muslimen, R. is with the Dept. of Mechanical and Manufacturing Engineering, Faculty of Engineering, Universiti Malaysia Sarawak, 94300 Kota Samarahan, Sarawak, MALAYSIA (e-mail: rasna_126@hotmail.com). Yusof, S. M. is with the Faculty of Mechanical Engineering, Universiti Teknologi Malaysia, 81310 UTM Skudai, Johor, MALAYSIA (e-mail: shari@fkm.utm.my ). Abidin, A.S.Z. is with the Dept. of Mechanical and Manufacturing Engineering, Faculty of Engineering, Universiti Malaysia Sarawak, 94300 Kota Samarahan, Sarawak, MALAYSIA (e-mail: anras_126@yahoo.com ). LM was transferred across countries and industries [1]. LM has become a widely acceptable and adoptable best manufacturing practice across countries and industries [2]. The primary goals of LM were to reduce the cost of product and improve productivity by eliminating wastes or nonvalue added activities [3]. The success of LM implementation depends on several factors and approaches. Prior study has identified four critical success factors: leadership and management, financial, skills and expertise, and supportive organizational culture of the organization [4]. Other researchers also suggested that applying the full set of lean principles and tools also contribute to the successful LM transformation [5], [6]. However, in reality not many companies in the world are successful to implement this system [7], [8]. Furthermore, previous researchers insist that there is no cookbook to explain step by step of the LM process and how exactly to apply the tools and techniques [9], [10], [11]. Many manufacturing companies have implemented LM in many different ways and names in order to suit with their environment and needs. Therefore, it is important to conduct the research in order to identify the approaches and processes in LM implementation. Some studies have been done in Malaysian manufacturing industries regarding on LM implementation. Reference [12] focussed to examine the adoption of LM in the Malaysian electrical and electronics industries. Reference [13] focused on exploring the extent of LM implementation in Malaysian automotive manufacturing industries. Both of the studies found that most of the Malaysian manufacturing industries have implemented LM up to a certain extent and intransition towards LM. However, the findings based on Malaysian manufacturing industries do not provide on how to implement and what approach to be used to successfully implement LM. Therefore, the purpose of this study is to investigate on how to implement and what suitable approach to be used in order to successfully implement LM in Malaysian manufacturing industries. The investigation focuses on the LM implementation approach in Malaysian automotive components manufacturer. From this study, it will give one of the several approaches in implementing LM that has been practiced in Malaysian automotive components manufacturer. This study will present and highlight the early stage of the LM implementation approach by the case study company. The next stage of the LM implementation approach will be presented in future publication that will highlight the continuous improvement of LM

, July 6-8, 2011, London, U.K. implementation approach in order to sustain the efforts and success. II. RESEARCH METHODOLOGY The research methodology used in this research is a case study methodology. The case study method allows researchers to retain the holistic and meaningful characteristics of the real-life events [14]. A case study was performed in one of the automotive components manufacturer in Malaysia. This company selected was based on its achievement as a Toyota Production System (TPS) Model Company awarded by Malaysia Japan Automotive Industries Cooperation (MAJAICO) in year 2007. MAJAICO is a five year project from 2006 until 2011 initiated under the Malaysia Japan Economic Partnership Agreement (MJEPA) to develop and improve the Malaysian automotive industry to become more competitive as global automotive players. The main function of MAJAICO is to introduce continuous improvement activities in manufacturing companies mainly through total implementation of lean manufacturing. Interview was conducted at the case study company with two executives; Manager of Safety Environment & Quality Management, and Assistant Manager of Toyota Production System & Skill Development. Both of them are from Total Quality Management Department and very familiar with the LM implementation projects. Interview was conducted through prepared semi-structured and open-ended questionnaires. The semi-structured interview and openended questions were used where interviewees were encouraged to explain why the line operated in a certain way [15]. The semi-structured and open-ended questionnaires were utilized to gain insights regarding the status of LM implementation approach in this case study company. For this case study company, the semi-structured and openended questionnaire consists of three sections; (a). The company s background information (year of establishment, start of production, ownership, number of employees, products, customers, and achievements) (b). The understanding of lean manufacturing (c). The implementation of lean manufacturing. In order to find out the approach of LM implementation from this company, a number of questions were tailored to enable the extraction of ideas that give a true reflection on the interviewee s practices. Therefore, set a number of questions in this case study that embodied the companies understanding of LM and LM implementation. For example, the key questions in section (b) and (c) of the semistructured and open-ended questionnaires were as follows: How long it takes to complete the first implementation project of LM in your company? Do you think it is necessary to hire consultant to assist the implementation of LM? How about your company s practice? Who is the person responsible to lead the implementation of LM in your company? Where has LM been implemented in your company? What were the criterions for choosing that specific area? How many people involved in the project? What kind of waste does LM eliminated in the project? During the interview, it was tape recorded with the permission from the interviewees to avoid any missing points of information given by them. Finally, the overall information obtained from the interview was summarised and verified with the interviewees. Findings from the interview were analyzed and discuss in the findings and discussion section. III. BACKGROUND OF COMPANY From the section (a) of the semi-structured and openended questionnaires, the company s background information was gained and illustrated in Table 1. The name of this company is changed to MJ Sdn.Bhd. in terms of confidential issues. The company was established on 3 rd April 1980 and starts their production on 1 st July 1983. They have two manufacturing plants; Thermal Systems Plant and Electronics Plant. In Thermal Systems Plant, they have three product divisions; Air-conditioning, Cooling Systems, and Wiper & Motor Division where they produce nine products namely condenser, compressor, hose, piping, heater, ventilator, blower, radiator, and washer. And in Electronics Plant, they have four product divisions; Industrial Systems, Electronics, Body Electronics, and Engine Control Division where they produce four products namely programmable controller, engine electronic control unit, air-con amplifier, and CDI amplifier. Currently, the number of employees of this company is 1200 persons. This company is an industry specialist in high quality and technologically advanced automotive components with original equipments manufacturer status. This company has manufactured a total of thirteen products from these two plants. This company is a major automotive components supplier to national car in Malaysia. Their major customers are Toyota, their own group companies, Perodua, Honda, Proton and others. Since when did your company started to implement LM? What is your understanding about LM? Who has motivated your company to implement LM?

, July 6-8, 2011, London, U.K. TABLE 1 COMPANY S PROFILE Company Name MJ SDN.BHD. Establishment 3 rd April 1980 Start of Prod. 1 st July 1983 Employees 1200 Land Area 70,100 M² Build up Area 17,410 M² (Office + Thermal Systems Plant) 14,060 M² (Electronics Plant) Manufacturing Product Product Division Products Thermal Systems Plant Electronics Plant Customers Achievements Condenser, Compressor, Hose, Air-conditioning Piping, Heater, Ventilator, Blower Cooling Systems Radiator Wiper & Motor Washer Industrial Programmable Controller Systems Electronics Engine Electronic Control Unit Body Electronics Air-con Amplifier Engine Control CDI Amplifier Toyota, MJ Group Companies, Perodua, Honda, Proton, Others 1994 ISO 9002 Certification from SIRIM 2000 ISO 14001 Certification from SIRIM 2003 ISO/TS 16949 Certification from SIRIM 2006 Company Group President Award 2006 Achieved Zero Emission 2007 TPS Model Company by MAJAICO 2007 Environment Award from Selangor Government 2007 Achieved Quality Management Excellent Award from MITI 2008 ISO 9001:2000 Certification from SIRIM 2008 OHSAS 18001/MS 1722 Certification from SIRIM 2009 The winner of Prime Minister Hibiscus Award IV. FINDINGS AND DISCUSSIONS Lean manufacturing implementation in this company was started in 1996. At that time, the concept of lean manufacturing is still new and the knowledge in this company is still at a very low level. In 2002, the president of the company from headquarter in Japan came and asked to start lean manufacturing activities where one team was formed with five full-time members. At the early stage of lean manufacturing implementation in this company, the project based approach was used. The project based is a small scale project where the focus of LM implementation in this company is to solve the problem at the small area. From the interview, the authors have formulated the lean manufacturing implementation approach by this company as shown in Figure 1. First, this company forms a small team with five fulltime members to run the lean manufacturing implementation project. A few Japanese experts from headquarter in Japan came to teach and shared their knowledge of lean manufacturing implementation with the team members. Fig. 1. Lean manufacturing implementation approach Second, one model line was determined in order to run the lean manufacturing implementation project. The selection of the model line was based on the following characteristics; small area, bottleneck area, and delivery area. Before running the lean manufacturing implementation, the buffer stock was ready and prepared at the model line for any shortages of the product during lean manufacturing implementation. Finally, at the project base approach by this company, the focus of lean manufacturing implementation is reducing the level of inventory. For this company, inventory is the mother of other wastes. Reference [16], the father of Toyota Production System identified seven types of waste: Waste of over production Waste of waiting inventory Waste of unnecessary transportation Waste of waiting times Waste of unnecessary processing Waste of unnecessary motion Waste of defected products In lean manufacturing implementation approach by this company, the level of inventory is visualized similar to the level of water in a river. When they reduced the level of inventory, this means that they will be able to lower down the level of water in the river. Consequently, this action will highlight other wastes hiding at the lower level. The other wastes at the lower level are namely over production, waiting times, excessive transportation, excessive processing, excessive motion, and defective products. This scenario of reducing inventory level can be best illustrated in Figure 2.

, July 6-8, 2011, London, U.K. Excessive transportation Excessive processing Excessive motion Defective products Over production Waiting Fig. 2. The level of inventory Inventory level In the project base approach by this company, they did the continuous improvement effort at the selected model line. This continuous improvement effort is continued until a saturated level of major improvement is made and they reached the stable condition of the model line. In certain cases stabilizing the model line, the interviewee highlighted they did the major improvements for up to ten times. The duration to complete the LM implementation project by this case study company is within three to six months. After that, they will continue the next LM implementation project to another area following the same approach. This direction and approach in LM implementation is similar with a traditional Toyota approach where they begin with a model line. In Toyota, they helped their external suppliers to implement TPS through their Operation Management Consulting Group lead by Taiichi Ohno [17]. However, findings from the interview session regarding the assistant from the consultant show different approach. In this case study company, they did not hire any external consultant. They solely depended on the internal consultant from their own group companies and their skill workers that have been trained in Japan. They also used their own facilities and their companies facilities in order to implement lean manufacturing tools and techniques. For this case study company, they did the basic LM implementation largely common sense, and suit with their environment and needs. The analysis done by reference [18], found that the major difficulties companies encounter in attempting to apply lean are a lack of direction, a lack of planning and a lack of adequate project sequencing. In this case study company, they have clear direction from the top management, proper planning done by the full-time team members, and have a long term project in LM implementation. This long term project will be discussed further in the next stage of LM implementation approach. It can be said that this company has their own strength and capabilities in order to implement lean manufacturing and further develop their LM implementation approach. V. CONCLUSION AND FUTURE WORK The purpose of this study was to investigate how to implement and what approach to be used in order to implement lean manufacturing in Malaysian automotive components manufacturer. The findings from the interview session with semi-structured and open-ended questionnaire shows that the case study company used the project based approach in implementing lean manufacturing. They form a team with five full-time members, determine a model line, and did the continuous improvements effort until the model line was stabled. In their LM implementation project, they focus on reducing the level of inventory as the mother of the other wastes. After they reduce the inventory level, the other wastes has been highlighted and continuously reduce. The other wastes are over production, waiting times, excessive transportation, excessive processing, excessive motion, and defected products. In order to conduct the lean manufacturing projects, they have full support and clear direction from top management level especially from their president of the company. They have proper planning through their LM approach and implemented by the five full-time members that produce the full-time results. They follow the same approach in another area after having completed the first LM implementation project. As a result of LM implementation effort by this case study company, in year 2007 this company has been awarded as Toyota Production System Model Company by MAJAICO. As a lean production system model company, this company has become a reference and role model in implementing lean manufacturing for other manufacturing companies in Malaysia. Future work will involve presenting the next stage of LM implementation approach by this company towards sustaining lean manufacturing implementation. ACKNOWLEDGMENT The authors would like to thank the case study company in Malaysia for their willingness to participate in this study and future work. REFERENCES [1] R. J. Schonberger, "Japanese production management: An evolution - with mixed success," Journal of Operations Management, vol. 25, pp. 403-419, 2007. [2] M. Holweg, "The genealogy of lean production," Journal of Operations Management, vol. 25, pp. 420-437, 2007. [3] J. P.Womack, D. T.Jones, and D. Roos, The Machine That Change The World New York: Rawson Associates Scribner, 1990. [4] P. Achanga, E. Shehab, R. Roy, and G. Nelder, "Critical Success Factors for Lean Implementation within SMEs," Journal of Manufacturing Technology Management, vol. 17, pp. 460-471, 2006. [5] C. Herron and P. M. Braiden, "Defining the foundation of lean manufacturing in the context of its origins," IET International Conference on Agile Manufacturing, pp. 148-157, 2007. [6] T. James, "Wholeness as well leanness," IET Manufacturing Engineer, pp. 14-17, 2006. [7] M. Balle, "Lean attitude - Lean application often fail to deliver the expected benefits but could the missing link for successful implementations be attitude?," in Manufacturing Engineer. vol. 84, 2005, pp. 14-19. [8] T. C. Papadopoulou and M. Ozbayrak, "Leanness: experiences from the journey to date," Journal of Manufacturing Technology Management, vol. 16, pp. 784-807, 2005. [9] J. H. Allen, "Making Lean Manufacturing Work for you," Journal of Manufacturing Engineering, vol. 2000, pp. 1-6, 2000.

, July 6-8, 2011, London, U.K. [10] N. Oliver, "Lean production practices," British Journal of Management, pp. 1-10, 1996. [11] A. Nanni, M. Gregory, and K. Platt, "Performance measurement system design," International Journal of Operations and Production Management, vol. 15, pp. 80-116, 1995. [12] Y. C. Wong, K. Y. Wong, and A. Ali, "A Study on Lean Manufacturing Implementation in the Malaysian Electrical and Electronics Industry," European Journal of Scientific Research, vol. 38, pp. 521-535, 2009. [13] N. Nordin, B. M. Deros, and D. A. Wahab, "A survey on lean manufacturing implementation in Malaysian automotive industry," International Journal of Innovation, Management and Technology, vol. 1, pp. 374-380, 2010. [14] R. K. Yin, Case Study Research: Design and Methods, Fourth ed. vol. 5. United States of America: SAGE Publications Inc., 2009. [15] D. Simons and K. Zokaei, "Application of lean paradigm in red meat processing," British Food Journal, vol. 107, pp. 192-211, 2005. [16] T. Ohno, Toyota Production System Beyond Large - Scale Production. Oregon: Productivity Press, 1988. [17] J. K. Liker, Becoming Lean: Inside Stories of U.S. Manufacturers. New York: Productivity Press, 1998. [18] S. Bhasin and P. Burcher, "Lean Viewed as a Philosophy," Journal of Manufacturing Technology Management, vol. 17, pp. 56-72, 2006.