Update MRC s Preliminary Design Guidance (PDG)

Similar documents
MRC Guidelines and Tools for Sustainability Development of Hydropower SHDS, PDG, PNPCA, and Future Updates

MEKONG RIVER COMMISSION. Concept Note Final Draft Version

Review and Update Sustainable Hydropower

Mekong River Commission

Basin-wide Strategy for Sustainable Hydropower Development for the Lower Mekong Basin

Progress Overview and Next Steps

Report of the Mekong River Commission **

1 Consultancy Summary

Joint Environmental Monitoring (JEM)

and Action Plan Mekong Climate Change Adaptation Strategy

MRC stakeholder engagement

PNPCA Commentary from the PNPCA Lessons Learnt

MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework

Implementation of Previous PNPCA Processes and Lessons Learnt

Guidelines for Transboundary Environmental Impact Assessment in the Lower Mekong Basin 1

Heng Suthy, Regional Coordinator for CS, MRCS Regional Stakeholder Forum on Council Study 22 Feb 2017, Luang Prabang, Lao PDR

Initiative on Sustainable Hydropower (ISH) Document. Discussed at the first meeting of the ISH Regional Advisory Committee

Mekong Climate Change and Adaptation Initiative and the Mekong River Commission

PROMOTING A FAIR BALANCE ON MEKONG S SHARED WATER. Te Navuth (Mr.) Secretary General, Cambodia National Mekong Committee

The Mekong River Commission s Initiative for Sustainable Hydropower. Oslo, Norway 4-6 September Presented by: Voradeth Phonekeo

The Role of the Mekong River Commission (MRC) in Conflict Management. SATIT PHIROMCHAI Mekong River Commission Secretariat

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

ANNUAL REPORT Version 2.0

Xayaburi Hydropower Project

Mekong River Commission

Trends and long-term outlook for the Mekong region

Internal review at Lao PDR level before PNPCA

Public Participation in Transboundary EIA in the Mekong Region. MPE Webinar Series AECEN Secretariat/Mekong Partnership for the Environment

USING CUMULATIVE IMPACT ASSESSMENT AND SUSTAINABILITY TOOLS FOR RIVER BASIN MANAGEMENT Peter John Meynell Chiang Mai, 11 March 2011

Mekong Climate Change & Adaptation Initiative

VIETNAM ENGAGEMENT IN TRANSBOUNDARY WATER COOPERATION IN MEKONG RIVER BASIN

Mekong Climate Change and Adaptation Initiative of the Mekong River Commission

PRIOR CONSULTATION PROJECT REVIEW REPORT

Mekong River Commission

A nexus of adaptation Climate change implications on the water food-energy nexus of the Lower Mekong Basin

MRC Fisheries Programme On-going study:

Review and Update of the MRC Design Guidance for Proposed Mainstream Dams of the Lower Mekong Basin

Stakeholder Participation and Communication Plan for Basin Development Planning in the Lower Mekong Basin

Technical Review of Pak Beng Hydropower Project Water Quality, Aquatic Ecology and Fisheries

Annex III. Report of the 1 st Planning Meeting for the Council Study

Siem Reap Declaration

Siem Reap Declaration

Siem Reap Declaration

From Upstream to Downstream:

The Council Study. Sustainable Management and Development of the Mekong River Including Impacts of Mainstream Hydropower Projects

Cumulative Impact Assessment Key Findings Report

Interactions Among Key Stakeholders in Hydropower Development in Vietnam

Key features and development challenges for the Mekong River Basin

The ADB/ World Bank/ MRC Mekong Water Resources Assistance Strategy (MWRAS): Justifying large water infrastructure with transboundary impacts

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION

MRC Climate Change and Adaptation Initiative - Development of Regional Climate Change Scenarios and the Mekong Adaptation Strategy and Action Plan

COMMENTS BY LAO PDR ON THE MRCS TECHNICAL REVIEW REPORT OF THE PROPOSED XAYABURI DAM PROJECT

Transboundary Water Resources Management Issues

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012

SCOPING AND PLANNING OF THE ASSESSMENT OF BASIN-WIDE DEVELOPMENT SCENARIOS

The Mekong River Commission

The Mekong River Commission s state of knowledge and state of governance with respect to Mekong mainstream dams

ENERGY AND POWER SUMMARY (Avoidance, mitigation and enhancement considerations)

Geopolitical benefits of transboundary water cooperation. The Mekong River Basin Case

TRANSBOUNDARY DIALOGUE

Chapter 3: Fish Passage on Mainstream Dams

The LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018

MRC ASSESSMENTS ON FLOODS, DROUGHTS AND CLIMATE CHANGE

HYDROPOWER DEVELOPMENT IN THE MEKONG BASIN

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

The Mekong River Report Card on Water Quality ( )

SHARING BENEFITS FROM TRANSBOUNDARY WATER MANAGEMENT

Presentation Transboundary water cooperation in Mekong Countries, key issues, challenges and intervention to address

Consultation Proceedings

Case Presentation: Law for Benefit sharing on hydropower projects in Viet Nam - & - Linking national benefit sharing to Transboundary benefit sharing

Simon Howard Sustainability Specialist, IHA 30 May 2012

Strategic Plan Mekong River Commission. Cambodia. Lao PDR. Thailand. Viet Nam For sustainable development

Climate Change and Adaptation Initiative: balanced top-down and bottom-up approaches

Mekong River Commission. Mekong Adaptation Strategy and Action Plan

Contemporary Issues on the Mekong River

LOWER MEKONG RIVER BASIN DEVELOPMENT PLAN PROGRAMME ( ): AN INTRODUCTION

Impacts of mainstream dams on fisheries and mitigation options - Current status of knowledge

MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS. Letters from the EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF

I C E M - I n ternat i o n a l C e n tre fo r E n v i ro n m e n t a l Manage m e n t

Integrated Capacity Building Programme

Trans-boundary Flood Issue in Lower Mekong River Basin

ACKNOWLEDGEMENTS the 4th Regional Stakeholder Forum on the Mekong Basin Development Strategy

Mekong River Commission

Mekong River Commission

Regional Action Plan

Council Study: Inception Report

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE For an individual consultant and/or individual consultant assigned by consulting firms/institutions

TERM OF REFERENCE DRAFT

The First Mekong River Commission Summit 2010

Agenda B.1 Progress Report on the Study on Sustainable Management and Development of the Mekong River including Impacts by

MRC Work Programme 2009

Second meeting of the Task Force on the Water-Food-Energy-Ecosystem Nexus, 8-9 September 2014,

Trishuli River Case Study

Review of Existing Knowledge on the Effectiveness and Economics of Fish-Friendly Turbines

Benefit sharing in hydropower development. Initiative on Sustainable Hydropower

Economic, Environmental and Social Impacts of Hydropower Development in the Lower Mekong Basin

Draft Concept Note Agriculture and Irrigation Programme (AIP) ( )

Creating Synergy and ADB s Water Policy

Mekong River Commission

Transcription:

Forty-Sixth Meeting of the MRC Joint Committee 22-23 August 2017 Vientiane, Lao PDR. Update MRC s Preliminary Design Guidance (PDG) The 4 th Hydropower Forum Developers Dialogue 10 th 11 th August 2017 MRCS, Vientiane, Lao PDR 1 1

1. Objective of MRC s DG2018 Updated DG2018 for proposed mainstream and (significant tributary) dams on LMB provides: Contemporary, research based performance standards, design and operating principles; Covering compliance monitoring and adaptive management; To be endorsed by the Joint Committee by mid-2018

2. Principles (adapted from PDG2009) MRC s Design Guidance 2018 will be provided in the form of: 1. Performance targets, design and operating principles for mitigation (not prescriptive design requirements); 2. Emphasise joint compliance monitoring and adaptive management; 3. Adopts a consistent approach across the basin in the design of individual dams, as well as the proposed mitigation and management measures. 4. Allows developers the flexibility to identify and propose the best solutions.

3. Lessons Learned from PNPCA Implementations Guidance on minimum primary data requirements; Good social impact assessment and resettlement practices; Emphasis on the avoidance of impacts (through strategic planning); Options for joint planning, join coordination and join monitoring particularly at trans-boundary level; Elaborate on Adaptive Management; Guidance as to quality of the EIA to avoid delays in the provision of adequate information for assessment; Operating rules for projects are often not provided in PNPCA documents; Inclusion of the need for Trans-boundary CIA requirements with reference to current MRC preparation of guidance for TbEIA.

4. ISH0306 Mitigation Guidelines: across the lifecycle Mitigation Focus Investigation Project Phase

Update of the MRC s PDG (DG 2018) 5. Consideration of Additional Sections in DG2018 1. Hydrology and Water Flow: Dealt with separately in PNPCA (ramp rates, flow variation, minimum flows etc.); 2. Socio-economics and Livelihoods: Considered in PNPCA but no guidance, focus on transboundary and take account of national standards; 3. Transboundary EIA: Currently under preparation by MRCS through WB funds, will allow separation of local and Tb impacts to be fully set out.

6 Scope of Review All sections of PDG2009 will be reviewed and selectively updated; Philosophy to be used performance standards rather than prescriptive designs will be retained; New sections may be added to cover areas of agreed gaps as highlighted bullet 2.5; Clear links to Mitigation Guidelines (ISH0306); Stakeholder inputs and ideas will be gathered where possible; Consultation with, and endorsement of, MRC Member Countries will be vital to gain an agreed set of guidelines in DG2018.

7 Steps and Method 1. Agree Objectives and Scope by MRCS July 2017, and Joint Committee November 2017; 2. Mobilise a Team of Key Experts; 3. Gather inputs from regional and national experts (+developers) who have familiarity with PDG2009; 4. Draft revised and updated Clauses (Draft V0.1); 5. Discussion with MRC Secretariat (V0.2), then with MCs for National Review and Consultation (Draft V0.3); 6. Regional Meeting of MRC (JC Task Group- TBC) to seek consensus on final wording of DG2018 V1.0; and 7. Finalise DG2018 V1.0 and report to JC for endorsement.

STEPS Update of the MRC s PDG (DG2018) 8 Timeline YEARS PDG Review Timeline J A S O N D J F M A M J J A S O N D Agree Objectives,Scope : Secretariat (July 17); JC (Aug 17) National and Regional Consultation Se c JC 2017 2018 Q3 Q4 Q1 Q2 Q3 Q4 Procure Technical Team Mobilise Team Gather inputs and lesson learned from PNPCA and ISH0306 Draft Revised Clauses V0.1 Intrnal Secretatiat discussion and Draft V0.2 National Review and consultation of DG2018 V0.2 Na t Include National comments Draft V0.3 DG2018 Regional Meeting of MRC (JC Task Group- TBC) Finalise DG2018 V1.0 and report to JC for endorsement Re g

Forty-Sixth Meeting of the MRC Joint Committee 22-23 August 2017 Vientiane, Lao PDR. Thank you