INSPECTION GUIDELINES: STRUCTURAL INSULATED PANELS (SIPs)

Similar documents
SECTION R614 STRUCTURAL INSULATED PANEL WALL CONSTRUCTION

INSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC.

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

INSPECTION GUIDELINES: SPECIAL INSPECTION REQUIREMENTS

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: FOUR SEASONS SOLAR PRODUCTS

INSPECTION REQUIREMENTS: FOUNDATIONS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: SIDING REPORT HOLDER: SHAKERTOWN 1992, INC.

ANSI/APA PRS Standard for Performance-Rated Structural Insulated Panels in Wall Applications

Guide to Attaching Exterior Wall Coverings through Foam Sheathing to Wood or Steel Wall Framing

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

PRODUCT: Structural Insulated Panels (SIPs) DIVISION: Wood and Plastics (06) SECTION: Structural Panels ( )

PRODUCT: Structural Insulated Panels (SIPs) DIVISION: Wood, Plastics, and Composites (06) SECTION: Structural Panels ( )

POST FRAME BUILDING STANDARDS

RESIDENTIAL PATIO COVER Submittal/Permitting Guidelines

PRODUCT: Structural Insulated Panels (SIP) DIVISION: Wood and Plastics (06) SECTION: Structural Panels ( )

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR

Originally Issued: 11/04/2016 Revised: 11/28/2017 Valid Through: 11/30/2018

Lamit Industries, Inc. 710 Marion Road Columbus, Ohio P-(614) F-(614)

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: EVALUATION SUBJECT: STRUCTURAL PANELS

SECTION STRUCTURAL INSULATED PANELS

Building Division Informational Handout

The better way to build TM. Installation Manual NAILBASE PANELS

ESR-2894 Reissued April 2014 This report is subject to renewal April 1, 2016.

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

Listing Report: MUR Reissue Date: 12/07/17 This report is subject to annual review

SECTION COLD-FORMED METAL TRUSSES

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: LAMINATED VENEER LUMBER REPORT HOLDER: REDBUILT LLC EVALUATION SUBJECT:

Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses (MPCWT) Design Guide Revised 11/17/2016

DECK PERMIT APPLICATION

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PLASTIC SIDING REPORT HOLDER: CERTAINTEED CORPORATION

IAPMO UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR JOIST HANGERS AND MISCELLANEOUS CONNECTORS

City of Bemidji Building Office City Hall 317 4th Street NW Bemidji, Minnesota Phone Fax emi mn s

CSI PRODUCT: Structural Insulated Panels (SIP) DIVISION: Wood, Plastics and Composites SECTION: Structural Panels

ICC ES SYSTEM SYSTEM. Trusted DIVISION: 07 SECTION: AND FINISH REPORT HOLDER: ICC-ES Evaluation. Reissued 08/2016.

FIGURE R502.2 FLOOR CONSTRUCTION

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) PREFACE

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PLASTIC SIDING REPORT HOLDER: GENTEK BUILDING PRODUCTS, INC.

Joint Evaluation Report

DIVISION: CONCRETE SECTION: INSULATING CONCRETE FORMING REPORT HOLDER: DIVERSIFOAM PRODUCTS EVALUATION SUBJECT:

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

ANSI/APA PRS Standard for Performance-Rated Structural Insulated Panels in Wall Applications

C. Delegated-Design Submittal: For metal-plate-connected wood trusses indicated to comply with

Garage/Accessory Structures

Special Inspections for Wood Construction BCD710 Michelle Kam-Biron, PE, SE, SECB Senior Director, Education American Wood Council

Typical Deck. CONSTRUCTION TIP SHEET 5 Basic Decks w/ 60 psf Live Loading

Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)

ATI Evaluation Service A Division of Architectural Testing Certification Services

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING AND SIDING PANELS REPORT HOLDER: KINGSPAN INSULATED PANELS, INC.

Joint Evaluation Report

Typical Deck. CONSTRUCTION TIP SHEET 5 Basic Decks w/ 60 lb Live Loading

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD I JOISTS REPORT HOLDER: STARK TRUSS COMPANY, INC.

Joint Evaluation Report

Joint Evaluation Report

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: NAILS REPORT HOLDER: HY-TEK FASTENERS INC. EVALUATION SUBJECT: HY-TEK NAILS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS REPORT HOLDER: METAL SALES MANUFACTURING CORPORATION

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: 3A COMPOSITES USA INC.

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: SHOP FABRICATED WOOD TRUSSES REPORT HOLDER: BARRETTE STRUCTURAL DISTRIBUTION, INC.

ANSI/APA PRS Standard for Performance-Rated Structural Insulated Panels in Wall Applications

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: CONCRETE ROOF TILES REPORT HOLDER: BARTILE ROOFS, INC. EVALUATION SUBJECT:

REPORT HOLDER: HUBER ENGINEERED WOODS, LLC ONE RESOURCE SQUARE DAVID TAYLOR DRIVE, SUITE 300 CHARLOTTE, NORTH CAROLINA 28262

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: WATER-RESISTIVE BARRIERS/WEATHER BARRIERS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PLASTIC SIDING REPORT HOLDER: KAYCAN LTD.

Building Department Informational Handout

REPORT HOLDER: BLUE POINT FASTENING, INC YORBA COURT CHINO, CALIFORNIA EVALUATION SUBJECT:

REPORT HOLDER: AEROSMITH FASTENING SYSTEMS 5621 DIVIDEND ROAD INDIANAPOLIS, INDIANA EVALUATION SUBJECT: AEROSMITH BRAND FASTENERS

REPORT HOLDER: OMEGA PRODUCTS INTERNATIONAL, INC CALIFORNIA AVENUE CORONA, CALIFORNIA EVALUATION SUBJECT:

Project Address: Name of Person Completing Form:

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: NAILS REPORT HOLDER: PASLODE, AN ILLINOIS TOOL WORKS COMPANY

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

City of Republic Community Development Girder and Header Spans for Exterior Walls

Attachment of Residential Deck Ledger to Metal Plate Connected Wood Truss Floor Systems

LP OSB Sheathing & Structural 1 Sheathing

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

Minimum Residential Plan Submittal Requirements

Code Compliance Research Report CCRR-0186

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: PFB AMERICA CORPORATION

CHAPTER 5 FLOORS SECTION R501

Lamit Industries Nailbase Panels General Recommendations

TECH BULLETIN. SIP No. Subject: Engineered Wood Lap Siding from Louisiana-Pacific. Date: August 2010 (Revised January 2015)

BUILDING PERMIT REQUIREMENTS FOR: RESIDENTIAL DECKS CITY OF ESCONDIDO BUILDING DIVISION 201 N. BROADWAY, ESCONDIDO, CA (760)

TER No Attachment of Exterior Wall Coverings Through Kingspan Kooltherm Insulation Boards to Wood or Steel Wall Framing

Proud of its Heritage, Preparing for its Future

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: SHOP FABRICATED WOOD TRUSSES REPORT HOLDER: MITEK USA, INC.

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

INSPECTION GUIDELINES: ROOF/EXTERIOR SHEATHING/STRUCTURAL FRAME

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS REPORT HOLDER: METAL SALES MANUFACTURING CORPORATION

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: SHOP FABRICATED WOOD TRUSSES REPORT HOLDER: BARRETTE STRUCTURAL DISTRIBUTION, INC.

Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses. DD No

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: PFB AMERICA CORPORATION EVALUATION SUBJECT:

Contents. ZIP System R-Sheathing

City of Long Beach Department of Development Services Building and Safety Bureau. Design Limitation for Wood Shear Walls

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL WALL PANELS REPORT HOLDER: FCP, INC.

ICC-ES Evaluation Report Reissued November 2014 This report is subject to renewal November 2016

Advanced Wind Mitigation Methodologies, Pt. 1- Internet Course (5th Edition)

Transcription:

Structural Insulated Panels Page 1 of 7 Revision Date: 05/22/2017 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION GUIDELINES: STRUCTURAL INSULATED PANELS (SIPs) INSPECTION CODE: 111, 204, 216 SCOPE: RESIDENTIAL CODES ENFORCED: 2016 CBC, CRC, CPC, CMC, CEC, CALGreen, CEnC, and PAMC The information provided in this document is general and intended as a guide only. Each project is unique and additional requirements may be enforced as deemed appropriate. IMPORTANT Due to the complexity of Structural Insulated Panels (SIPs) as an alternative method of construction, a Pre- Construction Meeting (Inspection Code 111) is mandatory for all SIPs projects in Palo Alto. The Pre- Construction Meeting will address: o The manufacturer s fabrication drawings and installation manuals o Applicable ICC-ES report (or equivalent) o Required Special Inspections o Required engineer of record s field observation reports o Manufacturer s site representative contact information for clarification of field issues Please refer to the Sequence of Inspections checklist for a complete list of inspections required in Palo Alto. Please note that for SIPs, some inspections are critical. Below are some examples: o Inspection Code 111: Pre-Construction Meeting The pre-construction meeting is mandatory for SIP projects. o Inspection Code 204: Foundation and Setbacks SIP installation may require multiple foundation inspections to capture concealed anchorage and attachments to the foundation system. The fabrication plans and manufacturer s installation manual are required for this inspection. If applicable, foundations in flood zones require a joint inspection with the Public Works inspector. Contact PW inspector Denis Huegle @ 650-496-6962 and inform Denis of the building inspector s name, date, and approximate time of inspection. The purpose of the joint inspection is to determine the correct location of the flood vents. o Inspection Code 216: Roof, Exterior Sheathing, and Structural Framing The fabrication plans and manufacturer s installation manual are required for this inspection.

Structural Insulated Panels Page 2 of 7 Revision Date: 05/22/2017 SIP WALL CONSTRUCTION PER CRC R610 Structural Insulated Panels shall be designed in accordance with the provision of CRC R610, and it shall be used to design: o SIP walls o Project drawings o Typical details o Specifications The aforementioned provisions shall not exempt construction documents from the requirement to be stamped by a California licensed architect or engineer. (CRC R610.1) Special inspections may be required by the ICC ES report (or equivalent), and the ICC ES report (or equivalent) shall be included with the design documents detailing minimum installation and inspection requirements. (CBC 17) The prescriptive method described in CRC R610.2 shall not apply to Palo Alto, because Palo Alto is either a D or E seismic design category. Therefore, an engineered design is required for all SIP construction proposed in Palo Alto. (CRC R610.2) INSPECTION MATERIALS CORE Core material shall be composed of foam plastic insulation meeting one of the following: o ASTM C578 and have a minimum density of 0.90 pounds per cubic feet o Polyurethane meeting the physical properties shown in Table R610.3.1 o An approved alternative (must be shown in the drawings) (CRC R 610.3.1) FACING The facing shall be wood structural panels conforming to DOC PS 1 or DOC PS 2, each having a minimum nominal thickness of 7/16. The facing shall be identified by a grade mark or certificate of inspection issued by an approved agency. (CRC R 610.3.2)

Structural Insulated Panels Page 3 of 7 Revision Date: 05/22/2017 ADHESIVE Adhesives shall conform to ASTM D2559 or approved alternative intended for use as an adhesive used in the lamination of SIPs. Each container of adhesive shall bear a label with the adhesive manufacturer s name, adhesive name and type and the name of the quality assurance agency. (CRC R 610.3.3) LUMBER Verify that the lumber framing material is NLGA grade No. 2 Spruce-pine-fir. Substitutions shall meet or exceed the mechanical properties and specific gravity of No. 2 Spruce-pine-fir. (CRC R 610.3.4) SCREWS Screws shall be made of steel, provided by the manufacturer, and shall be able to penetrate the assembly not less than 1. The screws shall be corrosion resistant and shall have a minimum shank diameter of 0.188 and a minimum head diameter of 0.620. (CRC R 610.3.4) NAILS Nails shall be common or galvanized box unless otherwise noted. (CRC R 610.3.5) WALL CONSTRUCTION WALL PANELS Verify that the panels comply with Figure R610.4 or as shown in the city-approved drawings. The panels should be labeled or shall have a certificate of inspection issued by an approved agency. Each SIP shall be a stamp or label with the following information (CRC R 610.3.5): o Manufacturer name/logo o Identification of the assembly o Quality assurance agency

Structural Insulated Panels Page 4 of 7 Revision Date: 05/22/2017 TOP PLATE CONNECTION Verify that SIP walls are capped with a double top plate installed to provide over-lapping at corner, intersections, and splines as shown in Figure R610.5.1. The top plate shall be the same width as the panel core and shall be recessed into the SIP below. (CRC R 610.5.1) BOTTOM PLATE CONNECTION Verify that the SIPs have full bearing on the sole plate, which should have a width equal to a foam core. When the SIPs are on a foundation, the wall shall be anchored as shown in Figure R610.5.2. (CRC R 610.5.2)

Structural Insulated Panels Page 5 of 7 Revision Date: 05/22/2017 CONNECTIONS Verify that the SIPs are connected at vertical inplane joints as shown in Figure R610.8. (CRC R 610.8) Corner framing shall be constructed in accordance with Figure R610.9. (CRC R 610.9)

Structural Insulated Panels Page 6 of 7 Revision Date: 05/22/2017 HEADERS Verify that SIP headers are a minimum of 11-7/8 deep and are a continuous section. Wood structural head panel box headers shall be permitted where SIP headers are not applicable. (CRC R610.10) OTHER CONNECTIONS For connections between the SIP and a truss, follow Figure R610.5(3). For connections between SIPs at wall-to-wall and at balloon framing, follow Figures R610.5(4) and R610.5(5).

Structural Insulated Panels Page 7 of 7 Revision Date: 05/22/2017 DRILLING AND NOTCHING Verify that the maximum vertical chase penetration in SIPs does not exceed 2 centered in the panel and that they are at least 24 on center. (CRC R610.7) A maximum of two horizontal chases are permitted in each wall panel one at 14 (plus or minus 2 ) from the bottom of the panel and one at 48 (plus or minus 2 ) from the bottom edge of the SIPs panel. (CRC R610.7) Additional penetrations are permitted where justified by analysis. (CRC R610.7) ICC-ES REPORT OR EQUIVALENT Provide the ICC-ES Report or equivalent to the inspector for additional installation requirements and special inspections required.