Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France

Similar documents
Geographic context. Hydropower developments on the upper Rhone River

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Xayaburi Hydroelectric Power Project

Xayaburi Hydropower Project

in France and internationally

THE RHONE SEDIMENT OBSERVATORY: EVALUATION AND COMMUNICATION ON THE FLUXES OF PARTICULATE CONTAMINANTS AT THE BASIN SCALE

Internal review at Lao PDR level before PNPCA

CASE STUDY OKUYOSHINO, JAPAN

Prepared by: PacifiCorp 825 NE Multnomah Street Portland, OR 97232

Water Balance Assessment of the Roseires Reservoir

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS

Sabin Pond Comprehensive Initial Drawdown Plan Boardman River Dam Removal Project Grand Traverse County, Michigan

Content of Presentation

Natura 2000 and Hydropower. Hydropower and Fish Workshop Brussels 29 May, 2017

Water Resources ENV 107

Hydropower factoring in climate change

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012

Solution for Irrigation Engineering

Nam Theun 2. TNC workshop April 2014

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

HYDROLOGY - BASIC CONCEPTS

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area

Monitoring of water levels and flood discharge

The Consistent Development in the Whole River System

KEYS TO SUCCESS IN THE SUSTAINABLE MANAGEMENT OF THE RHINE RIVER : From an open sewer to a living river

Restoration of the Old Drava Riverbed at the ^akovec Hydropower Plant

The Case of Kurichu in the Indo-Bhutan Context

COMMENTS BY LAO PDR ON THE MRCS TECHNICAL REVIEW REPORT OF THE PROPOSED XAYABURI DAM PROJECT

Numerical Simulation of Flood Routing in Complex Hydraulic Schemes. The Routing System Computer Program

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

The Mackenzie River Hydroelectric Complex Concept Study

Control and Mitigation of Drinking Water Intake Problems along Nile River

Outlet Structure Modeling

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

Reservoir planning, design and operation

EFFECT OF HYDROGRAPHIC DATA QUALITY ON WATER SURFACE PROFILE AND NAVIGATIONAL DREDGING COMPUTATIONS

EFC WP MMW - Working Group II Workshop on Woody debris

PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT

PAKLAY HYDROPOWER PROJECT

CASE STUDY JHIMRUK, NEPAL

Performance improvement of headworks: a case of Kalignadaki A Hydropweor Project through physical hydraulic modelling

DAM REMOVALS IN THE BASQUE COUNTRY

Md. Khairul Islam Executive Engineer, Bangladesh Water Development Board, Dhaka, Bangladesh.

MRC SEA FOR HYDROPOWER ON THE MEKONG MAINSTREAM INCEPTION REPORT VOL II MAINSTREAM PROJECT PROFILE SUMMARIES 23 OCTOBER 2009

Yangtze River. Geomorphology, Hydrology, and the Three Gorges Dam. Chris Pavlovich, Lauren Ceckowski Brian Singer, Aveline Cruickshank

Hydropower infrastructure - How to make Swiss hydropower more competitive?

10 Project Cost Estimation

Harbour Constructions

Mijo River Project. Steve Hall, Spencer Taylor, Jennie Purcell Brigham Young University 4/11/2012

Module 2 Measurement and Processing of Hydrologic Data

VII - WATER CONTROL PLAN

WP4.4 Astico MCA alternatives description

EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION

MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS. Letters from the EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF

M RC S EA FOR H YD ROPOW E R O N TH E M E KO NG M AI NS T R EAM INCEPTION REPORT VOL II MAINSTREAM PROJECT PROFILE SUMMARIES 23 OCTOBER 2009

Profiles of 12 proposed Mainstream developments in the LMB

Federal Democratic Republic of Ethiopia STATE PARTY REPORT IN RESPONSE TO THE WORLD HERITAGE COMMITTEE DECISION WHC 34 COM 7B.44

Keeyask Generation Project. Physical Environment. Supporting Volume. Environmental Impact Statement

IMPACT OF HYDROELECTRIC DEVELOPMENT OF THE UPPER REACHES OF IRRAWADDY RIVER ON THE LOWER REACHES

SHARING THE EXPERIENCES IN MODERNIZATION OF IRRIGATION SYSTEMS IN KOREA POPULATION IN THE WORLD

LIFE Project Number LIFE06 ENV/D/ Layman s Report. Covering the project activities from to Reporting Date

CASPIAN SEA COASTAL ZONE REMOTE SENSING MONITORING 2002: VOLGA DELTA AND TEREK DELTA

Screening Simulations for Sediment Diversions: AdH/SEDLIB

From Upstream to Downstream:

Introducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown

OUR 9 COMMITMENTS IN FAVOUR OF ENERGY TRANSITION AND THE CLIMATE

PROJECT SUMMARY (6.)

Chinese River Basins Yellow River, Huai, Interior Basins. Preliminary results of the GCI II survey

Upstream structural management measures for an urban area flooding in Turkey

Hydropower retrofitted onto existing water infrastructure assets

SALTWATER INTRUSION IN THE BAIE DE RUPERT, JAMES BAY, CANADA

Water Resources. Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

Numerical unsteady flow model simulation during the sluice closure of Caruachi Dam

Technical Review of Pak Beng Hydropower Project Water Quality, Aquatic Ecology and Fisheries

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant

World Meteorological Organization Working together in weather, climate and water

Control of the risk of dyke failure caused by contact erosion. geophyconsult

Methods of Streamflow Analysis

The LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018

Optimization of the flood protection effect of a hydropower multi-reservoir system

This is an author-deposited version published in : Eprints ID : 11290

Modeling of Flow in River and Storage with Hydropower Plant, Including The Example of Practical Application in River Drina Basin

EVALUATION ON THE IMPACTS OF UPSTREAM DAM DEVELOPMENT ON SALINITY INTRUSION INTO VIETNAMESE MEKONG DELTA

SEES 503 SUSTAINABLE WATER RESOURCES HYDROELECTRIC POWER. Assist. Prof. Dr. Bertuğ Akıntuğ

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Tulsi Prasad Phuyal Research Engineer Hydro Lab, Pulchowk, Lalitpur, Nepal

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

HYDRAULICS DIVISION. Assoc. Prof. Dr. Mustafa ERGİL. Assoc. Prof. Dr. Umut TÜRKER

D EROSION AND SEDIMENT CONTROL. Table of Contents

Developing a local flood risk management strategy Annex 1: Flooding, flood sources and flood defences

Our reference BGS-0003-c. Direct line +31(0)

multiconsult.no Hydropower modelling Vientiane January

Irrigation System. BWCDD Zanjero Training 2/13/2008

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Guidelines and Recommendations for Mitigation of Hydrological and Flow Impacts Kees Sloff and Jenny Pronker

Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge

Legal Basis of Water Management in Austria

River Processes River action (fluvial)

Transcription:

Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France Christophe PETEUIL Compagnie Nationale du Rhone Engineering Department, River Systems and Climate Hazards Division 2, rue Andre Bonin - 69316 Lyon Cedex 04 - France Email: c.peteuil@cnr.tm.fr Geographic and hydropower context The Rhone River is one of the major rivers of Europe. Flowing from the Swiss Alps up to the Mediterranean Sea, the river winds through the French territory for 2/3 of its course. At the outlet of the catchment, the river delivers a mean annual discharge of 1700 m³/s for a basin area of 95,500 km². Relatively steep slopes for such large river (Figure 1) characterizes the Rhone River. As many of its major tributaries come also from the Alps, it is currently concerned by significant sediment fluxes (Table 1). Note that these fluxes have been dramatically reduced since the end of the 19 th century. Many factors explain this evolution: sediment trapping into specific hydraulic structures built in the late 19 th to improve the navigation (so called Girardon spur-dikes), extraction works for civil construction, sediment capture into large reservoirs built on tributaries, soil restoration works done by the forestry Administration Thus, at the outlet of the basin, bedload transport has been divided by 10 whereas suspended load has been divided by 3 since the end of the 19 th century (SOGREAH, 2000). Disruption of solid transportation is a serious concern on the Rhone River since the lack of solid materials at the Rhone River delta limits the possibility of sediment supply to the Mediterranean shoreline. Figure 1: Longitudinal profile of the French Rhone River.

Table 1: Mean annual fluxes at different locations both for bedload and for suspended load on the Rhone River. Station Bedload (m 3 /y) Suspended load (Mt/y) Lyon 5,000 to 10,000 4.0 Valence 10,000 to 25,000 8.0 Avignon 25,000 to 50,000 11.0 Since 1933, Compagnie Nationale du Rhone (CNR) has been granted the concession to operate the Rhone from the Swiss border to the Mediterranean Sea. In that framework, CNR carries out three interdependent missions: hydropower production, navigation and irrigation and other agricultural uses. It has built 19 hydropower plants on the river, opened up a wide-gauge waterway of 330 km long between Lyon and the sea and permits the irrigation of crops (Figure 2). All hydropower developments operated by CNR are run-of-river developments, except Genissiat, which is a 70 meter high dam. CNR is France s second largest electricity producer and 100% of its electricity production comes from renewable sources of energy (hydropower, wind power and solar energy). The company s invests also for the benefit of the population of the Rhone Valley by the way of its plans of Missions in the General Interest (MGI). Figure 2: Overview of CNR's hydraulic developments regarding electricity production sources and navigation (left) and key figures concerning hydropower developments on the French Rhone (right).

Run-of-River features and management Typically, run-of-river scheme operated by CNR for hydroelectricity production consists of a barrage built across the mainstream that controls the flow of the river and diverts the major part of it into a headrace canal (Figure 3). This canal conducts the water to the power plant to drive the turbines. The remaining part of the discharge is released in the natural course of the river to preserve the ecological balance of the fluvial environment. The major point of run-of-river concept is that the storage capacity of reservoir is negligible compared to river flow volumes, especially regarding flood volumes. There is neither possibility of inter annual regulation nor seasonal regulation. Thus, the output flow sent downstream of the dam is equal to input flow entering upstream the reservoir. The turbine discharge has to be adjusted in real time to fit Rhone River flow fluctuations. Some modulation of turbinate discharge remains possible to produce high value energy at peak hour but the water level variation is in general lower than 50 cm. The consistency in the operation of the power stations in cascade is obtained by synchronizing the flow. Figure 3: Typical CNR run-of-river development scheme. In normal conditions, i.e. out of flood periods, the level of the reservoir upstream each dam is close to the horizontal (Figure 4). The main part of the flow is driven through the powerhouse turbines. The spillway and bottom gates are closed until the input flow reaches the installed flow capacity of the powerhouse. During flood conditions, the slope of the backwater curves increases upstream of each dam. Keeping the same regulated water level upstream dam would lead to increase the flood hazards. To avoid this unacceptable situation, water level is decreased and slope is tilted by a partial

opening of the spillway gates. This lowering is performed slowly in order to avoid an excess of flow downstream and a destabilization of the banks in the reservoir. For the design flood, which corresponds to a discharge of 1000 year return period (Q1000) for hydraulic developments operated by CNR, all spillway gates are completely opened. Water level and slope in the reservoir are both similar to values observed in natural conditions. Thus, extra inundation hazard is totally prevented (Figure 4). Figure 4: run-of-river cascade management for normal hydrological conditions and for design discharge. The tilt of reservoir slope during high flow conditions has also the advantage of increasing significantly velocities and facilitates the mobilization of sediments. As natural velocities are recovered in the reservoir, most of the sediments can pass the barrage during flood situations. Morphologically speaking, run-of-river developments are nearly transparent (Fruchart, 2012), especially if their design include spillway gates that can be completely opened during flood conditions (Figure 5).

Figure 5: Example of spillway gate that can be completely opened during flood conditions (Sauveterre dam operated by CNR on Rhone River, France). Sediment management of the cascade Despite a design that globally minimizes the possible impacts on sediment fluxes, the Rhone River channel experiences locally some sediment deposits. As expected, these accumulations are located in the sections of very low velocities. It mainly concerns navigation lock garages and channel tributaries immediately upstream of their confluence with the Rhone River. This knowledge results from a steady monitoring of the river conducted with a fleet of hydrographic boats of different sizes (Figure 6). This work is done at the minimum every 5 year or after each significant flood (above a discharge of 10 year return period). These observations mobilize a staff of approximately 50 people from CNR to cover the whole concession perimeter. In the framework of the concession contract, CNR has to ensure maintenance works on the riverbed. The objectives are to keep adequate conditions of navigation and operation. Another key point is also to preserve the original hydraulic capacity of the channel for the design discharge (Q1000). It means that the same water elevation than in natural conditions has to be respected for these hydrological conditions. Maintenance works concern both vegetation and sediments. Different types of intervention can be conducted: log jam evacuation, vegetation maintenance, gravel bar plowing, deposits dredging,... Many factors have to be taken into account to define the required procedure and equipment: areas to be treated, timing for a limited impact, access conditions, sediment size... In order to provide a long-term view of the situation and then to facilitate the works triggering, a 10 year management plan is established under French administration supervising (CNR, 2010).

Figure 6: CNR hydrographic boat used for Rhône River channel monitoring. On the Upper Rhone, flushing operations can be regularly planned by Swiss operators and CNR thanks to the artificial flood discharge possibly released from Geneva Lake (see communication of Peteuil in the same Feature Session). As flushing operations have appeared much more difficult to plan on the Lower Rhone, mechanical means have been more favoured for sediment deposits management. Many reasons justify this situation. First, water level in the reservoirs has to be lowered slowly in order to avoid a destabilization of the banks. As such operation takes tens of hours, hydrological conditions can change meantime in an unfavourable way. Second, precise hydrological forecasts on most tributaries are generally unreliable above 24 hours. Even on the largest ones, flood flows are too short to maintain efficient discharge conditions for flushing. Third, stopping fluvial navigation on the Rhone River requires a one year delay to perform the administrative procedure. A so long duration is clearly inconsistent with the opportunistic management often required to perform a flushing operation. Thus, accumulations of sediment moved artificially by CNR are distributed according to the following objectives: 46% for keeping adequate conditions of navigation, 37% for preserving the original hydraulic capacity of the channel, 9% for keeping proper operating conditions on the hydraulic structures and 8% for oxbows restoration (CNR, 2010). This latter point is out of the concession contract and is voluntarily both funded and carried out by CNR in the framework of its MGI plan. The mean annual volume of sediment accumulations treated by CNR has been around 660,000 m 3 for the last decade with a yearly average cost close to 6 M. The grain size distributions of the sediments show the following proportions: 75% are composed of silt and

sand while gravels represent 25% (CNR, 2010). For a given development, the volume of deposits corresponds on average to 3% of the suspended sediment fluxes passing through the river reach. The main section affected is currently located between Valence and Avignon. Sediment are put into suspension or artificially moved further downstream in order to minimize the potential disruption of sediment supply to the delta. Lessons learned The long term monitoring carried out by CNR shows that the riverbed elevation of the Rhone River is globally stable (Doutriaux, 2006). The specific design and operation of CNR run-ofriver developments are certainly key points to explain that long-standing situation. Including spillway gates as high as the barrage, these hydraulic developments conduct to very limited impacts regarding sediment transportation. Following frequent flood events, sediments are used to be temporally stored in reservoirs whereas a massive mobilization is observed after intense floods. For instance, 7 Mm 3 of sediments have been removed during the 2003 flood only. This figure has to be compared with the 660,000 m 3 or 1.3 Mt of sediments annually dredged by CNR for maintenance operations. To limit the potential impact on sediment supply to the river and its delta, these sediments are either put into suspension or artificially moved further downstream. For these maintenance works, a strict framework has been defined on the French Rhone River. For practical and administrative reasons, it includes in particular a 10 year management plan and the establishment of Environmental Impact Assessment studies. As pollution by heavy metals or PCB is a very sensitive issue, physical and chemical analysis of deposits are systematically performed before removal. Nevertheless, CNR surveys show that the pollution observed on the Rhone River is not significantly worse than the pollution experienced by other French Rivers. References Cited CNR, 2010, Entretien du lit du Rhone : plan de gestion des dragages d entretien Doutriaux E., 2006, Aménagements hydrauliques dans le cours du Rhône français. Bilan sédimentaire, Archives des Sciences. Fruchart F, 2012, Run-of-River: Revisiting the Definition and Interpretations, Workshop Towards the sustainability of hydropower in the Mekong Region: Options for improved project design and technologies. Bangkok SOGREAH, 2000, Etude globale pour une stratégie de réduction des risques dus aux crues du Rhône Etude du transport solide, Rapport de synthèse pour l Institution Interdépartementale des bassins Rhône-Saône.