Coordinated Procurement Transmission in the Northeast

Similar documents
New England States Committee on Electricity

2015 ISO/RTO Metrics Report. Summary. November 2015

New England States Committee on Electricity

Meeting Natural Gas/Electricity Challenges in New England

ISO New England Overview and Regional Update

ISO New England Regional Electricity Outlook

New England Electricity Outlook

New England Power Sector Overview

New England State and Federal Laws and Regulations and the Electric Power Sector

The Road to Better System Planning: ISO-New England s Revised Energy Efficiency Forecast

Regulatory Issues and Smart Grid Transmission Solutions

Advancing Renewable Alternatives

Agenda. Natural gas and power markets overview. Generation retirements and in developments. Future resource mix including large hydro

A New Role For States In The Administration of Regional Electricity Markets

New England States Committee on Electricity

From Restructuring to Decarbonization: Operational and Market-Design Challenges in New England

New York CES: Renewable Energy Standard Underlying Fundamentals

NALCOR ENERGY. Comments on Draft Request for Proposals for Clean Energy and Transmission

New England s Changing Energy Landscape

NESCOE Comments on the Draft 2017 Regional System Plan July 21, 2017

The Transformation of the New England Electric Grid and the Importance of Situational Awareness Tools

2016 Summer Reliability Assessment

Queue Interconnection Studies of Projects Potentially Affecting Neighboring Systems

2030 Power System Study Report to the New England Governors 2009 Economic Study: Scenario Analysis of Renewable Resource Development

Update on Northeast Seams Issues. February 20, 2008 NYISO Business Issues Committee Meeting

A Forward Clean Energy Market for New England?

Electricity Cost Highlights of Avoided Energy Supply Costs in New England 2007 Final Report. Briefing to NSTAR. October 5, 2007

REDACTED THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION PREPARED TESTIMONY OF JAMES G. DALY

Closer Look At EPA Proposed Rule 111D: Utility Perspective

Eversource Energy AGA Financial Forum May 15 17, 2016

Green Line Overview. system with transfer capability of 660 MW or more (e.g.,1200 MW) miles submarine cable, 1 foot in diameter)

The New England Clean Power Link A powerful wind and hydro partnership for Massachusetts

Queue Interconnection Studies of Projects Potentially Affecting Neighboring Systems

2007 Regional System Plan.

Queue Interconnection Studies of Projects Potentially Affecting Neighboring Systems

TDI-NE Responses to 83D Questions December 28, b. Type of Organization (Public/Industry/Advocacy/Other)

Non-transmission Alternatives Process. The Vermont Experience. Hantz A. Présumé Principal Engineer System Planning

Managing the Reliability of the Electric Grid While the Power Industry Undergoes Rapid Transformation

Analysis of Greenhouse Gas Emissions Impacts:

Recognizing the Value of Existing Hydropower June 25, 2009

VELCO Operating Committee MINUTES April 20, 2017, 11 a.m. 3:00 p.m. GMP Montpelier Office

Regulatory Mechanisms to Ensure Fuel Adequacy U.S. DOE Electricity Advisory Committee

Preliminary Assumptions for Economic Studies DRAFT. Planning Advisory Committee June 16, Wayne Coste Principal Engineer

NEW ENGLAND CLEAN POWER LINK

Generator Interconnection Developer Perspective. February 28, 2019

Broader Regional Markets Report

The State of Wind Energy in New England

The Role of Energy Efficiency and Other Demand Resources in Helping Meet the Region s

Renewable and Clean Energy Scenario Analysis and Mechanisms 2.0 Study

Managing the Rapid Transformation of New England s Energy Resources

The State of the CT RPS:

HYDRO-QUÉBEC ELECTRICITY: CLEAN, RENEWABLE AND RELIABLE. November 2015

Gas-Electric Coordination: Pipeline Infrastructure

Comments of National Grid to the New England States Committee on Electricity on the Coordinated Competitive Renewable Power Procurement Process

ISO New England Inc. February /19 ICR Related Values 1

A POWERFUL HYDRO PARTNERSHIP FOR MASSACHUSETTS

Impact of Variable Generation on the Vermont Transmission Grid. Chris Root Vermont Electric Power Company, Inc.

EIPC Interconnection-wide Webinar and Stakeholder Discussion. November 17, 2015

What s the Deal? 21 st Century Energy. CBIA and CPES. New England States Committee on Electricity. October 8, 2014

Meeting Natural Gas Demand Demand Response A New England Perspective

TABLE OF CONTENTS. Section I. NESCOE Governance & Management Page 3. Section II. NESCOE Staff & Consultants Page 9

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission

The Latest News on Energy Efficiency as a Resource in New England

July 9, Heather Hunt Executive Director, NESCOE 655 Longmeadow Street Longmeadow, MA Heather Hunt,

Broader Regional Markets Report

Dave LaPlante Vice President, Markets Development September 18, 2002

The Anbaric Pipeline of Transmission Projects. New England

Renewable State of Mind: New York Releases the Clean Energy Standard

Broader Regional Markets Report

Joanne Flynn David Cormie NFAT Technical Conference July 15, 2013

Midwest ISO EIM Start-up and Exiting Issues Todd Ramey, Executive Director Market Administration. March 7-8, 2011

Impacts from Peak Load Reductions in Markets and Long-Range Planning

Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM

Officer Certification Form Discussion

FERC/RTO Training Session Institute for Policy Integrity New York University School of Law June 15, 2011

NPCC 2016 New England Interim Review of Resource Adequacy

New England 2030 Power System Study

Joel Gordon PSEG Energy Resources & Trade, LLC George McCluskey NH Public Utilities Commission Brian Forshaw Energy Market Advisors, LLC Maureen

Demand Response Parity in Wholesale Markets Hinges on FERC 745 Outcome

Blueprint for Reliability:

Outline. Introduction to Wisconsin. Barriers to Generating Electricity from. Incentives and Regulations Intended to

Infrastructure Needs: Electricity-Natural Gas Interdependencies

A Market Solution to the Duck Curve

Electricity Options for Vermont

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Electric Transmission in Northern NH

RESUME. Alvaro E. Pereira, Ph.D. Managing Consultant

CO 2 Emissions from Electricity Generation and Imports in the Regional Greenhouse Gas Initiative: 2011 Monitoring Report

Winter Reliability Assessment

Analysis of Benefits of Clean Electricity Imports to Massachusetts Customers. Massachusetts Clean Electricity Partnership

Energy and Climate Report

Intertie Capacity Value for Alberta

New England States Committee on Electricity

Generation Capacity Mechanisms and Resource Adequacy Planning

MEETING ENERGY NEEDS WITH CLEAN AND RENEWABLE POWER

Atlantic Link: An Update. June 6, 2017

Update on New England s Demand Response Programs

PacifiCorp 2017R Request for Proposals. Pre-Issuance Bidders Conference May 31, 2017

Regional Energy Infrastructure Initiative: Status Update & Input Opportunity

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017

Transcription:

Coordinated Procurement Transmission in the Northeast February 26, 2016 New England States Committee on Electricity

NESCOE is New England s Regional State Committee, governed by a Board of Managers appointed by each of the New England Governors to represent the collective views of the six New England states on regional electricity matters ü Focus: Resource Adequacy, System Planning & Expansion ü Resources: 6 full-time staff with diverse disciplines & experience. Consultants, primarily for transmission engineering & independent studies ü More information: including filings & comments at www.nescoe.com Twitter @NESCOEStates 2

Overview ü New England transmission investment, a look at comparative methodologies and likelihood of consumer benefits of competitive dynamic and Order 1000 s public policies provisions ü Multi-State Clean Energy RFP ü State Energy and Environmental Policy Execution 3

New England has invested in reliability-based transmission, more than other regions from 2010 forward $100.00 Wholesale Power Cost Breakdown, 2010-2014 ($/MWh) RTO Cost & Regulatory Fees OperaMng Reserves Ancillary Services Transmission Capacity Energy $90.00 $80.00 $70.00 $60.00 $50.00 $40.00 $30.00 $20.00 $10.00 $0.00 Transmission ISO- NE CAISO* MISO NYISO PJM SPP *(Does Not Include Tx) Data source: 2015 ISO/RTO Metrics Report 4

Perennial Debate in New England: How do ISO-NE s Transmission Planning Assumptions and Methodologies Compare to Those of Other Regional Transmission Operators? ü ü NESCOE commissioned a consultant to develop an objective, fact-based detailed comparative summary of RTOs transmission system reliability planning approaches and methodologies Comparison of Transmission Reliability Planning Studies of ISO/RTOs in the U.S. will inform conversations going forward http://nescoe.com/wp-content/uploads/2016/02/icf_rtoreliabilitystudiescomparison_4feb2016.pdf 5

Competition in (reliability) Transmission Development Good Results for Consumers Elsewhere Illustration: Cost Variation in Bids Source: NextEra Energy PresentaMon, October 26, 2015 CompeMMve Transmission Forum 6

FERC s Order 1000 on Public Policy : ü NESCOE/5 States challenging FERC s compliance orders at D.C. Circuit ü FERC unlawfully expanded the rule to require project selection rather than consideration of public policies The problem with Order 1000 is not academic By requiring project selection and at the same time denying states a central role in that process, FERC substitutes ISO-NE judgment for the judgment of state officials implementing state laws. 7

What s the Vision? The half of ISO-NE that determines how to transmit electricity must consider state public policies under Order 1000 The half of ISO-NE that determines what resources will generate electricity generally do not consider state public policies 8

Multi-State Clean Energy RFP Objective To explore whether a multi-state procurement might attract largerscale projects and transmission than single state procurements and achieve individual states clean energy goals more cost effectively than if each state proceeded on its own. Initial Action: Certain state agencies and utilities in CT, MA and RI developed, with NESCOE assistance, the joint RFP for clean energy projects based on each state s current authority. All documents at www.cleanenergyrfp.com 9

Multi-State Clean RFP Schedule Feb 2015 June - October 2015 Fall 2015 Winter 2016 Draft RFP issued for public comment RFP posted and filed at DPUs MA and RI DPU s approved RFP for issuance RFP Issued November 12 th Bidder Conference December 3 rd Bidder Q&A ended December 29 th Final Q&A posted January 14 th Bids submitted January 28 th NOW Now Evaluation of bids through July 2016 Summer Submission of selected projects to regulatory authorities for review 10

Bid Evaluation RFP Issuers jointly and individually evaluate bids ü No obligation to procure anything at all ü Each state, EDC use own authority, criteria, judgment to determine whether a proposed project is cost-effective and beneficial for its consumers NESCOE facilitated development and issuance of RFP instruments and has no role in bid evaluation or project selection 11

Proposed Projects based on publicly available information Sizes: Locations: 20 MW to more than 600 MW Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, New York, and eastern Canada Types: Traditional PPAs No Transmission Requirement PPAs with associated Transmission Clean energy delivery commitments Clean energy delivery commitment approach ties transmission-only payments to project s performance in fulfilling commitments for clean energy delivery Support payments under a FERC filed/accepted Tx tariff/rate schedule paid for by participating states; Tx developer, clean energy supplier negotiate commercial terms 12

Proposals with No Transmission : 13

Transmission Proposals with Associated Generation. Review generation projects at www.cleanenergyrfp.com 1. Clean Energy Connect 600 MW HVDC from Alps Substation in NY to Berkshire Substation in western MA 2. Vermont Green Line 400 MW HVDC from Plattsburgh, NY, under Lake Champlain to New Haven, VT 3. Northern Pass* 1090 MW HVDC from Quebec to Deerfield, NH 4. Maine Renewable Energy Interconnect 345 kv joint project of CMP and Emera ME, running from a new Hammond Substation in Hammond ME to a new substation in Pittsfield, ME 5. Maine Clean Power Connection 345 kv CMP project running from a new substation in Johnson Mountain Township, ME to a new substation in Pittsfield, ME 6. Evergreen Express 345 kv joint project of New Hampshire Transmission and CMP, running from a new Jim Pond Switching Station to Larrabee Substation * Northern Pass is the only project that proposes a delivery commitment model rather than a power purchase agreement 14

Green Tracking : ü Verification of clean energy attributes for imported power is critical if Canadian resources wish to be credited with helping states satisfy carbon reduction requirements or environmental objectives No uniform structure currently in place in Eastern Canada to measure, verify, and track emissions characteristics of imports into New England. ü In 2013, N.E. Governors and Eastern Canadian Premiers adopted a resolution encouraging Canadian provinces to evaluate existing options and opportunities to adopt verification mechanisms of generation sources and environmental attributes that correspond with the existing New England Power Pool GIS verification system Recent changes to NEPOOL GIS rules to facilitate tracking but corresponding changes likely needed on other side of the New England s borders. 15

While improvement to the suite of market rules and policy mechanisms is always a subject of discussion, New England states will move forward to implement policy requirements and will seek to do so in the most cost-effective way for consumers. See also, http://nescoe.com/wp-content/uploads/2015/12/publicpolicymechanisms_december2015.pdf In the Meantime, Some Oppose State Energy and Environmental Policy Execution At Every Turn Clean Energy RFP RTR In FCM DG Forecast in ICR Rehear Appeal Oppose 16

Opposi5on To Implementa5on of State Laws Is Not A Produc5ve Plan 1. Competitive markets must accommodate state policies in order for markets to be sustainable over the long-term 2. States must execute state policies with or without generators support, in- or out-of-market as needed 3. Even if generators succeed to weaken in-market mechanisms, it won t eliminate state energy and environmental laws 2016 - the year to move forward productively 17

An example A Modest Clean Energy Mechanism in the FCM: Renewable Technology Resource Exemption In February 2016 auction, 55 MW of new renewable resources cleared under the exemption roughly.15% of the resources procured Generators challenged the RTR Exemption at FERC FERC disagreed NRG, PSEG and NextEra petitioned for review in the D.C. Circuit. Entergy supported. Remanded to FERC Some now challenge the RTR Exemption at every corner by seeking to tie it to the DG Forecast in stakeholder discussions about other proposed market changes to advocate for changes more favorable to them 18

And another - Recognizing Consumer Investment In Distributed Resources ISO-NE uses DG Forecast to determine the level of resources consumers must buy via ISO-NE markets This helps to ensure consumers do not buy resources as if that solar did not exist Generators challenged ISO-NE s use of the DG Forecast at FERC FERC disagreed NRG recently asked FERC to rehear the matter 19

www.nescoe.com 20