August 2015 INTERIM No. 180 (I)

Similar documents
UBC Technical Guidelines Section Edition Fume Hoods Page 1 of 5

APPENDIX A CHECK-LIST FOR SCIENCE SAFETY REQUIREMENTS. (Required Minimums for Approval by the N.C. Board of Education)

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

Uniform Construction Code

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109)

Community Services Dept., City of Mississauga Subdivision Requirements Manual Page 1 of 5 Specifications Revised: September 26, 2005

Advanced Ventilation for Residential applications FBC Res 2010.

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

Property Condition Assessment

General Requirements for Mobile Homes

SECTION MISCELLANEOUS METALS

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

MSA MOORE & SPENCE ARCHITECTS, P.A.

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

SECTION ENGINEER'S OFFICE

Home Inspection Report

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

Wood Casework Acid Storage

Electric Service Standards

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

STEPPING STONES DAYCARE NEW LISKEARD PUBLIC SCHOOL

CW 3550 Chain Link and Drift Control Fence TABLE OF CONTENTS

[If the tender is not opened on the above date due to unforeseen circumstances, then it will be opened on the next working date]

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

Presented to the IAPMO Standards Review Committee on December 10, 2018

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION CHAIN LINK FENCES AND GATES (PARK)

New Jersey Home Inspection - Standards of Practice

SECTION ELECTRICAL POWER ATTIC EXHAUST VENTILATOR

Bulletin BLD May 24, 2013 (Updated September 26, 2017) SECONDARY SUITES

ACCESSORY BUILDING. Building Permit Requirements: (must be completed before submitting application)

City of Friendswood Community Development 910 South Friendswood Drive Friendswood, Texas 77546

North Village Condominiums

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ PHONE:

Rental Inspection Checklist

APPLICATION FOR FINISHED BASEMENT PERMIT

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

CAPE CLUB SPECIFICATIONS & ALLOWANCES LOTS 1-28

FACILITIES MAINTENANCE WORKER

Residential Bathroom Remodels

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section AUTOMATIC CONTROL VALVE INSULATED ENCLOSURE (HOT BOX)

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

Revised October 2017, the information contained in this bulletin supercedes the requirements of all previous bulletins.

Residential Rental Property Self-Certification Checklist Rental property municipal address Rental Property number Office Use Only License No.

NORMAL HILLS BUILDING 8 COSMESTIC UPGRADES PROJECT

NORMAL HILLS BUILDING 6 COSMESTIC UPGRADES PROJECT

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

Section Standards of Practice. a) The following are terms commonly used in the writing of home inspection reports.

3D Home Improvement and Inspection Services, Inc

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

SECTION ALTERNATES

SECTION TEMPORARY FACILITIES AND CONTROLS

workstationindustries.com Made in the USA

Inspection Report. Property Address:

CRYOGENIC FLUIDS CHAPTER 55

Minimum Standards for Building Occupancy. Safety Resources

Madison's Home Inspections

1993 Specifications CSJ SPECIAL SPECIFICATION 4880 Bridge Equipment Cabinets

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD.

AS/NZS 3000: 2018 Changes to Wiring Rules Standard

MATERIAL ALLOWANCES AND UNIT PRICES

STATEMENT OF WORK. Troy Armoury Generator System Replacement

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR RECLAIMED WATER CONSERVATION SYSTEM FOR FLUSHING TOILETS

KIPLING SCHOOL RENOVATION AND EXPANSION PHASE 2 KIPLING, SASKATCHEWAN

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

$ Plan Review Fee when Permit Application is submitted BASEMENT REMODEL BUILDING PERMIT APPLICATION. Status Sticker OFFICIAL USE ONLY

CONSTRUCTION SPECIFICATION FOR TUNNELLING

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

Building Inspection Report

Bid Opportunity Wilkes Reservoir North Cell Rehabilitation

Building Program Example. Eric Anderson

GENERAL MECHANICAL SYSTEM REQUIREMENTS

1995 Metric CSJ , etc. SPECIAL SPECIFICATION ITEM Communication Hub Cabinet

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS


1234 Main St Denver CO 80210

ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED.

9) Home Inspection: As defined in Section 1-10 of the Act.

TITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION

Oak Springs. 14/16 Series. Skyline Homes Built in Fair Haven, Vermont

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

UBC Technical Guidelines Division Edition Furnishings Page 1 of 1 INDEX

THE CAPE CLUB ESTATES

new casework tailored for your new lab

FAIRA TRANSPARENCY REPORTS Robert Wayne Dr, Pasco, WA July 18 th, 2017

Before You Start Renovating Your Bathroom

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

OPERATI LATRINES. Standard Range Types

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS

Building Permit Application

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

Transcription:

SPECIFICATIONS FOR FIELD LABORATORIES 180. 1. SCOPE These Specifications govern all requirements for supplying and maintaining a field laboratory for the exclusive use of the Engineer. 2. SUPPLY The Contractor shall supply one laboratory, blocked and level, ready for use before work commences for: Each grading project. Each base course laying project. Each crushing operation. Each screening operation. Each bituminous plant operation. Each concrete plant operation. The laboratory shall remain on the project until completion of the work unless released earlier by the Engineer. The Contractor shall have the option to supply an approved microwave oven, related accessories and a suitable facility for density dry backs, in lieu of supplying a density field laboratory. 3. LOCATION Laboratories shall be located on approved sites independent of all other buildings. The Engineer and Contractor shall agree on the location of the field labs. For grading and base course laying operations the laboratory shall be located convenient to the construction site. For operations where aggregate is being produced or processed the laboratory shall be located so that it affords a clear unobstructed view of the work being performed. 4. CODES AND STANDARDS Field laboratories must conform to the National Building Code [NBC] (in particular Part 9 Section 9.10.21 Fire Protection for Construction Camps, and Part 9 Section 9.10.22 Fire Protection for Gas, Propane and Electric Cook tops and Ovens), the Manitoba Building Code [MBC], the Manitoba Fire Code [MFC], and all other applicable Federal, Provincial, and Municipal Codes, Bylaws, and Regulations and CSA standard A394-M1984 Guide to Requirements for Relocatable Industrial Accommodation or latest edition. All equipment must comply with the requirements of all applicable federal and provincial building codes and regulations. Materials, workmanship, and design must meet or exceed applicable requirements of Canadian General Standards Board [CGSB], Canadian Standards Association [CSA], Canadian Sheet Steel Buildings Institute [CSSBI], American Society for Testing and Materials [ASTM], Underwriters Laboratory of Canada [ULC], Canadian Gas Association [CGA], Canadian Electrical Manufacturers Association [CEMA] or other referenced organizations. All plumbing fixtures and fittings, mechanical equipment, electrical devices, fixtures and equipment must be approved for use intended by C.S.A. and/or U.L.C. Page 1 of 5

180. 4. CODES AND STANDARDS Compliance shall be with latest edition of the applicable code or standard. It is the Contractor's responsibility to ensure compliance. 5. PHYSICAL REQUIREMENTS Laboratories shall be insulated weatherproof structures having the following physical requirements: A minimum inside floor area of 9.3m² covered with a washable floor covering. Two windows equipped with screens. Windows shall be on opposite walls, each with an opening of at least 0.56m². All or one-half of each window shall be capable of being opened, closed and latched. One tight fitting solid door equipped with a lock. Two keys shall be provided to the Engineer. Doorstep shall be provided where required as per code. A solid, level workbench at least 1.8m long, 750mm wide and 900mm above the floor having a smooth heat resistant surface. A fume cabinet with dimensions as shown on the plan of the typical field laboratory. The sides of the cabinet and a removable divider shall be of a non-flammable material. A corrosion resistant variable speed exhaust fan, CANARM AX12-3 or equivalent, capable of drawing at least 34m³ per minute, shall be installed to expel heat and fumes from within the hood to the outside. A stainless steel sink, at least 450mm square and 175mm deep shall be built into the workbench, complete with a drain to the outside. 6. UTILITIES 1) The Contractor shall supply electricity. Laboratories shall be wired for 60 amp electric service. Wiring, receptacles and overhead lights shall be installed to current standards. 2) An approved heating and/or cooling system with controls shall be provided to maintain a room temperature of 18 to 25 C. 7. MISCELLANEOUS The following items shall be provided with each laboratory; An approved permanent propane service line including connections and regulator from outside of the laboratory to the fume cabinet. Clean Water, for use in testing samples as required. A desk at least 1.25m long and 750mm wide, two chairs and one stool. A floor mop, pail, broom and dustpan. A fully charged fire extinguisher with a minimum size of 2.3kg, rated ABC, shall be conveniently located on the wall. A propane and carbon monoxide detector. Washroom facilities for the exclusive use of Department staff. The washrooms shall be the self-contained chemical type which are cleaned and serviced a minimum of once a week. Page 2 of 5

180. 7. MISCELLANEOUS An approved eyewash station capable of delivering flushing fluid to both eyes of no less than 1.5L per minute or 0.4gal per minute for 15 minutes. 8. GENERAL The Contractor shall supply propane for use in test procedures unless an electric stove or hotplate is provided by the Department. The laboratory shall have enough space available so that any furniture and equipment can be arranged in a manner that does not pose an obstacle to (or interfere with) the safe performance of any testing procedures. During the use of the laboratory by the Department, the Engineer will be responsible for its general upkeep. When delivered to the project, the laboratory shall be clean. The lab shall also be free of chemical and petroleum stains. The Engineer and the Contractor shall take notes on the condition of the laboratory before and after its use by the Department. Damages caused by the Engineering staff during its use will be repaired by the Department. 9. IGNITION OVENS For bituminous projects, the Department will supply install, maintain and remove an ignition oven for determining the gradation and asphalt content of bituminous samples. The Contractor shall provide the following to support the operation of the ignition oven: a dedicated 20 amp circuit providing single phase 220/240 volt AC power. Power shall be available at least 2 hour prior to production start-up; supply and installation of a 76.2mm diameter galvanized seamless vent pipe with rain cover for the ignition oven (as shown on the attached Plan B Typical Layout Sketch Sheet ). The vent pipe shall extend into the laboratory a sufficient distance to allow the Department employees to connect flexible exhaust tubing (supplied by the Department) from the ignition oven to the vent pipe. The Contractor shall ensure the placement of the vent pipe through the roof conforms to all current fire and safety codes; a work surface layout conforming to the attached Plan B Layout Sketch or acceptable alternative. The work surface shall be capable of supporting an ignition oven with a minimum weight of 130kg. No additional payment will be made for providing the items listed above, as this will be considered as incidental to the Contract. 10. BASIS OF PAYMENT No direct payment will be made for providing laboratories, heating fuel, water and electricity and providing items necessary or incidental thereto, as herein described, all of which will be considered incidental to the operations being performed. Page 3 of 5

Page 4 of 5

Page 5 of 5