CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

Similar documents
RESIDENTIAL BUILDING PERMIT INFORMATION

RESIDENTIAL BUILDING PERMIT INFORMATION

RESIDENTIAL BUILDING PERMIT INFORMATION

The following materials and documents are required in order for you to obtain a Building Permit:

RESIDENTIAL BUILDING PERMIT INFORMATION

CLAY TOWNSHIP BUILDING DEPARTMENT

DETAILED CONSTRUCTION DRAWINGS SHALL BE SUBMITTED WITH APPLICATION CITY/VILLAGE TOWNSHIP SECTION ZIP CODE CITY STATE ZIP CODE TELEPHONE NUMBER

II. IDENTIFICATION A. OWNER OR LESSEE ADDRESS (number, street, P. O. Box, Apt., etc.)

Application for Building Permit St. Charles Township 1003 N. Saginaw St St. Charles, MI Phone (989) Fax (989)

THIS INFORMATION MUST BE TURNED IN TO THIS OFFICE BEFORE A BUILDING PERMIT IS ISSUED.

Plainfield Township Building and Zoning Department P.O. Box 247 Hale, MI PH(989) FX(989) Authority: P.A. 230 of 1972 As Amended

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

Lot Size: OWNER OR LESSEE: Name: Telephone: Address: City: State: Zip: ARCHITECT OR ENGINEER: Name: Telephone: Fax #: License #:

Permit: *Inspection Scheduling: * Monday thru Friday Receipt #: Between And Property Code#

COUNTY MICHIGAN NEAREST CROSS STREETS SUBDIVISION LOT #

APPLICATION FOR BUILDING PERMIT AND'PLAN EXAMINATION

CITY STATE ZIP CODE TELEPHONE NUMBER (include area code) B. Owner or Lessee

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

ALL WATER CONNECTION CHARGES SHALL BE PAID PRIOR TO ISSUANCE OF A BUILDING PERMIT.

BUILDING PERMIT SUBMISSION CHECKLIST NEW SINGLE-FAMILY RESIDENCE NEW TWO-FAMILY RESIDENCE NEW MULTIPLE SINGLE FAMILY (TOWNHOUSE)

CITY OF PORTLAND BUILDING PERMIT APPLICATION Date:

BUILDING PERMIT APPLICATION

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Plains Township Building Permit Application

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

TOWN OF GREENVILLE APPLICATION FOR PERMIT

Proud of its Heritage, Preparing for its Future

BUILDING A NEW HOME. Construction Permit Tips For Home Owners

FORKS TOWNSHIP DECK GUIDE

Last Updated March 15, 2016

HONEY BROOK TOWNSHIP

Application Requirements for obtaining a Building Permit

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

DAMASCUS TOWNSHIP, WAYNE COUNTY, PENNSYLVANIA APPLICATION FOR BUILDING PERMIT ZONING & UCC #

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name:

ALAMANCE COUNTY MODULAR HOME PERMIT APPLICATION

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Fill out all sections or mark with N/A (not applicable)

Required Information for Permit Issuance

Lot#_ Subdivision/Land Development: Phase: Section:_. NON-RESIDENTIAL (Commercial)

CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT S.

Town of Fredonia. 25 N Main St. * PO Box 217 Fredonia AZ Fax: * Office

Fill out all sections or mark with N/A (not applicable)

Village Of Carthage ZONING AND BUILDING PERMIT PROCESS

All new construction, mobile home placement & additions.

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY. Deck/Porch Guide & Permit

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

Town of Grantham, NH Building Permit Application Procedures

PLEASE READ AND SIGN RESIDENTIAL ENERGY CODE AND EROSION CONTROL!

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

UCC CONSTRUCTION PERMIT APPLICATION INSTRUCTIONS

BUILDING PERMIT SUBMISSION REQUIREMENTS

DAMASCUS TOWNSHIP, WAYNE COUNTY, PENNSYLVANIA APPLICATION FOR BUILDING PERMIT ZONING & UCC #

Any questions, please call the Codes Enforcement/Planning & Zoning Department at (315)

Westtown Township Building Permit Application Instructions Notes:

INSTRUCTIONS. Address: Sec/Block/Lot:

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

RESIDENTIAL BUILDING PERMIT INSTRUCTIONS Town of Liberty 120 North Main Street Liberty, New York 12754

BUILDING PERMIT SUBMISSION CHECKLIST NEW MULTIPLE-FAMILY RESIDENCE NEW COMMERCIAL BUILDING

Deck Permit Zoning requirements Adopted Code Submission Requirements Fees Review time Contractor licensing Inspections

ONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS

City of Centerville Building, Zoning & Code Enforcement Department

BUILDING DEPARTMEN T

Scale Drawing This drawing will need to show the full lot and location of the proposed

Residential Building Permit Application Note: Storm Water Permit may be required.

B U I L D I N G P E R M I T A P P L I C A T I O N

Huntington Building Inspection

RESIDENTIAL BUILDING PERMIT APPLICATION TOWN OF EASTON Easton Valley Road Easton, NH Phone: Revised May 2016

PROCEDURE FOR REQUESTING A BUILDING PERMIT

City of Galax BUILDING PERMIT APPLICATION

*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT

APPLICATION FOR PORCH / DECK PERMIT

JACKSON COUNTY PERMITTING & CODE ENFORCEMENT New Residential, New Commercial Application

Commercial Building Permit Applications. Commercial Permit Applications

THIS IS NOT A PERMIT DO NOT START CONSTRUCTION. City of Pell City. Residential Building Permit Application

TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES

Commercial Remodel Permit

*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT

PERMIT APPLICATION REQUIREMENTS NEW SINGLE FAMILY DWELLING

The following information is required when submitting a building permit application:

Job Site Address. Lot/Parcel# Permit To: New Addition Alter/Remodel Code Compliance

Commercial Solar Photovoltaic System Permit

Commercial Submittal Packet

New York State Fire and Building Codes William LaCount Code Enforcement Official

NEW COMMERCIAL CONSTRUCTION PLAN REVIEW AND APPROVAL CHECKLIST Return a signed copy of this page to the City with submission.

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

Applicant s Name Applicant s Address Phone # Year Built (verified) Property Owner s Name Address Phone # Site Phone # Description of Proposed Work:

Building Permit Documentation Required:

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Residential Building Permit & Inspection Procedures

Note: all above fees can be on one check made out to Town of Wilson. Check to be made out to Sanitary District #1

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

New Commercial Construction Permit

Transcription:

Requirements for Obtaining Building Permits City of Coldwater, Michigan Any owner, owner s builder, architect or agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to cause such work to be done, must submit an application to the building official and obtain the required permit(s). Application To obtain a permit, complete an application and return to the building department for review along with the following: Residential Structures (One and Two-family Residential with less than 3,500 square feet of calculated floor area) Minimum of two (2) sets of plans that include the following: Foundation & floor plans Roof and wall section Heating Energy Analysis Comparison Report Building elevation Site plan Permit fees Commercial Structures (Including One and Two-family Residential with more than 3,500 sq ft of calculated floor area) Minimum of two (2) sets of sealed architect plans Permit fees Mobile and Pre-manufactured Homes Minimum of two (2) sets of plans for the foundation and the method or anchoring the unit to the foundation Site plan For Michigan approved pre-manufactured units; one (1) copy of the Building System approval and the approved plans Permit fees Building Permit Fees Permit fees may be obtained from Neighborhood Services by calling 517-279-9501. CITY of COLDWATER Neighborhood Services Department Henry L. Brown Municpal Building One Grand Street, Coldwater, Michigan 49036 (517) 279-9501 www.coldwater.org Contractor Requirements Homeowners The Michigan Licensing Law gives homeowners an exemption to act as their own general contractor Homeowner must be on site for all inspections, is responsible for all building code violations and will incur all of the responsibility that a licensed contractor would assume Contractors Contractors are required to register with Neighborhood Services and provide the following: Current Contractors License (applicant license number & expiration date) Drivers License Copy of Worker s Comp Insurance

When to Call for Inspection It is the permit-holder s responsibility to call for all required inspections at least 24 hours in advance and to provide access and means for inspection. Inspections can be scheduled in person at Neighborhood Services or by calling 517-279-9501. Work shall not be done beyond each successive inspection without first obtaining approval of the building official. No portion of work shall be covered or concealed without authorization from the building official. Foundation Inspections Footing call for inspection prior to placing concrete in piers, trenches and formwork Foundation no form oil on re-bar Backfill call for inspection prior to backfilling, after waterproofing and drain tile are installed (1 st floor framing must be installed). Radon a radon system inspection is required prior to pouring concrete floor Rough Inspection A rough inspection is to be made after the roof deck, all framing, fireblocking and bracing are in place and the rough electrical, mechanical and plumbing are approved and before insulation is installed. Insulation Inspection An insulation inspection is required after rough-in for building, mechanical, electrical and plumbing has been approved. A separate insulation inspection shall be scheduled. Final Inspection A final inspection is to be completed prior to occupancy of structure. All open permits (fire, electrical, mechanical, alarm system and plumbing) must be approved prior to scheduling a final inspection. Certificate of Occupancy A new building or a building that is altered shall not be used or occupied until a Certificate of Occupancy has been issued. After the Building Official inspects the building or structure and finds no violations a Certificate of Occupancy may be issued.

I. JOB LOCATION CITY of COLDWATER Neighborhood Services Department Henry L. Brown Municpal Building One Grand Street, Coldwater, Michigan 49036 PH (517) 279-6929 schavez@coldwater.org TE: Obtain Plumbing, Mechanical and Electrical Permits separately from Neighborhood Services SITE ADDRESS TYPE OF PROJECT ZONE COUNTY ZIP CODE CITY OF: Coldwater Branch 49036 II. IDENTIFICATION A. Owner or Lessee (proof of ownership required) Property Owner Land Contract NAME ADDRESS CITY STATE ZIP PHONE NUMBER FAX NUMBER B. Architect or Engineer NAME ADDRESS CITY STATE ZIP PHONE CELL LICENSE NUMBER EMAIL EXPIRATION DATE FAX NUMBER (Include Area Code) C. Contractor *Note: Separate Contractor Registration MUST be filled out with the city NAME ADDRESS CITY STATE ZIP PHONE FAX BUILDERS LICENSE NUMBER EXPIRATION DATE EMAIL FEDERAL EMPLOYER ID NUMBER OR REASON FOR EXEMPTION MESC EMPLOYER NUMBER WORKERS COMP INSURANCE CONTRACTOR SIGNATURE DATE III. AFFIDAVIT I agree the statements made in this application are true, and if found not to be true or incomplete, any zoning permit may be issued may be void. I agree to comply with the conditions and regulations provided with any permit that may be issued. I agree the permit that may be issued is with the understanding all applicable sections of the City of Coldwater Ordinances will be complied with. Applicant Signature DATE Started in BSA Approval by Zoning Administrator Approval by Building Inspector Finished in BSA Initials: Date: COMPLETE INSIDE & BACK OF APPLICATION The Department of Neighborhood Services will not discriminate against any individual or group because of race, sex, religion, age, national origin, color, marital status, disability, or political beliefs. If you need help with reading, writing, hearing, etc., under the Americans with Disabilities Act, you may make your needs known to this agency.

IV. Type of Improvement New Building Alteration/Repair Demolition Roofing Fence Foundation Only Addition Change of Use Mobile Home Setup Siding Garage V. Local Governmental Agency to Complete this Section The departments identified below as being applicable to this construction project must provide written approval PRIOR to the issuance of the building permit by the Construction Code Department. REQUIRED APPROVED DATE NUMBER BY A - Zoning B - Fire District C - Drive/Curb Cut D - Addressing E - Soil Erosion F - Flood Zone G - Water Supply H - Septic System I - Variance J - Other VI. PROPOSED USE OF BUILDING RESIDENTIAL One Family, No. Bedrooms: Multi-Family, No. Units: Hotel/Motel, No Units: Mobile Home Garage Attached Detached Pole Building / Storage Building Other: N-RESIDENTIAL Assembly Business Educational Factory Institutional/Hospital Mercantile Storage Utility/Miscellaneous Industrial Church/Religion Parking Garage Service Station Tanks Towers Amusement Other VII. DESCRIPTION OF WORK - Please provide a detailed description of your permit request in the space provided below Estimated Cost of Project $. VIII. BUILDING INFORMATION DATA/DIMENSIONS DIMENSIONS Foundation Other 1 st Floor No. of Stories 2 nd Floor TOTAL AREA FOUNDATION AREA Crawl Space Slab Piers Basement Full Partial Walkout IX. VALIDATION - DEPARTMENT USE ONLY CONSTRUCTION TYPE BUILDING PERMIT # USE GROUP PLAN REVIEW # A. Approval Approved by: Conditions/Stipulations/Inspections Required: *Note: Must call for all required inspections per the building official. Date: BUILDING PERMIT FEE PLAN REVIEW FEE TOTAL AMOUNT DUE $ $ $

X. ZONING A. Setbacks Front Setback Rear Setback Side Setback Side Setback Is the parcel within 500' of a lake, stream, river or any body of water? If yes, State Law, (PA 451, Part 91) requires a Soil and Sedimentation Permit Application be completed. B. Existing use of property - Please check all uses that apply Vacant Residential Single Family Dwelling Residential Storage Residential Home Occupation Agricultural Commercial - Retail Commercial - Storage Commercial _ Other C. Proposed Building Info Overall Width Overall Length Overall Height Porch/Deck/Misc Porch/Deck/Misc Porch/Deck/Misc Garage Pole Bldg D. Number of off-street parking spaces Enclosed Outdoors E. Plot Plan Please include each item listed below on the plot plan on page 4 of this application. Check the "drawn" box after the item is included in the plot plan. Check the N/A box if the item required is not applicable to your parcel. Drawn N/A Required Information to be Included on Plot Plan Property line dimensions and property shape Location of street Location of sidewalk (if applicable) Location, shape & size of all existing & proposed buildings on property Location of all driveways and parking areas Distances of structures to property lines and other structures Place north arrow on plot plan Rivers, lakes, wetlands, or streams within 500 ft Other essential zoning information XI. VALIDATION - DEPARTMENT USE ONLY Zoning District: Approval based on Zoning Ordinance: A. Approval Signature of Zoning Administrator: Date: Conditions/Stipulations:

XII. SITE OR PLOT PLAN - FOR APPLICANT USE Plans must be submitted with the appropriate fee before a permit can be issued, except as listed below. *Plans are not required for alterations and repair work determined by the building official to be of a minor nature. *Plans and specifications are required for all other building types and shall be prepared by or under the direct supervision of an architect or engineer licensed pursuant to 1980 PA 299 and shall bear that architect s or engineer s seal and signature. XIII. Homeowner AFFIDAVIT CITY OF COLDWATER BUILDING DEPARTMENT HOMEOWNER PERMIT POLICY The Michigan Licensing law gives a home-owner an exemption to act as their own general contractor. This means that in the case of his own single family residence, the home-owner may obtain a building permit for construction at his own home, even though a builder may be significantly involved. The builder is required to be Licensed by the State of Michigan. If you the homeowner choose to act as your own general contractor, and obtain the required building permit. please be aware of the following: AS THE PERMIT HOLDER, YOU, THE HOMEOWNER, INCUR ALL OF THE LIABILITY AND ALL OF THE RESPONSIBILITY THAT THE LICENSED CONTRACTORS WOULD RMALLY ASSUME. --The City of Coldwater cannot assist you in any cause of action against an unlicensed contractor you have hired to perform work under the building permit you obtained. --It is you, the HOMEOWNER'S responsibility to have a complete understanding of the current building code. --You, the homeowner, are responsible to correct any code violations. Even if the contractor or any other persons did the work, under the permit you obtained. --You, the homeowner, could be held liable for any injury which occurs on the job, whether it is to a builder's or subcontractor's employee. --In the event of an occurrence beyond the builders control, which causes the builder to be unable to complete the work, you, the homeowner, will be legally responsible for completion of the job, under the permit you obtained. ELECTRICAL/MECHANICAL/PLUMBING Trades cannot be subcontracted; work must be done by homeowner or have licensed contractor pull permit. I, have read and understood the above information and still wish to obtain the required building permit. (Print Name)