MADISON COUNTY BUILDING PERMIT APPLICATION FORM

Similar documents
Last Updated March 15, 2016

Woodford County Health Department 1831 S. Main Street, Eureka, IL Phone: (309) Fax: (309)

MONROE COUNTY ZONING OFFICE

Accessory Building/Detached Building Permit

Boone County Area Plan Commission Residential Structure Accessory, Addition, Remodel, Deck, Porches, Gazebos, Pergolas, Farm Buildings, Swimming Pool

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Residential Building Permit Application Note: Storm Water Permit may be required.

EROSION CONTROL AND GRADING PERMIT APPLICATION

Single Family Residential Building Permit Questions & Answers

Required Information for Permit Issuance

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Construction Application for Permit (CAP) Instructions

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

MOBILE HOMES DAWSON COUNTY PLANNING & DEVELOPMENT PHONE FAX

All new construction, mobile home placement & additions.

VILLAGE OF BETHALTO RESIDENTIAL BUILDING PERMIT INFORMATION / REQUIRMENTS. Village of Bethalto. Building and Zoning Department. 213 N.

RESIDENTIAL BUILDING PERMIT

Single Family Residential Construction Erosion/Sediment Control Standards

Westtown Township Building Permit Application Instructions Notes:

Basement Build-Out Guidelines

ENGINEERING & CONSTRUCTION MANAGEMENT RESIDENTIAL PERMIT APPLICATION CHECKLIST

The following information is required when submitting a building permit application:

Lot Size: OWNER OR LESSEE: Name: Telephone: Address: City: State: Zip: ARCHITECT OR ENGINEER: Name: Telephone: Fax #: License #:

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

Contact Information Owner s Name Home Phone Cell Phone Mailing Address City Zip Code

Benezette Township OFFICE OF BUILDING CODE ADMINISTRATION Jones Township P.O. Box 25, Wilcox, PA 15870

SHORELAND PROTECTION PERMIT APPLICATION

Town of Grantham, NH Building Permit Application Procedures

RESIDENTIAL BUILDING PERMIT INFORMATION

Deck Permit Zoning requirements Adopted Code Submission Requirements Fees Review time Contractor licensing Inspections

Please print or type.

PERMITS REQUIRED BEFORE OBTAINING A PERMIT

Village of Corrales Planning and Zoning Department

WEST BRANDYWINE TOWNSHIP 198 Lafayette Road Coatesville, PA Fax PERMIT NO.

Permit Procedures For New Construction, Additions, and Alterations

CITY OF VINE GROVE BUILDING PERMIT APPLICATION

One and Two Family Additions

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

CONSTRUCTION GUIDELINES

TOWN OF WARNER OFFICE OF THE SELECTMEN/BUILDING INSPECTOR PO BOX 265 WARNER NH 03278

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

Contact Information Owner s Name Home Phone Cell Phone Mailing Address City Zip Code

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

Residential Building Permit Checklist

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT S.

RESIDENTIAL BUILDING PERMIT INFORMATION

If you have any questions, feel free to contact the office of the Planning Commission at

Town of Orange, New Hampshire Application for a Building Permit

CONTRACTOR INFORMATION NAME, ADDRESS, CITY, STATE, ZIP LICENSE# 058- LICENSE# SIGNATURE OF APPLICANT ADDRESS PHONE NUMBER

Building Permit For new construction projects

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

Applicant s Name Applicant s Address Phone # Year Built (verified) Property Owner s Name Address Phone # Site Phone # Description of Proposed Work:

Cass County Soil Erosion & Sedimentation Control Program

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

Boss Inspection Inc Wisconsin Uniform Dwelling Code Inspection and Code Enforcement

Residential Construction Minimum Required Inspections

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

Residential Building Permit Application

SACHSE EROSION CONTROL GUIDELINES

Plains Township Building Permit Application

Cass County Soil Erosion & Sedimentation Control Program

New Residential Building Permit Check List:

HOW TO OBTAIN A BUILDING PERMIT

ONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS

TOWN OF LOUDON OFFICE OF THE BUILDING INSPECTOR P.O. BOX 7032 ~ 8 COOPER STREET LOUDON, NH 03307

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name:

CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

West Virginia Department of Health & Human Resources Department of Health

Permit: *Inspection Scheduling: * Monday thru Friday Receipt #: Between And Property Code#

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

STANDARD PLAN FOR MINOR EARTH DISTURBANCES

STORMWATER AND EROSION CONTROL PERMIT

BUILDING PERMIT APPLICATION

STORMWATER AND EROSION CONTROL PERMIT

Legal: 1/4, 1/4, 1/4, 1/4, Section, Township Range, Oklahoma County.

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

Building Permit Application Office Use Only Please Print Clearly in Ink or Type

BUILDING PERMIT INFORMATION PLEASE READ CAREFULLY AS IT MAY AFFECT APPROVAL OF YOUR BUILDING PERMIT

CAREFULLY REVIEW AND COMPLETE ALL THE ENCLOSED DOCUMENTS PLEASE ALLOW THREE (3) WEEKS FOR PROCESSING

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Scale Drawing This drawing will need to show the full lot and location of the proposed

HONEY BROOK TOWNSHIP

A. GENERAL PROPERTY INFORMATION. Applicant s name Day Phone Installer Name Send permit to installer. B. PROPERTY DESCRIPTION

RESIDENTIAL BUILDING PERMIT APPLICATION TOWN OF EASTON Easton Valley Road Easton, NH Phone: Revised May 2016

Inspection of New One- and Two- Family Dwellings

CLEAR CREEK COUNTY BUILDING DEPARTMENT REQUIREMENTS FOR A SINGLE FAMILY RESIDENCE

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

Transcription:

Madison County Government Planning and Development Department Matt Brandmeyer, AICP - Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman MADISON COUNTY BUILDING PERMIT APPLICATION FORM PERMIT #: DATE ZONING TOWNSHIP PARCEL NO. 911 ADDRESS CONSTRUCTION COST TYPE OF IMPROVEMENT OWNER ADDRESS CITY/STATE/ZIP PHONE E-MAIL ADDRESS GEN. CONTRACTOR ADDRESS CITY/STATE/ ZIP PHONE E-MAIL ADDRESS SAN. SEWERS Y/N SEWAGE ENTITY PRIVATE SEWAGE SYSTEM Y/N (IF YES, COMPLETE BOX AT BOTTOM) WATER SUPPLY ENTITY WATER SERVICE SIZE UTILITY COMPANY FLOOD ZONE ENTRANCE PERMIT PLUMBER CONTRACTOR LICENSE # SEW. DISPOSAL INSTALLER LICENSE # ROOFER LICENSE # SIGNATURE OF OWNER OR THE AUTHORIZED AGENT PERMIT FEES BLGD. FEES ADDITION FEE ELECTRICAL FEE ACCESSORY BLGD. FEE PLUMBING FEE C OF O/COMPLETION FEE SEW. DISPOSAL SYSTEM FEE REPAIR AND ALT. FEE TOTAL FEES Complete for Applications that include a Private Sewage System: Private Sewage Disposal System: New Replacement Modification Type: Aeration Sand Filter Septic *Lot Size Size of Septic Tank: Garbage Disposal (Y/N) Aeration Manufacturer and Model Discharge Permit (Y/N) Percolation Test (Y/N) (Aeration or sand filter: must fill out a discharge permit. Percolation tests for all laterals must also be submitted) Lateral Type: A) Gravel Width Lineal Feet B) Chamber Size C) Gravelless 8 10 * All lots must be a minimum of 40,000 square feet per the Madison County Zoning Ordinance.

Madison County Government Planning and Development Department Matt Brandmeyer, AICP - Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman A) DRAW PROPERTY, MARK EXACT DIMENSIONS & SHOW ROAD (S). B) LOCATE BUILDINGS & SHOW DISTANCES FROM ALL PROPERTY LINES & BUILDING DIMENSIONS. C) INDICATE WELL AND/OR WATER LINE & DISTANCE TO CLOSEST COMPONENT OF PRIVATE SEWAGE SYSTEM. D) LOCATE PRIVATE SEWAGE SYSTEM & ALL COMPONENTS. E) INDICATE NORTH. F) IS THE PRIMARY USE OF THE PROPERTY AGRICULTURAL?? IF SO, INDICATE NUMBER OF ACRES. G) IF AERATION SYSTEM WILL BE USED, INDICATE LOCATION OF ALARM. IF USING LIFT STATIONS OR DOSING CHAMBERS, IN ADDITION TO THE ABOVE, LOCATE BOTH ALARMS. (LOCATION MUST BE UNDER ROOF).

Madison County Government Planning and Development Department Matt Brandmeyer, AICP - Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman FLOOR PLAN: INDICATE ROOM ARRANGEMENT AND SIZE OF ROOMS: INDICATE LOCATION OF DOORS, WINDOWS AND DECKS; USE EXTERIOR DIMENSIONS. 1 st FLOOR (SQ FT) 2 nd FLOOR (SQ FT) DORMERS (SQ FT OF EACH) COVERED PORCHES (SQ FT OF EACH) (*) ALL DECKS (SQ FT) BASEMENT OR CRAWLSPACE (SQ FT) NUMBER OF BEDROOMS HEIGHT TO PEAK OF ROOF TOTAL SQUARE FEET GARAGE (SQ FT) NUMBER OF SMOKE DETECTORS NUMBER OF CARBON MONOXIDE DETECTORS (EFFECTIVE JANUARY 1 st, 2007) (*) IF YOU INDICATE ON YOUR PLANS THAT YOU ARE INSTALLING AN OPENING FOR ACCESS TO A DECK, THE DECK WILL HAVE TO BE INDICATED ON THE PLANS AND CONSTRUCTED AS PART OF THIS PERMIT. THIS DEPARTMENT WILL NOT PERMIT AN OPENING WITH PLANS LATER FOR A DECK.

Madison County Government Planning and Development Department Matt Brandmeyer, AICP - Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman MADISON COUNTY PLANNING & DEVELOPMENT DEPARTMENT OUTLET LOCATION PERMIT Applicant Information Property Owner Present Address New Address Telephone Township E-mail Address Parcel Number Location (if address is not marked on properly) New Residence Replacement Modification Cost of System $ Number of Bedrooms System Information Type of System: Sand Filter Aeration Tank Size Absorption Trench Size (150 Sq. Ft. Minimum) Licensed Installer License # Distributor Building Permit # Date Issued Discharge Information (See information sheet for minimum requirements) Size of Lot (Must be a minimum of 40,000 sq. ft. of property) Type of Discharge: Same Lot Common Lot Receiving Stream, Lake or Pond Distance of Discharge from: Well Dwelling Property Line Distance of discharge from discharges on adjoining properties: (Minimum of 235): Number of systems proposed for a common line Address of other systems on a common line Applicant & Date Approved By & Date

Madison County Government Planning and Development Department Matt Brandmeyer, AICP - Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman MADISON COUNTY PRIVATE ENTRANCE PERMIT INQUIRY Name: Current Address: City, State & Zip: Construction Address: City, State & Zip: Phone: E-mail Address: Parcel Number: Road which entrance will be installed: ************************************************************************************ Please contact the following individual for entrance permit application: 1.) If Township Road- Twp. Road Commissioner 2.) If County Road Contact Bill Doil @ 618-296-6289 3.) If State Road Contact Ruanna Stumpf @ 618-346-3280 Phone Number 4.) If Private Road No Contact Required Planning & Development Department ************************************************************************************ Guidelines for Mailbox Standard: Foundations. Do not set mailbox supports in concrete unless the support design has been shown to be safe by crash tests when so installed. Do not embed the post more than 2 ft. into the ground. Do not fit a metal post with an anchor plate; however, it may have an anti-twist device that extends no more than 10 in. below the ground surface. Post Sizes. The following posts sizes are generally considered to be acceptable: A single 4 in. x 4 in. square wooden post; a 4 in. diameter wooden post; or a metal post with strength no greater than 2 in. diameter standard strength steel pipe. FOR OFFICE USE ONLY: PLEASE FAX A COPY OF THIS SHEET TO STAN GIFFHORN @ 692-7049

Madison County Government Planning and Development Department Matt Brandmeyer, AICP - Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman MADISON COUNTY EMERGENCY TELEPHONE SYSTEM BOARD ADDRESS REQUEST FORM BEFORE OBTAINING A 9-1-1 ADDRESS THE FOLLOWING REQUIREMENTS MUST BE MET 1. A PARCEL I.D. NUMBER FOR THE PROPERTY IN QUESTION MUST BE FURNISHED. 2. IF THE PROPERTY TO BE ADDRESSED IS ON A PARCEL OF TWO ACRES OR MORE, THE EXACT LOCATION OF THE BUILDING TO BE ERECTED MUST BE INDICATED. ALSO, THE POINT OF ACCESS TO THE BUILDING MUST BE INDICATED. DEPENDING ON THE LOCATION OF THE PROPERTY IN QUESTION, IT MAY TAKE UP TO TEN WORKING DAYS TO COMPLETE THE ADDRESSING (SUBDIVISIONS UP TO THREE (3) WEEKS. AFTER ALL REQUIREMENTS HAVE BEEN MET, A CONFIRMATION LETTER WILL BE MAILED TO THE PROPERTY OWNER AT THEIR CURRENT ADDRESS. TYPE OR PRINT THE FOLLOWING INFORMATION PROPERTY OWNER S NAME PROPERTY OWNER S ADDRESS TELEPHONE NUMBER E-MAIL ADDRESS PARCEL I.D. NUMBER PERSON SUBMITTING FORM (IF DIFFERENT FROM ABOVE): NAME ADDRESS CITY, STATE & ZIP FOR OFFICE USE ONLY NEW ADDRESS FIRE DISTRICT POST OFFICE PERMIT NUMBER ESN

Madison County Government Planning and Development Department Matt Brandmeyer, AICP - Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman Permit Number: Erosion and Sediment Control Residential Application Contractor: Address: City/State/Zip: Phone: E-mail: Property Owner: Address: City/State/Zip: Phone: E-mail: Subdivision Name: Lot Number: Zoning: Site Address: City/Township: Parcel Number(s): Location: Description of proposed development: Size of Site (Acres or S.F.): Total Proposed Square Footage of Impervious Surface: Total Proposed Square Footage of Land Disturbing Activity: (i.e., clearing, grading, stripping, excavation, fill etc.) Is any portion of the land disturbing activity within 25 feet of a river, lake, pond, stream, sinkhole, or wetland? Zoning Classification: Brief Description of Proposed Sediment and Erosion Control System: Signature Date

Madison County Government Planning and Development Department Matt Brandmeyer Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman Erosion and Sediment Control Permit- Residential Permit Rules and Inspection Requirements THE FOLLOWING EROSION AND SEDIMENT CONTROL MEASURES AND INSPECTION PROCEDURES MUST BE FOLLOWED FOR RESIDENTIAL PERMITS: Erosion and Sediment Control Measures: 1. Erosion and Sediment Control measures must be installed prior to the initial grading or clearing activity. All subsequent grading activities including rough and final grading also may not proceed unless erosion control measures have been installed. 2. All property lines adjacent to an improved tract of land, where water sheet flows off of the property, and all property lines adjacent to a street, must be seeded and mulched immediately after the initial grading or clearing. Temporary vegetation shall be established using the seeding rates in the attached brochure. The width of the seeding/mulching must be at least eight feet in width. Temporary vegetation must be established in these areas as soon as the seasonal weather permits. If cut and fill operations occur during a season not favorable for immediate establishment of permanent ground cover, a fast germinating annual such as rye grasses or sudan grasses shall be utilized to retard erosion. Where existing vegetation is not disturbed in sufficient width to prevent the release of sediment from the site, then temporary seeding and mulching will not be required in these locations (provided, however, that siltation control structures continue to be provided in locations where stormwater flows leave the site See #3) 3. Siltation fences or straw bales must be properly installed in all areas where water sheet flows from the lot onto another piece of property or to a natural drainage way. 4. In areas where erosion siltation fencing or straw bales are not adequate due to the volume of rain water running through the location, other erosion control devices such as earth ridge diversion berms must be used. 5. Siltation and Erosion Control devices shall be installed following the attached diagrams 6. A temporary rocked driveway must be installed for vehicles entering and leaving the site. The rocked drive must be a minimum of 4 inches deep. All delivery and work vehicles must utilize the rocked area to avoid dirt and mud being tracked onto the street. 7. When dirt or mud has washed onto the street, it is the applicants responsibility to immediately remove the dirt. 8. Erosion Control measures must be maintained. All building inspections will include an inspection of the erosion and sediment control measures. If the measures are not properly installed, or are not functioning, the building inspection will be denied. Continued failure to comply with these restrictions may result in a stop work order being placed on the construction activity. 9. When clearing and/or grading operations are completed or suspended for more than 30 days, all necessary precautions shall be taken to retain soil materials on site. Protective measures may be required by the Planning & Development Administrator such as permanent seeding, periodic wetting, mulching, or other suitable means. 10. Temporary siltation control measures (structural) shall not be removed until permanent final vegetation is established at a sufficient density to provide erosion control on the site. 11. All lots shall be seeded and mulched at the minimum permanent rates defined below or sodded before an occupancy permit is issued except that a temporary occupancy permit may be issued by the Madison County Planning & Development Department in cases of undue hardship because of unfavorable ground conditions. Permanent seeding rates: Tall Fescue- 6.9 lbs. per 1000 square feet; Smooth Brome- 4.6 lbs. per 1000 S.F.; Combined: Tall Fescue 3.4 lbs. per 1000 S.F. and Smooth Brome 2.3 lbs. per 1000 S.F. 12. Additional siltation control may be required as deemed necessary by the County of Madison.

Madison County Government Planning and Development Department Matt Brandmeyer Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman Erosion and Sediment Control Permit Rules and Inspection Requirements Inspections: Notify the Madison County Planning & Development Department 48 hours prior to the commencement of grading and/ or prior to the commencement of construction. Inspections of all erosion control measures must occur. The permittee shall notify the Building and Zoning Inspector within two (2) working days of the completion of the construction stages specified below: 1. Upon completion of installation of the erosion and sediment control measures prior to proceeding with any other earth disturbance or grading, 2. After stripping and clearing, 3. After rough grading, 4. After final grading, 5. After seeding or sodding, and 6. After final stabilization and landscaping, prior to removal of sediment controls. Please provide the building permit number when notifying the Building Inspector of the completion of each task above. Expiration of Permit: Every Soil and Erosion Control Permit shall expire and become null and void if the work authorized by such permit has not been commenced within one hundred and eighty (180) days, or if not completed by a date which shall be specified in the permit; except that the Planning & Development Administrator may, if the permittee presents satisfactory evidence that unusual difficulties have prevented work being commenced or completed within specified time limits, grant a reasonable extension of time if written application is made before the expiration date of the permit. Certification: I have read the above rules and inspection requirements and agree to abide by them, as well as any other requirement of the Madison County Soil Erosion and Sediment Control Ordinance. Applicant Date

Madison County Government Planning and Development Department Matt Brandmeyer Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman Soil and Erosion Control Site Plan Include the following Information: 1. North Arrow 2. Dimensions of Lot 3. Footprint of House 4. Location and Name of Street(s) 5. Area where vegetation will be stripped 6. Location and Description of Erosion Control Measures 7. Draw arrows indicating where water runs off of the property 8. Location of temporary rock drive way 9. Indicate adjoining Land Uses Approved by: Date:

Erosion and Sediment Control Diagrams, Examples, and Brochures

2009 INTERNATIONAL ENERGY CONSERVATION CODE Madison County Planning & Development 157 N Main Street Suite 254 Edwardsville, IL 62025 (618) 296-4468 Fax (618) 692-8982 Email: zoning@co.madison.il.us Effective Immediately The State of Illinois is requiring the enforcement of the International Energy Conservation Code (IECC), which regulates minimum energy conservation requirements for new commercial and residential structures. In order to enforce IECC, Madison County is requiring the submission of detailed construction documents and other supporting data with each application for all commercial construction and newlybuilt residential structures. These documents must be prepared by a design professional. The applicant is also required to complete the applicable COMcheck or REScheck form in order to demonstrate compliance with the code. The forms must be filled-out online then submitted with the application. Forms can be found at http://www.energycodes.gov at the COMcheck and REScheck links. Also, note that Madison County is located in Climate Zone 4 as indicated on Figure 301.1 and Table 402.1 of the IECC. Two (2) sets of construction documents are required with each application. One set of plans will remain on file with the department for a period of at least seventeen months after the final inspection is completed. The other set of plans is to be available on the construction site during all construction activity. Please also be advised that there will be a minimum review period of seventy-two (72) hours for each application. Climate Zone Fenestration U-Factor Insulation and Fenestration Requirements by Component Skylight U-Factor Fenestration SHGC Ceiling R-Value Wood Frame Wall R-Value Mass Wall R- Value Floor R- Value Basement Wall R-Value Slab R-Value & Depth Crawl Space Wall R-Value 1 1.2 0.75 0.4 30 13 3 13 0 0 0 2 0.65 0.75 0.4 30 13 4 13 0 0 0 3 0.5 0.65 0.4 30 13 5 19 5/13 0 5/13 *4(excluding 0.35 0.6 NR 38 13 5 19 10/13 10.2 ft 10/13 Marine) 5(including 0.35 0.6 NR 38 20 or 13-5 13 30 10/13 10.2 ft 10/13 Marine) 6 0.35 0.6 NR 49 20 or 13-5 15 30 15/19 10.4 ft 10/13 7&8 0.35 0.6 NR 49 21 19 38 15/19 10.4 ft 10/13 *minimum Source: IECC 2009 Table 402.1.1

Madison County Government Planning and Development Department Matt Brandmeyer, AICP - Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964 Phone (618) 692-7040 ext. 4468 Fax (618) 692-8982 E-Mail zoning@co.madison.il.us Kurt Prenzler, CPA County Board Chairman SPECIFICATION SHEET FOR SWIMMING POOLS AND DECKS SWIMMING POOL MATERIALS: ABOVE GROUND OR IN GROUND POOL: ARE THERE OVERHEAD WIRES DIRECTLY OVER THE POOL? OVAL, RECTANGULAR OR ROUND IN SHAPE: SIZE OF POOL: DEPTH OF POOL: EXTERIOR OF POOL: LINER OF POOL: IF YOU ARE INSTALLING AN ABOVE-GROUND SWIMMING POOL, WILL YOU BE USING A REMOVABLE LADDER OR ONE THAT FOLDS UPWARD AND CAN BE SECURED? IF YOU ARE INSTALLING AN IN-GROUND SWIMMING POOL, A FENCE IS REQUIRED TO BE AROUND THE POOL THAT HAS A SELF-CLOSING GATE WITH A SELF-LOCKING DEVICE. WILL YOU BE USING THIS? DECK MATERIALS WIDTH OF PIERS: DEPTH OF PIERS: SIZE OF POSTS: HOW MANY POSTS WILL BE USED: SIZE OF FLOOR JOISTS BEING USED: 2 X 6 2 X 8 2 X 10 2 X 12 DECKING MATERIAL: RAILING MATERIAL: (36 HEIGHT MINIMUM ON RAILINGS AND 4 MAXIMUM SPAN BETWEEN SPINDLES IS REQUIRED).