(~u~ ~' CC!LUSA C<JlJNT Y. ~l----. 'l\f;. t'hl H'~'l. v iiil i ''t'. Data on Acreage, Yield, and price. California Acr~s Yielg Price Acres Yield

Similar documents
Estimated Costs of Wheat Production in the Columbia Basin of Oregon

BUDGET AREA... FARM SIZE IRRIGATION TYPE NUMBER OF CROPS.. Item

BUDGET AREA... ROGERS-DORA AREA, ROOSEVELT COUN FARM SIZE... 1, ACRES IRRIGATION TYPE. DRYLAND NUMBER OF CROPS 2 VERSION 1.0

Table 13A. Income and Cash Operating Summary; Winter Wheat, 1998 Page 66

TABLE 1. Acreage Summary, San Juan County, TABLE 2. Basic cost information for San Juan County, Projected 2017 Projected 2017.

Item 35 ACRES FLOOD NUMBER OF CROPS 4. Labor Wage Rate: Equipment operators $/hour $7.20 WATER USE. General & Irrigators $/hour $7.

Item. NUMBER OF CROPS... 2 Labor Wage Rate: LAND USE Equipment operators $/hour $7.75 ACREAGE SUMMARY: (ACRES) General & Irrigators $/hour $7.

ITEM PRICE YIELD TOTAL GROSS RETURNS OAT HAY TONS (IN FIELD) TOTAL PURCHASED PURCHASED INPUTS PRICE QUANTITY INPUTS TOTAL

$3,048 $1,524 $1,873 $2,800 $12,700 $2,502 $2,007 $0 $0 $1,657 $457 $191. Total $28,759

Item. Labor Wage Rate: Equipment operators $/hour $8.55 WATER USE

BUDGET AREA FARM SIZE... IRRIGATION TYPE NUMBER OF CROPS. Item

VERSION 1.0. COPYRIGHT (C) 1984 by NEW MEXICO STATE UNIVERSITY BOARD OF REGENTS

WATER USE. Employee Liability Insurance $/$1,000 wages $ Employee Benefits percent/wages 18.00% Labor Downtime percent 25.

4 Labor Wage Rate: Equipment operators $/hour $8.55 WATER USE

VERSION 1.0. COPYRIGHT (C) 1984 by NEW MEXICO STATE UNIVERSITY BOARD OF REGENTS

BUDGET AREA.. DRY CIMARRON AREA, UNION COUNTProjected 2018 FARM SIZE ACRES IRRIGATION TYPE FLOOD NUMBER OF CROPS 2 VERSION 1.

Table 7A. Income and Cash Operating Summary; Grain Sorghum (Dbl. Crop), 1998 Page 30

$1,600 $1,143 $565 $953 $6,541 $1,181 $768 $0 $6,010 $591 $292 $191

EC Dry Edible Bean Production Costs and Returns in Scotts Bluff County, Nebraska 1967

MICROCOMPUTER CROP COST AND RETURN GENERATOR

Enterprise Budget. Annual Ryegrass, Conventional Tillage, Volunteer Seeding and No-Till, Willamette Valley Region

MICROCOMPUTER CROP COST AND RETURN GENERATOR VERSION 1.0. COPYRIGHT (C) 1984 by NEW MEXICO STATE UNIVERSITY BOARD OF REGENTS

3 Labor Wage Rate: Equipment operators $/hour $8.55 WATER USE

COPYRIGHT (C) 1984 by NEW MEXICO STATE UNIVERSITY BOARD OF REGENTS

Enterprise Budget. EM 8370 Revised February 1999

Employee Benefits percent/wages 18.00% Labor Downtime percent 25.00%

1992 U.C. COOPERATIVE EXTENSION SAMPLE COSTS TO PRODUCE ORGANIC RICE Water Seeded IN THE SACRAMENTO VALLEY

1992 U.C. COOPERATIVE EXTENSION SAMPLE COSTS TO PRODUCE ORGANIC RICE No-Till Drill Seeded IN THE SACRAMENTO VALLEY by

Table 7A. Income and Cash Operating Summary; Grain Sorghum (Dbl. Crop), 1998 Page 30

Table 14A. Income and Cash Operating Cost Summary, Wheat, Salome/Vicksburg, 1996 Page 65

Enterprise Budget. Sweet Corn, Willamette Valley Region. EM 8376, Revised August 1995

U.C. COOPERATIVE EXTENSION

Table 10A. Income and Cash Operating Summary; Grain Sorghum (Late), 1998 Page 45

SEED $ LBS $ $ HERBICIDE $ ACRE $32.40 $32.40 SUBTOTAL $ $ ACCOMPLISHMENT RATE

Table 7A. Income and Cash Operating Summary; Grain Sorghum (Spring), 1998 Page 30

Table 7A. Income and Cash Operating Summary; Grain Sorghum, 1998 Page 30

Enterprise Budget. Meadowfoam Seed, Willamette Valley Region, Page 1

Table 6A. Income and Cash Operating Summary; Durum Wheat, 1998 Page 25

Costs to Establish and Produce Olives for Oil

Table 10A. Income and Cash Operating Summary; Edible Dry Beans, 1998 Page 45

Dryland Wheat Production and Marketing Costs in Oregon's Columbia Plateau

MICROCOMPUTER CROP COST AND RETURN GENERATOR

Table 17A. Income and Cash Operating Summary; Dry Onions (Processing), 1998 Page 86

Table 3A. Income and Cash Operating Summary; Alfalfa Stand Establish, 1998 Page 10

Table 8A. Income and Cash Operating Summary; Fall Cabbage, 2001

Table 8A. Income and Cash Operating Summary; Corn Silage, 1998 Page 35

Background and Assumptions

U.C. COOPERATIVE EXTENSION

Table 10A. Income and Cash Operating Summary; Spring Lettuce, 2001

Ohio State University Extension Agriculture & Natural Resources

Pershing County Alfalfa Hay Establishment, Production Costs and Returns, 2006

Custom Rates Survey, 2013

Custom Rates Survey, 2013

Sacramento Valley Yolo County Irrigated

SAMPLE COSTS TO PRODUCE TOMATOES Fresh Market and Subsurface Drip Irrigated IN THE SAN JOAQUIN VALLEY

UNIVERSITY OF CALIFORNIA - COOPERATIVE EXTENSION SAMPLE COSTS TO PRODUCE WHEAT. SAN JOAQUIN VALLEY Double Cropped

Glenn. County PRODUCTION COSTS FOR SUDANGRASS SEED TENANT LANDOWNER SD-GL-92 BASIS. ROBERT L. SAILSBERV Farm Advisor

Enterprise Budget. Tall Fescue Seed, Establishment and Production South Willamette Valley Region

Enterprise Budget Apples, Medium Density, North Central Region

U.C. COOPERATIVE EXTENSION

Table 14A. Income and Cash Operating Summary; Fall Lettuce, 2001

1998 Missouri Crop Costs and 2000 Crop Cost of Production Estimates

Projected 2016 Projected 2016 BUDGET AREA... SAN JUAN COUNTY, FARM SIZE 80 ACRES Item IRRIGATION TYPE SPRINKLER

Table 18A. Income and Cash Operating Summary; Sweet Corn, 2001

Custom Rates and Machine Rental Rates Used on Illinois Farms, 1968

Enterprise Budget. Alfalfa Establishment, Christmas Valley Area

Table 4A. Income and Cash Operating Summary; Romaine Lettuce, 2001

Special Crop Production Costs

Table 8A. Income and Cash Operating Summary; Watermelons, 2001

Table 10A. Income and Cash Operating Cost Summary, Grain Sorghum (Dbl. Crop), 1996 Page 41

Table 6A. Income and Cash Operating Cost Summary, Lettuce (Spring), 1995 Page 25

Table 8A. Income and Cash Operating Summary; Spring Cantaloupe, 2001

Table 9A. Income and Cash Operating Cost Summary, Grain Sorghum, 1996 Page 37

Table 13A. Income and Cash Operating Summary; Upland Cotton, 1998 Page 61

1997 Hand- Harvest Cucumber Costs and Returns, Northwest Washington

TABLE 1. Basic cost information for Socorro County Projected 2017 BUDGET AREA... SOCORRO COUNTY Projected 2017

TOTAL $ PURCHASED INPUTS PRICE SEED $ LBS $45.00 $45.00 MANURE $ TON $21.60 $21.60 LIVESTOCK FAC & EQUIP $5.00 $5.

Total 2, ,519

MICROCOMPUTER CROP COST AND RETURN GENERATOR

Michael E. Salassi and Michael A. Deliberto

2017 Alfalfa Enterprise Budget

Michael E. Salassi and Michael A. Deliberto

U.C. COOPERATIVE EXTENSION

2001 Cost of Producing Native and Scotch Spearmint Under Rill and Side- Roll Irrigation Central Washington

2012 Cost Estimates of Establishing, Producing, and Packing Red Delicious Apples in Washington

Table 13A. Income and Cash Operating Summary; Fall Cantaloupe, 2001

Total PRODUCTION Units Price Quantity $/Acre Pecans Lbs. $ $ 1, Other Income Acre $ - Total Receipts $ 1,160.00

Agriculture & Business Management Notes...

Table 9A. Income and Cash Operating Cost Summary, Wheat, 1996 Page 35

SACRAMENTO VALLEY Irrigated-Bed Planted and Dryland-Flat Planted

Michael A. Deliberto, Brian M. Hilbun, and Michael E. Salassi

Guidelines for Estimating Crop Production Costs. in Manitoba

Enterprise Budget. EM 8849 January 2004

SEED $ LBS $ $ NITROGEN (N) $ LBS $24.75 $24.75 PHOSPHATE (P205) $ LBS $56.00 $56.00 SUBTOTAL $ $260.

EBB2 Po Costs and Returns Estimate Southwestern Idaho: Treasure Valley Shepody Commercial Potatoes: Fumigation and No Storage District II

Table 8A. Income and Cash Operating Cost Summary, Grain Sorghum, 1996 Page 29

Enterprise Budget. Winter Wheat, Conventional Tillage and No-Till, Willamette Valley Region

D a Oregoa 's. Costs. 8Z.j983. Oregon State ersity Exte5j Service. EM 823k

Robert W. Boucher and Jeffrey M. Gillespie

Table 10A. Income and Cash Operating Summary; Bt. Upland Cotton, 1998 Page 46

Transcription:

. '"---~,.~ -""'"""' "'""""""""""''-'"'"""'"'"''"""'"""'"""""'""""~=,.,,,,,,.,,,.,""~=~-="'"""' ""''""~""""'""'~""'=-" \ ' 1 Data on Acreage, Yield, and price I< t'hl H'~'l ~l----. 'l\f;. v iiil i ''t'. vzi == <.~1,, vr- _ Colusa Count;z California Acr~s Yielg Price Acres Yield J,945 48,674 2,465 3.25 235,000 2,660 +946. 55;000 2,545 3.81 261,000 3,030 1947 52,000 2,585 6,64 256,000 3,140 ].948 490 2,460 4,66 256,000 2,670 1949 63,040 3,000 3,30 305,000 3,350 l950 47,693 3,100 4,45 238,000 3,480 J,951 71,327 2,600 4,75 314,000 3,300 1952 73,012 3,140 6,03 330,000 3,600 (~u~ ~' IN CC!LUSA C<JlJNT Y Source: Colusa County Agricultural Commissioner and U,S,D,A. Bureau of Agricultural Economics. 200 copies January 1954 DB Agricultural Extension Service University of California Postoffice Bldg., Colusa

--.-.:;- RICE COSTS IN COLUSA COUNTY Karl Ingebretsen, Farm Advisor Doyle Recd, Extepeion Economist This publication is primarily for the beginner or the man contemplating rice production for the first time, and is designed to give a ~thod of figuring production,costs. The costs given here are typical of Colusa County. Howe'iier, as in all cost data, certain conditions must be assumed. Costs will vary when rice is grovm under conditions other 1han those used in compiling this publication. Size of Operation The minimum size of operation to return a satisfactory living is about 150 acres. This will var,, depending on the productive capacity of the land, the price level, and the managerial ability of the operator. However, the anount and size of equipm<i'nt which is necessary for rice production will permit one man, with a minimum of hired labor, to handle 300 acres. This same equipment will also handle up to 450 acres by using more hired labor. It is to the operator's advantage to farm as large an acreage as possible in order to reduce the overhead per acre. Using smaller equipment or fewer machines usually does not prove successful because jobs cannot be per~ formed when needed, with resulting lower y'ields. Yields Rice is Colusa County's major crop, being produced on about 75,000 acres of land in Colusa County. This is an increase of about 3 times over the prewar acreage. Most of the heavy soils of the county are adapted to rice production. Alkali proh:i.bits production :l.n some areas and o.ther crops may be more profitable on the better soils. Av<;lrage yi<i'lds for the county declined.mate:r;ially in the early 40's as less suit:;i.ble land was brought into produqtion. ~ieldoi, have inqeased. during the past few years however, due to more use of fertilizer, land leveling, and other.practices. Yields for the years 1948-52 averaged 2 1 870 pounds per acre...,. Yields of 30 pounds should be obtained on 1tlost of our rice land with good management. Suggested Readi!!li:,' Rice Production in Calif~nia - Loren Davis California Agricultural Extension Bulletin 163-1949 "Rice Fertilization in Colusa County" - Karl H. Ingebretsen, Agricultural Extension Service - 1953 The Rice Journal" - 006 Perdida St., New Orleans, La. Rice Production & Marketing in the Un:i.teq States" U9S.D.A Miscellaneous Publication No. 615 "Rice Market Review" Federal-State Market News Service, San Francisco

-~f ROTATIONS: In all well managed farm operations there should be a planned rotation system, The purpose of this rotation in rice fa:rniing is to rest the soil, allowing it to aerate or dry out. It is also considered essential in control of some aquatic weeds. The common rotations in Colusa County are three years rice out of five, or two years out of three, If rice is the only crop grown on the land, it might be advantageous to fallow about one year out of three, The cost of the idle or fallow year should be distributed into the productive years. The costs on the preceding page assume that rice had not been grown on the land the preceding year, thus requiring the erection of levees. Under these.conditions the second year of rice on this land would have the costs reduced by the expenses of two dfiikings, the floating and the checking, or a total cost per acre of........ -~.2..2 The third year or fallow year, would have a per acre cost of about........ -...,. $~5.oo The next year, or the first year in rice again, we can eliminate the plowing and floating costs ta.ken care of in the preceding or the fallow year, leaving a cost per acre of...,....... $104.OS The three year rotation outlined could then be followed, giving a cost per acre for the three years of,.,.................... f228.41 With two crops of 3500 lbs. each, or a total of?,ooo lbs., this gives a cost per.. cwt. for the tfiree years of... ~... ~ o ~J,.27 EQUIPMENT AND INVESTMENT For 300 acres of rice Machinery: Crawler tractor 60-70 Drawbar H,P, Crawler tractor 30-40 Drawbar H,P. Truck 1-} ton Pick-up Plow 10-14 Disk 18' Harrow, Spike Tooth 20' Float 12 1 x30 1 Dozer 6' Bankout Wagon Self-propelled harvester 2-14' Tools and Small Equipment Total Machinery..,........... J Approximate New Cost $,000 6,000 3,000 2,400 10 2,000 200 150 1,000 2,000 16,ooo 3.000 48,250 Land-300 acres @ $150 45,000 Ditches, ~oa4s, etc. 30 acres @ $150 40 Total Investment..... $ 97,750 Cash costs to raise Crop@ $58,15/A.. l?,445 Total Invested before Crop Harvested $5,195 It is desirable to have a small tractor with blade or bucket for closing checks and other odd jobs, A second it ton truck may also be needed if hauling distance to dryer is above average. The investment may be reduced by purchasing second-hand equipment, Good second-hand equipment is often a better buy than new equipment,

"'",\ SAMPLE COSTS FOR GRcit:r'rtG FIRST YEAR RICE ovmm - OPERATED FARM "~\ j,! ~ ' Based on produci:ng 306 acres rice ~ Yield - 30 lbs. drv naddv rice.jl!l!:._acre Labor ~ber hour i tsh Cost per Acre In't & ' Total ~ ours Tractor M ter"als. Total D aprec. Cost per and --c Cash on per ~anon Crew @d Eauil;;ment. Acre Labor Eouip. Contra()] K;ind CJ;:j cost EJuin. AQre Cultural Costs.;...;;;...- Plow: man, tractor, 10-14" plow Disk: 2 times: man, tractor 18 1 disk Float:2 times: man, tract. 12'x30' float Survey: custom Check: man, tract. (1 tract.cl>ecker hired) Disk & harrow: man, tract., disk & harrow Fertilize: plane Flood: Seed: plane Irrigate Spray 2 times: plane Drain and open checks Bird control: man and plane Total cultural cost Harvest Cost Combine: 2 man, 2 self propelled Bankout: man, tractor, bankout wagon Haul to mill: man, it ton truck Dry: 38 cwt wet @ 35 Storage 3500 lbs. @ $3.16 ton Total harvest cost Total Tractor and equipment cost includes fuel, repairs and other cash costs..5.60.6.75.4.3.40.3.40.5 2.0 2.00.1.10.6Q _5.85.6. 2.40.6.85.6.70.85 1.05.60.55 3.70 5.40 1,25 2.70 3.00 Nitrogen 60# 1 Seed. 150# Water 2?pxay 9.00 7 3 1.45 1.80 1.15 3.70.95 13 9 6,00 1.125 1.15.JO 1,00.10.40 1.00_ io.(e_o..,,.,32,,,,.""o.::.0_"""52.15 4. 85 7.80 2.10 1.35 13.30 13.30 5 1.35 1.00 2.70 2,95 1 4.00 1.60 13 10 6.oo,10 1.00-57.00 13.30 3.45 2.35 13.30 5.53 ------~-~--~5.~ =53~- 5.53 3.95 7.30 18.83_ --- _..l.q.98 7.85 37.93 9.80.00 29.43 32.00 82.gJ 12, 70 94.21 Miscellajieous Costs: Taxes 3,00 Other 3.00 Interest on land $150 @ 5% 7 Total Miscellaneous -6.oo '7 13 Total Cost per Acre 88.23 20.20 108.43 Cost per cwt. $3.10 ''=-'' '_W,_

University of California Agricultural Extension Service Farm Advisor, Hollister January, 1954 SAMPLE INPUTS AND COSTS E'OR~.,IN SAN BENITO COUNTY With a Yield of 2 JJr'ied"TOns per Acre Man J Trac-I ifsj Truck Cost Cost. 1-Jabor tor per per cost Hours _B._er acre acre ton ner A Pruning ~ $1 per hour 25 25.00 Brush disposal ~: 1,0 4. 70 Spraying, av. 1 application incl. 75 for rig 2 1.0' 5.85, Dusting, contract, 1 application (2.:5Q; 171,,.., Cultivate and check or fuj;'row 5 4.5 18.9!Irrigation, twice@.90 an hour 12 10.80 ~Vlisc. covercrop, etc. 3 1.0 1.0 8.80 Total cultural labor 49 6.5 2.0 76.60 ~ 38~30 ffropping, bracing, etc. 2 1.0 4. 70 2.35 I Picking, 5 fresh tons @ $10 - shake and pick 50 50.00 25.00 I Supervision, hauling out and misc. harvest 8 3.0 16.40 8.20 Dehydrating (contract) @ $12 per fresh ton 60.00 30.00 Hauling to market 2 dry_ tons 2 1.0 4.80 2.40 Total labor 1 6.5 7.0 212 106. 2S Irrigation, power to pump 12A in. 100 1 lift 6. 70 Covercrop seed 2 Spray and dusting materials 15.00 Misc. materials 2.00 Total material cost 26.20 13.10 General expense, office, phone, car, etc at 5% of L & M..94 County taxes, $310 value @ $3.25 10.00 Repairs to facilities 2.00 Insurance, compensation on hired labor $1.90, fire on eauip. 60 2 Total cash overhead 26.~4 13.22 Total cash costs 265.lli 132.57. Orig. Aver. 5% Depree- Investment based on cost Value Int. iation 30 acre orchard unit 30 A. Dollars per acre Trees, development cost $3667A 10800 180 9.00 Building for equip., etc. 600 10.75 Irrig. well, pump, & pipeline L1800 Bo 4.00 5.oo Tillage equipment 540 9.45 1.80 I Spraying equipment, part owner 900 15.75 2.00 Misc. ladders, boxes, props, etc. 900 15 75 2 Land 400 20.00 Total investment 1-4~p 30 0 702 - Total depreciation 2[.Q.5. " ' 12.0 j Total cash and depreciation costs 289.19 144.60 Total interest on investment 35.45 35.45 J2 Total costs except management 324.64 162.32- - The above labor costs are computed at the following hourly rates: Pruning, spraying, truck driving, tractor driving and supervision, $1.00, other labor i;o.90, 3 pj ow track tractor $3.10, l!-ton truck $2.80. Tractor and truck rates are - estimated to cover overhead and repairs as well as actual operating costs, and are based on original cost of new machines as of 1951. Average investment per acre for depreciable facilities is shown above at half of the orisinal costs. Trees are assumed to cost $36o an acre and be good for 30 years of profitable bearing, so depreciation is $12 per year.