WAT-TEMP-68. Water Resource Monitoring Plan Template. Water Use. Authorisation Number : Site Address :

Water of Leith catchment profile

River Carron catchment profile

Legal Basis of Water Management in Austria

Regulatory Method (WAT-RM-26)

ENVIRONMENTAL BRIEFING: WATER FRAMEWORK DIRECTIVE MAY 2013

Clyde area management plan

Impact of the Controlled Activities Regulations on Dam Construction, Maintenance and Operation in Scotland

PART 1. To: Scottish Consultation Authorities: PART 2

Kilsyth to Bearsden north of Glasgow City (Potentially Vulnerable Area 11/04) Local Plan District Local authority Main catchment East Dunbartonshire C

LICENCE APPLICANT GUIDANCE FORM D ABSTRACTIONS AND IMPOUNDMENTS

Construction Sites Regulation by SEPA. Phil Leeks

Challeng es and choices WATER FRAMEWORK DIRECTIVE (WFD): CHALLENGES & CHOICES CONSULTATION RESPONSE (NATIONAL)

Surface Water Management Masterplan. Summary and Actions. September 2016

The EU Water Framework Directive

Hydromorphology in the Danube River Basin

Review of Lake Heavily Modified Waterbody (HMWB) Designation and Classification

GAIRLOCH WWTW: CAR/L/ APPLICATION FOR TECHNICAL VARIATION SUPPORTING INFORMATION

Guidance on the Classification of Ecological Potential for Heavily Modified Water Bodies and Artificial Water Bodies

Rutherglen (Potentially Vulnerable Area 11/14) Local Plan District Clyde and Loch Lomond Local authority Glasgow City Council, South Lanarkshire Counc

8 Geology, Hydrology & Hydrogeology

Water Framework Directive and Flooding Implications for Flooding Policies in Scotland

Position Statement (WAT-PS-10-01)

Lunan Valley Area Dunkeld- Blairgowrie Lochs Special Area of Conservation

Surface water is the rainwater that runs off roofs, roads and paved areas into the public sewerage system.

River Avon catchment profile

Both organisations have a good track record of working together. However, there is a need for even closer collaboration due to:

Tidal Thames Catchment-based Pilot Project

terms of sections 24(2), 24(5), 24D and 44, read with section 47A(1)(b) of the

Scottish Environment Protection Agency

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

COMMON IMPLEMENTATION STRATEGY FOR THE WATER FRAMEWORK DIRECTIVE (2000/60/EC)

Planning water resources in England and Wales

Prestwick and Ayr (Potentially Vulnerable Area 12/09) Local Plan District Ayrshire Local authority South Ayrshire Council Main catchment Doonfoot to M

Guidance for developers of run-of-river hydropower schemes

Regulations and applications of SUDS technology in Scotland

These potential changes and their implications are outlined in Annex 1.

Water NI February 2016 Belfast

EID POLICY MANUAL. WATER Water Delivery and Operations Policy Revised January [supersedes May ]

Irvine to Troon (Potentially Vulnerable Area 12/07) Local Plan District Local authority Main catchment North Ayrshire Council, Ayrshire Monkton to Irv

Planning Background Paper. Water Environment. LUPS-BP-GU2b v.1 UNCONTROLLED DOCUMENT WHEN PRINTED Page 1 of 30

Introduction to Urban Drainage. Scott Arthur. Civil Engineering at the School of the Built Environment. [Class 1 - Into+ 1]

Working together To improve our water environment Glazert Water

The variation of authorisation at Gairloch WWTW application received by SEPA on 24 May 2016 for

Dredging for Climate Change and Transport in the Netherlands

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

UK Technical Advisory Group on the Water Framework Directive

Freight Potential of the Caledonian Canal

Petra Diamonds (Finsch) Storm Water Management Plan Update. Project No: PET-FIN Shangoni Management Services (Pty) Ltd

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS

Case Study Union Canal In-house Spot Dredging January 2015

Improving the quality of Scotland s water environment Argyll and Lochaber area management plan

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 2: Environmental Statement. Chapter 8: FLOOD RISK AND SURFACE WATER

Dissolved Oxygen in the Clyde

Hydropower Guidance Note: HGN 7 Competing Schemes

The Metropolitan Glasgow Strategic Drainage Partnership

PART 1 PART 2. An SEA Screening Report is attached for the plan, programme or strategy (PPS) entitled: COMPLETE PART 3 OR 4 OR 5 PART 3

Clydebank and Kirkintilloch bedrock and localised sand and gravel aquifers

De-culverting of watercourses

Implementation Plan and FAQs for the Guide to Water Act Authorizations Required for Dugouts, Borrow Pits and other types of Pits/Excavations

Pollution Prevention and New Industrial Estates

Summary of 2017 NWPs NWP #3 NWP #5 NWP #7 NWP #12 NWP #13 NWP #14 NWP #15 NWP #18 NWP #19 NWP #21 NWP #23 NWP #25 NWP #27 NWP #29 NWP #30 NWP #31 NWP

Improving the condition of Solway Tweed s water environment Tweed area management plan

Western State Water Issues Proposed Definition of. Waters of the United States

Statement of Particulars Western Wales Flood Risk Management Plan

River Forth catchment profile

3. ROLES AND RESPONSIBILITIES FOR COMPLIANCE WITH THIS CODE PART 2: CODE OF PRACTICE FOR ACTIVITY IN THE MARINAS AND MOORINGS BUSINESS

Appendix 7: Improving the water environment

COTTON CREEK CULVERT REPLACMENT

Consultation responses to the Significant Water Management Issues Report for the Scotland RBD

Tongaat WWTW Water Use Licence Application. Draft Report Meeting 1 October 2015

Funded by the Irish Government under the National Development Plan Document Number: DC098. DC098/lh/May 08

GUIDANCE ON THRESHOLDS AND METHODOLOGY TO BE APPLIED IN IRELAND S RIVER BASIN DISTRICTS

Compliance Assessment Scheme Public consultation

SECTION 3: Water, Wetlands and Waterways

European Sediments 1

The Cleddau & Pembrokeshire Coastal Rivers Abstraction Licensing Strategy May A licensing strategy to manage water resources sustainably

DENR Statutes and Rules Relating to Aquatic Weed Control

Flood Risk Assessment and Drainage Supplementary statement

Guidance note completing form WRC consent to investigate a groundwater source

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

Downstream Flow Regimes

Site 25: Lappet Mill, Calder Vale

Oxon Ray Catchment Summary of significant issues affecting the water environment

Waters of the United States. National Conference of State Legislatures August 20, 2014 Virginia S. Albrecht

PANAMA CANAL RESERVOIR WATER QUALITY EVALUATION STUDY

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area

Appendix E : Guidelines for Riparian Buffer Areas

Water Framework Directive and EIA: our experience. Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012

Name Assessor or Approver Date

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

The environmental objectives and Programme of Measures of the River Basin Management Plan. The case of Cyprus. Iacovos Papaiacovou

Council CNL(14)40. Annual Progress Report on Actions Taken Under Implementation Plans for the Calendar Year 2013

Chapter 6 Objective: Protect and Enhance the Environment

Transcription:

Water Use Supporting Guidance (WAT-SG-71) Sector-specific Guidance: Canals Version: v4.0 Released: Apr 2013

Copyright and Legal Information Copyright 2013 Scottish Environment Protection Agency (SEPA). All rights reserved. No part of this document may be reproduced in any form or by any means, electronic or mechanical, including (but not limited to) photocopying, recording or using any information storage and retrieval systems, without the express permission in writing of SEPA. Disclaimer Whilst every effort has been made to ensure the accuracy of this document, SEPA cannot accept and hereby expressly excludes all or any liability and gives no warranty, covenant or undertaking (whether express or implied) in respect of the fitness for purpose of, or any error, omission or discrepancy in, this document and reliance on contents hereof is entirely at the user s own risk. Registered Trademarks All registered trademarks used in this document are used for reference purpose only. Other brand and product names maybe registered trademarks or trademarks of their respective holders. Update Summary Version Description v1.0 First issue for Water Use reference using approved content from the following documents: British Waterways Scotland canal details- final version 27 10 08.doc v2.0 Doc links revised to new website, new template applied v3.0 Multiple changes: monitoring requirements and canal details updated with new network map; guidance added for 3rd party abstractions, (un)controlled feeders, regulation of eng activities v4.0 Expired CMS links reviewed and updated. Notes References: Linked references to other documents have been disabled in this web version of the document. See the References section for details of all referenced documents. Printing the Document: This document is uncontrolled if printed and is only intended to be viewed online. If you do need to print the document, the best results are achieved using Booklet printing or else double-sided, Duplex (2-on-1) A4 printing (both four pages per A4 sheet). Always refer to the online document for accurate and up-to-date information. 2 of 16 Uncontrolled if printed v4.0 Apr 2013

Table of Contents 1. Key Points... 4 2. Background... 5 3. The Canal Network... 6 3.1 Caledonian Canal... 6 3.2 Crinan Canal... 7 3.3 Lowland - Forth & Clyde Canal... 7 3.4 Lowland - Union Canal... 8 3.5 Lowland - Monkland Canal... 8 4. British Waterways Scotland Licences... 9 5. Abstractions into a Canal... 10 5.1 Controlled and Uncontrolled Feeders... 10 6. Monitoring Requirements... 11 7. Impoundments, Sluices and Locks... 12 8. Abstractions from a Canal... 13 9. Engineering in Canals... 14 References... 15 v4.0 Apr 2013 Uncontrolled if printed 3 of 16

1. Key Points This document provides specific pre-application and ongoing regulatory guidance for: Canals Abstractions from canals This includes background information to the sector, related definitions and supporting information requirements. 4 of 16 Uncontrolled if printed v4.0 Apr 2013

2. Background Canals are part of the water environment as defined in Chapter 1, Section 3 of the Water Environment and Water Services (Scotland) Act 2003. Canals are classed as Artificial Water bodies (AWB). AWBs are bodies of surface water created by man where no water body previously existed. AWBs are required, under WFD, to achieve Good Ecological Potential (GEP) and the default target date is 2015. For AWBs the ecological potential represents the degree to which the quality of the water body s aquatic ecosystem approaches the maximum it could achieve, given the artificial characteristics of the water body that are necessary for the use or for the protection of the wider environment. In practice for the first river basin planning cycle (2009-2015), GEP will be assessed by reference to checklists of mitigation measures appropriate to the activity for which the AWB has been created. In the case of canals this is inland navigation. GEP also requires water bodies to achieve good surface water chemical status. For further details, refer to Guidance for defining Good Ecological Potential (for HMWBs and AWBs). v4.0 Apr 2013 Uncontrolled if printed 5 of 16

3. The Canal Network British Waterways Scotland (BWS) receives grant funding from the Scottish Government to ensure that navigation channels remain open and in a safe and well-maintained condition. There are 3 main canal networks in Scotland namely: Caledonian Crinan Lowland which is made up of the Forth & Clyde, Union and Monkland Canals. Together they form a network of inland waterways which is 137 miles (220km) in length and was constructed between 1768 and 1822. Figure 1 British Waterways Scotland Canal Network 3.1 Caledonian Canal The Caledonian Canal is 60 miles (96.6 km) in length of which 22 miles (35.4 km) is man-made, stretching from Inverness to Corpach near Fort William. The canal was constructed between 1804 and 1822. The navigation includes 4 natural lochs, Oich, Ness, Dochfour and Lochy which also provide the water supply. In total there are 29 locks along the length of the canal. 6 of 16 Uncontrolled if printed v4.0 Apr 2013

The Canal Network The Caledonian Canal has played a significant role in the development of the Highland economy, fostering trade between East and West, as well as with Germany, Holland and the Scandinavian countries. The canal continues to play a significant role in the economy accounting for 14% of tourism spending in the Highlands. 75% of the canal traffic is for leisure with 25% commercial use. A total of 1300 boats transit the canal each year and 50 hire boats are based on the canal year round. 3.2 Crinan Canal The Crinan Canal is 9 miles (14.5km) long and rises to 68ft (20.7m) above sea level. Construction of the canal began in 1794 and was completed in 1809. 10 reservoirs and a sea pump supply water to the canal and there are 15 locks in total along its length. The canal was created to open up the west coast and improve access to the Western Isles, offering a safe transit route from Ardrishaig on Loch Gilp to Crinan, thus avoiding the often difficult sail around the Mull of Kintyre and cutting over 100 miles (160km) off the journey. The Crinan Canal serves as a still water marina base for cruising yachtsmen. 95% of the canal traffic is for leisure (5% is commercial traffic) with around 1700 boats per annum transiting the canal. The harbour at Ardrishaig is also an important element in Scotland s timber trade. The canal contributes around 4m to the local economy via jobs and direct spending. 3.3 Lowland - Forth & Clyde Canal The Forth & Clyde Canal is 35 miles (56 km) long extending from Grangemouth on the Firth of Forth to Bowling on the Firth of Clyde with the Glasgow branch another 4.7 km in length. The Forth & Clyde was constructed between 1768 and 1790 and the waterway was extended when the Monkland Canal was joined to the Port Dundas Basin in 1793 and the Union Canal at Camelon in 1822. Water is supplied to the Forth & Clyde Canal from 5 reservoirs - 2 near Kilsyth (Birkenburn and Townhead) and 3 via the North Calder Water, Monkland Canal and supply pipes under the M8 motorway which follow the original route of the Monkland Canal (Hillend Reservoir, Black Loch and Lily Loch). In total, there are 39 locks on the Forth & Clyde Canal. Following completion of Millennium Link restoration work, the Forth & Clyde Canal re-opened again in the spring of 2001, providing coast-to-coast navigation. The link with the Union Canal, allowing navigation from the centre of Glasgow to the centre of Edinburgh was achieved following the opening of The Falkirk Wheel on 24 May 2002. v4.0 Apr 2013 Uncontrolled if printed 7 of 16

Supporting Guidance (WAT-SG-71) 3.4 Lowland - Union Canal The Union Canal, or to give the waterway its full name, the Edinburgh and Glasgow Union Canal, was constructed between 1818 and 1822. A 32 mile (52 km) contour canal, it runs from Edinburgh to Falkirk where it joins the Forth & Clyde Canal. The connection between the Union Canal and the Forth & Clyde Canal, a flight of 11 locks, was severed in the 1930s and was re-established via the construction of a 2 km extension of the Union Canal and the Falkirk Wheel in 2002. There are 3 locks on the Union Canal, 2 just above and 1 just below the Falkirk Wheel. Water is supplied to the canal from Cobbinshaw Reservoir via the Almond feeder at Almondell & Calderwood Country Park. 3.5 Lowland - Monkland Canal The Monkland Canal was constructed between 1770 and 1793 and although no longer available for navigation it is, nevertheless a vital part of the system. It acts as a conduit for the main supply of water to the western end of the Forth & Clyde Canal and is locally important as an amenity for the community. When the M8 motorway was built it followed the route of the Monkland Canal which was filled in. The water supply from the 3 reservoirs (Hillend Reservoir, Black Loch and Lily Loch) near Coatbridge now flows via a set of twin pipes under the motorway and enters the Forth & Clyde Canal at Port Dundas in Glasgow. 2 open water channel sections of the Monkland Canal remain (in Coatbridge and Woodhall, east of Coatbridge) but there are no locks on these sections. 8 of 16 Uncontrolled if printed v4.0 Apr 2013

4. British Waterways Scotland Licences BWS has 3 multiple water use licences to cover their canal network. These licences contain details of abstraction, impoundment, engineering activities and their associated conditions. The licences are: CAR/L/1010718 for the Caledonian Canal CAR/L/1011179 for the Crinan Canal CAR/L/1011140 for the Lowland Canals (incorporating the Forth & Clyde, Union and Monkland canals). Note that Registration level sewage discharges from BWS properties are not included within these licences even though it would be possible under CAR to include them as part of a multiple water use licence. As agreed with BWS, these authorisations remain as separate Registrations in order to facilitate the potential future sale of BWS properties where required. v4.0 Apr 2013 Uncontrolled if printed 9 of 16

5. Abstractions into a Canal Abstractions from rivers, lochs and reservoirs are made by BWS in order to supply water to canals to maintain a navigable depth. Canals have been in situ for a considerable amount of time and will therefore have established their own habitats for a wide and diverse number of plants and animals. Under the Water Framework Directive, canals are considered as artificial water bodies (AWB) and will therefore be expected to meet Good Ecological Potential (GEP). Any proposals for additional abstractions into the canal by BWS should be dealt with as licence variation applications, following the procedures in WAT- RM-01: Regulation of Abstractions and Impoundments. Generally speaking, canals operate within narrow volume limits with the principle that flood water (termed waste water overflows ) is spilled back to the natural water environment. These amounts totalled account for the gross abstraction volume, however what should be authorised and included in the licence is the net volume used in the operation of the canal. 5.1 Controlled and Uncontrolled Feeders Controlled feeders are inputs where BWS can control the volume entering the canal using weirs and sluices etc. Such inputs can be readily monitored (see Section 6 Monitoring Requirements ). Uncontrolled feeders are inputs where BWS does not have control over the volume entering the canal system (i.e. there is no weir controlling the flow into the canal) and where the canal is intercepting natural watercourses which either flow directly into the canal or indirectly via other feeders. Therefore uncontrolled feeders will also channel flows into the canal from high flow and storm events. Uncontrolled feeders should be authorised according to the net inflow in the canal which is assumed to be the natural Q95 for that watercourse. The level of authorisation is then dependant on that Q95 so authorisation could be by GBR, Registration or Licence. Where the Q95 is at Registration level, the Registration activity should be included within the existing British Waterways Licence. SEPA Hydrology will need to be contacted to derive the appropriate Q95 acting as the net abstraction The use of the Q95 value as the abstraction rate into the canal is based on the assumption that higher flows exit the canal back to the water environment via the nearest waste water weir in the adjacent pound. It should be noted that the assumption of a net abstraction of Q95 at uncontrolled feeders is not equivalent to stating that the abstraction meets environmental standards. However in most cases it is expected that these uncontrolled feeders would not be having a significant environmental impact. Minor drainage ditches etc into canals should be considered as land drainage and therefore do not require authorisation under CAR. 10 of 16 Uncontrolled if printed v4.0 Apr 2013

6. Monitoring Requirements All sources of water supply will need to be monitored in some format and this will be stated in the licence document or monitoring plan. The type of monitoring that will be appropriate for each source may vary. It may be that certain methods of monitoring will be inappropriate at certain sites. In some areas it might be necessary to rely on the known capacity of a pipe that feeds the canal through gravity, as long as the pipe runs at full bore all the time. For inputs from controlled feeders, the aim with such abstractions would be to install monitoring at the points where the feeders enter the canal. There will be cases were there are fixed structures that permit a known quantity to leave the source of supply and enter into the canal. Where these types of structures are in place it will be necessary to carry out calibration tests to ensure the quantities passing through them are in fact the permitted quantities. It will also be necessary for the responsible person to carry out regular maintenance checks to ensure the structures have not become blocked or damaged and therefore impacting on their performance. Another way to monitor the quantities of water that are entering the canal system is through lockage figures. In the majority of cases it will be possible to work out the capacity of a lock that takes water from the original source and transfers it into the canal. It will then be a matter of recording the number of times that this lock is operated and multiplying it by the known capacity to work out how much water has entered into the canal. Note that other operating practices may need to be taken into account such as that of maintaining flows over the locks. A potential difficulty with monitoring is where there are inflow monitors picking up the gross volumes entering the canal, including storm flows and unintentional abstractions from tributaries which are outwith BWS s control i.e. uncontrolled abstractions. This may give the impression of licensed volume exceedence. However, in such cases, a method for distinguishing and highlighting unintentional and storm flow events in the submitted data returns will require to be agreed with SEPA via the monitoring plan. The means of abstraction at each site which feeds into the canal will be noted in a table on the CAR licence associated with the canal, along with the permitted daily and annual quantities to be abstracted for each site. The resulting data will be recorded in accordance with the approved monitoring plan and reported to SEPA. As required by the CAR licence, BWS has provided SEPA with a monitoring plan for each of the 3 canal networks. v4.0 Apr 2013 Uncontrolled if printed 11 of 16

7. Impoundments, Sluices and Locks Locks within the canal itself are not deemed to be impoundments, will not need to be regulated and therefore do not require an impoundment licence. Structures on waterbodies that are used to feed the canal which do not fall under GBR 1 will need to be regulated and will require licensing. These could for example include managed weirs incorporating a sluice to facilitate abstraction and which may raise or lower the water level upstream of the impoundment. Any proposals to alter or add further associated impoundments to the existing canal licence should be done by application for variation from BWS. 12 of 16 Uncontrolled if printed v4.0 Apr 2013

8. Abstractions from a Canal It should be noted that this section applies to abstractions from sections of artificial waterbody only and does not apply to natural lochs which may form part of the canal network. For example, Scottish Water and Scottish & Southern Energy both abstract separately from Loch Ness which is a natural waterbody even though it is included as part of the Caledonian Canal system. As well as being used as navigation channels, canals themselves can be used as a source of supply for other abstractors and these abstractions are referred to below as 3rd party abstractions. All 3rd party abstractions from canals should be included on the BWS licences and so BWS becomes the Responsible Person for all such abstractions. Therefore no separate CAR authorisations should be issued to 3rd parties for abstractions from the canal and if SEPA is approached by a 3rd party they should be advised to contact BWS directly. If BWS receives any requests from a 3rd party for a new abstraction or a request to increase the volume of an existing 3rd party abstraction then BWS will require to apply to SEPA for a variation of their existing licence. However, no environmental assessment is required for abstractions from a canal and so all changes to the BWS licence for 3rd party abstractions will be done as administrative variations, regardless of the volumes being abstracted from the canal. 3rd party abstractions will be included in a canal licence as a separate table and for the purpose of regulation, will be treated as Registrations, regardless of volume. As the named Responsible Person, BWS will be responsible for ensuring that the licence conditions (including volume limits) pertaining to the 3rd party abstractions are complied with. If, as a result of changes to 3rd party abstractions, BWS require to increase the volume of abstraction into the canal from feeders or other parts of the water environment, then a full technical variation with environmental assessment will be required. In such cases, the procedures in WAT-RM-01: Regulation of Abstractions and Impoundments will apply. v4.0 Apr 2013 Uncontrolled if printed 13 of 16

9. Engineering in Canals Engineering works affecting artificial water bodies are controlled activities and as such engineering activities on canals may require to be authorised. Common maintenance activities undertaken on canals; including weed control, dredging, bank reinforcement and dewatering activities are covered by conditions contained within the existing canal licences issued under the Water Resources Regime. Where any additional engineering activities are proposed and require to be authorised, the existing canal licence should be varied and the relevant conditions included in that licence. Table 1 summarises the level of authorisation required for common activities. Table 1 Summary of level of authorisation for common activities Activity Authorisation Comment Weed control Dredging Bank reinforcement De-watering Authorisation Standard conditions included in all existing canal licences Sediment management Authorisation Conditions should be included in existing licence however where absent licence variation required Structure maintenance No authorisation Provided design and footprint of the structure remain the same and the same (or equivalent) materials are used Construct new canal or new section of canal Removal Re-alignment Culverting No authorisation Authorisation No authorisation under engineering regime, may be captured under the water resources regime Where canal deemed to be of ecological value then would require authorisation New structures Authorisation Where activity impacts on the bed of the canal and it is deemed to be of ecological value then would require authorisation Further clarification and information is contained within WAT-PS-07-03: Engineering in Artificial Inland Surface Waters 14 of 16 Uncontrolled if printed v4.0 Apr 2013

References NOTE: Linked references to other documents have been disabled in this web version of the document. See the Water >Guidance pages of the SEPA website for Guidance and other documentation (www.sepa.org.uk/water/water_regulation/guidance.aspx). All references to external documents are listed on this page along with an indicative URL to help locate the document. The full path is not provided as SEPA can not guarantee its future location. Key Documents WAT-PS-07-03: Engineering in Artificial Inland Surface Waters (www.sepa.org.uk) WAT-RM-01: Regulation of Abstractions and Impoundments Guidance for defining Good Ecological Potential (for HMWBs and AWBs) Mar 2008 UKTAG (www.wfduk.org) Water Environment and Water Services (Scotland) Act 2003 (www.netregs.org.uk) Useful Links WAT-RM-03: Regulation of Sewage Discharges to Surface Waters WAT-RM-05: Regulation of Trade Effluent Discharges to Surface Waters v4.0 Apr 2013 Uncontrolled if printed 15 of 16

Supporting Guidance (WAT-SG-71) - End of Document - 16 of 16 Uncontrolled if printed v4.0 Apr 2013