COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

Similar documents
MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

Supplying Key Resources into Expanding Asian Markets COMPANY PRESENTATION

15% Increase in JORC Inferred Coal Resource to 1.36 Billion Tonnes

For personal use only

Re : Completion of the Barnes Hill drill-out

New drill results add to resource database at Barnes Hill and Tasmanian Government sets Development Proposal guidelines

For personal use only

For personal use only

For personal use only

for the three months ended 31 march 2017 One Asia and Provident working closely to advance the Pani Project Board changes

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010

Shaw River Completes Acquisition of 75.5% Interest in Namibian Manganese Project

ACQUISITION OF CROYDON COAL LTD

KATINGAN RIA COAL PROJECT FOB CASH COST AND VALUATION REVISION. FOB cash cost forecasts reduced by $8/t or 20% to US$31/t before royalties

Company Overview. August 2011

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

ASX Announcement 25 November 2010 MT BEVAN IRON ORE PROJECT EXPLORATION UPDATE. About Legacy Iron Ore. The Company Announcements Office ASX Limited

Mt Ida Magnetite Project Phase 1 Drilling Program Complete

QUARTERLY ACTIVITIES REPORT For the period ending June 30, 2009

FIRST GOLD ORE DISPATCHED FROM ULYSSES

5 th Asian Bauxite & Alumina Conference

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results

ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL

FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT

For personal use only

BAUXITE RESOURCES LIMITED ACN

Bald Hill Delivers Excellent Metallurgical Test Work Results

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

For personal use only. Company Overview. 30 May 2011

Haoma Mining NL A.B.N

BUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA

CEO Presentation Annual General Meeting. November 2016

QUARTERLY REPORT March 2011

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

Great Western Scoping Study Update & Onsite Gold Processing

For personal use only

For personal use only

For personal use only

PILOT TEST WORK TRIGGERS FINAL TRANCHE OF TREMONT FINANCING

For personal use only

PACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA

For personal use only

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold

Maiden Ore Reserve for Camel Creek JV

Grange Resources Australia s leading magnetite producer

For personal use only

For personal use only

AUSTRALIAN BAUXITE LIMITED

Updated JORC Statement of Coal Resources and Reserves for PT Katingan Ria Thermal Coal Project, Indonesia

PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST

Caula graphite and vanadium project on track for first production in mid-2019

MT CATTLIN DRILLING DELIVERS MORE HIGH GRADE INTERCEPTS

For personal use only

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT

NEW HIGH GRADE IRON ORE DISCOVERY AT WOGGAGINNA

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

HILLGROVE ACQUIRES OPTIONS ON INDONESIAN BAUXITE PROJECTS

Valence Industries Australia s Only Graphite Producer

For personal use only

Atlantic Ltd (ASX: ATI; Atlantic or the Company) is pleased to present its report for the quarter ended 30 June 2011.

MAYOKO-MOUSSONDJI TRANSPORT INFRASTRUCTURE UPDATE

CORPORATE PRESENTATION. February 2016

For personal use only. Minerals Explorer in South Korea

Investor Update. June 2016

For personal use only

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

ASX ANNOUNCEMENT 12 MAY 2016

Haoma Mining NL. Dear Sir, ACTIVITIES REPORT FOR THE QUARTER ENDED MARCH 31, 2011 HIGHLIGHTS

Valence Industries. Australia s Only Graphite Producer. Asia Pacific I Europe I North America. Manufacturing Our Carbon Future TM.

For personal use only

For personal use only

Quarterly Report Period ending 30 September 2018

Investor Presentation

For personal use only

For personal use only

Carbon Energy Executes Agreement to Become UCG Provider to Zhengzhou Group

ASX ANNOUNCEMENT 15 August 2011

For personal use only

For personal use only

Investor Presentation Jogjakarta Iron Sands Project

INDONESIAN BAUXITE PROJECTS

For personal use only

For personal use only

For personal use only

BLAIR ATHOL COAL PROJECT

For personal use only

For personal use only

FURTHER GROWTH FOR BALAMARA WITH AWARD OF SIGNIFICANT NEW COAL CONCESSION AT MARIOLA

OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT

Wide Zones of Graphite Intersected on Wa Project

AN EXCITING PLAYER IN AUSTRALIAN BASE METALS. Annual General Meeting 21 st October 2016

Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes;

For personal use only

Mining Update - Mongolia

For personal use only

DALGARANGA PRE-FEASIBILITY UPDATE

For personal use only

Symposium Presentation August 2012

QUARTERLY REPORT FOR THE THREE MONTHS ENDED 30 SEPTEMBER 2014 HIGHLIGHTS

Transcription:

ASX/Media Release 18 January 2012 COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA Highlights Phase 2 drilling work commenced and will continue through to mid February Inferred Resources estimate (JORC) for the Main seam increased to 63Mt and Total Inferred Resources increased to 79Mt Funding strategy and Feasibility Study work in progress Jakarta team strengthened by appointment of Michael Black as COO and Eva Armila as General Manager Legal Realm Resources Ltd (ASX: RRP) (Realm or the Company) is pleased to report that inferred coal resources have increased from 40Mt to 79Mt at the company s Katingan Ria Coal Project in Indonesia. Katingan Ria is an advanced thermal coal exploration project located in Central Kalimantan. The project is central to Realm s strategy to become a coal producer in 2012 and ultimately a mid-tier Asia Pacific bulk commodity company. The company is pleased to provide this update on its activities relating to the project. EXPLORATION Exploration work by Realm at Katingan Ria has been carried out in 2 Phases: Phase 1 Realm completed its first stage of exploration activities in November 2011. This programme included a total of 28 holes including 9 cored holes as shown on Figure 1. Drilling in the south identified 3 seams (Main, No. 2 and No. 3 seams). An additional seam overlying with the Main seam was intersected towards the centre of the site. The Main seam remains the target seam. In the north, multiple seams were intersected including the Main seam. This was overlain by a series of 4 to 5 seams with a cumulative total of approximately 11

metres of coal. Initial modelling in the north showed the seams dipped gently to the west. Phase 2 Realm commenced the second phase of exploration work in December 2011. The scope of this work is broadly targeted at achieving the following: 1. Up to 17 holes (6 cored holes) planned to: improve the quality data for the Main seam and upper seams in the north and allow completion of the inferred resource estimate for the Main seam; improve definition of Main, No. 2 and No. 3 seams in the southern resource area with the aim to move to indicated resources to allow reserves estimation in particular in the initial start up area; and refine understanding of structure, in particular the location, vertical and lateral displacement of the fault which separates north and south. 2. Undertake a Lidar Radar survey to improve the topographical model for the site and associated areas for resource definition, mining and civil design work. The locations of Phase 1 and 2 (planned) boreholes and the interpreted fault are shown on Figure 1.

Figure 1 Location of Phase 1 and Phase 2 Boreholes Figure 2 summarises the stratigraphy for both north and south resource areas. Vertical displacement of approximately 50m was interpreted across the fault with a potential eastern lateral displacement to the north of the fault, exposing the Main seam to the east.

Figure 2: Stratigraphical columns for North and South resource areas

COAL RESOURCES The Company reported its maiden inferred resource estimate for Katingan Ria of 40.1Mt on 11 July 2011. This was based on an assessment of the coal in the southern portion of the lease. Updating of the resources estimate has now been undertaken by Xenith Consulting with the following key changes in approach, reflecting the current understanding of the deposit: Updated topography adopted for both north and south resource areas from the recent aerial survey work (LIDAR); The north/south boundary has been relocated for modelling purposes from the existing exploration forestry permit boundary to reflect the site s geological structure i.e. the fault now becomes the division line. This redistributes coal from south to north resource areas; and Inclusion of Main seam quality data from redrilled KR27 hole in the north which experienced some contamination during the original sampling. This work has led to an increase in the resources and quality for the Main seam. Inferred resources (JORC) for the Main seam is now 63.1Mt, whilst total inferred resources have increased to 79Mt, as detailed in Table 1 below. B and C seam quality is currently limited due to the laboratory test procedures which initially limited the scope of testing to moderate ash coal. These seams will continue to be reported as exploration and laboratory test data becomes available and are reported for information purposes. Table 1 Inferred JORC Resource Estimate Seam Tonnes Thickness PRD TM NORTH IM Ash Volatiles TS Specific Energy kcal/kg Mt m t/m3 arb adb adb Adb adb adb B 8.0 1.13 1.33 10.8 16.5 C 8.2 1.22 1.39 12.2 26.7 Main 32.7 3.8 1.30 30.6 12.4 10.8 39.6 0.24 5,265 49 SOUTH - Main 30.4 3.55 1.31 30.7 17.1 9.5 38.0 0.20 5,069 48 Total Main 63.1 1.30 30.7 14.6 10.2 38.8 0.22 5,171 49 Total all 79.3 HGI The resource estimate does not include the D, No. 2 and No. 3 seams. These will be reported as Phase 2 drilling is completed.

Figure 3 shows the resource area and estimated Main seam thickness distribution. Figure 3: Katingan Ria Resource Area and Main Seam Thickness PERMITTING The Company s application for the production forestry permit (Pinjam Pakai Exploitasi) is progressing well through regulatory process. PT Katingan Ria anticipates receiving this permit, which is a prerequisite for commencement of mining operations, within the first quarter 2012.

Table 2: Permit Status Katingan Ria Project Description Project Region Status Expected Date IUP Exploration Both areas Secured Pinjam Pakai 1 (Exploration) South Secured Pinjam Pakai (Exploration) North Secured Environmental Impact Statement (AMDAL) Both areas Completed IUP Operations Both areas Secured Pinjam Pakai (Exploitation) Both areas Submitted 2 Mar 2012 1 Forestry permit 2 Finalisation subject to Ministry of Forestry completing an assessment of the volume of timber to be disturbed NB: All mining licences confirmed clean and clear by Minister of Energy and Mineral Resources. See http://www.djmbp.esdm.go.id/modules/news/?_act=detail&sub=news_minerbapabum&news_id=3313 FUNDING STRATEGY Realm announced on 12 April 2011, that it had entered into a 2 stage acquisition process for the PT Katingan Ria coal project ( PTKR ). Stage 1 was successfully completed with a $15 million funding package secured (announced 14 September 2011), this resulted in the acquisition of 51 of PTKR (announced 6 October 2011) Tranche 1; Stage 2 of the acquisition (expected before the end of April 2012, subject to satisfactory fulfilment of conditions precedent) requires payment of US $17 million, to take Realm s ownership of PTKR to 75 - Tranche 2; and Further to the initial concept study and current exploration programme findings, the capital required for start-up is being analysed with a view to commence sustainable operations with a minimum level of investment and operational expenditure. Given the weak state of capital markets, Realm s approach is to assess all avenues of funding while at the same time endeavouring to minimise shareholder dilution. The following funding options are being pursued: Off-take for equity - discussions are underway with potential strategic investors regarding the potential sale of a minority stake in Realm or a subsidiary in return for off-take;

Prepayment for Off-take Realm s marketing agents have identified several potential customers who may be prepared to make advanced payment for the coal they would receive in future; Debt - confidentiality agreements are in place with several banks to allow them to analyse relevant information on the company and the coal project. Initiating discussions have taken place on a range of debt facilities from offtake finance through to project finance; and, Equity markets road-shows and market updates continue. A strategic review of the company s South African assets is underway, this is expected to be completed by the end of March. At this stage however, potential outcomes are not expected to crystalise in the short-term. The company will provide further updates on any material developments in relation to funding as they arise. Management is pleased with the progress of exploration, study work and preparations for a start up of the Katingan Ria project. Management continues to work vigorously towards funding the acquisition of the final 24 of PTKR and build Realm s capability in bulk commodities and in Indonesia. KEY STAFF APPOINTMENTS Realm is pleased to confirm the appointment of Mr Michael Black as Chief Operating Officer for Realm s Indonesian activities and Ms Eva Armila as General Manager Legal. Both Eva and Michael are based in Jakarta. Michael s recent roles include CEO Teknix Capital, Deputy CEO of Asia Pulp & Paper and Partner at McKinsey & Company. Michael is a civil engineer with more than 10 years of experience in developing and managing resource projects in Indonesia including a period as Deputy CEO of Asia Pulp & Paper, a business employing 50,000 people and with annual revenues of USD2.5 billion. While at McKinsey & Company, Michael led the McKinsey s work with the Indonesian Central Bank and the IMF in restructuring of the Indonesian banking sector following the Asian Financial Crisis. Eva is an Indonesian national holding a Bachelor of Law from Padjadjaran University, Indonesia, a Master of Law and a Master of Business Administration from the Queensland University of Technology, Australia. She has been admitted to practice law in Indonesia since 2002 and is also a licensed litigation lawyer. Prior to joining Teknix Capital as General Counsel in 2006, Eva practised law with international (DLA Piper) and Indonesian (AKHH and Hanafiah & Ponggawa) law firms. Her practice areas included corporate, investments, project finance, debt restructuring, merger and acquisition and natural resources. Her time at Teknix

Capital has further enhanced her skills in these areas, particularly in the area of resource law including particularly the new mining law. Managing Director Andrew Matheson commented we are delighted to have secured both Eva and Mike on the Realm team. Their appointments now provide us with a highly experienced, on-the-ground presence in Jakarta. This is a key step in achieving our initial goal to establish Realm, through its investment in PTKR, as a mining operator in Indonesia. ABOUT REALM Realm's strategy is to create shareholder value through exploration and development of bulk commodity projects, primarily in coal. In addition, the Company s has platinum group metals (PGM) advanced exploration projects and an aluminium dross treatment plant in South Africa. For further information please contact: Andrew Matheson (MD) on +61 431037143; Richard Rossiter (Chairman) and Theo Renard (FD) on +61 2 8249 4542 Or visit the company s website www.realmresources.com.au Competent Persons Statement Katingan Ria Project The information in this announcement that relates to Exploration Results, Mineral Resources or Ore Reserves at the Katingan Ria Project is based on information compiled by Mr Troy Turner, who is a Member of the Australian Institute of Mining and Metallurgy. Mr Turner is a full-time employee of Xenith Consulting Pty Ltd. Mr Turner is a qualified geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Turner consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.