Floating Regasification The Aegean LNG terminal

Similar documents
The role of Greece as a supply route to Europe: An emphasis to SEE market s quest for security and competitiveness

Changing the game in the new era

Harry Sachinis, Chairman & CEO, DEPA S.A. Public Gas Corporation

SOUTHEASTERN EUROPE s NATURAL GAS CHOICES

DEPA SA and Natural Gas in Greece. Greece s role in Diversifying Energy Supply sources to Europe. Vangelis Kosmas Corporate Affairs & Communication

The changing landscape of gas pipelines in SE Europe & the

The Eastern Mediterranean and European Energy Landscape: Trends and Opportunities

The Role of Greece in Enhancing European Energy Security

Introduction to the Expanded South Corridor Concept

The role of the ITGI system New Opportunities and Synergies. Harry Sachinis, Chairman & CEO Nicosia 26/01/2012

Gas & LNG market developments & geopolitics in SE Europe

Gas & LNG market developments

PCI candidates presentations; project by project. SGC Regional Group 24 th of February 2015

Greece the New Energy Hub of South Eastern Europe: The evolving new Pipeline Projects in the region & their importance

member of the TSAKOS GROUP of companies

LNG Import Facility Infrastructure Options

Meeting the Growing Need for Natural Gas Imports in the EU >

Nabucco at a glance opening the Southern Corridor

LNG for bunkering Prospects in Greece and Southeast Europe

The Greek Energy Market: Reforms and Investment Potential

The Nabucco Pipeline Project Fourth Corridor to Europe

SOUTH-EAST EUROPE: A STRATEGIC ROLE IN EURO-ATLANTIC ENERGY SECURITY

CPC SPECIAL BRIEF: ROLE OF THE US AND CASPIAN NATURAL GAS EXPORTS FOR EUROPEAN ENERGY SECURITY AND DIVERSIFICATION 25 OCTOBER 2017

Southern Corridor Gas Regional Investment Plan

SGC Gas Regional Group meeting. Preparation of the third Union list of PCIs Presentation of and discussion on the PCI candidates

EUROPEAN ENERGY MARKET:

KOGAS s Technical Capability and Plan on Off-shore Plant Business

SHAPING THE NATURAL GAS MARKET OF CYPRUS

New Opportunities for Greece s Energy Trade with the Arab World

Greener Shipping Summit Athens November 10, 2015 George Alexandris, Associate Strategy & Corporate Development

The Dynamic Energy Landscape: Geopolitical Implications of the Changing Energy Economy

LNG Market Prospects. Mr Jae Sung Choi. 1 st November, 2017

Natural Gas Security of Supply in the Danube Region. Contribution of the Danube Region to the debate on the Energy Union

The South Corridor Latest Developments. Energy & Development, 2012 Athens, October, 2012

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

German Marshall Fund Brussels Forum. Dev Sanyal, chief executive, alternative energy and executive vice president, regions

Delivering Caspian Gas from the Caspian Region to Europe Its coming

Bulgaria: Natural Gas and Oil Sector 2014

Developing gas trading opportunities in SE Europe


OLT Offshore LNG Toscana Alessandro Fino CEO

CLEAN ENERGY PACKAGE & MARKET INTEGRATION IN SOUTH-EAST EUROPE

The Revithoussa LNG Terminal:

THE DYNAMICS of LNG INDUSTRY. Prof. Valeria Termini AEEGSI Commissioner - MEDREG Vice President

Session 3: Enhancing gas supply and diversification New sources & markets

Southeast Europe as the gateway to European gas Security of Supply

The Outlook for a Gas Hub in SE Europe

Poseidon-Med Project: The Global Project for the Adoption of LNG as Fuel in the Easter Mediterranean Sea

Conversion of South Kavala Gas Field into Underground Gas Storage On the crossroad of pipelines in South East Europe

Gas Market Challenges in SE Europe A gas marketer point of view

The South East Region Defined

ENERGY SECURITY IN CEE REGION PRAGUE POINT OF VIEW

European Economic and Social Committee OPINION

LNG MARKET TRENDS AND OPPORTUNITIES IN LNG SUPPLY CHAIN

REPORT OF THE HELLENIC GAS TRANSMISSION SYSTEM OPERATOR (DESFA S.A.) ON THE IMPLEMENTATION OF INTERIM MEASURES

ZEEBRUGGE LNG TERMINAL: FROM REGAS TERMINAL TO VERITABLE LNG HUB IN NORTH-WESTERN EUROPE

Pareto conference. 31 August 2011

George Polychroniou Poseidon Med II Project Manager Executive Director Strategy, Development, Administration & IT, DEPA S.A.

LNG market developments. 12 th of February 2015 Jonathan Raes development EXMAR LNG Infrastructure

South east Europe gas security: suppliers, routes & EU policy initiatives

ISSUES OF GAS SUPPLY SECURING

Annex II of the Memorandum of Understanding of the Central and South-Eastern European Gas Connectivity (CESEC) High Level Group.

Investor Presentation

Introduction. FLNG: Costs and Cost Drivers. What is FLNG (and what isn t) FLNG Project Costs

Dominant Energy Security Issues in SE Europe and Proposed Accommodation Strategies

DEVELOPMENT OF A REGIONAL GAS MARKET IN THE BALTIC AND CEE REGIONS

European Gas & LNG Markets, Energy Policy, and Geopolitics October 2016

The Clean Energy Investment Challenge for SE Europe

GIE ANNUAL CONFERENCE. EUROPEAN GAS MARKET IN A GLOBAL CONTEXT SUPPLY/PRICE OUTLOOK May 2013 Andrew Morris

BULGARIA S CONTRIBUTION TO THE ENERGY POLICY FOR EUROPE

The Greek National Natural Gas System: The existing infrastructure and its planned expansions

ACCELERATION OF SMALL SCALE LNG SUPPLY CHAIN INFRASTRUCTURE FOR CENTRAL AND EAST REGION OF INDONESIA

Towards 2020 and beyond

Global and Regional Fuels Markets: Implications for European Union Foreign Policy. Discussion Presentation*

Energy Infrastructure Investment Keynote Address

EXMAR GROUP: Leadership Through Innovation

LNG in the United States

LNG TERMINAL IN ŚWINOUJŚCIE AS A LNG GATE TO THE BALTIC SEA

Projects of Common Interest and gas producers pricing strategy

Model-based Analysis of Infrastructure Projects and Market Integration in Europe with Special Focus on Security of Supply Scenarios

Gas Markets Globalization: Perspectives and Limits

New gas infrastructure insuring Europe s energy security

Green Offshore structures and Shipyards transformation

Building TAP, the European Leg of the Southern Gas Corridor. Project Update

4 TH GAS FORUM. Jean Jaylet, Senior Vice President Strategy, Markets & LNG. May 30 th, 2016

Geopolitical aspects of energy transportation in the Black Sea and the Baltic Sea regions

DR. VITALIY BAYLARBAYOV. Deputy Vice President, SOCAR

Fabio Ballini World Maritime University

LNG supply Chain From the LNG receiving terminal to the LNG truck TrainMoS II

REGIONAL INTEGRATION OF ENERGY NETWORKS IN THE BALKAN AREA. Gas & Power Business Forum 2012 Sofia, May 11, 2012

Redefining SE Europe s Energy Map

GALSI PROJECT THE NEW ROUTE FOR ALGERIAN GAS TO ITALY AND EUROPE. Chisinau May 11th, 2007

Removing barriers to LNG and to gas storage product innovation

Russian Gas Exports to Europe

6th Annual LNG Transport Handling & Storage 2016 Forum. FSRU as The Pivotal Point for Effective LNG Distribution

Liquefied Natural Gas alternative fuel for transportation expanding into Danube region

STRATEGY OF UKRAINIAN GAS INDUSTRY DEVELOPMENT: EUROPEAN CONTEXT

European energy infrastructure policy

2016 CEF Synergy Call Actions selected for funding SYNERGY

Transparency Workshop Brussels, 14 September 2010

Transcription:

Energy and Shipping Athens, March 2013 Floating Regasification The Aegean LNG terminal George Polychroniou Division Head, Strategy & Corporate Development

Contents The growing role of FSRUs The case of the Aegean LNG terminal / IGB System

FSRUs: an increasingly interesting perspective Floating Regasification Projects by Status All 73 Stalled 60 13 Proposed 37 Authorized 5 7 with PFC start dates Under Construction 7 None with PFC start date Existing 10 Decommissioned 1 # of projects 0 10 20 30 40 50 60 70 80 Source: PFC Energy

Geographic spread of floating regasification

FSRUs: an increasingly interesting perspective

Floating vs Onshore LNG import Terminals Ideal to go offshore Site specific restrictions and constraints Permitting and security Highly populated areas Cost efficient solution Rapid time-to-market access compared to onshore regasification plant Can be built in a well controlled shipyard environment Easy to mobilize and thus re-deployable

Floating terminals: a cost efficient solution $m /bcm 350 Average Regasification Costs by Terminal Size: Onshore and Floating (Range shows one standard deviation) 300 250 200 150 100 FRSU 10-year charter 50 0 FRSU 5-year charter 1-4 bcm 4-6 bcm 6-10 bcm 10-16 bcm Source: PFC Energy

Two vessel design options FSRU (barge shaped type) LNGRV (ship type, which can also function as a traditional LNG carrier)

Option #1: FSRU Non-propelled barge Permanently moored to a shore jetty Significant simplifications/cost reductions Straight barge-shaped hull shorter hull length Minimal engine room without propulsion plant Lower power requirements and fuel consumption Higher mobilization cost In-water diving inspection in lieu of dry-docking every 5 years in accordance with Classification requirements

Option #2: LNGRV LNG Regasification Vessel Proven Design LNG Carrier (LNGC) + regasification plant Ship-Shaped & propulsion installed Easily re-deployed Optionality of using the LNGRV as conventional LNG Carrier Higher power requirements and fuel consumption (steam turbine) Lower mobilization cost

The growing role of FSRUs The case of the Aegean LNG terminal / IGB System

The Aegean LNG / IGB System The Aegean LNG project will be located in Northern Greece In conjunction with IGB provides opportunity to reach the growing SE European energy market offering possibilities for diversification of natural gas sources and further penetration of LNG in the area.

EU Market EU-30 Growing Supply Demand Imbalance Europe needs to replace ~100 bcma from declining production by 2025. Increasing demand (just in Greece and despite the crisis, demand rose from 3.6bcm in 2010 to 4.2bcm in 2012). Most of its existing suppliers will not increase exports. Europe faces a supply-demand gap by 2020 and it grows larger by 2025. Source: PFC Energy

Regional Market : South Eastern Europe (SEE) & Turkey Developments in the region Gas demand will grow by 2,5% p.a. through 2025 in SE Europe & Turkey (growth of 37,5bcma, from 62,5 bcma in 2010 to 100 bcma in 2025). Greece, Bulgaria, Romania and Turkey remain the biggest markets in the region in 2025. There are new potentially significant discoveries offshore Romania and Bulgaria. Romanian domestic gas production is expected to decline by 2-3 bcma by 2025. Considering the few options for meeting this supply gap, around 26 bcma are left to be met by different sources. SEE & Turkey are in URGENT need of new suppliers to enhance its energy security. Source: PFC Energy

Opportunity for the Aegean LNG suppliers to capture the SEE market SEE market is: the closest market to new sources, including LNG through Greece; a growing market with competitive prices; in urgent need to diversify its supply sources and increase its energy security. The Aegean LNG can be the first new infrastructure in the race to supply SEE by 2015-16

The Aegean LNG / IGB system provides a solution for SEE countries and Turkey to diversify gas sources & routes A planned Floating Storage and Regasification Unit (FSRU) in Northern Greece will allow LNG to flow from 2015. The Greece Bulgaria Interconnector (IGB) will supply up 3-5bcma by 2015-16. Onward interconnectors to: Turkey (already in place) Hungary (already in place), Romania (May 2013), Serbia (2015), FYROM (planned) Albania (planned)

Aegean LNG Technical Feasibility Established DEPA has concluded a feasibility study of the Aegean LNG receiving terminal, based on which: Location feasibility established Floating facility, barge type FSRU or LNGRV Regasification capacity to support equivalent of 3-5 bcma Storage capacity 150,000 m 3 EIA study expected by mid 2013 Estimated cost 250-270 m Project execution: 30 months from FID

The Greece-Bulgaria Interconnector (IGB) IGB acts as a gateway to SEE through Greece, creating synergies with smaller interconnectors in the region (eg. BG-RO), allowing access to the evolving SEE energy market. Capacity 3-5 bcma Construction to start within 2013 The duration of construction / commissioning scheduled to last for 18 months. IGB has a wider regional importance (ranked first among EU Projects of Common Interest (PCI)) First gas is expected to flow in 2015.

Aegean LNG / IGB Summary Characteristics CAPEX Capacity Completion Shareholders Aegean LNG 270 m Potential for EU Funding 3-5 bcma 2015-16 DEPA Other possible investors IGB 230 m Granted EU Funding: 45 m 3-5 bcma 2015 ICGB A.D. 50% 50% BEH A.D. IGI Poseidon S.A. 50% EDISON 50% DEPA

Why the Aegean LNG / IGB System Greece, the rest of Southern Europe and Turkey need long-term supply and are stable growing markets. The Aegean LNG is the closest and least expensive route to the Greek, SEE and Turkish markets. Aegean LNG can be the first regasification terminal to target the broader SE European market through IGB. Multiple countries can be served through one EU entry point. Aegean LNG is at the crossroads of several key infrastructure projects, including crossborder pipelines and gas storage.

Thank you for your attention