Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

M/S. Dain Colour Chem

PRE FEASIBILTY REPORT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

PRE-FEASIBILITY REPORT

Pre-Feasibility Report

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT. for

PRE FEASIBILITY REPORT

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

PRE FEASIBILITY REPORT

EXISTING PROJECT FOR ORDINARY SAND MINING

PREFEASIBILITY REPORT

PROJECT FEASIBILITY REPORT

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

For TOR New. 1. Basic Information of the Project:

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE FEASIBILITY REPORT

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

PRE FEASIBILITY REPORT

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

PRE FEASIBILITY REPORT

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

PRE FEASIBILITY REPORT. M/s. Riddhi Dyechem Industries

Pre- Feasibility RepoRt

M/s. Lakeland Chemicals (India) Ltd.

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

UNSATURATED POLYESTER RESIN

1.0 EXECUTIVE SUMMARY

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

2. PRE-FEASIBILITY REPORT

Synthetic Organic Chemicals 5(f)

Sub: - An application for obtaining Environment Clearance for New Unit.

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE FEASIBILITY REPORT

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

PRE-FEASIBILITY REPORT

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] Expansion of Project

BALAJI AMINES LIMITED

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

Pre-Feasibility Report

M/S. Ever Shine Décor P. Ltd.

2. PRE-FEASIBILITY REPORT

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE FEASIBILITY REPORT

ANNEXURE A DETAILS OF PRODUCTS

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

Environment Consultant:

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

PRE - FEASIBILITY REPORT. M/s. S. R. CHEMICALS

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS)

Pre-Feasibility Report

1. PRE-FEASIBILITY REPORT

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

PRE FEASIBILITY REPORT

10 PF Resin (liquid) PF Resin (powder) Silver refining Hexamine Hardener Hexamine Tablet

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

2. The expected cost of the project is Rs.50 crores.

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana

ENVIRONMENTAL IMPACT ASSESSMENT REPORT. M/s. VISHRUDH ORGANICS PVT LTD.

Transcription:

PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT, INDIA M-9879787727 E Mail- shreejibapadyechem@gmail.com 1

PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s SHREEJI BAPA DYE CHEM is having existing CTE and CTO of the GPCB for manufacturing of S.O. Dyes and proposing expansion project @ 110 MT/Month of S.O. Dyes, located at Plot No. 1319 & 1320, PHASE-III, GIDC, Vatva, Ahmedabad- 382445 The project falls under category B, section 5(f) of EIA notification 2006 and amendment thereof. The site is well connected with road and railway, nearest city Ahmedabad and there is no national park, wildlife sanctuary, eco sensitive areas in surrounding 10 km radius. The project doesn t fall under CRZ boundaries. 2.0 INTRODUCTION OF THE PROJECT BACKGROUND INFORMATION 2.1 Identification of project and project proponent. M/s. SHREEJI BAPA DYE CHEM proposing expansion project @ 110 MT/Month of S.O. Dyes, located at PLOT NO 1319 & 1320, PHASE-III, GIDC, Vatva, Ahmedabad- 382445 M/s SHREEJI BAPA DYE CHEM is a Proprietorship firm. 2.2 Brief description of nature of the project. The project falls under category B, section 5(f) of EIA notification September 2006 and amendment December, 2009. Hence Environmental Clearance is applicable to the proposed project. 2.3 Need for the project and its importance to the country and or region To meet the demand of Local & international market. The unit will put best efforts to employ local people depending upon the availability of skilled & un-skilled man-power. In operation phase, the proposed project would require significant work force with nontechnical and technical background. Employment to skilled & unskilled worker will result in increase their standard of living & expenditure power. 2

2.4 Employment Generation (Direct and Indirect) due to the project The proposed project will give direct employment to local people based on qualification and requirement. In addition to direct employment, indirect employment shall generate through ancillary business to some extent for the local population. 3.0 PROJECT DESCRIPTION 3.1 Type of project including interlinked and interdependent projects, if any. There is no interlink project. As M/s. SHREEJI BAPA DYE CHEM is planning for expansion of existing business at Plot. No 1319 & 1320, PHASE-III, GIDC, Vatva, Ahmedabad-382445 and applying for EC. 3.2 Location (map showing general location, specific location, and project boundary &project site layout) w i t h coordinates. Coordinate of the Project: Point Latitudes Longitudes A 22 58 38.41 N 72 37 52.30 E B 22 58 39.45 N 72 37 52.00 E C 22 58 40.05 N 72 37 53.00 E D 22 58 39.08 N 72 37 53.43 E 3

Figure 1: Location Selecting the proposed site, particularly the environmental considerations gone into should be highlighted. Major factors involved in the selection of site are listed below: Proposed project site is in the Vatva Notified Area. The project site is located on level ground, which does not require any major land filling for area grading work. Proximity to Raw Material suppliers. Site is very well connected by road and railway. Availability of Power, Water, etc. Common CETP & TSDF & MEE facility are available. 4

3.3 Size or magnitude of operation. T h e p r o d u c t d e t a i l s a r e g i v e n b e l o w : PRODUCTION DETAILS Sr. No. Name of Product Production Capacity MT/Month Existing Proposed After Proposed 1 Reactive Orange-2R 3.5 106.5 110.0 2 Reactive Golden Yellow R 3 Reactive Red H7B 1 Reactive Black 5/8/39-2 Reactive Blue 13/19/49/171/198/220/221/250 3 Reactive Brown 11 4 Reactive Magenta HB 5 Reactive Orange 2R/3R/W3R/12/13/35/84/107/122 6 Reactive Red 3.1/24.1/31/45/111/120/195/198/218/245/278 7 Reactive Yellow 15/18/42/57/84/85/86/95/135/145/160/210 Total 3.5 106.5 110 3.4 Project description with process details (a schematic diagram, flow chart showing the project layout, components of the project etc. should be given) Please refer Form 1, Annexure II for process details. 3.5 Raw m at e r i al required a l o n g with estimated quantity, likely source, marketing area of final products, Mode of transport of raw Material and Finished Product. We shall procure the raw material from domestic & international market by roads& sea. For finished Product we will use Road & sea transportation. Raw materials detail as per Annexure-I 3.6 Resource optimization / recycling and reuse envisaged in the project, if any, should be briefly outlined. 5

ETP shall provide for treatment of effluent and dispose to CETP, Vatva after achieving the desired norms. Process treated water shall use for washing & scrubbing in spray dryer scrubbing system to reduce the water consumption rate. 3.7 Availability of water its source, Energy/power requirement and source should be given. Water Source: The source of water for the proposed project shall meet through GIDC Supply. Electricity and Energy Requirement: Electricity shall be obtained from Torrent Power Ahmedabad. Wood/White Coal/PNG shall use as a fuel for Boiler, HAG & Spray Dryer. Diesel will be used as a fuel for D.G set. The total power & fuel requirement for the proposed project are given below: Source of Electricity Sr. No. Electricity (KW) Existing Total (KW) Proposed Total After (KW) Proposed Source of Supply 1 99.607 100.393 200 Torrent Power Air emission & Fuel Requirement: After Proposed Please refer annexure VII. 3.8 Quantity of waste to be generated (liquid and solid) and scheme for their Management/disposal. Waste Water generation & Management plan Total water requirement for the proposed project will be 47.8 KLD. The total waste water generations from Industrial will be 31.800 KLD. 24.5 KLD of effluent shall be treated in ETP and treated effluent shall dispose to the CETP, Vatva. Industrial process waste water @ 7300 lit/day will be discharged to MEE, Vatva. 2.2 KLD Domestic effluents shall be disposed to Soak pit. Details of water consumption and waste water generation as shown in Annexure IV. 6

Effluent Treatment Plant DILUTED EFFLUENT CONCETRATED EFFLUENT INLET 5 TO MEE Sr. Name of Unit Size in meter Capacity in m 3 No. 1 Collection cum neutralization 2.86 x 2.86 x 3.048 24.50 Tank 2 Filter Press 36 x 36 x 36-3 Holding tank 3.65 x 4.87 x 2.9 51.5 4 Overhead Storage Tank - 3.0 5 MEE Tank - 30.0 Solid& Hazardous waste generation& Management plan Hazardous waste generate from the process & ETP. Empty drums and bags are hand over to authorize recycler for further recycle or Used for ETP waste packing. The Management of Hazardous waste will be done as per Hazardous Waste Management Rules 2008. The list of hazardous waste generation is enclosed as Annexure-VI 7

4 SITE ANAYSIS 4.1 Connectivity. Site is very well connected by road and railway. Availability of water, power, etc. Environment Settings Sr. No. 1 2 3 4 5 6 7 Particulars Details Distance (km) Nearest Village Vinzol 3.85 S Nearest Town / City Ahmedabad 1.0 N Nearest Railway Station Vatva 2.7 W Nearest Hospital L.G. Hospital Ahmedabad 4.3 N Nearest Highway Express Ahmedabad-Vadodara 1.4 E Nearest Airport Ahmedabad 10.0 NW Nearest Water Body Sabarmati River 9.15 W 4.2 Land Form, Land Use and Land Ownership Land Form: GIDC Land. Land use: Industrial purpose for proposed project of manufacturing of S.O. Dyes. Land Owner ship: Private Land,SHREEJI BAPA DYE CHEM is a proprietorship firm. 8

THE LAND OWNERSHIP LETTER FROM GIDC & SITE PLAN. 9

10

SITE PLAN & FACTORY LAYOUT SHREEJIBAPA DYE CHEM PLOT NO. 1319 & 1320. 11

12

13

4.3 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ)), shortest distances from the periphery of the project to periphery of the forests, national park, wildlife sanctuary, eco sensitive areas, water bodies(distance from HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette notification should be given. There is no forest, national park, wildlife sanctuary, eco sensitive areas in surrounding 10 Km of the plant boundary. CRZ is not applicable to the project. 4.4 Existing Infrastructure The unit is having existing infrastructure to manufacture the S.O Dyes. 4.5 Soil Classification NA proposed project is in GIDC area. 4.6 Social infrastructure available. Depending on the growth of the company the required social infrastructure will be provided. 5 PLANNING BRIEF 5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country planning/development authority classification. Type of Industry: IND (II). 5.2 Land use planning Land Use Planning Sr. No. Details of Land Area For Proposed Plant (m 2 ) 1 Net Plot Area 1406.0 14

5.3 Assessment of Infrastructure Demand( Physical & Social) Employment would be as per prevailing norms of state government for skilled and unskilled people for the proposed project activity. 5.4 Amenities/Facilities Proper site services such as First Aid, Drinking Water etc. will be provided to the workers. 6.0 PROPOSED INFRASTRUCTURE Plot Area: 1406 m 2 Sr. No. Floor Built Up Area In m 2 1 Ground Floor 466.66 2 First Floor 466.66 3 Second Floor 466.66 4 Third Floor 6.02 Total 1406.00 6.1 Social Infrastructure Depending on the growth of the company the required social infrastructure will be provided. 6.2 Connectivity (Traffic and Transportation Road/ Rail/ Metro/ Waterways etc.) Road and railways are very close to the working site. There is no proposal to make any new kind of connectivity. 6.3 Drinking water Management(Source & Supply of water) Water for drinking will be met from GIDC supply. 15

6.4 Sewerage System Domestic waste water will be disposed in to soak pit. 6.5 Industrial Waste Management The unit have membership of CETP & MEE of GESCSL, Vatva for effluent disposal. The unit also Having membership of Society for Clean Earth, Vatva for effluent disposal. Industrial process waste water @ 7300 lit/day will be discharged to MEE. Washing and other diluted streams after treatment @ 24500 lit/day will be discharged to the CETP, Vatva, Ahmedabad. 6.6 Solid Waste Management ETP & Process waste shall discharge to TSDF site of CETP (GESCSL), Vatva, Ahmedabad and Eco Care Infrastructure Pvt. Ltd. Surendranagar. Membership certificates are enclosed. 6.7 Power Requirement & Supply/Source Electricity shall be obtained from Torrent Power Ltd. The total power requirement for the proposed project is 200 KW. We are also using solar energy (25 KW) 7.0 REHABILITATIONAND RESETTLEMENT(R & R) PLAN Not Applicable 8.0 PROJECT SCHEDULE & COSTESTIMATES 8.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given). We are having existing facilities of manufacturing of S.O. Dyes. 8.2 Estimated Project cost along with analysis in terms of economic viability of the project. Total Project Cost for proposed project activity is Rs.0.80 crores. 16

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) 9.1 Financial and social benefits with special emphasis on the benefit to be local people including tribal population, if any, in the area. The project will be prove time by time for beneficial to the people as the company progress and expands its activity. By CSR activity company management will committed to improve infrastructural facilities for the local people like Educational facilities, Medical facilities, and Transportation facilities etc. as well the local people especially tribal population will be taken as employers which will improve the socio economic environment to the area. Date:24.05.2017 Place: Ahmedabad Signature of the Applicant With Name and Full Address Mr. K.C.PATEL Plot No 1319 & 1320, PHASE-III, GIDC, Vatva, Ahmedabad. (Project proponent /Authorized Signatory) 17