City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

Similar documents
Index. Composition and Order of Plan Set. Utility Plan... 5

CONSTRUCTION PLAN CHECKLIST

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.

Richland County Department of Public Works Engineering (Land Development) Division

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL

STREET IMPROVEMENTS (Refer to Title 18, chapter entitled "STREETS" of the Layton Municipal Code.)

CITY OF BENICIA IMPROVEMENT PLAN REVIEW CHECKLIST

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS

Chapter 3: Permit Procedures and Requirements

CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT

COMMERCIAL PROJECT PLAN REVIEW PROCESS

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

T a b l e o f C o n t e n t s

CITY OF WALLED LAKE 1499 E. WEST MAPLE WALLED LAKE, MI 48390

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

CITY OF MERIDIAN LAND DEVELOPMENT SERVICES SUBDIVISION PLAN REVIEW CHECK LIST

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

OVERALL UTILITY PLANS 1. Provide a typical section depicting the roadway (proposed/future), utility locations, and separation for

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

Project: Developer/Designer: Reviewer:

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER:

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

SUBDIVISION IMPROVEMENT PLANS FORM

Design Specifications & Requirements Manual

STORM DRAINAGE DESIGN MANUAL

SECTION CONSTRUCTION SERVICES

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

CHAPTER 5 WATER SYSTEM DESIGN STANDARDS


CITY OF FARMINGTON HILLS DEPARTMENT OF PUBLIC SERVICES ENGINEERING DIVISION. ENGINEERING DESIGN STANDARDS For Site Development and Redevelopment

ENGINEERING DESIGN STANDARDS

ROADWAY DESIGN AND CONSTRUCTION STANDARDS

CITY UTILITIES DESIGN STANDARDS MANUAL

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887

Design Specifications & Requirements Manual

Construction Documents Checklist

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

LAND DISTURBANCE PLAN AND IMPLEMENTATION REQUIREMENTS

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

7.00 INTRODUCTION... 1

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Section H - Site Plan Guidelines

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

6 STORMWATER IMPROVEMENTS

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

City of Redding Construction Standards Index

Appendix B Construction SWPPP Short Form

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

Classifications of Improvements and Definitions

Submittal Requirements. Post Construction Verification Document Plan Requirements

PUBLIC IMPROVEMENT CONSTRUCTION PLANS APPLICATION

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

6 STORMWATER IMPROVEMENTS

COUNTY OF YUBA DEPARTMENT OF PUBLIC WORKS IMPROVEMENT STANDARDS

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

APPENDIX A DESIGN SPECIFICATIONS FOR NEW ROAD CONSTRUCTION

EXHIBIT A FEE SCHEDULE

ZONING CLEARANCE PLAN REVIEW CHECKLIST. Based on the Revised Town of Carefree Zoning Ordinance

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

Chapter 2 ADMINISTRATIVE PROCEDURES

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

Stormwater Local Design Manual For Houston County, Georgia

PROCEDURES MANUAL INFRASTRUCTURE DEVELOPMENT

Chapter 2 ADMINISTRATIVE PROCEDURES

STATE UNIVERSITY CONSTRUCTION FUND

General Legend Details...100

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING AND DRAINAGE CHECKLIST. Project Address Applicant Name Telephone Applicant and/or Property Owner Signature(s) Date _

CHARTER TOWNSHIP OF HIGHLAND

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Storm. Section. B. General Design and Drawing Standards Design

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MODEL Stormwater Local Design Manual. City of Centerville

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

PLANS. All plans shall be submitted on 24 x 36 sheets

20 North Main Alpine, UT (Phone) (Fax) SITE PLAN

Transcription:

If this is a re-submittal, please provide a point-by-point response to previous review comments, identifying how each comment has been addressed, location in the plan set of the changes made to address the comment and also identify any additional changes made from the previous submittal. I. FINAL ENGINEERING PLANS - PROVIDE 4 COPIES ON 24 X 36 SHEETS AND ONE 11 X 17 COPY All sheets shall have the following general plan sheet information as applicable: Legend North Arrow (pointing up or right) Numerical Scale with Graphic Scale (1 =40 or 1 =50, unless overall plans) Vertical scale (1 = 5 ) Title Box : i. Plan title and revision date on the right side border ii. Sheet name iii. Subdivision name iv. Developer s contact information v. Engineer s contact information vi. Designed by, drafted by and checked by names vii. Revision block with revision number and date viii. Sheet number Show existing conditions as gray scaled backround layer Key map (on all sectional sheets) with sheet numbers and boundaries identified Existing conditions to 100 beyond the site limits in all directions Include the following sheets at a minimum: 1. Cover Sheet Title: FINAL ENGINEERING IMPROVEMENT PLANS FOR (name of subdivision) Vicinity Map (1 = 1000 to 1 = 2500 ) including all roads and main features Benchmarks (USGS NGVD 29) within the vicinity (2 minimum) City of Elgin contact information (ATTACHMENT 1) J.U.L.I.E. information Utility companies contact information: company name, address, phone number Index of Sheets (total numerical) Legend Surface Water Drainage Statement (ATTACHMENT 2) Original Signature and Seal of a registered professional engineer of Illinois (at least on approval copy) GASB Reporting Information (Table Form) (ATTACHMENT?) 2. Overall / Phasing Plan (if applicable) One sheet showing the entire site Limit of each proposed phase numbered in sequence Existing features: labeled streets, drainage facilities, waterways, railroad, utilities Proposed features: streets with names, numbered lots and outlots Page 1 of 9

3. Master Utility Plan City of Elgin Existing features adjacent to site or relevant Watercourses with floodway, 100 year floodplain Wetland boundaries Proposed Lot (lines & number) Proposed streets with names (matching final plat) Proposed utilities: Water-main System: Sanitary Sewer System: Storm Sewer System: i. Connections to existing watermain ii. Layout iii. Loops iv. No dead ends v. Identify transmission mains with sizes vi. Valve vaults (with #) spaced so no more than 20 units are shut down due to a break or 1000 whichever is more restrictive vii. Hydrants (with #) spaced maximum of 300 in line i. Connection(s) to existing sanitary sewer ii. Layout iii. Identify trunk mains with sizes iv. Manholes (with #) i. Connections to existing storm sewer (if applicable) ii. Discharge into appropriate management facilities iii. Layout iv. Manholes (with #) v. Catch basins (with #): off main line, sequence of two maximum vi. Existing drain tile connected to proposed storm system vii. Detention facilities with HWL viii. Drainage divides with 100 year overflow routes identified No public utility within the influence of stormwater management facilities Street lights (with #) Match lines with sheet reference Phase lines Page 2 of 9

4. Grading Plan Existing topography: i. 1 Contours lines ii. Grayed out line iii. 100 feet beyond parcel limits Existing footprints, and foundation elevation of structures on adjacent properties Proposed topography (1 contour lines) compatible with adjacent existing topography Any cuts or fills to the existing conditions do not cause cover over public utilities to be below minimum or in excess of maximum allowable Foundation footprints and foundation elevation (including lowest openings) Driveway approach slope between 2% and 6% Street centerline stationing with elevation every 50 Curb elevation every 50, at lot line extensions, at PC s & PT s, and at overflow crossings Sidewalk and pathways Lot lines and lot numbers Proposed elevation at each lot corner and side yard, drainage direction included Rim elevations of all structures, including FES Grading slope within acceptable range: i. Residential yard slope 4:1 (25%) maximum, 50:1 (2%) minimum ii. Within stormwater management facilities: 4:1 iii. Other areas: 3:1 (33%) maximum, 50:1 (2%) minimum 100-year overflow routes Cross-section(s) of overflow swale(s) with HWL elevations during overflow condition Detention basin topography Detention Basin Data: i. NWL & HWL ii. Detention & retention capacity (required & proposed) iii. Top of berm elevation vi. Overflow weir elevation v. All building openings are at least 2 higher than HWL or overflow elevations (if tributary area < 20 acres) Detention Basin Details: i. Restrictor structure ii. Embankment iii. Overflow Weir vi. Level spreader v. Basin cross section 100-year floodplain elevation and limit Floodway elevation and limits Wetland and its buffer limits Page 3 of 9

5. Plan and Profile Street information: City of Elgin Right of way width Lot lines Lot Numbers Easements Building setback lines Building envelopes i. Centerlines with stationing, PC s and PT s, curve data ii. Curb and gutter: location, type, radii, and dimensions (if different from the typical section), PC s and Pt s iii. Street names iv. Street width (back to back of curb): collector/commercial/industrial=36, minor=30, frontage access = 24 v. Cul-de-sac: 26 road back to back of curbs, circular terminus pavement with 90 back to back of curbs Street profile with vertical curve data. Gradient => 0.4% i. Major/Minor arterial: 5% maximum ii. Collector street: 7% maximum iii. Minor and Cul-de-sac street: 9% maximum Profile at existing ground along centerline Station equation for all street intersections Sidewalk: i. Both sides of the street ii. 1 inside ROW Watermain: iii. iv. 5 width Sidewalk crossing street showing ramps with ADA detectable warnings both sides and comply with IDOT regulations (slope < 1:12, within full depressed curb) v. Sidewalk crossing approach at grade with ADA detectable warnings both sides, parking lot curb and approach curb taper down and terminate at the sidewalk (commercial and industrial) Bike-Path: location and dimensions (=>10 width, 2 asphalt, 6 gravel base) Elevation reference at both ends of profile grid Profiles of any existing underground utilities including identification, size, slope, and invert elevations at all structures Adjust rims and change frame and grate of existing structures as necessary i. Minimum 8 diameter ductile iron pipe (show actual) ii. Cover: minimum of 5.5 and maximum of 7 iii. 48 vault for =< 8 pipe; 60 vault for >8 to <16 pipe; 72 vault for =>16 iv. VV location by station and offset v. Rim elevation vi. Fire hydrant location by station and offset vii. Bottom flange elevation viii. No services to a water main larger than 12 in diameter Page 4 of 9

5. Plan and Profile (continued ) Sanitary Sewer: i. Minimum 8 diameter (show actual) ii. Length: maximum 300 runs between MH s iii. Slope: minimum required by IEPA plus a minimum 10% factor of safety to accommodate contractor error iv. MH location by station and offset v. Rim and invert elevations vi External drop connection if invert difference is greater than two foot vii. Core and boot existing sanitary structures for sanitary main extensions viii. Sanitary services with Y connection into main flow direction ix. Sanitary services connection to main only (no MH connection) Storm Sewer: i. Minimum 12 diameter (show actual) ii. Length: maximum 300 sections between structures, with slope iii. Slope: minimum and maximum to maintain flow at 2 ft/s cleanout velocity but not to exceed 15 ft/s iv. Structure identification (MH, CB), no inlets permitted v. Structure location by station and offset vi. Frame / grate and type of lid (open / closed) identification vii. Rim and invert elevations viii. No more than two (2) catch basins shall be allowed on a main line and they need to be at the upstream end of the line. (No in-line catch basins are permitted) ix. Maximum distance from a clean-out point (a structure in the public ROW and adjacent to a paved surface) to the farthest structure in rear yards shall be 300 x. All connections need to be made to a structure (no blind taps to main) xi. Provide a note to core, brick and mortar connections into existing storm structures xii. Private storm sewer connection to a main shall be 12 RCP Maintain a minimum of 10' horizontal separation or a minimum 18" vertical separation (water-main over sewer) Identify sewer with water-main crossing conflicts and provide separation information, invert and top of pipe. Follow IEPA regulations for water-main protection Street lights (symbol only): i. 6 separation from any underground structure ii. 5 separation from any surface structure and its foundation iii. Relocated public street lights identified Street signs (symbol only) Driveway approach location Adequate separation between public utilities, structures and other site features shall be provided Highlight limits of trench backfill Match line, both ends, with sheet sequence and station sequence Page 5 of 9

City of Elgin 6. Soil Erosion and Sedimentation Control Construction entrance Silt fence downstream of any slope Silt fence surrounding stockpile Silt fence surrounding the parcel Ditch checks on swales and drainages paths Intake structure protection Rip-rap downstream of FES Overflow weir stabilization Temporary riser at outlet structure Level spreader (if necessary) Special erosion control measures Erosion control maintenance schedule Permanent stabilization plan Seeding description 7. Erosion Control Details Existing topography: i. 1 Contours lines ii. Gray line iii. 100 feet beyond parcel limits iv. Source identified Existing footprints, and foundation elevation of structures on adjacent properties Proposed topography (1 contours) compatible with adjacent existing topography Stormwater Pollution Prevention Plan NRCS standard details as provided in the Illinois Urban Manual as appropriate 8. Street Lighting, Signage and Pavement Marking Plan Legend (wattage of lights, type of signs and type of pavement markings) Maximum light separation (250 standard, 225 ornamental) Light at all intersections i. 400W arterial intersection ii. 250W collector intersection iii. 175W minor intersection iv. Other agreements Light at end of cul-de-sac Light at the top of T intersection Identify relocated street lights and note no in-line splices are permitted Street name sign at all intersections 30 mph Speed Limit sign at each entrance to the subdivision Stop signs at all intersections Stop bars at major intersections 25 mph Speed Limit sign if centerline curve radius is less than 200 No Overnight Parking on all street light poles and on sign poles opposite side of street from each light. End of Road sign & reflectors (street stub) Details of traffic control signage Pavement marking with dimensions Page 6 of 9

9. City of Elgin Standard Street Light Details (ATTACHMENT 4) 10. City of Elgin Standard Street Name Sign Details (ATTACHMENT 5) 11. Landscape Plan Parkway trees spaced every 40 maximum 5 separation to any other public utility Identify utility structures and verify proposed landscaping does not restrict access and visibility of these structures No woody vegetation on stormwater facility berms Verify seed mix for basin is adequate depending on wet/dry bottom basin 12. Roadway Improvement to Existing Roads Existing conditions (grayscaled) Stationing Proposed improvements: i. Geometrics ii. Location (station + offset) ROW dimensions Plat of Dedication (if applicable) Demolition plan (if extensive) Centerline and utility plan and profile Limits of construction Sidewalk and bike-path Pavement markings Grading Signage Grinding and overlay limits Street lighting Typical cross-section Match lines (if necessary) 13. Summary of Quantities Table delineating Public vs Private Infrastructure 14. City of Elgin General Notes Sheet (ATTACHMENT 6) 15. City of Elgin Standard Details (ATTACHMENT 7) 16. Developer s General Notes 17. Developer s Details Page 7 of 9

ATTACHMENTS 1 City of Elgin Contact Information 2 sheets 2 Drainage Statement 1 sheet 3 City of Elgin Standard Street Light Detail Sheet - 1 sheet 4 City of Elgin Ornamental Street Light Detail Sheet 1 sheet 5 City of Elgin Standard Street Name Sign Sheet 1 sheet 6 City of Elgin General Notes Sheet - 1 sheet 7 City of Elgin Standard Detail Sheets - 2 sheets 8 Signature block (plat of subdivision) 1 sheet 9 Grant of Easement Standard Format - 1 sheet 10 Easement Provisions for Use on Plats Standard Format - 8 sheets 11 Engineer s Estimate of Construction Costs Standard Format - 3 sheets 12 Performance Bond for Issuance of Development Permit Standard Format - 1 sheet 13 Mass Grading and Soil Erosion Control Performance Bond Standard Format - 1 sheet 14 Letter of Credit Standard Format - 3 sheets 15 Undertaking in Lieu of Completion Bond - 2 sheets 16 Sanitary Sewer Inspection Memorandum - 1 sheet 17 Watermain Hydrostatic Testing Procedure 3 sheets Page 8 of 9

Subdivision Approval Checklist The following items need to be approved and in the file prior to going to City Council for the final plat approval. Item Description Date of Document Date Last Revision Date Received 1 Final Engineering Plans Approved (refer to checklist) 2 Final Plat Approved (refer to checklist) 3 EOPC for infrastructure improvements including mass grading & soil erosion control and any offsite improvements 4 Surety in the form of cash, letter of credit or bond for 110% of the Estimate of Cost -- THE ORIGINAL DOCUMENT MUST BE IN HAND PRIOR TO HAVING THE FINAL PLAT ON THE AGENDA Approval of Bonding Agent from Finance Approval of Bond Format from Legal 5 Kane County Stormwater Approval (staff or consultant) 6 Metropolitan Water Reclamation District of Greater Chicago (Cook County) Watershed Management Permit (just notify applicant if development is in Cook County and make it a condition of approval) 7 IEPA Permits 8 Army Corp Permits (if applicable) 9 Review consultant fees up-to-date; or Escrow Account balance sufficient for outstanding invoices. Page 9 of 9