A Proposed Total Productive Maintenance (TPM) Tool for Lean Dashboard, Statistics and Performance Efficiency in Malaysian Modern Manufacturer

Similar documents
The relationship between 5S lean tool and WP of FMCG Warehouse in Peninsular Malaysia

The Relationship between Environmental Information System and Performance for Malaysian Manufacturing Industry

Measuring Green Performance for Malaysian Automotive Industry

The Relationship between Kaizen Event and Operational Performance in Malaysian Automotive SMEs

A Proposed Tool for Lean Healthcare Performance Improvement (LHPI)

The Relationship between Green Practices and Innovation Performance in Malaysian Automotive SMEs

A Review: The Impacts of Green Practices Adoption on Green

The Lean Healthcare Practices and Performance Improvement Measurement for the Malaysian Healthcare Industry

Supply Chain Management (SCM) Practices and Continuous Innovation (CI) in Malaysian Automotive Industry

TOTAL PRODUCTIVE MAINTENANCE: ISSUES AND DIRECTION FOR FUTURE RESEARCH

A Proposed of Green Practices and Green Innovation Model in Malaysian Automotive Industry

The Structural Analysis of Green Innovation (GI) and Green Performance (GP) in Malaysian Automotive Industry

Total Productive Maintenance Strategy in a Semiconductor Manufacturer: A Case Study

Junshi: A Daily Kaizen activity of Lean Production Management

TPM IMPLEMENTATION CAN PROMOTE DEVELOPMENT OF TQM CULTURE: EXPERIENCE FROM A CASE STUDY IN A MALAYSIAN MANUFACTURING PLANT

DEVELOPMENT OF TPM IMPLEMENTATION PLAN IN SWITCHGEAR & ENGINEERING COMPANY

OEE IMPROVEMENT BY TPM IMPLEMENTATION: A CASE STUDY

Productivity Change in Higher Education Sector: A Case Study of Malaysian Universities

Assignment #2 IE 2303/AME 2303 Spring 2012 Introduction to Manufacturing. Example Answers

Total Productive Maintenance In Automotive Industry: Issues And Effectiveness

ISSN: Volume 2, Issue 8, January 2016

The Relationship between Strategic Performance Measurement System and Managerial Work Performance of Co-operatives in Malaysia

The development of process innovation and organisational performance in Malaysian healthcare industry

SEA Definitions. 5/14/13 SEA 2013 All Rights Reserved Definitions V22

MEDIATING EFFECT OF ENTERPRISE RISK MANAGEMENT PRACTICES ON RISK CULTURE AND ORGANIZATIONAL PERFORMANCE

Research Article Special Issue

A case study on Measurement of Degree of Performance of an Industry by using Lean Score Technique

QUALITY MANAGEMENT SYSTEM 8/30/2017

Relationship of TQM and Business Performance with Mediators of SPC, Lean Production and TPM

econstor Make Your Publications Visible.

Improving maintenance by profit indicators

UNIVERSITY OF NAIROBI

Effectiveness of quality management system audit to improve quality performance A conceptual framework

Performance Measurement System and Business Performance Measurement System: A comparative study

DEVELOPMENT OF A TOTAL PRODUCTIVE MAINTENANCE REPORT CARD FOR CRITICAL MACHINES

A PM on Lean Production Randel Ltd.

Tolu Adesalu Head of Procurement West Africa Cadbury Nigeria PLC Nigeria

Quantification of Machine Performance Through Overall Equipment Effectiveness

Improvement of Manufacturing Performance Measurement System and Evaluation of Overall Resource Effectiveness

Continuous Improvement and its Barriers in Electrical and Electronic Industry

Analysis and Ranking the Obstacles and Challenges in performing and reforming core banking based on Ferguson Model (Case Study: Agricultural Bank)

International Journal on Emerging Technologies 4(1): 66-74(2013) ISSN No. (Print) : ISSN No. (Online) :

MANAGEMENT INFORMATION SYSTEMS COURSES Student Learning Outcomes 1

Systematic Organization of Multi-criteria for Effective Tender Evaluation using Balanced Scorecard Approach

CHAPTER 8 INTEGRATION OF QMS AND LMS

SDD: Total Productive Maintenance REV1: 2014 January 31. Page 1 of 21. Step 1

PMPA Tech Conference Do we have the Tools and Knowledge to weather the Storm?

The level of achievement of Lean Manufacturing Implementation status before and after the development of KPIs at an Aerospace Manufacturing Company

Operationalisation of Safety Culture to Foster Safety and Health in the Malaysian Manufacturing Industries

The Impact of 5S Implementation on Industrial Organizations Performance

[ICAMS: March 2017] ISSN: IMPACT FACTOR

How to Accomplish Effectiveness of Six Sigma

Lean Principles. Jerry D. Kilpatrick. This article was originally written for and published by MEP Utah in 2003 (

Maintenance and reliability is strategic to most organisations: So why is there so little. empirical research?

Scientia Research Library

An occupational safety and health management system related to level of safety culture in construction site

Extending Lean Initiatives Across the Organization:

IMPLEMENTATION OF TOTAL PRODUCTIVE MAINTENANCE AND OVERALL EQUIPMENT EFFECTIVENESS EVALUATION

Implementing Total Productive Maintenance (TPM) in Malaysian Manufacturing Organisation: (One Yoon Seng, Muhamad Jantan, dan T.

II. METHODOLOGY OF TQM

Key Performance Indicators for Maintenance Management Effectiveness of Public Hospital Building

IMPACT OF MULTI-SKILL WORKERS FACTOR ON COMPETITIVENESS

A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION

JUST IN TIME APPROACH IN INVENTORY MANAGEMENT

Lecture 6 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L6: Quality Management

MANAGEMENT INFORMATION SYSTEMS COURSES Student Learning Outcomes 1

The practical application of the machinery management

The Weaknesses of OSHA 1994 Implementation in Malaysian Construction Industry

Pertanika J. Soc. Sci. & Hum. 25 (S): (2017)

Evaluating the Impact of Total Productive Maintenance elements on a Manufacturing Process

Lean Manufacturing Implementation in Malaysian Automotive Components Manufacturer: a Case Study

MEETING STAKEHOLDER AND QUALITY NEEDS

The Construction of Indicator System for Performance Measurement of Chinese Enterprises Based on Balanced Scorecard

The Impact of Human Resource Management Functions in Achieving Competitive Advantage Applied Study in Jordan Islamic Bank

Publishing as Prentice Hall

IT 470a Six Sigma Chapter X

Dimensionality and relevance of maintenance performance measures DECISION SCIENCES INSTITUTE. (Full Paper Submission)

AN INVESTIGATION INTO THE EFFECTS OF THE APPLICATION OF TQM, TPM, AND JIT ON PERFORMANCE OF INDUSTRY IN BAHRAIN

A framework of fuzzy control-based intelligent control system for greenhouse

Competency Enhancement: Intangible Benefits of TPM Implementation

Integrating SPC and TPM

MOSQUE ECONOMIC ACTIVITIES AND ENTREPRENEURIAL ORIENTATION: A PRELIMINARY STUDY

SUPPLIER S CAPABILITIES AND ITS INFLUENCE ON COMPETITIVE ADVANTAGE IN AUTOMOTIVE INDUSTRY

Measuring the Performance of Internal Audit Function in Saudi Listed Companies: An Empirical Study

Implementation of TPM in cellular manufacture

Maintenance Planning & Scheduling. Dr. Khaleel Abushgair

Safety and Health Cost Allocation for Urban Rail Infrastructure Project: Identifying issues and importance

Correlation matrices between ISO 9001:2008 and ISO 9001:2015

Maintenance & Dependability Effective Maintenance Planning and Productivity Improvement Potentials

MASTER IN PUBLIC ADMINISTRATION (MPA) (Revised Curriculum)

IMPORTANCE OF EMPLOYABILITY SKILLS AS PERCEIVED BY EMPLOYERS OF MALAYSIAN MANUFACTURING INDUSTRY

In this unit we are going to speak about quality management in organizations.

Developing the health, safety and environment excellence instrument

6 PAKISTAN INSTITUTE OF MANAGEMENT CALENDAR OF EVENTS AND FEE CHART (AUGUST 2017 to JANUARY 2018) Progress through Better Management PIM is a pioneer

ABSTRACT I. INTRODUCTION LITERATURE REVIEW

Univ. Prof. Dr.-Ing. Uwe Dombrowski Dipl.-Ing. Isabel Crespo Dipl.-Wirtsch.-Ing. Stefan Schmidt, MSIE

1. Quality Right First Time for product and services will ensure fulfillment of external and internal Customers satisfaction. 2. It is a coordinated a

Effects of Production Facilities Maintenance on Competitive Advantage of Selected Firms in Nigeria

Online Student Guide Total Productive Maintenance

TQM i.e. (Total Quality Management) Construction Projects

Transcription:

A Proposed Total Productive Maintenance (TPM) Tool for Lean Dashboard, Statistics and Performance Efficiency in Malaysian Modern Manufacturer *1 Nurul Fadly Habidin, 2 Norlaile Salleh Hudin, 3 Wan Salmuni binti Wan Mustaffa, 4 Siti Asma Mohd Rosli, 5 Sharon Yong Yee Ong, 6 Nursyazwani Mohd Fuzi, 7 Nuurul Najwa Zulkifle *1, 2, 3, 4, 5 Department of Management and Leadership, Faculty of Management and Economics, Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim, Perak, Malaysia. 6 Departments of Accounting and Finance, Faculty of Management and Economics Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim, Perak, Malaysia 7 Departments of Education, Faculty of Education and Human Development, Universiti Pendidikan Sultan Idris, 35900 Tanjong Malim, Perak, Malaysia. DOI: 10.6007/IJARBSS/v7-i6/3061 URL: http://dx.doi.org/10.6007/ijarbss/v7-i6/3061 Abstract The development of manufacturing industries in Malaysia has started more than 50 years ago. Nonetheless, after more than 50 years Malaysian manufacturing has been established, the issues of maintenance, safety, quality, cost, and performance efficiency still receive criticism, complaints, and various suggested approach to improve their product quality, operation management, and customer satisfaction. As a result, in order to improve the quality of manufacturing industries, Malaysian government has supported and encourage for develop total solution especially for quality improvement, increase safety and setup low cost for productive maintenance. Thus, to help the Malaysian manufacturer to achieve national agenda, further Total Productive Maintenance (TPM) tool essential. Recently, manufacturing companies are moving toward maintenance engineering practices, lean dashboard methodology process, statistical engineering solution, audit quality maintenance control and performance efficiency improvement; lower cost of production, cheaper maintenance cost, just in time (JIT) operation deliveries, eliminate of waste in any aspect of its operations and finally produce high quality product and better service to customer compared to competitors. The objectives of this research is to develop propose TPM tool as an important catalyst for continually seek better maintenance performance and in turn against competitive advantage. By implementing prototype of TPM system, modern manufacturing companies will eliminate waste in operation activities such as to reduce maintenance cost, reduce time monitoring and control's, reduce defect, to reduce lead time, and reduce variation process and also improve quality product and good service for customer satisfaction. 1012

Keywords: Total Productive Maintenance, Lean Dashboard, Statistics, Performance Efficiency, Malaysian Modern Manufacturer Introduction The maintenance concept is important in the manufacturing environment and it provides support for productivity. Maintenance practices like Total Productive Maintenance (TPM) are important to increase level of readiness to face any eventuality, keep product quality and safety. Besides that, safety factor is very important for employees to make sure that they can work very well. Occupational Safety and Health Administration (OSHA) practices can improve the safety and health at the selected industry. TPM and OSHA practices also directly affect the financial performance (Mberia, 2001). Hence, TPM also will directly affect the cost of maintenance in manufacturing industry (Al-Najjar & Alsyouf, 2003; Alsyouf, 2006; Hashim et al., 2012a). Manufacturing companies are under increasingly diverse and mounting pressure due to more sophisticated markets, changing customer choice, and global competition. With globalization broadening the market place and increasing competition, customers are placing greater demands on manufacturers to increase quality and flexibility while maintaining or decreasing costs (Dangayach & Deshmukh 2001). Thus, to become relevant, maintenance performance measures such as financial, customer satisfaction, internal business process, and learning growth and innovation require for cooperation among all manufacturer employee in order to achieve TPM performance. important process and very much needed as a TPM tool for measuring and monitoring the Islamic business engineering operations initiative, performance measurement provides a contribution to improved operation and engineering process, and increased control customer satisfaction. Therefore, in this study focused on the development of TPM tool for sustaining lean dashboard methodology, statistical solution and performance efficiency improvement. 2. Literature Review 2.1 Total Productive Maintenance (TPM) TPM is a maintenance system defined by Nakajima (1988) in Japan, which covers the entire life of equipment in every division including planning, manufacturing, and maintenance. It describes a synergistic relationship among all organizational functions, but particularly between production and maintenance, for continuous improvement of product quality, operational efficiency, capacity assurance and safety. TPM practices provide a new view on the maintenance organization system by stating that maintenance is not an activity which cannot produce profits. Profits will be generated indirectly from an effective and systematic maintenance system (Ahuja & Khamba, 2008). Therefore, TPM practices affect other functions within the organization for improving product quality, operational efficiency, productivity and safety. Hence, the TPM practices were introduced to achieve certain goals. In accordance with Venkatesh study (2006), the objectives of TPM practices are to avoid excesses in the use of equipment which is not used to the maximum level, producing the high quality product effect from orderly equipment maintenance, manage costs, and provide products which are free from damage to the customer. 1013

TPM philosophy was introduced based on mastery, competence, and involvement of all employees of the organization. It has a relationship to the organization capabilities through various dimensions (Wang & Ellinger, 2011). Typically, TPM practices are generally divided into two elements, namely short team and long-term element. The short-term elements are more focused in AM for production department. Then it also focused on PM for maintenance department and skill development for operation, and maintenance staff. Besides, the long-term element is more focused on the new equipment design which involves the innovation practice. Hence, it is also involves the elimination of sources of lost equipment time. TPM is also very concerned about the kaizen and safety of its employees in performing equipment maintenance process (Hashim et al., 2012b; Hashim et al., 2012c; Hashim et al., 2013). Preventive measures of the accident were doing planned maintenance. Furthermore, safety cautions about the machine were mentioned so as to avoid any occurrence of accidents during initial cleaning (Chan, Lau, Chan, & Kong, 2005). Meanwhile, TPM goals via group preventive maintenance, small-group activities, maximization equipment effectiveness, zeroaccident and zero-pollution aims, improving operating reliability, reducing the cost, and problem solving (Eti et al., 2004). In addition, current maintenance in the company is based on traditional practices and is reactive, i.e., breakdown. It is a practice that inherently wasteful and ineffective with disadvantages such as: unscheduled downtime of machinery, possibility of secondary damage, no warning of failure with possible safety risks, production loss or delay, and the need for standby machinery where necessary. Based on this relevant issues and problems, TPM is classified into an independent preservation, quality preservation, an individual's improvement, an environment safety, a planned reservation, an activity supporting a business and education, training and prototype of decision making. Related on this also, in the world of information technology, business process requires a decision making tool that is effective and systematic organization and enhance its competitive edge. In literature and practitioner it appears very difficult to find studies that have developed TPM initiatives, sustainable lean dashboard improvement, statistical and performance efficiency improvement measurement for the manufacturing industry. 2.2 Lean Dashboard, Statistics and Performance Efficiency in Malaysian Modern Manufacturer Performance Measurement required to balance between financial and non-financial (Habidin et al., 2016; Habidin et al., 2012). The propose TPM Tool The unpredictable maintenance has a crucial effect on the performance efficiency in Malaysian Modern Manufacturer. The Manufacture maintenance is normally based on the statistical analysis of the machine failure and maintenance history. Graisa and Al-Habaibeh (2011) suggest having tool in order maintenance modern manufacturer. In this study, the propose TPM tool is an evolve tool to monitor the lean dashboard, statistic and performance efficiency in Malaysia Modern Manufacturer. Dashboard is a medium of communication that presents information. Karami and Safdari (2016) indicate the importance of dashboard in helping to informed decisions about workflow by creating a link between different information systems. In this study, lean 1014

dashboard present the dashboard of lean practice in Malaysian Modern Manufacturer. As Danese et al. (2017) explain that lean is a complex and often extended process and need to consider it as a whole rather than as a sequence of phases in organization. For these reasons, a tool to show the lean dashboard is needed. According to Graisa and Al-Habaibeh (2011), with the implementation of TPM it is a vitally important part of the business. As the implementation of the available technology are also necessary to achieve Lean Dashboard, Statistics and Performance Efficiency in Malaysian Modern Manufacturer. 3. Purpose of the study The aim of this study is to develop and apply the dashboard, measurement solutions and, maintenance performance for the development of TPM system for sustaining maintenance engineering practices and total maintenance performance improvement. Even though, the competitive nature of manufacturing practices leads many organizations attention to the maintenance and performance improvement issues rising from collaboration efforts. Consequently, the purpose of this study is to start the measurement of Lean dashboard, statistics and performance efficiency systems for Malaysian modern manufacturer. 3.1 Objective (s) of the Research 1. To verify the prototype of measurement items of sustaining maintenance engineering practices, lean methodology and total maintenance performance improvement. 2. To evaluate TPM prototype tool road map and structure for lean dashboard methodology, statistical solutions and performance efficiency improvement for Malaysian Modern Manufacturer. 3. To evaluate a software-based tool was develop by using PHP and MySQL for lean dashboard methodology, statistical solutions and performance efficiency improvement for Malaysian Modern Manufacturer. 4. Methodology The aims of this study are develop and validate TPM tool for Malaysian modern manufacturer. Researchers propose to use validate as it is relatively considered as the most economical among methods available for data collection especially in term of cost, time saving, and approach. Moreover, by using validation case study methods, it can clarify the question for survey respondents, and able to perform efficient data collection by recording their responses. The following section describes the method that will be employed in this research. The first phase is the critical literature review. All these research activities will be conducted to establish the use of the proposed TPM tool; maintenance and engineering practices, lean dashboard methodology, statistical solutions and performance efficiency improvement for Malaysian manufacturer industry. This then paved the way towards formulating a research model developing the research hypotheses, and instrument in investigating the TPM implementation in the industry. For future research, author proposes another two phase of research activities. The research activities focus on data collection by determining the population, number of samples and selection, building and modifying the instrument, selection of the companies for 1015

pilot study and full survey, as well as the procedure for obtaining, and permission to engage case study. The final phase, the research activities were on data analysis. The input data was analyzing using SPSS and AHP software to build the tool. 5. Significant of the Study By developing a TPM tool, it is expected to help researchers, consultant and practitioners and identify opportunities for improvements in the processes of implementing TPM initiative and also enhancing decision facing the global competition and uncertain global economy, it is important to the organization to see if the quality initiative needs, and work environment by integrating TPM with sustaining lean dashboard, statistical solution and performance efficiency improvement where necessary to be developed the model for Malaysian modern manufacturer. 6. Conclusion The increasing attentions is being paid to maintenance and engineering practices, lean dashboard methodology process, statistical solution and performance efficiency improvement, it is a phenomenon that is emergent and not yet widely studied explored the theory, practices and gap between lean methodology process, statistical solution control, and performance improvement initiatives for Malaysian manufacturing industry. Expected practices of TPM tool within local manufacturers, global industry, and future research as an important and problem solving. This study is expected to arrive at the following conclusion: This propose tool has important implication lean dashboard methodology Improvement and performance efficiency improvement and quality, environment, safety management system that are important to improve organizational performance in Malaysian manufacturing industry. As such, it is expected benefit to researches and practitioners. Future agenda, this study also suggest other quality practices such as lean (Hibadullah et al., 2013), green practices (Conding et al., 2013), green lean six sigma (Zamri et al., 2013), green innovation (Conding et al., 2012), corporate social responsibility (Fuzi et al., 2015) and Sustainable manufacturing practices (Habidin et al., 2015) need to integrate with TPM for better maintenance management services and performance improvement. Acknowledgement The researchers also like to acknowledge the Ministry of Higher Education (MOHE) for the financial funding of this research thought Fundamental Research Grant Scheme (FRGS) and Research Management Innovation Centre (RMIC), UPSI for Research University Grant (RUG). Corresponding Author *1 Nurul Fadly Habidin Department of Management and Leadership Faculty of Management and Economics Universiti Pendidikan Sultan Idris 1016

35900 Tanjong Malim, Perak, Malaysia Email: fadly@fpe.upsi.edu.my References Ahuja, I. P. S., & Khamba, J. S. (2008). Total productive maintenance literature review and directions. International Journal of Quality & Reliability Management, 25(7), 709-756. Al-Najjar, B., & Alsyouf, I. (2003). Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making. International journal of production economics, 84(1), 85-100. Alsyouf, I. (2006). Measuring maintenance performance using a balanced scorecard approach. Journal of Quality in Maintenance Engineering, 12(2), 133-149. Chan, F. T. S., Lau, H. C. W., Ip, R. W. L., Chan, H. K., & Kong, S. (2005). Implementation of total productive maintenance: A case study. International Journal of Production Economics, 95(1), 71-94. Conding, J., Habidin, N. F., Zubir, A. F. M., Hashim, S., & Jaya, N. A. S. L. (2012). The structural analysis of green innovation (GI) and green performance (GP) in Malaysian automotive industry. Research Journal of Finance and Accounting, 3(6), 172-178. Conding, J., Zubir, A. F. M., Hashim, S., Jaya, N. A. S. L., & Habidin, N. F. (2013). The investigation of green practices, green innovation and green performance in Malaysian automotive industry. Environmental Management and Sustainable Development, 2(1), 1-13. Danese, P., Danese, P., Romano, P., Romano, P., Boscari, S., & Boscari, S. (2017). The transfer process of lean practices in multi-plant companies. International Journal of Operations & Production Management, 37(4), 468-488. Dangayach, G. S., & Deshmukh, S. G. (2001). Manufacturing strategy: Literature review and some issues. International Journal of Operations & Production Management, 21(7), 884-932. Eti, M. C., Ogaji, S. O. T., & Probert, S. D. (2004). Implementing total productive maintenance in Nigerian manufacturing industries. Applied energy, 79(4), 385-401. Fuzi, N. M., Habidin, N. F., Desa, A. F. N. C., Hibadullah, S. N., & Zamri, F. I. M. (2015). Critical success factors of corporate social responsibility practices for Malaysian automotive industry. International Journal of Critical Accounting, 7(2), 142-156. Graisa, M., & Al-Habaibeh, A. (2011). An investigation into current production challenges facing the Libyan cement industry and the need for innovative total productive maintenance (TPM) strategy. Journal of Manufacturing Technology Management, 22(4), 541-558. Habidin, N. F., & Yusof, S. M., Omar, B., Mohamad, S. I. S., & Janudin, S. E. (2012). A proposed strategic balanced scorecard model: Strategic control system and organizational performance in Malaysian automotive industry. IOSR Journal of Business and Management, 1(6), 39-44. Habidin, N. F., Salleh, M. I., Latip, N. A. M., Azman, M. N. A., & Fuzi, N. M. (2016) The development of strategic balanced scorecard tool (SBST) for Malaysian automotive industry. Journal of Industrial and Production Engineering, 33(4), 271-285. 1017

Habidin, N. F., Zubir, A. F. M., Fuzi, N. M., Latip., N. A. M., & Azman M. N. A. (2015). Sustainable manufacturing practices in Malaysian automotive industry: Confirmatory factor analysis. Journal of Global Entrepreneurship Researchh, 5(1), 1-13. Hashim, S., Habidin, N. F., Conding, J., Zubir, A. F. M., & Jaya, N. A. S. L. (2013). Total productive maintenance, kaizen event and innovation performance in Malaysian automotive industry. International Journal of Physical and Social Sciences, 3(1), 45-64. Hashim, S., Habidin, N. F., Conding, J., Zubir, A. F. M., & Jaya, N. A. S. L. (2012a). Total productive maintenance and innovation performance in Malaysian automotive industry. International Journal of Engineering Research and Development, 3(11), 62-67. Hashim, S., Habidin, N. F., Conding, J., Zubir, A. F. M., & Jaya, N. A. S. L. (2012b). The integrated between total production maintenance practices and kaizen event practices in Malaysian automotive industry. International Journal of Engineering Research and Applications, 2(5), 136-143. Hashim, S., Zubir, A. F., Conding, J., Jaya, N. A. S. L., & Habidin, N. F. (2012c). Kaizen event and innovation performance in Malaysian automotive industry. Business Management and Strategy, 3(2), 11-22. Hibadullah, S. N., Desa, A. F. N. C., Habidin, N. F., Fuzi, N. M., & Zamri, F. I. M (2013). ISO 14001 performance efforts and environmental performance in Malaysian automotive industry. Journal of Environmental Science, Computer Science and Engineering & Technology, 2(1), 129-138. Karami, M., & Safdari, R. (2016). From information management to information visualization: development of radiology dashboards. Applied clinical informatics, 7(2), 305-308. Mberia, A. M. (2001). A survey of the occupational health and safety programmes adopted by the banking industry in Kenya: An empirical study. MBA Project. Nakajima, S. (1988). Introduction to TPM: Total productive maintenance. Productivity Press, Inc., 1988, 129. Venkatesh, J. (2006). An introduction to total productive maintenance, in Bandyopadhyay, P. K. (Ed.), Strategic Maintenance Management, 3-32. Hyderabad, India: ICFAI University Press. Wang, Y. L., & Ellinger, A. D. (2011). Organizational learning: Perception of external environment and innovation performance. International Journal of Manpower, 32(5), 512-536. Zamri, F. I. M., Habidin, N. F., Hibadullah, S. N., Hibadullah, S. N., Fuzi, N. M., & Desa, A. F. N. C. (2013). Green lean six sigma and managerial innovation in Malaysian automotive industry. International Journal of Innovation and Applied Studies, 4(2), 366-374. 1018