Is the Semi-Automated or Automated Rail Mounted Gantry Operation a Green Terminal?

Similar documents
MARITIME REPORTER AND ENGINEERING NEWS. Offshore Energy. Arctic Operations Finland Breaks the Ice. Markets Fishing Fleet Americas

BNSF North SIG Intermodal Improvement Project. Seattle, Washington

GUAM PORTS OF ENTRY. Presented By: CMTF Ports & Customs Subcommittee. Carlos H. Salas Deputy Executive Manager. Kenneth Tagawa General Manager

High Volume, High Velocity Intermodal Operations

Innovations in Urban Freight. Commercial Challenges for the Port of Seattle February 6, 2011

Installation of RMG Cranes at Intermodal Rail Yard ABSTRACT INTRODUCTION

Intermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS

Improved Inland Rail Transport Through New Concepts for Intermodal Hubs

2017 Facilities Engineering Awards: Design and Construction of Marine Structures. Title of Project Mississippi River Intermodal Terminal Improvements

Re: Participation of the Vancouver Fraser Port Authority in Orientation Session #2 for the Roberts Bank Terminal 2 Project Environmental Assessment

TECHNICAL MEMORANDUM DRAFT. Port of Tacoma GCP Uplands Modernization Program. Throughput and Truck Trip Forecasts. Date: March 30, 2018

THE ECONOMIC BENEFITS OF INVESTMENTS AT SOUTH TERMINAL AT THE PORT OF EVERETT

APM Terminals Mumbai. Welcomes

PORT OF NEW YORK & NEW JERSEY RAIL FACILITY EXPANSION PROGRAM

PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port Engineer / Vice President

Revolutionizing Portto-Rail

Port Cooperation Agreements Propelling Capital Projects

Global Supply Chain Management: Seattle-Tacoma

... Terminal of the Future in San Pedro Bay. by Ashebir Jacob Larry Nye Moffatt & Nichol

Investor Presentation February 2018 Slide 1. Investor Presentation February 2018

PROFESSIONAL BULK HANDLING WITH MOBILE HARBOUR CRANES (MHC) Study case Tecer / Unilink - Terminal de Múltiplo Uso Pecém (TMUT), Brazil

American Association of Port Authorities Marine Terminal Management Training Program October 6-10, 2014 Philadelphia, PA

White Paper on the Terminal Capacity of Pier 300 with the Automation of the 41-acre Backland at Proposed Berth 306

Integration of Green Technologies into an Existing Terminal

RTSA Technical Session

The Future of Port Solutions. Building on a strong tradition

LNG AND THE FUTURE AAPA MARINE TERMINAL MANAGEMENT TRAINING PROGRAM ANTHONY CHIARELLO PRESIDENT & CEO TOTE

UNMANNED CONTAINER HANDLING MEETING THE FUTURE CHALLENGES

Terminal 5 Improvements

Port Capacity Analysis in Long Beach. Matt Plezia, POLB and Vaibhav Govil, AECOM TRB Irvine, CA June 29, 2010

Environmental Management Division, Port of Los Angeles

Presentation Topics The Alameda Corridor Project Corridor Performance Goods Movement Challenges

MARINE TERMINAL AUTOMATION FINDING THE RIGHT FIT

KALMAR AUTOMATIC STACKING CRANE

AUTOMATION OF TERMINALS AND EQUIPMENT

Making Container Terminals greener

PORT OF SAVANNAH Garden City Terminal: The Southeast Gateway for the U.S. Presented to

Select U.S. Ports Prepare For Panama Canal Expansion

Container Terminal Planning & Operations Current and Coming Trends

AAPA Harbors, Navigation and Environment Seminar Vancouver, B.C.

House Appropriations Committee Overview of Virginia International Terminals (VIT) October 15, 2012

Automation and Blockchain: A New Freight Distribution Paradigm for the Shipping Industry?

Investor Presentation November 2017 Slide 1. Investor Presentation November 2017

2007 AAPA Annual Convention October 3, 2007

Pacific Northwest Association of Rail Shippers. September 19, 2013

The Port of New York & New Jersey. A partnership between two states A premier gateway to the world

Deltaport Terminal Road and Rail Improvement Project

Port Planning Texas City International Terminal. William L. Allen, PE, SE*; Christopher B. Cornell, PE, SE**; and Dr. Joseph Moseley, PE***

Rail Service at Brookley Aeroplex

Automated Container Handling

PORT OF SAVANNAH. Garden City Terminal: The Southeast Gateway for the U.S.

Bayport Sustainable Development: Planning, Design, and Operational Practice

Bottleneck between Ports and Railroads on the U.S. West Coast

Pier 3 Upgrade Project

APM Terminals Announces Innovative, more Sustainable Terminal Design

BRIDGING GLOBAL TRADE

PORT DEVELOPMENT PLAN

New Container Terminal Development for a Proposed Area

Robert MORRIS Georgia Ports Authority

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida

MILLENNIUM MARINE RAIL, LLC Page 1 of 6 Revised Date June 18, Millennium Marine Rail, LLC - ExpressRail Elizabeth Terminal Schedule

Miami River Freight Improvement Plan Financial Management Number:

AVOLUTION OF INTERMODAL

Role of Ports in Addressing Environmental Justice Issues Related to Goods Movement

NC State Ports Authority. 21 st Century Transportation Intermodal Committee February 21, 2008 NC State Ports Authority Tom Eagar, CEO

Port of Los Angeles. America s Port Harbor Transportation Club June 20, 2013 Kathryn McDermott

Accommodating Mega-Ships at Existing Wharves

Part 3: Concepts and methods for designing and operating dry ports

TRANSFORMING TERMINALS IN THE MEGA-AGE

Operations Systems of Container Terminals: A Compendious Overview

Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program

COAST LINE CONNECTOR. Facilities Redevelopment Port Commerce Department

Preparing port container terminals for the future: making the most of Intelligent Transport Systems (ITS)

Providing Cost Effective, Reliable Services

SERVICE MACHINE TOOL SERVICE LIGHT LIFTING INDUSTRIAL CRANES PROCESS CRANES PORT CRANES LIFT TRUCKS YARD IT YOUR PARTNER IN LIFTING

Norfolk Southern: Creating Options for Ohio Shippers

Facilities Guide NORTH & SOUTH HARBORS S E AT T L E TAC O M A, U. S. A.

Union Pacific Railroad. Application for Development Project Approval. Intermodal Container Transfer Facility (ICTF) Modernization Project

North Carolina Offshore Energy Exploration Subcommittee. Mr. Jeff Keever Senior Deputy Executive Director Virginia Port Authority February 23, 2010

Sustainability in Port Engineering Douglas J. Sereno Director of Program Management

Suggested Guidelines for Hot Mix Asphalt (HMA) Underlayment in Track by AREMA Committee l-sub Committee No. 2 - Ballast.

The Effect of Ultra Large Container Vessels on Cranes and Infrastructure

Technical Memorandum 3 Executive Summary Existing Conditions and Constraints Presentation. March 22, 2006

Kalmar Innovation and Offering

Manzanillo International Terminal

environmental challenges energy consumption and efficiency in ports and terminals

About the Proposed Project

GREENCRANES GREEN Technologies and Eco-Efficient Alternatives for CRANES and Operations at Port Container Terminals

USWC Port Congestion & ILWU/PMA Contract Update. Last update: November 12, 2014

SPECIAL PUBLIC NOTICE

Is assistance available for the new generation container vessels? 26/09/2011 1

Rail Intermodal Keeps America Moving

American Marine Highways

Effect of ULCVs on Cranes and Infrastructure

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant

Chapter 2. Description of Proposed Action(s) and Alternatives

INTE-TRANSIT 3 rd Training Workshop Strategic Roadmap to 2020 for Piraeus Container Terminal

MARITIME ADMINISTRATION STRATEGIC PORT READINESS PROGRAM Brian Blower

CRC Infrastructure Sub-Committee. Project Identification Template and Instructions

INNOVATIVE APPLICATION OF AUTOMATION IN PORT OPERATIONS. Wednesday 5th Of December

Transcription:

Panel I: An Automated Terminal is a Green Terminal Is the Semi-Automated or Automated Rail Mounted Gantry Operation a Green Terminal? Milan B. Lazic January 11 13, 2006 Jacksonville, Florida

A A conference is a gathering of important people who singly can do nothing, but together can decide that nothing can be done. * * Fred Allen, quoted in the Johannesburg Business Day

Present Situation at US Ports Container cargo volume is constantly growing Ports experiencing growth in the double digits No land for expansion - No lateral expansion, only vertical

Ports Business Objectives Improve container capacity per acre Densify their terminals Deployment of hi-density operations Rubber Tired Gantry (RTG) Rail Mounted Gantry (RMG) Overhead Bridge Cranes (OBC)

Present Environmental Encounter at Ports Ports are considered to be one of the biggest polluters Public and community challenges - fighting over impact of terminal growth and operations CA Environmental organizations delaying marine and intermodal terminals - Ports haven t been doing enough!

T. Shore, Bluewater Network - Air and Waste Management Association West Coast Region Conference on Port Air Quality Impacts, April 2004, Seattle, WA, USA

Ports Investment into Green Initiatives Protect communities from harmful port operation impacts Distinguish themselves as a leader of environmental stewardship Engage and educate the community and activists groups

Rail Mounted Gantry Cranes (RMG) Operation CTA Hamburg

Advantages of the Rail Mounted Gantry automated or semi-automated terminal operation over conventional ones from the environmental perspective

Why RMG Electrically powered Efficient operation Land utilization Less travel distance for street trucks at terminals Deployment: Semi-automated or automated Environmentally friendly

Matson Facility California (1981) Courtesy of D. Reiss, Automated Terminal Systems, Inc.

How RMG Operation Benefits Environmental Perspective Emissions are not produced Very low operating noise levels Low light requirements

Air Emissions Electrically powered - no diesel emissions like with present operating equipment Improves air quality in ports

Noise Pollution Electric powered operation much quieter than any diesel powered operation Automated operation considered - almost noiseless operation

Light Pollution Light fixtures mounted under the frame Bright light used only when required No light poles throughout yard Only perimeter for security reasons At client s delivery side

Speaker s statement: The Rail Mounted Gantry Operation is the Green Terminal! Thamesport, England

RMG Operational Benefits Compared to RTG Regenerate power back to the network - cost savings in energy consumption No diesel engine and related maintenance requirements Gantry speed (10 13 ft/sec) Accurate movements - Locate box in any given time, no GPS required RMG can be manned but can be easily fully automated if required or permitted

Additional Facts To Be Considered Infrastructure cost higher (electrification) Unit price of RMG is a bit higher than same span RTG (operation cost reduction - over compensate the additional cost) Fixed terminal design - fixed and fine tuned planning well before ordering cranes Equipment maintenance cost savings (diesel vs. electrical)

Rail Track Requirements Rail track support Piling Concrete sleepers in gravel bed Stringy manufacturer specified rail tolerances (CTA requsted requsted that RMG allow for 10 times limitation set in standard)

Concrete Sleepers Thamesport, United Kingdom

Rail Tolerances Rail grade can be adjusted over time, as necessary, by raising the sleepers and compacting additional ballast under them. Thamesport, United Kingdom

Container Blocks Area Containers grounded on gravel or crushed stone curbed bed Reduces development cost - minimal maintenance cost Improved drainage with under drain system within the gravel bedding

RMG Operation Types

CH2M HILL Projects Utilizing RMG as the Operational Scheme APMT - Portsmouth, VA New York Container Terminal - Staten Island, NY Port of Tacoma Tacoma, WA

APMT

NYCT - Parcel C

NYCT Parcel C Facts: Container Terminal: 36 acres RMG semi-automated operation Block size: 10W / 6H (1 / 5) Annual throughput: 435,000 TEU Lifts / Acre / Annually: 12,000 TEU / acre Estimated capital cost: $ 210 M (includes cost of all operating equipment) ROIC (if completed by 2008): Year 2030

Port of Tacoma Washington United Terminal Densification Study Deployment of RTG or RMG Operation Maximum capacity Annual throughput Required infrastructure upgrade Capital cost requirements Construction phasing

WUT Existing Site Plan

WUT RMG Site Plan

WUT (80 acre CY) Facts Operating System Capacity (TEU) TGS (TEU) Annual Throughput (TEU) - Yard Chassis 6,141 6,141 448,300 RTG 24,300 5,093 1,412,600 RMG 41,081 7,412 2,687,300

CH2M HILL Services to Clients for Assessment of Impacts Technical Economical Environmental Emissions Pollutions CTA Hamburg

Challenges for Total Green Terminal Trucks Vessels Hustlers - container and rail yard Street trucks Muuga Container Terminal - Estonia Integrate slow approach to ports into sailing schedules Shore Power Cold ironing

Conclusion Do our best in the process to plan and build the greenest terminal possible Work together to make the environment safer for us and future generations What have you done today to make a green terminal?

Thank You! MTL, Dublin, Ireland