A-One Polar Ltd. Bhulta,Rupgonj,Narayangonj. ( , ) 27th April 2014

Similar documents
Posh Garments Ltd Ltd

HELA Clothing Bangladesh Ltd

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014

Dew Fashions Ltd. Le-Nouveautex Ltd. House-65,Board Bazar, Gazipur, Dhaka ( N, E) 22 June 2014

Star Garments (Pvt Ltd.)

Babylon Casualwear Ltd Aboni Fashions Ltd Suravee Garments Ltd

Utah Knitting & Dyeing Ltd #9533. Boran, Monipur, Mirzapur, Gazipur 03.May.2014

S B Design Ltd. Famous Design Ltd. 246/1/F, West Agargaon, Sher-E-Bangla Nagar, Dhaka-1207 ( N, E) 17 February 2015

Pimkie Apparels Ltd. (9205) Plot #328, Bloc #F, Tongi Industrial Area, Tongi ( N, E) 27.May.2014

Panwin Designs Ltd. Baniachala (Bagher Bazar), Bhabanipur, Gazipur , rd May 2014

4A Yarn Dyeing Ltd. Kaichabari, Savar, Dhaka-1340, Bangladesh ( , ) 25 March 2014

Elite Garments Ind. Ltd.

Suman Fashion Garments Ltd. Nipunika Ltd. Cha-72/1/B, Moddha Badda, Holland Centre, Progoti Sarani, Dhaka ( N, E) 09 March 2014

Warn Knit Fashion Sun Knitwear Ltd. ARS Printing Chanmari, Near New Court, Fatullah, Narayanganj 1400, Bangladesh ( N, 90.

Al Islam Textile Ltd.

Echotex Ltd. Chandra, Mouchak, Shafipur, Gazipur, Dhaka ( N, E) 6 February 2014

Tanzila Textile Ltd.

Fakir Knitwears Ltd. Kayempur, Fatullah, Narayanganj-1400, Bangladesh ( N, E) 19 December 2013

Aman Graphics and Design Ltd. Nazimnagar, Hemayetpur, Savar, Dhaka ( E, N) 29 April 2014

Epcot Apparels Ltd Epcot Jeans Ltd Chandana, Joydebpur, Gazipur ( N, E) 11 May 2014

Saasco Tex (BD) Ltd Muksudpur Apparels Ltd Expo Dress Ltd Julfikar Fashions Ltd

ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014

Masco Cottons Ltd. 44, Redwan Complex, Gazipura Bustand, Tongi, Gazipur ( N, E) 25 January 2015

Sonnet Textile Industries Ltd.

Apparel Gallery Ltd.

K.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur ( N, E) 01.July.2014

Structural Safety Inspection

Camlet Fashions Ltd. Simco Fashions Ltd Fine Craft Ltd Ayesha & Galeya Fashions Ltd

Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj ( E, N) 28 June 2014

Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844)

New Era Fashions Mfrs (BD) Ltd

TEMECULA MEDICAL CENTER PRESENTATION OUTLINE

Badhan Knit Fashions Ltd

Natural Sweater Village Ltd

Level 6 Graduate Diploma in Engineering Structural analysis

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014

Amena (Pvt.) Ltd. (9817) Abdul Latif Market, Ahalia,Sector #5,Road #9-C,Uttara ( N, E) 15.June.2014

Amity Design Ltd. House #7&9, Road #9 Block #D, Section #11 Mirpur Dhaka 1216, Bangladesh (23.820N, E) 03.MARCH.2014

EH Textiles Ltd EH Fabrics Ltd

Structural Inspection Report

Purna Fashions Ltd. RH Attire Ltd

CE 3150 Reinforced Concrete Design Design Project

[TECHNICAL REPORT 3] Lateral System Analysis

Shin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar ( N, E) 27.MAY.2014

SENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING

Integrity of Compartmentation in Buildings During a Fire. Tom Lennon 30 th September 2004, BRE, Garston

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

East Lyme Middle School EAST LYME MIDDLE SCHOOL

111 MORGAN ST. Ryan Friis

Elevated Slab Sequence

SEISMIC BEHAVIOUR OF RC BUILDING RESTING ON PLAIN AND SLOPING GROUND WITH BRACINGS AND SHEAR WALL

Structural Redesign Gravity System

Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1)

Kuliarchar Sweater Industries Ltd.

Graphic Textiles Ltd.

Cassiopea Fashions Ltd. Cassiopea Apparels Ltd.

Lateral System Analysis and Confirmation Design

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

IMPRESS FASHION LTD. Dag No. 2224, Matuial, Konapara Katherpool, Jatrabari, Dhaka-1362 ( N, E) 27 August 2015

KDS IDR Ltd. CDA Plot # 15 (P)+16, Mohora I/A, Chandgaon, Chittagong ( N, E) Survey Date: 11 th March 2015

Cork Institute of Technology. Summer 2006 Structural Design & Detailing I (Time: 4 Hours)

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

Thesis Proposal 12/13/06

Technical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R

two structural systems, planning and design Structural Organization Bearing Walls Structural Components

two structural systems, planning and design Structural Organization Structural Components Bearing Walls

fourteen Structural Planning 1 APPLIED ACHITECTURAL STRUCTURES: DR. ANNE NICHOLS SPRING 2019 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631

A/E REVIEW CHECKLIST STRUCTURAL

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

Thesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

Chuck Brooks, P.E., P.Eng. C&S Engineers

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

Best Buy Corporate Building D (4) Richfield, MN

Global Village Rochester Institute of Technology Rochester, New York

Studying a multistory building with different types of bracing

Hilton Baltimore Convention Center Hotel Western Podium

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Christopher McCune Structural Option 2006 Senior Thesis Penn State Architectural Engineering. Eight Tower Bridge Conshohocken, Pennsylvania

Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee, Wisconsin

A.M. Design Ltd. Diakhali, Beron, Jamgara, Ashulia, Bangladesh ( N, E) 3 May 2014

Lateral System Analysis and Confirmation Design November 15, 2004

Addendum 1 Resort Lifestyle Communities- Office Addition

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari December 12 th, 2011

Complete structural arrangements

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION

Temecula Medical Center Temecula, CA

Pro-Con Structural Study of Alternate Floor Systems

Fire Behaviour of Steel and Composite Floor Systems Worked examples

Franklin Square Hospital Center Patient Tower

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012

Stephan Northrop Structural Option Dr. Linda Hanagan. North Shore Equitable Building Pittsburgh, PA Senior Thesis Proposal

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

FDA OC/ORA Office Building

SEISMIC ANALYSIS OF SIX STOREYED RC FRAMED BUILDING WITH BRACING SYSTEMS

SEISMIC ANALYSIS OF SIX STOREYED RC FRAMED BUILDING WITH BRACING SYSTEMS

Technical Report #1. Matthew R Peyton

Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07

Transcription:

1 A-One Polar Ltd Bhulta,Rupgonj,Narayangonj. (23.754782,90545710) 27th April 2014

2 Observations

Observations Knitting & Garments building Building 1 1 3

4 Observations Roof structure: no roof bracing

5 Observations Stability: No roof bracing observed Structure relies on roof deck for transferring horizontal loads to façade walls.

6 Observations Heavy loadings on first floor

1 st floor Heavy loadings on 1 st floor slab Storage ± 3 kn/m 2 7 Observations

Loading plan provided dated 25-03-14 1 st floor Ground floor 8 Observations

9 Observations Observed Aggregate

Brick aggregate was observed in columns at ground floor and in slab 1 st floor Brick aggregate in slab 1 st floor Brick aggregate in column 10 Observations

Discrepancies between structural drawings and as-built situation 11 Observations

Observed area Discrepancies between structural drawings and as-built situation: - Flat slab used instead of beam and slab used in two bays - Grid and column location on ground floor do not match drawings 12 Observations

Observations Printing Shed Building 2 2 13

14 Observations Roof structure: no roof bracing

Stability: No roof bracing observed Structure relies on roof deck for transferring horizontal loads to façade walls. Façade wall Roof deck 15 Observations

Observations Dyeing & Printing Shed, New Shed and Utility Building Buildings 3, 4 and 5 3 4 5 16

17 Observations Roof structure: no roof bracing

Stability: No roof bracing observed Structure relies on roof deck for transferring horizontal loads to façade walls. New shed Dyeing & Printing shed Utility shed 18 Observations

19 Observations Structural drawings do not match as built situation

Discrepancies between structural drawings and as-built situation of New Shed: - Size and layout building do not match the drawings New shed 20 Observations

Observations WTP Building Building 6 6 21

We were informed that as-constructed columns were made larger (collar of concrete cast around original columns) with addition corbels to facilitate higher floor loading. This was to enhance the capacity of the original cast beams and columns. No permit drawing 22 Observations

Observations Canteen Building 7 7 23

24 Observations Roof structure: no roof bracing

Stability: No roof bracing observed Structure relies on roof deck for transferring horizontal loads to façade walls. No permit drawing 25 Observations

Problems Observed 1. Differences between the as constructed and the structural drawings Flat slab in area shown and beam and slab Column sizes differ to as constructed 2. The lack of bracing in the roofs of all the building with reliance on the roof sheeting 3. The lack of drawings for the buildings under construction 26

Item No. Observation Recommended Action Plan Recommended Timeline 1 Differences between the as Building engineer to check, collect information and produce constructed and the structural accurate and complete as-built documentation. drawings 6-weeks 2 Differences between the as Building Engineer to assess what impact these differences constructed and the structural have on the structural integrity of the building. drawings 6-weeks 3 The lack of bracing in the roofs of all the building with reliance on the roof sheeting Building engineer to review lateral stability of steel roof structure. 6-weeks 4 The lack of bracing in the roofs of all the building with reliance on the roof sheeting Building engineer to design any additional structure deemed necessary. 6-weeks 5 The lack of drawings for the Water treatment building under construction Engineer to analysis and design using verified material strengths and as built structural arrangement (E.g. reinforcement grade, concrete compression capacity for the structure prior to any loading of the building 6-weeks 6 The lack of drawings for the Water treatment building under construction Loading of current constructed floor plates not to exceed the above analysis and justified design. 6-months 27