SECTION LIGHTNING PROTECTION SYSTEM

SECTION FACILITY LIGHTNING PROTECTION

Repair Maintenance Hangar Phase II August 2010 SECTION LIGHTNING PROTECTION SYSTEM PART 1 GENERAL

LIGHTNING PROTECTION. 3.6 National Fire Protection Association (NFPA) NFPA 780, Standard for the Installation of Lightning Protection Systems

PURCHASING DEPARTMENT

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications.

Kaf-Tech Product Specification

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

STRUCTURAL STEEL FRAMING

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

A. ANSI A10.32, "Personal Fall Protection Used in Construction and Demolition Operations."

A. Product Data shall be provided for each type of product indicated.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

SECTION METAL PLATE CONNECTED WOOD TRUSSES PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION TIMBER FLOATS

NECA x. Recommended Practice for Installing and Maintaining Lightning Protection Systems. SecondFirst Ballot Draft. August 2017August 2015

SECTION CONCRETE FORMWORK AND ACCESSORIES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Hobby Parking Office HOU/ Proj./ No. 738 Houston, Texas 100% Bid and Construction Documents- Addendum #3, January 27, 2017

DBI-SALA Uni 8 Horizontal Lifeline Cable System

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails.

Session Two: SANS 10313:2010 & IEC Part 2 & 3 Explained

SECTION GROUNDING

SECTION LOW-VOLTAGE TRANSFORMERS

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

[Project Name] Section [ ]

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

SECTION STRUCTURE MOUNT RAILING SYSTEM

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

SECTION METAL DOORS & FRAMES

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

SECTION HORIZONTAL FALL PROTECTION RAIL

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION ENCLOSED BUS ASSEMBLIES

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

When Lightning STRIKES

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION STAINLESS STEEL WALL PANELS

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

A. Section includes busway and fittings including plug-in units.

SECTION GROUNDING AND BONDING

SECTION CHAIN-LINK FENCES AND GATES 02821/1

FreeAxez LLC Page 1 of 8 Low Profile Access Floor System FA-70 / FA INCH / 1.6-INCH LOW-PROFILE ACCESS FLOOR SECTION

A. Pre-engineered, pre-finished extruded aluminum Pavilions.

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

Architectural Roof and Wall Products Guide Specifications

When Lightning STRIKES

SECTION EARTHING AND EARTH FAULT PROTECTION

SECTION GROUNDING AND BONDING

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

SECTION GROUND STORAGE TANK

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

HOTEL SPECIFICATION SECTION 08100

B. Samples for Initial Selection: For each type of impact-resistant wall protection unit indicated.

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.

A. Product Data: For each type of cold-formed steel framing product and accessory.

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION

City of Westerville Guide to Commercial Inspections

SECTION BUSWAYS

L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System

Foundation Specifications

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

WC SERIES SPECIFICATION SECTION ACCESS FLOORING

SECTION ACOUSTICAL PANEL CEILINGS

DIVISION 07 - THERMAL & MOISTURE PROTECTION

DECK CONSTRUCTION REQUIREMENTS

SECTION ENCLOSED BUS ASSEMBLIES

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Architectural Decking panels and Fabrications REVISED 11.

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

A. This Section includes steel cable trays and accessories.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Foundation Specifications

Attachment A Repair Knee Brace on High Arch Salt Building Fayette County, Mill Run Stockpile #24 Project # Building #PA

Attachment A Project Specification Repair of a Salt Dome Building Philadelphia County, Betsy Ross Stockpile # Dome# Project #

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

SECTION. Trellis and Pergola

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System

1. Selective Demolition Section Adhered PVC Roofing System Section Sealants and Caulking Section 07920

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION The specification section is organized by placing information in three standard parts:

Transcription:

Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and occupants by preventing damage to the structure caused by lightning. The design of this system is to be in strict accordance with this section of the specification and all contract drawings that apply. B) The work covered under this section of the specifications consists of furnishing labor, materials and services required for the completion of a functional and unobtrusive lightning protection system approved by the architect and engineer. C) A specialty contractor actively engaged in the installation of certified lightning protection systems. System Description The entire lightning protection system shall be designed and installed in accordance with: A) National Fire Protection Assoc. (NFPA) Document # 780 B) Underwriters Laboratories, Inc. (UL) Standard # 96A C) Lightning Protection Institute (LPI) Standard # 175 Submittals A complete shop drawing shall be submitted to the architect and engineer for approval prior to commencement of the installation. The shop drawing will show the extent of the system layout designed for the structure along with details of the products to be used in the installation. The drawing will include the stamp of the LPI Master Installer responsible for the system design.

Quality Assurance A) The lightning protection contractor shall furnish an LPI Master Installation Certificate or a Limited Scope report upon completion of the installation. B) The system installation shall be made by a contractor that specializes in the installation of lightning protection systems and be under the supervision of an LPI Certified Master Installer or Master Installer Designer. Products: Standard All materials shall comply in weight, size, and composition with the requirements of a nationally recognized testing laboratory. All equipment shall be properly listed and labeled. The system furnished under this specification shall be the standard product of a manufacturer regularly engaged in the production of lightning protection equipment and a member of LPI. Equipment shall be the manufacturer s latest approved design of construction to suit the application where it is to be used in accordance with accepted industry standards and with NFPA, LPI, & UL requirements. Acceptable Manufacturers A/C Security Lightning, LLC (www.aclightningprotection.com) Advanced Lightning Technology, Ltd. (www.altfab.com) East Coast Lightning Equipment, Inc. (www.ecle.biz) FURSE, ABB Ltd. (www.furse.com; www.abb.com) Harger, Inc. (www.harger.com) Independent Protection Company, Inc. (www.ipclp.com) PENTAIR/ERICO (www.erico.com) Preferred Lightning Protection (www.preferredlp.com) Robbins Lightning, Inc. (www.robbinslightning.com) Thompson Lightning Protection, Inc. (www.tlpinc.com) Materials A) Class I materials shall be used for systems on structures not exceeding 75 feet in height and Class II materials shall be used for systems on structures exceeding 75 feet above grade. B) Copper shall be of the grade ordinarily required for commercial electrical

work, generally designated as being 95 percent conductive when annealed. Aluminum conductors shall be of electrical grade aluminum. C) Lightning protection materials shall be coordinated with building construction materials to assure compatibility. Aluminum lightning protection materials shall not be embedded in concrete or masonry, installed on or below copper surfaces, or used where contact with the earth is possible terminating 18 above grade level minimum. Copper lightning protection materials shall not be installed on aluminum surfaces. Copper system components within 2 feet of chimney exhausts shall be tin coated to protect against deterioration. D) Strike termination devices shall be provided to place the entire structure under a zone of protection as defined by the Standards. Air terminals shall project a minimum of 10 inches above protected areas or objects. Air terminals shall be located within 2 feet of exposed corners and roof edges. E) Metallic bodies having a thickness 3/16 or greater may serve as strike termination devices without the addition of air terminals. These bodies shall be made a part of the lightning protection system by connection(s) according to the Standards using main size conductors and bonding fittings with 3 square inches of surface contact area. F) Cable conductors shall provide a two-way path from strike termination devices horizontally and downward to connections with the ground system. Cable conductors shall be free of excessive splices and sharp bends. No bend of a conductor shall form a final included angle of less than 90 degrees nor have a radius of bend less than 8 inches. Structural elements and design features shall be used whenever possible to minimize the visual impact of exposed conductors. G) Cable down conductors may be concealed within the building construction or enclosed within PVC conduit from roof to grade level. Down conductors shall be spaced at intervals averaging not more than 100 feet around the protected perimeter of the structure. In no case shall any structure have fewer than two down conductors. Where down conductors are exposed to environmental hazards at grade level, guards shall be used to protect the conductor to a point 6 feet above grade. H) In the case of structural steel frame construction, cable down conductors may be omitted and roof conductors shall be connected to the structural steel frame at intervals averaging not more than 100 feet around the protected perimeter of the structure.

Execution: I) Exposed cable conductors shall be secured to the structure at intervals not exceeding 3 feet 0 inches. Fasteners, nails, screws, or bolts shall be of suitable configuration for the intended application and of the same material as the conductor or of electrolytically compatible materials. Galvanized or plated steels are not acceptable. J) Connectors and splicers shall be of suitable configuration and type for the intended application and of the same material as the conductors or of electrolytically compatible materials. K) Ground terminations suitable for the soil conditions shall be provided for each downlead conductor. Where the structural steel framework is utilized as main conductors for the system, perimeter columns shall be connected to the grounding system at intervals averaging 60 feet or less on the protected perimeter. For any structure in excess of 60 ft. in vertical elevation above grade, a ground loop interconnecting all ground terminals and other building grounded systems shall be provided. L) Common interconnection of all grounded systems within the building shall be accomplished using main size conductors and fittings. Grounded metal bodies located within the calculated bonding distance as determined by the formulas of the Standards shall be bonded to the system using properly sized bonding conductors. M) Surge suppression shall be provided at every system entrance to the structure to prevent massive lightning overvoltages from entering the structure. Additional surge protection for internal electronic equipment may be determined through cost-benefit analysis by a trained engineer. Standard The installation shall comply with the requirements of NFPA 780, UL 96A, and LPI 175. Acceptable installers The installing contractor company shall be listed with the Lightning Protection Institute. The installation contractor shall have personnel on staff Certified by the LPI as a Master Installer or Master Installer Designer of lightning protection systems. LPI qualified staff shall provide supervision of the installation to the Standards.

Installation A) The installation of the lightning protection system components shall be done in a neat and workmanlike manner. B) Roof penetrations required for down conductors or for connections to structural steel framework shall be made using through-roof assemblies with solid rods and appropriate roof flashings. The roofing contractor shall furnish the methods and materials required at roofing penetrations of the lightning protection components and any additional roofing materials or preparations required by the roofing manufacturer for lightning conductor runs to assure compatibility with the warranty for the roof. (Note: The roofing contractor will be responsible for sealing and flashing all lightning protection roof penetrations as per the roof manufacturer s recommendations. The lightning protection roof penetrations and/or method of conductor attachment should be addressed in the roofing section of the specifications.) C) LPI certification requires a signature by a representative of the owner for two stages of the installation the concealed in-ground system and the exposed or roof level area at completion. LPI certification also requires photo documentation of the in-ground system and concealed portions of the installation. LPI certification requires inspection by their third-party field staff after completion of the installation. Upon completion of the lightning protection installation, the installing contractor shall provide to the owner an as-built drawing of the system, along with copies of the LPI Certificates of completion. D) If the protected structure is an addition to or is attached to an existing structure that does not have a lightning protection system, the contractor shall certify that the system installed complies with the requirements of the Standards, and advise the owner of the lightning protection work required on the existing structure to obtain full certification for the structure. If the existing structure does have a lightning protection system, the contractor shall advise the owner of any additional work required on the existing system to bring it into compliance with current Standards and thus qualify for LPI certification.