Laos Country Report on Environmental Management in the Lao PDR Mining Sector. International Conference A Greater Mekong?

Similar documents
Economic Returns from Conserving Natural Forests in Sekong Province

GOLDEN APPLE SNAIL DAMAGE AND MANAGEMENT PRACTICES IN RICE FAMERS FIELDS IN THE LAO PDR

Pesticide Use in Developing Countries Development Economics Research Group (DECRG) World Bank

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity NATIONAL BIODIVERSITY STRATEGY TO 2020 AND ACTION PLAN TO 2010

Lao People s Democratic Republic

Environmental Performance Assessment in the Greater Mekong Subregion

Lao PDR Country Paper Current Status of Agriculture Mechanization and Marketing

Lao People Democratic Republic

Promoting Cooperation on Ecosystem-based Approaches in the Greater Mekong Subregion (GMS)

Concept of WSM Country Status on Watershed Management Planning Institution and Legislation relevant to WSM in Laos Application of Watershed Management

Poverty reduction strategies On CAFTA, Lao PDR I. Background

Nam Theun 2. TNC workshop April 2014

Energy Policy in Lao PDR

m:..district Agriculture an<lforestry Of.fkes

State of the Environment

Energy and Mining Policies in Laos and National Budget

THE STANDING COMMITTEE OF THE NATIONAL ASSEMBLY DECIDED.

Geographical Location

A full version of the RTEA National Report for Lao PDR can be obtained at

SUMMARY 2013 EDITION

Unofficial Translation. The Prime Ministerial Decree on The Organization and Functionalities of the Ministry of Agriculture and Forestry

WELCOME TO. The First General Meeting Network of Asian River Basin Organisation

COUNTRY REPORT ENVIRONMENTAL IMPACT ASSESSMENT MAY 02 TO JUNE 02 YEAR 2000

Mrs. Singkham KHONGSAVANH Vice Governor, Vientiane Province, Lao PDR

Regional economic and environmental cooperation in Southeast and Northeast Asia

Open Working Group, February 2014: Australia, the Netherlands, United Kingdom Constituency Statement. Oceans and Seas, Forests and Biodiversity

Integrating Pro-poor Development into Biodiversity Strategic Planning: Lessons from the UNEP-UNDP Poverty- Environment Initiative

Decree On theprotection Forest

AGRICULTURAL OVERVIEW

TERMS OF REFERENCE Individual Contractor. Phnom Penh Cambodia and Home Based Expected Place of Travel:

Local Participation on Benefit Sharing of Nam Lik 1-2 Hydropower Project in Lao PDR

Briefing Summary. Board Meeting on Nam Theun 2 Project: November 22, 2010

TRANSBOUNDARY DIALOGUE

Your Excellency Yingluck Shinawatra, Prime Minister of the Kingdom of Thailand. Excellencies, Heads of Delegations, Ladies and Gentlemen,

National context NATIONAL CONTEXT. Agriculture and the Sustainable Development Goals in the Lao PDR

Transboundary Cooperation Workshop # January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management

Economic Change in Lao Agriculture: The Impact of Policy Reform

FISHERIES SECTOR POLICY AND ACTION PLAN BRIEFING

NATIONAL STANDARDS TECHNICAL SPECIFICATION FOR RIVER WORKS IN LAO PDR

Challenges and Opportunities

From Upstream to Downstream:

PROVINCIAL REDD+ ACTION PLAN IN LAM DONG PROVINCE - VIETNAM

FRAMEWORK FOR ECOSYSTEM-BASED ADAPTATION(EBA) AT SUBNATIONAL LEVEL FOR THE GMS- IMPLEMENTATION AND MAINSTREAMING RAJI DHITAL

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES 1

Impact of Global Financial Crisis on Economic Growth in Lao PDR

Thai-Lao Hydro Projects Should Meet International Standards

Current State of Water in Myanmar

Drought Situations and Management in Vietnam

Climate Change Country Profile: Viet Nam

Mr. Khamsavang Sombounkhanh Champasak Agriculture and Forestry College (CHAFC), Champasak Province, Lao PDR.

Monitoring of Infrastructure Impacts on Biodiversity:

Working for Better Water Quality The State of Water Quality Management in WEPA Partner Countries

STATUS, NEEDS AND PRIORITIES FOR SUSTAINABLE SOIL MANAGEMENT IN SIERRA LEONE

Drought conditions and management strategies in Lao PDR.

WWF-LAOS STRATEGY STRATEGY LAOS. Xe Sap National Protected Area Thomas Calame

KLIMOS Environmental Sustainability Profile MOZAMBIQUE

Population, Health and Environment (PHE) Piloting in Nepalese Himalayas: A Lesson for Developing Climate Resilience at Grassroots

ON THE IMPLEMENTATION OF THE WORLD FOOD SUMMIT PLAN OF ACTION UNTIL END 2003

Chapter 10. Lao PDR Country Report. September 2016

Forest Carbon Partnership Facility

The First Mekong River Commission Summit 2010

THE FIRST MEKONG RIVER COMMISSION SUMMIT Hua Hin, Thailand

Hongsa Health Surveillance Start-up and Approaches

Langcan Mekong Cooperation and the Future of the Mekong River Introduction

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness PRIME MINISTER. /QĐ -TTg. Hanoi, dd..mth

CUSO-VSO Lao PDR Strategy Lao People s Democratic Republic. CUSO-VSO Lao PDR Strategy

Result of Analysis on Lao Agricultural Census 2010/11

Indonesia. Landscape Factsheet

10 Project Cost Estimation

3. Present Situation of Environmental Problems

ROLES OF RBOs OR PUBLIC AGENCIES ON WATER RESOURCES MANAGEMENT, WATER ALLOCATION AND RELATED ISSUES IN VIETNAM. Presented by NAM VU PHUONG

VIETNAM ENGAGEMENT IN TRANSBOUNDARY WATER COOPERATION IN MEKONG RIVER BASIN

Addressing the Environmental and Social Challenges Resulting from Large-Scale Agricultural Land Concessions in Cambodia and Lao PDR

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES (ENDANGERED RESERVOIRS) 1

Decree of the Prime Minister on Savan-Seno Special Economic Zone

Considerations on the integrated watershed management in western China. Huang Guangcheng Yunnan Academy of Social Science

Case Presentation: Law for Benefit sharing on hydropower projects in Viet Nam - & - Linking national benefit sharing to Transboundary benefit sharing

Sustainable Development 6 and Ecosystem Services

Asia Dialogue on Community Forest and Property Rights in the Context of Climate Change August 2010 Kathmandu, Nepal

LAO PEOPLE S DEMOCRATIC REPUBLIC REGULATIONS ON THE AUTHORISATION FOR THE OPERATION OF THE IMPORT-EXPORT BUSINESS

Increasing Flood Risk in the Lower Mekong River Region & Direction for Future Adaptation

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity

NAP - GSP SNAP SHOT PRESENTATION ON NATIONAL ADAPTATION PLAN ON CLIMATE CHANGE IN SIERRA LEONE. SIERRA LEONE 15 TH April, 2014

Linking Poverty Reduction with Forest Conservation

10 Facts about Forest Protection

Theme: Rich soils biodiversity leads to Better livelihoods.

Lao PDR Development Report 2010 Natural Resource Management for Sustainable Development

FIP/SC.7/CRP.1 October 31, Meeting of the FIP Sub-Committee Washington, D.C. October 31, 2011 PRESENTATION BY GOVERNMENT OF LAO PDR

Assessment of Economic, Social and Environmental Costs and Benefits of Wood Processing Investments: Case Study in Saravan Province

Clean Development Mechanism CDM

Water Resources CHOIR in China

Technical Report No. 11 ENVIRONMENT

Intercropping with Rubber for Risk Management

PAREDD Participatory Land and Forest Management Project for Reducing Deforestation in Lao PDR

Development Strategy of the Crop Sector 2025 and Vision 2030


Country Analysis Paper. < Lao PDR>

Poverty Profile Executive Summary. Lao People s Democratic Republic

Democratic Republic. Investing in rural people in the Lao People s. Rural poverty in the Lao People s Democratic Republic

Adam Oswell / WWF-Greater Mekong LEAFLET MARCH. WWF-Greater Mekong. WILDLife, landscapes and livelihoods

Transcription:

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Laos Country Report on Environmental Management in the Lao PDR Mining Sector International Conference A Greater Mekong? Poverty, Integration and Development At the University of Sydney, Australia 26-27 September 2007 Prepared by Phonethip Phetsomphou Environment Research Institute Water Resources and Environment Agency

General Information The Lao PDR is a country abundant with natural resources lying in the central Indochina peninsula between 13.54-22.31 degrees north and 100.05-107.42 degrees south. It is a landlocked country with total land area of 236,800 km 2, more than 40% of which consists of stocked forestlands. The Lao PDR border stretches for 416 km in the north with the people Republic of China for 492 km in the south with kingdom of Cambodia, for 1,957 km in the eats with the socialist Republic of Vietnam, and for 1,370 km in the west with the kingdom of Thailand. The country is divided into sixteen provinces, one municipality and one special region. In 2002, it was estimated that the total population of the country was some 5.48 million people or 861,500 households, of which approximately 83% live in rural area. The climate of the Lao PDR is seasonally tropical, with a pronounced wet and dry season. The lowest level of mean annual rainfall are about 1,300 mm in the northwest, while the highest levels are well above 4,000 mm in the southern Annamite range. The majority of the lowland experience between 1,500-2,000 mm of rainfall annually. The prevailing economy of Lao PDR is heavily dependent on natural resources as the country is dominated by subsistence production, with the majority of the population relying on farming and the collection of NTFPs for their basic livelihoods. In 2000, nominal GDP was estimate to be 13,483 billion (IMF 2002). Although per capita GDP increased from US $ 114 in 1985 to US $330 in 2000, the incidence of poverty remains high. Thirty nine percent of the populations are currently thought to be living in poverty and the Lao PDR is ranked 140 out of 174 in UNDP s Human Development Index, making it one of the poorest counties in the Asia region (ADB 2001a-2001b). The Lao government has prepared a number of action plans related to sustainable natural resources management including the National Tropical Forestry Action Plan (1991) and the Environmental Action Plan (1993). A significant number of laws relevant to natural resource management and protection and pollution control have been passed since 1990, e.g. Law on Water and Water Resources (1996), Law on Forestry (1996), The Land Law (1997) and The Environmental Protection Law (1999). Furthermore, Ministry of Industry and Handicraft is in the process of seeking the Peoples' Assembly s approval of a new Law for Industries. There are involved by Science Technology and Environment Agency (STEA) which is the central agency within the Prime Minister's Office, in charge of general environmental policy, systems development and follow-up, while line ministries and specialized agencies in cooperation with STEA manage environmental aspects as well as projects of their own operations. STEA is represented in all of the country's 18 provinces.

Map of Laos

Environmental Management in the Lao PDR Mining Sector Keeping Pace with a Rapidly Growing Industry The Government of the Lao People s Democratic Republic (Lao PDR) is facing significant challenges in addressing environmental issues in the rapidly growing mining sector. In particular, the development of appropriate legislation in conjunction with increased Government of Lao PDR (GoL) capacity for environmental monitoring and assessment is critical to the future sustainable development of Lao PDR natural resources. Status of the Mining Sector In recent years, the mineral sector in Lao PDR has experienced significant growth. Private investment in the mineral sector has increased almost 34% per year over the past five years. At present, the mineral sector comprises 19.5% of the output of the entire Lao PDR industrial sector, and continued growth is expected at a rate of approximately 11% per year during 2006-2010 (MINDECO 2006). There are currently over 200 companies engaged in various activities related to exploration, development and/or mining operations within the country. Of this number, 34 are foreign companies. Two world-class mines are operational for gold and copper, and there are 55 new mines under development. Environmental Issues The environment and natural resources of Lao PDR are being threatened by a number of factors associated with the mining sector, including: Availability of flat land is an increasing issue, with only 8% of total land area suitable for agriculture. The limited available land is under pressure by logging, slash and burn cultivation practices, use of chemicals in agriculture, soil erosion, poor soil quality, and unexploded ordinance (UXO); Extensive areas of primary tropical forest and biodiversity have been under threat from commercial logging, upland erosion and consequent watershed deterioration, and flooding from new hydroelectric reservoirs. Deforestation rates in certain districts were more than 20% over the period 1993-1997; Increased pressure on water resources through increased use for mining activities and hydropower development; Threats to aquatic species due to unsustainable fishing practices, introduction of exotic fish species, weed infestation and pollution; Hazardous chemicals, including heavy metals such as mercury, lead, cadmium, arsenic, chromium, copper, and zinc as well as persistent organic pollutants (POPs) such as dioxins and furans, polychlorinated biphenyls (PCBs), and various pesticides and herbicides; and Potential impacts in downstream countries from improperly managed discharges.

Most of these potential issues are associated with small and medium-scale mining operations (both foreign and domestic). Larger more sophisticated operations tend to have more comprehensive environmental management practices due to external pressures (shareholders, international environmental NGO s, general population in parent country, etc.). Environmental Legislation The GoL has made substantial progress towards developing policies, strategies and legal frameworks to protect the environment and conserve the natural resource base of the country. The principal legal instrument covering environmental matters for the mining industry of Lao PDR is the Environmental Protection Law (EPL) of 1999. The EPL specifies necessary principles, rules and measures for managing, monitoring, restoring and protecting the environment in order to protect the public, natural resources and biodiversity, and to ensure the sustainable socioeconomic development of the nation. However, developing a legal framework and capacity specific to the management and monitoring of the mining sector has lagged behind the development of the industry. Current State of Environmental Consideration and Environmental Management Plans The main administrative authorities for the mining industry in Laos are Water Resources and Environment Agency and Department of Geology and Mining - DGM. The current state of environmental management is described as follows: The relevant laws for the mining industry related on the environment are the Laotian Constitutional Law, Environment Protection Law, Environmental Protection Regulations Environmental Assessment Regulation, Mining Sector, Law on Water and Water Resource, Land Law, Forest Law, etc. These laws and regulations must be reviewed systematically from the viewpoint of the mining industry. Lao environmental standards have not yet been established but some provisional standards are in place and environmental standards used by international organization and advanced mining countries have been adopted as reference compliance standards. The main administrative authority for the mining industry in the Lao PDR is the DGM, now a part of the Ministry of Energy and Mining- MEM. The DGM issue exploration and mining licenses and maintains the environmental protection by providing information and regulations for environmental protection, and also encourages investors to recognize the importance of the environmental. However, legally regulations have not been implemented due to the lack of capacity, knowledge and technology in the organization.

Water Resources and Environment Agency is legally required to implement environmental management and monitoring activities but does not currently implement any environmental monitoring due to budgetary constraints An environmental Compliance Certificate is needed to obtain licenses for exploitation or mining after examination and approval by Water Resources and Environment Agency. Detailed degrees on regulating mining activities have been relaxed so the DGM may conduct its environmental management duties. They will need to be complete fulfilled in the future. No baseline survey has yet been to provide back up data for environmental monitoring What are the Challenges to the GoL? Example: Tailings spill from medium-scale copper mine in northern Lao PDR into surrounding agricultural area. This incident highlighted several general issues that need to be addressed to improve environmental management of the mining sector Limited capacity in the provincial and central government to properly assess the EIA document for project; Limited capacity and resources in provincial governments to properly assess the impact and extent of environmental incidents; Lack of control over foreign investors operating in Lao PDR; Lack of independent monitor of mining sector activities; Lack of legislated penalties for mining infractions; No legislated requirement for land compensation to the local community; and Limited funds available to implement proper independent environmental monitoring programs for the mining sector. These challenges are cross-cutting through other sectors including power generation and infrastructure development. How are the Challenges Being Addressed? GoL Initiatives Development of Third Party Monitoring Unit of STEA to provide independent monitoring of mining operations; Increased linkages between Water Resources and Environment Agency and Department of Mining;

Legislative changes IEMAT Project Funded by the Canadian International Development Agency, the Improved Environmental Monitoring and Assessment Technologies for the Mining Sector Project is building provincial and central Water Resources and Environment Agency capacity for independently developing and implementing proper environmental monitoring programs for mining projects. SEM-2 Project - Since 2001, the Swedish International Development Agency (SIDA) has been supporting capacity building for effective environmental management in Lao PDR through the Strengthening Environment Management (SEM) Project. Phase II of the project (2005-2010) is designed to support Water Resources and Environment Agency in developing environmental management strategies for the year 2020 and the Action Plan 2006-2010.