CATAMARAN TOWER - 1 Seef Area Plot 19, 20

Similar documents
REEF RESIDENCE ON PLOT NO. JVC13JHRA002, JUMEIRAH VILLAGE CIRCLE, DUBAI, UAE.

Reliance House Investors Report. IR11 September 2018

Executive Summary Project Details and Building Progress report

REEF RESIDENCE ON PLOT NO. JVC13JHRA002, JUMEIRAH VILLAGE CIRCLE, DUBAI, UAE.

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

HIDD HEIGHTS PROGRESS REPORT

TERRACE FACTORY - TYPE A1

PATTAYA POSH. A chance to own the best location in North Pattaya. North Pattaya Road, Pattaya, Thailand

B. RESIDENTIAL MASTER PLUMBER $ $ $

The Alcalá Residential Development combines the peace and quiet of a residential area with the convenience of living in the city.

THE TREASURE TOWER PROGRESS REPORT

BUILDING SPECIFICATIONS

Quality specifications for my home

Via Parque Alicante BUILDING SPECIFICATIONS

HIDD HEIGHTS PROGRESS REPORT

PHASE 1A - THE WESTIN LE PARADIS BEACH & GOLF RESORT. Construction Progress Report: Work commence on site:

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

Fundamentals of Building Construction: Materials and Methods

Residencial Las Américas - Edificio California C/ Sierra de Gredos,

NEW MNIR DESIGN INTERNATIONAL OPEN DESIGN COMPETITION COST PLAN ANALYSIS MNIR REDEVELOPMENT ELEMENTAL COST PLAN

Residencial Vila Park - "Viviendas desde *. Plaza y Trastero Incluido" Avda. Mestral s/n,

Stages of building a house

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Location. Therefore this exceptional modern building will ensure Capital Growth Potential.

Manx Accredited Construction Contractors Scheme 2018/19

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules

Trade Licensing Guide Queensland. Use this guide to verify which licensed trade you need for your home improvement job

SIMVEST 22 CC MORIBANA - APARTMENTS - 7 PITTS ST. DUNKELD WEST SCHEDULE OF FINISHES

proposed dwelling fjm homes lot 7 wrinklers drive scamander tasmania 7215 concept design jennifer binns Building Areas

EKATERINI COURT I 48 Kyriacou Matsi Avenue 2409 Egomi, Nicosia,Cyprus. EKATERINI COURT IV, Kantaras Avenue, Strovolos, Nicosia

APPLICATION AND CERTIFICATE FOR PAYMENT

TABLE OF CONTENTS Public Safety Building

ESTIMATE FOR BUILDING WORKS BARONS COURT ROAD

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase

SPECIFICATION AND FINISHING SCHEDULE

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

Technical information 2017

Building Systems and Design Elements included in SliDeRulE

GENERAL SPECIFICATION

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16

SAVANNAH HILLS. DOUBLE STOREY SPECIFICATIONS - TYPE D (N) 186m² & D (S) 191m²

BRIEF DESCRIPTION. "L'HORLOGERIE" Rue de Genève FERNEY VOLTAIRE. COLLECTIVE BUILDING 19 apartments for sale

Division 00 Procurement and Contracting Requirements

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #142 Douthit Hills Student Community, Clemson University Project Tony Greene


NATASA COURT, Kyriacou Matsi Av. & Kykkou Str., Ayios Dometios, Nicosia

Job Cost Summary 11/27/08

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

COMFORT PLUS TECHNICAL SPECIFICATIONS.

PROGRESS JAIPUR PH-II AS ON 20 JULY 2018

NAAHB Workgroup Index General Ledger Account

Price List - All Qualifications

GardenView Residential Development. Class 'C' Construction Cost Estimate (Rev #2)

Townhouse 33. Central Park on Copeland Townhouses

--*6 S CONSTRUCTION GROUP, INC SW 87 Avenue Miami, FL Phone:

Townhouse 3. Central Park on Copeland Townhouses

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

INCLUSIONS & SCHEDULE OF FINISHES

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

RODINNÉ DOMY STODŮLKY. Standards

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

Edificio Puerto Príncipe Pza. de Las Américas,

THE WESTIN LE PARADIS BEACH AND GOLF RESORT

Residential Outline Specifications

LRC HAZMIEH FIRST BASEMENT Date: 26/11/2018. Architecture and ID Works BILL NO. 04: BILL OF QUANTITIES (ID WORKS)

CONSTRUCTION SMARTSCREEN

PRM/KA/RERA/1251/446/PR/171230/002141

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

cjd N02 Canon Hill Crescent - Scope Of Refurbishment Works September 2014 External

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

Customer Specification

LORONG K, TELUK KURAU 4 STOREY STRATA-TITLE APARTMENT WITH LIFT & SWIMMING POOL. At Lorong K, Teluk Kurau, Singapore

WALNUT CREEK - DETAILS OF TECHNICAL SPECIFICATIONS SPECS FOR VASWANI PORTION. 200 mm solid concrete blocks. Reinforced Cement Concrete - Flat Roof

Owner Builder Inspection Report

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

Standard Inclusions for

K.B. Polk Recreation Center Summary

TOWER-1A: TERRACE FLOOR SLAB

160.F1 PROPERTY INSPECTION REPORT 6 Vitoria St, Sebastopol, 3356 INSPECTION DETAILS Registered Practitioners Signature:

BN SENA SPECIALIST HOSPITAL

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

Customer Specification

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #139 Douthit Hills Student Community, Clemson University Project Tony Greene

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS

SCHEDULE OF DEVELOPMENT AMENITIES JANUARY 2016 ANNEXURE 4

Residencial Estoril Camino de los Neveros,

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS

ESSENTIAL TECHNICAL SPECIFICATIONS.

Residencial Center Avda. de la Estación

1. FOUNDATIONS AND STRUCTURE

The 19 th Saudi Int l Building, Construction & Heavy Equipment Exhibition MARCH 2017

architraves. d. Sliding doors to

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

EXCLUSIVE RESIDENTIAL COMPLEX

Customer Specification

Building Excellence IV Capital Levy Projects Under Construction

DALAL FLAT PACK MODULAR UNITS

Transcription:

STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details No 1 Project Name CATAMARAN -1 2 Location Plot 19,20 at Seef 3 Contractors Kooheji Contractors 4 Consultant Aref Sadeq Consultant 5 Interior design IDA interiors 6 Built up area 44,602.00 meter square 7 Start Date March 27,2016 B. Work progress status: 1. Mock up flat in the 5 th floor Completed works 1. Plaster, Tile work and First Coat of Painting is completed 2. MEP works also completed 3. Gypsum work 4. Bathroom shower enclosure sample was fixed 5. Light Fittings (Spotlights is fixed) 6. Vanity (Samples are fixed) 7. Sockets and Switches are fixed 8. Sanitarywares are fixed 9. Joinery works (doors, kitchen, wardrobes sample) STATUS REPORT Page 1

10. Shower Glass Partitions and Mirrors in Bathrooms 11. Kitchen and Appliances 12. Revised samples for kitchens, doors and wardrobes are requested to be fixed for approval. 13. Aluminum Cladding and Glazing Works (preparation is in progress) Balance works 14. Other Fitted and Loose Furniture 15. Wooden Skirting 16. A/C Unit 2. Mock up floor ( 13 th floor) Completed works 1. Bathroom Wall and Floor Tiling Works 2. Wet Area Waterproofing 3. First Fix Electrical, Plumbing & HVAC Works 4. Gypsum Ceiling Framing Works 5. Floor Tiling for Apartments 6. Second Fix Electrical, Plumbing and HVAC Works (above Ceiling and below Floor Tiles) is in progress Balance works 1. Gypsum Ceiling (fixing of Gypsum Boards) is in progress 2. Floor Tiling for Corridors and Lift Lobby 3. Fixing of A/C Units is in progress 3. Completed works: Activity Completed STRUCTURAL Works 1 Substructure 100% 2 1 st to 4 th Floor slab & 4 th Floor Pool Deck 100% 3 6 th to 35 th Floor slab 100% 4 7 th to 26 th Level Block Work 100% 5 5 th to 18 th Floor Plastering 100% 6 19 th to 21 st Floor Plastering 40% 8 5th Level Mock Up Flat 100% 9 6 th to 18 th Floor Wall Painting Preparation 100% STATUS REPORT Page 2

10 3 rd Parking Wall Painting Preparation 90% MEP Works 11 5 th to 23 rd Floor 1 st Fix MEP Works excluding HVAC 100% 12 5 th to 21 st Floor 2 nd Fix MEP Works (above Ceiling) 90% 13 5 th to 7 th Floor Ducting Works for HVAC 50% FINISHING Works 14 13 th Floor Gypsum Ceiling 60% 15 13 th Floor Tiling Works 80% 16 13 th Floor Bathroom Wall & Floor Tiling 100% 17 5 th to 7 th Floor Bathroom Wall & Floor Tiling 50% 4. Work scheduled for next month (October 2017): a. Roof and Upper Roof Level Slab Completion b. 19 th, 20 th, 21 st, 22 nd and 23 rd Floor Wall Plastering Completion c. 27 th, 28 th, 29 th, & 30 th Floor Block Work d. 24 th, 25 th, & 26 th Floor MEP 1 st Fix Completion e. 8 th, 9 th, 10 th, 11 th, 12 th, & 14 th Floor Bathroom Wall and Floor Tiling Completion f. Completion of 13 th Floor Gypsum Ceiling and Floor Tiling g. Fixing of Aluminum Frames for Curtain Wall STATUS REPORT Page 3

C. Progress Photos CITY CENTER VIEW STATUS REPORT Page 4

CITY VIEW STATUS REPORT Page 5

SEA VIEW STATUS REPORT Page 6

CITY VIEW STATUS REPORT Page 7

FIXING OF ALUMINUM FRAMES for CURTAIN WALL 13 th FLOOR (MOCK UP FLOOR) GYPSUM CEILING WORKS STATUS REPORT Page 8

13 th FLOOR (MOCK UP FLOOR) GYPSUM CEILING WORKS STATUS REPORT Page 9

6 th to 9 th FLOOR BATHROOM WALL TILING WORKS STATUS REPORT Page 10

5 th to 8 th FLOOR MEPF WORKS (above Ceiling) STATUS REPORT Page 11

5 th to 8 th FLOOR MEPF WORKS (above Ceiling) 18 th to 22 nd FLOOR FIRST FIX MEPF WORKS (above Ceiling) STATUS REPORT Page 12

5 th to 7 th FLOOR ELECTRICAL WORKS prior to FLOOR TILING 15 th to 18 th FLOOR PAINTING PREPARATION STATUS REPORT Page 13

19 th to 21 st FLOOR PLASTERING WORKS STATUS REPORT Page 14

23 rd to 26 th FLOOR BLOCKWORKS STATUS REPORT Page 15

29 th, 30 th, 31 st, & 32 nd FLOOR COLUMN REINFORCEMENT and FORMWORKS STATUS REPORT Page 16

29 th, 30 th, 31 st, & 32 nd FLOOR SLAB SUPPORT 29 th, 30 th, 31 st, & 32 nd FLOOR SLAB STEEL FIXNG STATUS REPORT Page 17

29 th, 30 th, 31 st, & 32 nd FLOOR SLAB STEEL FIXNG 29 th, 30 th, 31 st, & 32 nd FLOOR SLAB CONCRETING STATUS REPORT Page 18