INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

LEAN FOOD & BEVERAGE (F&B)

Just-In-Time (JIT) Manufacturing. Overview

IT 470a Six Sigma Chapter X

Finished goods available to meet Takt time when variations in customer demand exist.

Lean Manufacturing 1

LEAN GOVERNMENT.

APPLICATION OF LEAN METHODS FOR IMPROVEMENT OF MANUFACTURING PROCESSES

A PM on Lean Production Randel Ltd.

LEAN ELECTRONICS.

OM (Fall 2016) Outline

JIT AND Lean Operations 14-1

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1

"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

PRINCIPLES OF LEAN MANUFACTURING. Purdue Manufacturing Extension Partnership (800)

TYPICAL FACTORY LAYOUT vs THE TOYOTA APPROACH

PLUS VALUE STREAM MAPPING

JIT and Lean Operations. JIT/Lean Operations

Lean Operations. PowerPoint slides by Jeff Heyl. Copyright 2017 Pearson Education, Inc.

INVESTIGATIVE REPORT ON WORKSTATION STABILITY AND CONTINUOUS IMPROVEMENT MAPPING TECHNIQUE TO REDUCE MANUFACTURING WASTE

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

Lean 101: An Introduction

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa. JIT --Intro 02/11/03 page 1 of 28

Learning Objectives. 1. Explain how lean systems improve internal and supply chain operations

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

Flow and Pull Systems

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Lean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6

CHAPTER 1 INTRODUCTION

MAS BEST PRACTICE SKILLS EVENT LEAN AWARENESS WORKSHOP

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004

Chapter 11. In-Time and Lean Production

SCM 302 OPERATIONS MANAGEMENT JIT

LeadingAge Maine & New Hampshire 2014 Annual Conference

Historical Phases of Production

Operational Lean Practices

Five Tips to Achieve a Lean Manufacturing Business

International Journal of Technical Research (IJTR) Vol. 5, Issue 1, Mar-Apr 2016

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

Example Deadly Wastes Canvas based on Pizzeria Toscana

Generic Case Study. Initial Condition. 1. Stability

TPS Basics. What defines worth? Value: The key focus. Delivery. Worth Value= Cost. Functionality: what the product will do Performance Features

IMPQI207Kv1 Principles of continuous improvement techniques (Kaizen) in a food environment

Lean Basics Overview. EMC 2011 Training. NCDENR April Copyright 2010 EMC Corporation. All rights reserved.

Energy Savings through Lean Thinking. Learning to See through Value Stream Mapping

Secrets to Establishing and Sustaining Standard Work and Work Cells in the Histocompatibility Laboratory

November 17, NYS Lean Basics What is Lean & How Does it Work?

GOOD MORNING AND WELCOME

Capital Markets Day. Lean production of the Kokkola zinc smelter. November Harri Natunen. Bildplatshållare. President Boliden Zinc Smelters

Value Stream Mapping Train the Trainer

Session III. LEAN Enterprise and Six Sigma

Development of Lean Enterprise Simulation Tools

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016

Eliminate Waste and. Increase Value

Introduction. Steps to Lean IT. Sample Lean IT Processes

CLASSIFICATION OF PRODUCTION SYSTEMS

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

Operations Management - 5 th Edition

Ashvath Sharma (Correspondence) +

Chapter 13. Lean and Sustainable Supply Chains

Knowing how to identify fake flow develops your eyes for recognizing continuous flow

LEAN MANUFACTUING-CONCEPT, LIMITATION, APPLICATIONS: AN OVERVIEW

Good Afternoon - We are a Core Team in the Stryker Neurovascular Organization. We Develop and Manufacture Precision Devices used for complete Stroke

World Class Manufacturing SMED. Single-Minute Exchange of Die

Process Mapping What It Means for You. FAQs. Desired Results. 5) What are Fastenal s objectives? 1) What is a process mapping?

Value Stream Mapping

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer

Production Scheduling

What is the Goal of 5S?

Just In Time (JIT) Quality and Reliability Engg. (171906) H I T. Hit suyo na mono O Iru toki iru dake Tasukuran

EDMM Cycle Time Definitions and Line Balancing (Yamazumi) Charting

ID Class MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

10 Steps to Reduce Manufacturing Costs

Lean Culture. Creating a Culture for continuous improvement to better serve our Customers

Pull Systems: Overview, Challenges and Success Factors

SALES PROSPECTING KIT

Lean Manufacturing Implementation in Small and Medium Industry

INTRODUCTION. LEAN SHIPBUILDING is the building process of Ships and Offshore Units, ruled and performed by LEAN PRINCIPLES.

Leadership and the Toyota Production System

The Book of Value Stream Maps II

A Lean RACE Model for Continuous Improvement in Four Possible Directions

Operations Management - II Post Graduate Program Session 5. Vinay Kumar Kalakbandi Assistant Professor Operations & Systems Area

This article is on Facility Layout and Types of Layouts. It contains concepts like -

TOPIC 2 : WORK METHODS 2.1 Elemental breakdowns 2.2 Performance rating 2.3 Personal, fatigue, unavoidable delay allowances 2.4 Workload and line balan

Tech 45: Unit 2. Manufacturing Facilities Design Procedures and Analysis Tools

THE RECEIVING REVOLUTION

Applying Lean Principles to Any Process

These tend to be sequential, and offer increasing levels of efficiency to an organisation.

Brad Staats NE Indiana Lean Network. Dec 8, 2016

Transcription:

LEAN PRODUCTION FACILITY LAYOUT www.fourprinciples.com

BACKGROUND The production facility layout is as important as the technology it houses and has a significant impact on business performance. The layout must be modified and improved continuously. Only then can the waste associated with a poor layout be eliminated or reduced. Still, changes to the existing layout are rarely taken into consideration when planning for production improvements. Instead the focus is on processes, materials and people, and the layout is most often out of scope. CHALLENGES There can be many reasons to why the existing production facility layout isn t optimal. The existing facility may impose restrictions on the choice of a good layout, existing layout may not have provisions for future expansion or changes to the product mix, layout planning is entrusted to unqualified persons, poor preventive maintenance results in machine breakdown which further leads to more machines/equipment on the shop floor to keep up with demand, related laws and local restrictions have changed and prevent an optimal layout from a production perspective and so forth. There are many challenges to be faced when improving the production facility layout. For example, improving the production facility layout is often time-consuming and costly. One of the reasons is that it is often complicated to constructively discuss and compare different layout options. The process is often prone to subjectivity due to missing facts and data. It is important to understand that planning for changes to the layout requires specialised skills, experience and understanding of the production process. 1

FOCUS AREAS Waste associated with a poor production facility layout can be identified, classified and minimised as well as creating tremendous savings potential. Lean principles, Kaizen methods, and re-engineering approaches can be applied when physically arranging or rearranging the production facility layout to improve the flow of raw material, through production to shipping. The right Lean Solutions can improve safety and reduce production lead-time. AREAS OF WASTE OFTEN IDENTIFIED IN PRODUCTION FACILITY LAYOUTS: TRANSPORTATION & HANDLING Long distance between workstations, extra handling (e.g. raw material not stored at working height, limited accessibility to work in process), blocked pathways. INVENTORY Making products before they are needed (e.g. batching of products because process steps are not connected or because set-up times are long), having more floor space than required. MOVEMENT Material and tools not stored at point of use, excess walking (e.g. to check, adjust or refill stations on the machine), lack of standards (e.g. looking for items because they do not have a defined place), unnecessary motion because of tools and machines being shared. OVER-PRODUCTION Producing without a demand (e.g. because of no visibility of customer demand, long setup times, attempt to avoid long set-up times, having more floor space than required ). OVER-PROCESSING Unnecessary processing (e.g. using complicated storage systems when simpler ones would be sufficient, creating advanced computer layout models when a simple drawing would be enough). DEFECTS An inefficient layout leads to more transportation, handling and storage of goods which increases the risk of mistakes causing scrap. WAITING Complex layout causing delay in material supply and delivery, long set-up times, poor communication (e.g. due to long distances between workstations). 2

LEAN SOLUTIONS Optimising the production facility layout is a key component to improving the overall production process. Well-designed and optimised production layouts support the production process with appropriate infrastructure and layout. We implement Lean Solutions to production facility layouts in a similar way to other areas. The solutions must fit the challenges. PULL Enable FIFO at the batch level Reduce inventory levels throughout processes Avoid over-production Increase visibility of bottlenecks in the process ONE PIECE FLOW Enable FIFO to a single product / service level Create transparency of the real process lead time Reduce lead time Reduce inventory levels throughout process Increase quality Reorganise the processes in the right sequence TAKT Process transparency Balanced distribution of the workload across resources Process flexibility Ability to plan resource capacity and / or improve forecasting Optimal efficiency in resource utilisation ZERO DEFECTS Enables problem root cause analysis and solving Prevents problems snowballing through the process Increases quality Enables an open culture of problem solving vs. finger pointing 3

TANGIBLE IMPROVEMENTS LEAD TIME Lean capital equipment plant layout reduced manufacturing process lead time by 45% on all three line outputs Optimised cylinder plant layout reduced distance material travels by 30% QUALITY Change in glass manufacturing plant production layout and process reduced first pass failures by 60% COST New plastics packaging plant Lean layout reduced inventory by 60% (worth USD 1,710,000) from old plant s layout s requirements Greenfield industrial equipment production facility Lean layout reduced land needed by 25% Optimised floor space utilisation avoided costs of USD 130,000-1,300,000 annually Lean layout project in food manufacturing plant improved capacity thereby avoiding an investment of USD 6,750,000 in additional machinery 4

Should you be interested to know more about our Lean services regarding this topic, then please contact us: Tel +971 4 368 2124 Email info@fourprinciples.com Dubai, UAE Office Address Dubai Media City Building 8 Office 212 P.O. Box 502621 Dubai, UAE 5