HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES GTEC THERMAL BOARD WITH PLASTERBOARD

Similar documents
HOW TO: BOARD ROOMS WITH HIGH HUMIDITY AND CONDENSATION GTEC MOISTURE AND VAPOUR BOARD WITH PLASTERBOARD

HOW TO: CREATE METAL PARTITIONS WALL LININGS AND CEILINGS GTEC FRAMES

HOW TO: FINISH AND REPAIR INTERNAL WALLS GTEC FINISHING PROFESSIONAL RANGE OF WALL FINISHING AND REPAIR SOLUTIONS

HOW TO: BOARD BATHROOMS, WET ROOMS & SHOWERS

DRYLINING PRODUCT RANGE

PLASTERBOARD PORTFOLIO A complete range for any application

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide

Thermal Laminate Board.

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

GypLyner (walls) Metal framed wall lining system. GypLyner.

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness,

TREAT RISING DAMP AND REDECORATE IN UNDER 24HRS

C07. S04. P02 P10 GypLyner universal

PIR Insulation XT/TL. Insulation for Drylining Walls Fixed with Adhesive Dabs. Walls 04/ /0183

Superior Performance Phenolic Insulation SR/TB. Insulation for Drylining Walls Fixed with Adhesive Dabs. Walls AS LOW AS

Aqua Board WATER RESISTANT BOARD FOR WET AREAS

Specifications for Insulation Board wall and ceiling applications

Refurbishment site guidance for solid-walled houses ground floors

SSS001: Substrate Specification Sheet 1 - Plasterboard Drylining Installation and Finishing

RESILIENT ACOUSTIC STUD

Garage Conversion - Between and Under Joist Applications

C07. S03. P02 P24 DriLyner basic, tl, mf, rf

Independent twin frame high performance acoustic separating wall system

GypLyner (Ceilings) Concealed grid ceiling lining system. GypLyner UNIVERSAL.

PIR Insulation XT/TL-MF. Insulation for Drylining Walls (Mechanically Fixed) Walls 04/ /0183

GypLyner UNIVERSAL (Ceilings)

The Celotex Handy Guide

GypLyner IWL Independent wall lining system

GypWall QUIET Acoustic separating wall system

C08. S04. P02 P08 Tiling

Thermal Laminate Board.

2.2. Jointing Jointing materials. Key facts. Sector Guide

Cavity fire barriers. Cavity fire barriers. Fire separation within concealed spaces. C06 Floors and ceilings

Typical detail: New roof with breathable underlay

Tiling Tiling Finishes C08

C05. S03. P02 P08 FireWall

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

Leaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for

PRICE LIST Metal Profiles Addendum effective 1 March 2017

The extra strong, extra durable, sound resistant system that you can direct fix to

Please Note: PhoneStar was previously branded as Phonewell

K17 Insulated Plasterboard

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

GypWall TM ROBUST 4.4. GypWall ROBUST. Durable impact resistant partition system. Key facts. Sector Guide

Knauf Wall Liner. Head Track. Brackets. Wall Lining Stud. Fixings. Knauf Plasterboard. Floor Track. 98 Wall Liner

The GlasRoc Shaftliner Type X advantage...

Why party wall insulation is required

K17 Insulated Plasterboard

C05. S03. P02 P08 FireWall

Internal walls. Creating perfect living spaces. Technical Advice Centre Tel:

GypLyner UNIVERSAL Metal framed wall lining system

Tiling Tiling

Concrete Soffit Direct Fix

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1

GypLyner UNIVERSAL Metal framed wall lining system

How glass or rock mineral wool works in a wall or floor cavity

Curved partition and wall lining system

Wall lining Inner leaf blockwork. K106 Cavity Board. Flexible sealant STANDARD DETAILS FOR 115 MM INSULATION BOARD IN A 125 MM CAVITY

Staggered stud acoustic partition system

GypWall AUDIO The ultimate cinema wall system

A Handbook of thermal bridging details incorporating aircrete blocks

GypWall QUIET Acoustic separating wall system

The Revolutionary New Plasterboard TIMBER FRAME GUIDE

The Passive Fire Protection Handbook

Cavity Drain Systems.

Limiting (average) Limiting (individual) Extensions (Wall>0.70, Roof>0.25) Extensions (Wall<0.70, Roof<0.25)

SECTION GYPSUM BOARD ASSEMBLIES

HouseWrap Applications System R-Value: R-4.17 Horizontal Heat Flow Only

FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas

Finishes. The visual quality of your finished wall or ceiling is dependent on the quality of workmanship and quality of the materials used.

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

Foirgniochta. Marking Scheme Leaving Certificate Examination, Ordinary Level. Construction Studies

GypWall AUDIO The ultimate sound insulating wall system

MAKING IT STICK: Nails and screws, adhesives and compounds... today contractors have a wide variety of choices.

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

Guidance on U Values from Domestic Heating Design Guide

June Non - Residential Refurbishment Separating floors

A Handbook of thermal bridging details incorporating aircrete blocks

Multi-layer Insulation Blanket for Walls

PRACTICAL TASK MANUAL

Loft Conversions - Attic Walls

Hello Future HYBRID SOLUTIONS AND SYSTEMS. NHBC acceptance

The Celotex Handy Guide

Insulation boards PhoneStar

aquapanel InstallatIon GuIde

Gold Bond BRAND Kal-Kore Plaster Base

SECTION GYPSUM BOARD ASSEMBLIES

Internal Wall and Floor Insulation with Marmox Multiboard

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork

Technical Data Sheet

TECHNICAL GUIDANCE XXXX 2015 EXXON QUESTION ANSWER. page 1 of 9

INSULATION, PLASTERBOARD & BUILDING REGULATIONS

ting Join Jointing Finishes C08

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

Refurbishment site guidance for solid-walled houses windows and doors

Single frame acoustic separating wall system

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

Transcription:

HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES WITH PLASTERBOARD GTEC THERMAL BOARD

1 BUILDING INSULATION THE REGULATIONS Building regulations are in place to drive improvements in thermal efficiency, these regulations apply to new build, renovation or replacement work. England & Wales: Part L Building Regulations Northern Ireland: Technical Standard F1 Scotland: Technical Handbook Domestic, Section 6 (energy) Thermal efficiency within these documents is expressed as a U-value. U-VALUE, WHAT DOES IT MEAN? Put simply, a U-value is the measurement of the rate of heat loss through a material. So in all aspects of home building & renovation customers should strive for the lowest U-values possible, the lower the U-value, the less heat will be unnecessarily lost. The calculation of U-values can be quite complex. It is measured as the amount of heat loss through a 1m 2 of material for every degree difference in temperature either side of the material. However, Siniat are here to help.

2 HOW TO CALCULATE U-VALUES Download our free Siniat Calculator App from the Apple or Android stores or contact one of our Technical Services Team who will help calculate your required U-value for you. WHAT YOU NEED TO TELL US 1. What type of construction is the wall/roof of your project? Or what age is your property? 2. For walls/roofs What is the construction of the wall/roof outside to in? What insulation products are in the wall/roof? Do you know the thermal values of these products? What U-value do you need to meet? 3. Building address (needed for calculating the condensation risk) Siniat Technical Services team can be contacted between 9am 5pm Monday to Friday. 01275 377 789

3 HOW TO SELECT YOUR THERMAL BOARD GTEC THERMAL K BOARD BASIC GOOD BETTER BEST EPS +40% 30 70 mm - 50% thermal improvement over GTEC EPS - Vapour barrier provided as standard - Available in thickness from 30 to 70mm GTEC THERMAL PIR BOARD EPS +40% 37.5 82.5 mm - 40% thermal improvement over GTEC EPS - Vapour barrier provided as standard - Available in thickness from 37.5 to 82.5mm GTEC THERMAL XP BOARD EPS +10% 27 55 mm - Over 10% thermal improvement over GTEC EPS - Available in thickness from 27 to 55mm GTEC THERMAL EPS BOARD S 22 50 mm - Our basic level thermal resistance - Available in thickness from 22 to 50mm

4 Save your client up to 37% on annual heating costs with a thinner profile than PIR board. (Source: GDF Home Energy Assessors. Based on Pre-Victorian stone detached house) Save your client up to 37% on annual heating costs. (Source: GDF Home Energy Assessors. Based on Pre-Victorian stone detached house) Save your client up to 32% on annual heating costs. (Source: GDF Home Energy Assessors. Based on Pre-Victorian stone detached house) Save your client up to 21% on annual heating costs. (Source: GDF Home Energy Assessors. Based on Pre-Victorian stone detached house)

5 CONTROLLING CONDENSATION Adding additional insulation layers to a building to prevent heat loss, helping the environment and lowering heating bills is, of course, a good thing, however there are some challenges. When you apply internal insulation to an external wall, the wall becomes colder. This creates a danger that vapour from inside the home will get trapped behind the insulation, and as it cools it can condense on and inside the wall fabric, in the same way that you get condensation on the surface of single glazed windows. This invisible condensation inside a wall is called interstitial condensation. This condensation can lead to substantial problems of damp, mould and rotting of timber elements. Siniat GTEC Thermal PIR and Thermal K Boards have a metallised vapour barrier provided as standard, the vapour barrier sits between the plasterboard and foam layers. The vapour control layer helps prevent the passage of warm moist air from inside the property from permeating into the wall structure or into the roof space, where it can condense and cause damage.

6 Plasterboard Metallised Vapour Barrier Insulating Foam GTEC PIR Thermal Board GTEC Thermal K Board

7 HOW TO INSTALL USING DOT & DAB METHOD Thermal board can be installed by either Dot & Dab or Dryliner method. The Dot & Dab method should only be used for walls that already include a cavity. Continuous bonding compound ribbon 50mm from top of board Thermal Board to suit required performance Universal Bonding Compound Nailable Plug Continuous dab around socket boxes Cut board to receive socket box Continuous bonding compound ribbon 50mm from base of board Max. spacing of 400mm Check out our Dot & Dab How To Video on our dedicated Siniat UK Channel www.youtube.com/siniatukchannel

8 INSTALLATION 1. Starting from a window, door reveal or internal angle, mark the wall vertically with a chalk line for the row of dabs. 2. Using Siniat Universal Bonding Compound place a continuous ribbon 50mm at the top and bottom of the board. 3. Then place your dabs on the wall making sure that they are 250mm x 75mm in size and at 300mm centres. 4. A maximum spacing of 400mm horizontally should be used. A continuous ribbon should be placed around any plug sockets or light fittings. 5. Press the plasterboard in place against the dabs fitting the board tightly against the ceiling using a wedge or off cut at the base. 6. Tamp the board into place with the floor and ceiling chalk lines using a straight edge. 7. Use two Nailable Plugs to suit board depth, fitted through holes drilled in the board through the dab cavity and penetrating 25mm into masonry. (Tip: Wait until the dabs have set before fitting plugs to avoid moving or bending the board.) 8. Remove wedges when compound has dried (allow 8 hours). Note: Thermal boards must be mechanically fixed for fire safety. 2 GTEC Nailable plugs need to be installed 300mm from the top of the board and 25mm from each edge, penetrating 25mm into the masonry wall.

9 HOW TO INSTALL USING DRYLINER The dryliner method should be used when upgrading an existing solid wall or to create a cavity. Dryliner Track Thermal Board to suit required performance Dryliner Bracket Dryliner Channel Dryliner Track Check out our Covering Uneven Walls How To Video on our dedicated Siniat UK Channel www.youtube.com/siniatukchannel

10 INSTALLATION 1. Fix a dryliner track at 600mm centres to the floor and ceiling using suitable fixings. Allow for required cavity of at least 25mm. 2. If applying direct to concrete make sure that the surface is dry and a damp proof membrane has been used. Ensure that the large flange of the dryliner track is on the plasterboard side. 3. Mark vertical lines at 600mm horizontal centres to fix the dryliner channels. 4. Start at the centre of the wall and position the dryliner brackets directly to the wall at a maximum 800mm vertical centres on the marked lines (at shoulder and waist height). Secure using suitable fixings. Fold out the toothed wings of each bracket to form legs. 5. Cut each dryliner channel 5mm shorter in height from the floor to the ceiling and place into the dryliner track. 6. Ensure channel is plumb and secure to each bracket using a Pan Head Self Tapping screw. 7. If installing kitchen units, install a GTEC fixing channel or timber reinforcement at the height the wall and floor units need to be secured. 8. Cut plasterboard 5mm shorter than the floor to ceiling height. Butt the board firmly against ceiling and fix with GTEC Drywall Self Tapping screws at 300mm centres. Screws must be at least 10mm longer than the board thickness. 9. Butt the plasterboard edges lightly against each other and centre the edges over the channels. NOTE: Cannot be used for cavities over 130mm.

11 HOW TO INSULATE LOFTS AND ROOF SPACES One of the main areas of heat loss is through the roof. This installation guide will demonstrate how Thermal Board can be installed to meet required thermal performance. Installing the board and insulation at the same time using a laminated board is less time consuming and easier than separate installations. INSTALLATION Joists or trusses Check out our How To Videos on our dedicated Siniat UK Channel www.youtube.com/siniatukchannel

12 INSTALLATION 1. Remove any existing plasterboard if present. 2. Install the required thickness of glass mineral wool or solid foam insulation between the rafters, joists or trusses ensuring no gaps. 3. Using the required thickness and type of Thermal Boards fix to the wooden rafters, joists or trusses using Siniat High thread screws, the screws need to be the total thickness of the board plus at least 25mm to penetrate the timber. 4. Screws to be fixed at 150mm centres around the perimeter and cut ends of the boards and 230mm centres in the centre of the boards. Glass Mineral Wool or Solid Foam Insulation Thermal Boards to suit required performance

13 HOW TO FINISH THE BOARDS Taping and Jointing is a simple finishing solution for drylining installations, to reinforce joints, to prevent cracking and ensure fire and sound performances are achieved. It is suitable for large areas of plasterboard where speed and ease of application can greatly reduce installation time and costs versus a skim finish. TRADITIONAL 3 STAGE PROCESS (RECOMMENDED) BEDDING & FILL COAT Tape or bead is bedded into the compound and taper filled out 1 ST FINISH COAT The taper is re-filled with compound where required 2 ND FINISH COAT Final compound layer is applied and sanded for a smooth finish 2 STAGE PROCESS BEDDING & FILL COAT Tape or bead is bedded into the compound and taper filled out 2 ND FINISH COAT Final compound layer is applied and sanded for a smooth finish

14 TAPERED EDGE Bed tape into layer of appropriate jointing compound GTEC Joint Tape GTEC Joint Tape and bedding layer Bedding layer down both edges of tape STAGE 1 Max. 60mm Max. 60mm 300mm approx. Second coat feathered out beyond filling layer Finishing layer feathered out on to plasterboard and sanded once dry STAGE 2 STAGE 3 Tapered edge board provides the best finish by allowing the joint tape to sit below the finished surface Board surfaces to be dry, clean, protected from weather, secure and evenly fixed Square edge plasterboard may also be jointed using the method on the following page

15 SQUARE OR CUT EDGE Bed tape into layer jointing compound GTEC Joint Tape GTEC Joint Tape and bedding layer Bedding layer down both edges of tape STAGE 1 200mm 200mm Second coat feathered out beyond filling layer STAGE 2 400mm Finishing layer feathered out on to plasterboard and sanded once dry STAGE 3 Correct screw fixings to be used with screw heads just below surface of board Gaps over 3mm to be filled with GTEC Joint Filler Xtra or GTEC Easy Finish prior to tape installation

16 INTERNAL CORNER Bed tape into layer of appropriate jointing compound GTEC Joint Tape GTEC Joint Tape and bedding layer STAGE 1 Second coat feathered out beyond filling layer STAGE 2 Finishing layer feathered out on to plasterboard and sanded once dry STAGE 3 Compound to be applied in nominal 1mm layers. Thicker layers will extend drying time GTEC Joint Tape cut to length to be pressed into bedding compound Second coat of jointing compound if required to be applied over dry joint, feathered out 50 60mm beyond the edge of first coat Finishing coat of compound feathered out 50 60mm beyond second coat. Finished, dry joint to be sanded to smooth finish for sealing and decoration

17 EXTERNAL CORNER Bed tape into layer of appropriate jointing compound GTEC Joint Tape Tape and bedding layer Filling layer feathered out Second coat feathered out Finishing layer feathered out on to plasterboard and sanded once dry Square edge joints only: Joint width to be wider to reduce visible crowning. External corners only: GTEC Flex Tape to be applied in place of GTEC Joint Tape as reinforcement.

18 UNIVERSAL SEALER Once the taping and jointing process has been completed, Universal Sealer must be applied to prevent regency striping. This term is used to describe the effect of the paint finish reacting differently on the joints to the surface of the board, if the sealer is not applied the joints may be visible no matter how good the taping and jointing process has been completed. Once dry a paint finish can be applied in the normal manner.

INSULATION TIPS For a step-by-step video guide and installation tips on using metal frame systems and installing thermal boards, check out our Siniat UK YouTube Channel. www.youtube.com/siniatukchannel For help with installation: Contact our Technical Enquiry line on: 01275 377 789 or Visit the new Siniat website at www.siniat.co.uk SINIAT Marsh Lane, Easton-in-Gordano, Bristol, BS20 0NE T +44 (0) 1275 377 773 www.siniat.co.uk Copyright 2016 (Siniat)