SECTION A-A. Control Panel

Similar documents
SECTION A-A. Blower Housing. SaniTEE 818-B. Shutoff Valve. Influent. Settling Zone Volume times daily flow. Treatment Zone.

SECTION A-A SCALE 1 : 45

SECTION A-A. Blower Housing. Settling Zone Volume times daily flow. Treatment Zone. SaniTEE 818-B. Vent. Shutoff Valve.

OWNER S, OPERATIONAL, AND MAINTENANCE MANUAL

DRIP EMITTER SYSTEM STUDY GUIDE

SECTION WASTEWATER TREATMENT SYSTEM (CONTROL PANEL AND INSTRUMENTATION)

SPECIFICATIONS. GAINEY SEWAGE Treatment Plants 2,500 G.P.D.

SUMP / EFFLUENT PUMPS ARE SINGLE PHASE WITH PIGGYBACK FLOAT SWITCH. Max. Flow 44. Max. Head 20. Voltage 115

Pump Tank and Pretreatment Inspection & Troubleshooting. Sara Heger University of Minnesota

Wastewater Systems. By Reza Shams-Khorzani, Ph.D. VP - Bio-Microbics, Inc. 9 th KWEA/KsAWWA Annual Joint Conference August 29, 2017 Wichita, Kansas

WASTEWATER TREATMENT SYSTEM MODEL 600 FEU

1500 Series BAT Media Plants

Owners Manual. 155 Gray Road Falmouth, ME (207) (207) Fax

CLEARSTREAM WASTEWATER SYSTEMS, INC.

DESIGN PACKAGE. COMMONS PARK Twin Falls, Idaho

ABC -N. ABC -N Denitrification Device Installation & Operation Manual FOR USE WITH ABC -N 0.5, 1.0, 1.5, 3.0, 4.5, 9.0 DENITRIFICATION DEVICE

Figure 1. Report of Inspection Process Flowchart.

I. Preconstruction Meeting and Site Preparation Date: Inspector: A. MDE Certified Installer Name

solutions technology available in HDPE with competitive pricing, to produce the cleanest, Featuring our innovative Bio-Film Reactor

TECHNICAL SPECIFICATION

WATER REUSE TREATMENT SYSTEM MODEL R3

EnviroServer Extended Storage Owners Manual

Akiki Engineering Est.

No-Holds-Barred Match: RBC vs. MBR

Procedures for Connecting to Central Sewer System

PRU-D INSTALLATION MANUAL MONO-LEG SYSTEM. PRU-D / Portrait - Revision B July 31 st, 2017 Polar Racking Inc.

PACKAGE TERTIARY FILTER SYSTEM SPECIFICATIONS MODELS TF-2-39-C THROUGH TF-2-53-C

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

On-lot System Component Requirements

Attachment N o F Control & Monitoring

1500 Series BAT Media Plants. owner s manual

SUGGESTED SPECIFICATIONS Pump Frames through 64132

Section [ ] Stormwater Catch Basin Filtration Device

1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 5000 as described below and as shown on the drawings.

1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 4000 as described below and as shown on the drawings.

AQUAROBIC MINI-PLANT TM

SECTION WASTEWATER TREATMENT SYSTEM

CLEARSTREAM WASTEWATER SYSTEMS, INC.

CLEARSTREAM WASTEWATER SYSTEMS, INC. P. O. Box 7568 Beaumont, Texas (409) Fax: (409)

AquaABF Automatic Backwash Filter. Your Water & Wastewater Specialists

The difference in unit processes for a traditional on-lot wastewater treatment system compared to the AdvanTex Treatment System

Norweco distributors are located throughout the United States. and much of the rest of the world. Research, product development,

Section [ ] Stormwater Catch Basin Filtration Device

1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 2000 as described below and as shown on the drawings.

SEPTIC TANK CONSTRUCTION GUIDELINES

ADDENDUM NO.2 REQUEST FOR PROPOSALS FOR CITY OF PALM COAST

INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

engineering MODULAIR BK 2000 the future of water and wastewater treatment comprehensive protection, guaranteed Specify Modulair

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

REUSE QUALITY EFFLUENT FROM RESTAURANT WASTEWATER James Bell 1, Chris Duhamel 2 and Sheryl Ervin 3

Section 10 Design Criteria: Components

Fusion Series Treatment Systems Small Scale Residential & Commercial Treatment Units

The EHS SMART-Treat On Site Wastewater Treatment System Site Location & Installation Manual

Class I Wastewater Treatment Plants

BULWARK BOLLARDS M30 & M50

System Specifications

Omnipac Field-Erected SBR Package Plants. jet tech sbr technology

CHAPTER 12 TRICKLING FILTER PLANTS

WASTEWATER TREATMENT SYSTEM MODEL 960

SPECIFICATIONS - DETAILED PROVISIONS Section Progressing Cavity Pump C O N T E N T S

EVW 2 Hynds Commercial Wastewater Systems April 2013

SHEF40. Performance Data. Wholesale Products Page: Section: Performance Data Dated: April 2002 Supersedes: January 2001

1500 Series BAT Media Plants

System Owner s Manual. PRO FLO WASTEWATER TREATMENT SYSTEMS For All Models: 500, 600, 800, 1000 &1500

tomorrow s environment

INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL

Section [ ] Storm Water Treatment Device

Pump Specifications 450 Series 1/2 hp Submersible Sump Pump

AQUA AIRE Concrete Class I Wastewater Treatment Plants

SERIES G1A, G1B & G1C SLIDE GATES

SECTION PACKAGE BOOSTER PUMP STATIONS

VSS S U B M E R S I B L E S E W A G E P U M P S

BG-PURE Reverse Osmosis Drinking Water System Performance Data Sheet

SECTION SPECIFICATION FOR TERRE KLEEN 05 HYDRODYNAMIC SEPARATOR

Household Sewage Treatment System Factsheet Aeration System- Frequently Asked Questions

Existing System Evaluation Report for Onsite Wastewater Systems

11001 Moving Bed Biofilm Reactor

SETTLING REVIEW CHECKLIST

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System. January 2012 Version

SECTION INFLUENT EQUALIZATION TANK PUMPS

Woodford County Health Department 1831 S. Main Street, Eureka, IL Phone: (309) Fax: (309)

INSTALLATION MANUAL RECTANGULAR COLUMN

Individual Residential Spray Irrigation Systems (IRSIS)

Beacon Hill Water & Sewer District Standard Specifications

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

dynamic combination of electro-mechanical equipment, solid state technology and web-based monitoring that translates to increased property

CFL Series User Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA

Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Point and Non-Point Source Management Harrisburg, PA

Common Septic System Installation Mistakes

.1 All equipment, controls and accessories to be compatible with system design, and matched to the steam boiler(s) by the boiler Manufacturer.

ARCHITECTURAL DESIGN SPECIFICATIONS CRB CRASH BEAM VEHICLE BARRIER. PART I General

SECTION DOWNSTREAM DEFENDER

Aero Tec Models 700 & 750 (115 vac)

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

Complete Grinder Package Offering

Transcription:

SaniTEE 818-B Blower Housing Settling Zone 1050 Gallon MIN 4500 Gallons Control [4000 L MIN] [17000L] Panel 183 MX 72 MX Height of Effluent Line 1. Blower piping to BioBarrier MBR may not exceed 40 FT [12 m] total length and use 4 elbows maximum per train. For distances greater than 40 FT [12 m] - consult factory. Blowers must be located above flood/standing water levels on concrete bases 26" X 20" X2" [65 X 50 X 5cm] minimum. 2. Run vent(s) to desired location above finish grade and cover opening(s) with vent grate(s) w/at least 12 sq in. [77 sq. cm] of total open surface area. Secure with stainless steel screws. Vent piping must not allow excess moisture build up or back pressure. 3. ll appurtenances to BioBarrier (e.g. tank pump outs, etc.) must conform to all country, state, province, and 4. The BioBarrier MBR control systems are provided by Bio- Microbics, Inc. 5. The primary compartments may be a separate tank. 6. The baffle separating the settling and the treatment chambers shall be sealed to the top of the tank, as shown on the drawing. Ventilation for the settling zone shall be provided for in the same manner as a traditional septic tank. 7. ll inspection, viewing, access, and pump out ports must be secured, to prevent accidental or unauthorized access. 8. Tank, anchors, piping, conduit, blower housing pads and vents are provided by others. 9. ll piping and ancillary equipment installed after BioBarrier MBR, must not impede or restrict filtrate pump. 10. BioBarrier MBR assemblies must be secured to the tanks to prevent movement or floatation(see Installation Instructions for details). 11. If less than any of the specified minimums is considered necessary, consult factory for guidance. Maximum Water Level MX MX SECTION - BIO-MICROBICS 2014 lb SIZE DRWING NUMBER MBR 1.5 NME DTE DRWN CTC 11/25/2009 CHECKED PF 5/13/2014 REVISED 5/13/2014 REV. INI-04-I 1 OF 6

B Influent SaniTEE 818-B Settling Zone 1050 Gallon MIN [4000 L MIN] Vent Mixing Device noxic Zone erobic Zone 2250 Gallons 2250 Gallons [8500L] [8500L] Control Panel Maximum Water Level Blower Housing 1. Blower piping to BioBarrier MBR may not exceed 40 FT [12 m] total length and use 4 elbows maximum per train. For distances greater than 40 FT [12 m] - consult factory. B Blowers must be located above flood/standing water levels on concrete bases 26" X 20" X2" [65 X 50 X 5cm] minimum. 2. Run vent(s) to desired location above finish grade and cover opening(s) with vent grate(s) w/at least 12 sq in. [77 sq. cm] of total open surface area. Secure with stainless steel screws. Vent piping must not allow excess moisture build up or back pressure. 3. ll appurtenances to BioBarrier (e.g. tank pump outs, etc.) must conform to all country, state, province, and 4. The BioBarrier MBR control systems are provided by Bio- Microbics, Inc. 5. The primary compartments may be a separate tank. 6. The baffle separating the settling and the treatment chambers shall be sealed to the top of the tank, as shown on the drawing. Ventilation for the settling zone shall be provided for in the same manner as a traditional septic tank. 7. ll inspection, viewing, access, and pump out ports must be secured, to prevent accidental or unauthorized access. 8. Tank, anchors, piping, conduit, blower housing pads and vents are provided by others. 9. ll piping and ancillary equipment installed after BioBarrier MBR, must not impede or restrict filtrate pump. 10. BioBarrier MBR assemblies must be secured to the tanks to prevent movement or floatation(see Installation Instructions for details). 11. If less than any of the specified minimums is considered necessary, consult factory for guidance. 12. For enhanced nitrogen removal. noxic Zone 183 MX 72 MX Height of Baffle wall should evenly distribute the volume in the between the anoxic and aerobic zone. Mixing device is required. Effluent Line SECTION B-B BIO-MICROBICS 2014 DRWN CTC 11/25/2009 NME DTE MBR 1.5-N 2 OF 6 CHECKED PF 5/13/2014 REVISED 5/13/2014 REV. INI-04-C

C 20 8 Maximum Water Level 142 MIN 56 MIN C SECTION C-C Settling Zone 1050 Gallon MIN [4000 L MIN] 4500 Gallons [17000L] 102 MIN 40 MIN MBR ccess 2. 3. 4. 5. 6. 7. 8. 9. ll appurtenances to BioBarrier (e.g. tank pump outs, 1. etc.) must conform to all country, state, province, and The primary compartment may be a separate tank. The baffle separating the settling and treatment chambers shall extend to the top of the tank locating discharge port above the Maximum water level as shown on the drawing. Ventilation for the settling zone shall be provided through a house vent line or a vent in the tank itself. ll inspection, viewing, access, and pump out ports must be secured, to prevent accidental or unauthorized access. Tank, anchors, piping, conduit, blower concrete base and vents are provided by others. ll piping and ancillary equipment installed after BioBarrier, must not impede or restrict free flow of effluent. BioBarrier module must be secured to the tank to prevent movement or floatation (See installation manual). Min Volume is determined based on the frequency of sludge wasting. For a reduced pump out schedule, tank volume should be increased, consult factory for guidance. If less than any of the specified minimums is considered necessary, consult factory for guidance. 46 18 SaniTEE ccess NME DTE BIO-MICROBICS 2014 DRWN CTC 11/25/2009 NME DTE Tank Details 3 OF 6 CHECKED PF 5/13/2014 REVISED 5/13/2014 REV. INI-04-N

D E 20 8 Maximum Water Level 142 MIN 56 MIN Settling Zone 1050 Gallon MIN [4000 L MIN] D noxic Zone erobic Zone 2250 Gallons 2250 Gallons [8500L] [8500L] E 102 MIN 40 MIN MBR ccess SECTION D-D SCLE 1 : 55 30 12 46 MIN 18 MIN SaniTEE ccess 30 MIN 12 MIN Mixing Pump ccess 15 6 66 26 1. ll appurtenances to BioBarrier (e.g. tank pump outs, etc.) must conform to all country, state, province, and 2. The primary compartment may be a separate tank. 3. The baffle separating the settling and treatment chambers shall extend to the top of the tank locating discharge port above the Maximum water level as shown on the drawing. Ventilation for the settling zone shall be provided through a house vent line or a vent in the tank itself. 4. ll inspection, viewing, access, and pump out ports must be secured, to prevent accidental or unauthorized access. 5. Tank, anchors, piping, conduit, blower concrete base and vents are provided by others. 6. ll piping and ancillary equipment installed after BioBarrier, must not impede or restrict free flow of effluent. 7. BioBarrier module must be secured to the tank to prevent movement or floatation (See installation manual). 8. Min Volume is determined based on the frequency of sludge wasting. For a reduced pump out schedule, tank volume should be increased, consult factory for guidance. 9. If less than any of the specified minimums is considered necessary, consult factory for guidance. 10. For enhanced nitrogen removal. noxic Zone Baffle wall should evenly distribute the volume in the between the anoxic and aerobic zone. Mixing device is required. 11 5 66 26 BIO-MICROBICS 2014 DRWN CTC 11/25/2009 30 12 SECTION E-E NME DTE Tank Details -N 4 OF 6 CHECKED PF 5/13/2014 REVISED 5/13/2014 REV. INI-04-N

LIXOR independent float stand supplied by others 23 9 F 23 9 Supplemental ir see note 4,5, & 6 Maximum Water Level Operating Water Level Submersible Filtrate Pump Notes: 1. Filtrate Pump must be secured in a dry vault and not be exposed to freezing temperatures. 2. Float stand should be located away from the MBR modules within the treatment zone to prevent float chatter. 3. Utilize SS lifting cable to remove the MBR module. 4. Supplemental aeration with LIXOR will be required for wastewater with higher than 300mg/L BOD. 5. See LIXOR Drawings for more details. 6. Provide additional ventilation as required per LIXOR specifications. NME DTE BIO-MICROBICS 2014 DRWN CTC 11/25/2009 NME DTE MBR Details 5 OF 6 CHECKED PF 5/13/2014 REVISED 5/13/2014 REV. INI-04-I

Specifications for BioBarrier MBR 1.5 Wastewater Treatment System 1. GENERL The contractor shall furnish and install (1) BioBarrier MBR 1.5 treatment system as manufactured by Bio-Microbics, Inc. The treatment system shall be complete with all needed equipment as shown on the drawings and specified herein. The principal items of equipment supplied by Bio-Microbics, Inc. shall include three (3) BioBarrier MBR assemblies, all controls, filtrate pumps, air blower assemblies, mixing device if applicable and a SaniTEE 818-B pre-screen device. The BioBarrier 1.50 unit shall be situated within a 4500 Gallon [17,000 L] minimum single compartment tank or in a 5550 gallon [21,000L] minimum multiple compartment tank with or without the optional mixing device. Suggested maximum settling zone is (1) X the daily flow. Tank(s) must provide adequate pump out access and conform to local, state, and all other applicable codes. The contractor shall provide coordination with the tank supplier with regards to fabrication of the tank, installation of the BioBarrier unit and delivery to the job site. 2. OPERTING CONDITIONS The BioBarrier MBR 1.5 treatment system shall be capable of treating up to 1,500 gpd wastewater from all facilities producing appropriate waste to develop and sustain a viable biomass. Waste containing inhibitory substances for the biological processes or membrane filtration operation is not recommended for treatment in the BioBarrier MBR system. Consult factory for proper sizing and usage. 3. MEMBRNE The membrane is a combination of ultrafiltration and microfiltration using PVdF and PES cast material. The membrane sheet is supported by HDPE or BS and laser welded to the plate. The BioBarrier MBR membrane module shall consist of flat sheet membranes arranged in a cartridge which is aerated via subhousing air grid. The BioBarrier MBR membrane assembly shall be fixed in position and shall use non corrosive parts. The membrane system shall be designed and installed to ensure that adequate turbulence is provided by the aeration system to insure easy movement of MLSS within the membrane system. 4. BLOWER The BioBarrier MBR 1.5 system shall come equipped with a one (1) blower capable of delivering 20-60 CFM [30-93 m3/hr]. The blower assembly shall include an inlet filter with metal filter element. Blowers shall be mounted, up to 40 feet [12 meters] maximum, from the BioBarrier MBR assembly on a contractor supplied concrete base. Blowers must not set in standing water and their elevation must be higher than the normal flood level. two-piece, rectangular housing shall be provided. The discharge air line from each blower to the BioBarrier MBR assembly shall be provided and installed by the contractor. 5. SUBMERSIBLE FILTRTE PUMP The submersible pump must be secured to the MBR housing to prevent damage to the treatment system. The discharge line must not exceed four feet above the pump during operations. The installation downstream of the Bio-Microibcs supplied effluent line must not create any backpressure on the pump. The submersible pump is not intended as dosing pump for final disposal of the effluent. 6. ELECTRICL The electrical source should be within 150 feet [45.7 meters] of the blower consult local codes for longer wiring distances. ll wiring must conform to all applicable codes (IEC, NEC, etc.). Wiring distances must prevent significant voltage loss. Input power on 60Hz electrical system is 110/220 VC, single phase, 15/20 mps. Input power on 50Hz electrical systems 127/230 VC, single phase 15/20 mps. ll conduit and wiring shall be supplied by contractor. 7. CONTROLS The BioBarrier MBR 1.5 system shall come equipped with one (1) control panel. The control panel provides power to the blower, the filtrate pump, the optional mixing device, and the water level floats with visual and audible alarms capable of signaling blower circuit failure and high water conditions. The control panel is equipped with SFR (Sequencing Fixed Reactor) timed control feature. manual silence button is included. 8. INSTLLTION ND OPERTING INSTRUCTIONS ll installation and connections work of the BioBarrier MBR 1.5 shall be done in accordance with the written instructions provided by the manufacturer and in accordance with all applicable local codes and regulations. Operations manuals shall be furnished which will include a description of installation, operation, and system maintenance procedures. 9. FLOW ND DOSING BioBarrier MBR systems have been successfully designed, tested and certified receiving gravity, demand-based influent flow. When influent flow is controlled by pump or other means to help with highly variable flow conditions, then multiple dosing events should be used to help ensure even flow. 10.WRRNTY Bio-Microbics, Inc. warrants all new residential BioBarrier models (BioBarrier 0.50, 1.0, and 1.5) against defects in materials and workmanship for a period of two years after installation or three years from date of shipment which ever occurs first, subject to the following terms and conditions, (all other BioBarrier system models are warranted for a period of one year after installation or eighteen months from date of shipment, whichever occurs first, subject to the following terms and conditions): During the warranty period, if any part is defective or fails to perform as specified when operating at design conditions, and if the equipment has been installed and is being operated and maintained in accordance with the written instructions provided by Bio-Microbics, Inc., Bio-Microbics, Inc. will repair or replace at its discretion such defective parts free of charge. Defective parts must be returned by owner to Bio-Microbics, Inc. s factory postage paid, if so requested. The cost of labor and all other expenses resulting from replacement of the defective parts and from installation of parts furnished under this warranty and regular maintenance items such as filters or bulbs shall be borne by the owner. This warranty does not cover general system misuse, aerator components which have been damaged by flooding or any components that have been disassembled by unauthorized persons, improperly installed or damaged due to altered or improper wiring or overload protection. This warranty applies only to the treatment plant and does not include any of the structure wiring, plumbing, drainage, septic tank or disposal system. Bio-Microbics, Inc. is reserves the right to revise, change or modify the construction and/or design of the BioBarrier system, or any component part or parts thereof, without incurring any obligation to make such changes or modifications in present equipment. Bio-Microbics, Inc. is not responsible for consequential or incidental damages of any nature resulting from such things as, but not limited to, defect in design, material, or workmanship, or delays in delivery, replacements or repairs. THIS WRRNTY IS IN LIEU OF LL OTHER WRRNTIES EXPRESS OR IMPLIED. BIO-MICROBICS SPECIFICLLY DISCLIMS NY IMPLIED WRRNTY OF MERCHNTBILITY OR FITNESS FOR PRTICULR PURPOSE. NO REPRESENTTIVE OR PERSON IS UTHORIZED TO GIVE NY OTHER WRRNTY OR TO SSUME FOR BIO-MICROBICS, INC., NY OTHER LIBILITY IN CONNECTION WITH THE SLE OF ITS PRODUCTS. Contact your local distributor for parts and service. BIO-MICROBICS 2014 DRWN 11/25/2009 NME DTE Specifications 6 OF 6 CHECKED PF 5/13/2014 REVISED 5/13/2014 REV.