DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

COMPLIANCE STATUS REPORT

J-11011/45/2009- IA II (I)

Environmental Clearance Compliance Half Yearly Report

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

FORM V :ENVIRONMENT STATEMENT RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT VISAKHAPATNAM

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Environment protection measures / technology

Calcom Cement India Limited

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

Janki Corp. Ltd., Six Monthly Compliance Report

Environmental Clearance Compliance Half Yearly Report

Cement Manufacturing Company Ltd. Page 1

Hind Energy & Coal Beneficiation (India) Ltd.

Environmental Clearance Compliance Half Yearly Report

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

HALF YEARLY COMPLIANCE REPORT 14 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA)

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

ENVIRONMENTAL STATEMENT FOR THE YEAR

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

Environmental Clearance Compliance Half Yearly Report

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

Hind Energy & Coal Beneficiation (India) Ltd.

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

Environmental Clearance Compliance Half Yearly Report

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

A. SPECIFIC CONDITION COMPLIANCE

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

BHUSHAN STEEL LIMITED

Rajasthan State Pollution Control Board

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

BHUSHAN STEEL LIMITED

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Telefax: 011: Dated:10 th May, 2013

Environmental Clearance Compliance Half Yearly Report

NMDC Iron and Steel Plant, Nagarnar, Dist-Bastar, (C.G.) Six Monthly Progress Report

Mangalam Cement Ltd. (Unit-II) Stack No.

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra

Mars Power & Steel Ltd.

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

My Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State

Accord Energy Corporation India Pvt. Ltd.

SAIL BOKARO STEEL PLANT ENVIRONMENT CONTROL DEPARTMENT

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project

Mangalam Cement Ltd.(Unit I)

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

My Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State

F. No. J-11011/28/2007- IA II (I)

Mill Expansion Cum Augmentation Project Compliance

Steel Authority of India Limited Durgapur Steel Plant Environment Control Department

; Fax No. :

SAIL BOKARO STEEL PLANT ENVIRONMENT CONTROL DEPARTMENT

The below is a detailed evaluation of the EIA report, based on a community request from Ekta Parishad, a local NGO in Chhattisgarh.

MIEL/NP/EMD/ 303/2015 Date:

COMPLIANCE TO EC CONDITIONS [1x 67.5 MW (UNIT # I)]

Telefax: 011: Dated: 8 th March, 2013

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS

Expression of Interest

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

Simran Industries Pvt. Ltd.

Expression of Interest

S No. Compliance Compliance Status A. Specific Conditions:

Rajasthan State Pollution Control Board

RASHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM STEEL PLANT, VISAKHAPATNAM

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

ENVIRONMENT STATEMENT FOR THE FINANCIAL YEAR ENDING 31 ST MARCH 2014.

. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~" 1tS8;0 b AiS77..c,b

(Period April 2017 ~ Sept. 2017)

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

2 x 300 MW (STAGE-I)

Bhushan Steel Limited 1. Name & Address of the owner/occupier of the industry, operation or process

M/s Balasore Alloys Ltd

FORM-V (See Rule - 14) Part-A

Environmental Policy Statement:

Mangalam Cement Ltd.

PRE-FEASIBILITY REPORT

Date: M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaranji, Kolhapur.

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)

Scanned by CamScanner

INSPIRE INDUSTRIES PVT. LTD.

Transcription:

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Half yearly Environment Compliance Report in respect of stipulated conditions while issuing Environmental Clearance Rashtriya Ispat Nigam Limited - Visakhapatnam Steel Plant (RINL-VSP), a Navratna PSE, is the country s first shore based integrated steel plant. The company is 100% owned by GoI. The plant is a 3 Million ton Integrated Steel Plant being expanded to 6.3 Million tons and is a market leader in long products For submission to Ministry of Environment and Forests Central Pollution Control Board & Andhra Pradesh Pollution Control Board Period : October 13 To March 14 First Integrated Steel Plant to be certified for Quality, Health & Safety, Environment & Energy ISO 9001, OHSAS 18001, ISO 14001 & ISO 50001 First Steel plant in India to be certified for CMMI Level 3 for Information Technology Address for correspondence: Environment Management Department Visakhapatnam Steel Plant Rastriya Ispat Nigam Ltd.-530032 Phone: 0891-2518002 Fax: 0891-2518631 E-mail: environment@vizagsteel.com

COMPLIANCE REPORT ON IMPLEMENTATION OF CONDITIONS LAID DOWN BY THE DEPARTMENT OF ENVIRONMENT WHILE ACCORDING CLEARANCE TO VSP AS PER DEPARTMENT OF ENVIRONMENT LETTER NO. 11011/1/87-IA I. a) ENVIRONMENT MANAGEMENT PLAN (EMP) MUST BE PREPARED WHICH AMONG OTHERS, SHOULD CONTAIN RESULTS OF AIR AND WATER QUALITY MONITORING TO BE DONE IN THE PROJECT AREA. Environment management plan which contains results of air and water quality monitoring along with the other details was provided and submitted. Besides, half-yearly reports are being submitted with the results, regularly. b) CONTINUOUS MONITORING OF AIR AND WATER QUALITY MUST BE INITIATED IMME- DIATELY. WATER TO BE MONITORED MUST INCLUDE BOTH MARINE AND INLAND WA- TERS. Monitoring of air & water quality including marine water is being done regularly. Results of Ambient air, effluents, stack emissions, fugitive emissions from coke oven batteries, etc are enclosed at Annexure I to V respectively. c) MINIMUM THREE AMBIENT AIR MONITORING STATIONS MUST BE INSTALLED. 3 nos (three) continuous ambient air quality monitoring stations within the plant premises and 4th station at Pedagantyada residential area (down wind direction of the plant) have been installed. d) AN AIR MONITORING STATION IN THE ZOOLOGICAL PARK IN THE NORTH EAST MUST BE INSTALLED. An ambient air monitoring station (Respirable dust sampler) is installed in the zoo park and monitoring being done regularly. 2 of 18

e. TWO MONITORING STATIONS - ONE FOR AIR AND OTHER FOR WATER MUST BE SET UP AT KONDAKARLA LAKE TOWARDS THE SOUTH OF VISAKHAPATNAM. Monitoring of Air quality (Ref. Annexure-I) and Water Quality (Refer Annexure-V) at Kondakarla Lake towards South of VSP is being carried out regularly.. II. THE PROJECT AUTHORITIES (VSP) MUST CONSIDER USING LOW SULPHUR GAS/OIL. IF SUCH USE IS NOT POSSIBLE, APPROPRIATE FLUE GAS DESULPHURISATION DEVICES MUST BE INSTALLED AT THE RELEVANT UNIT. VSP is using low sulphur fuels and composition of these fuels has been submitted earlier. The power plant of VSP is using Talcher coal which has sulphur content of 0.17%. The Calcining & Refractory Material Plant of VSP is using coal tar fuel (A by-product of Coke oven & Coal Chemical Dept.) with sulphur content of 0.5%. III. VSP AUTHORITIES MUST RECYCLE EFFLUENTS TO THE EXTENT POSSIBLE. IN ANY CASE, THE TREATED EFFLUENTS MUST BE USED FOR IRRIGATION OF AFFORESTED AREA. Township sewage water is being used as makeup water in Rolling mills & SMS (250 m3/hr) after treatment in Ultra-filtration plant since Dec 2005. Near Zero Water Discharge Scheme under implementation incurring an expenditure of Rs 115 cr and it is at various stages of completion. As part of this scheme Appikonda Waste Water Treatment Plant using RO system is commissioned. Also Balachervu Waste Water Treatment Plant is commissioned and put in use. Water savings from these schemes is as given here:. Appikonda Waste Water Treatment Plant Showing RO skids as inset 3 of 18

V. VSP AUTHORITIES MUST RELOCATE SLUDGE/DEBRIS DUMP, THE ASH POND, THE LA- BOR AND STAFF COLONY SHOWN IN THE SOUTH WEST CORNER AWAY FROM THE SEA SHORE. REVISED PLAN IN THIS REGARD MUST BE SUBMITTED TO THIS MINISTRY FOR APPROVAL. New slag dump yard area has already been constructed away from sea-shore as per the advice of Prof. Dave and Department of Environment. Revised plan was submitted vide letter no. 869/DE dt.30.7.88. VI. PRESENT AND FUTURE LINKAGE FOR COAL MUST BE ESTABLISHED AND REPORTED TO THE MINISTRY. The coal linkage for VSP is as follows. 1. Steam coal is from collieries of Talcher & Ib Valley of M/s Mahanadi Coal Fields 2. Coking coal is imported from Australia, New Zealand and USA etc., through Gangavaram Port limited. 3. Medium coking coal is from washeries -Rajarappa, Swang and Kathara of M/s Central Coal fields VII. a) VSP AUTHORITIES MUST PROVIDE A GREEN BELT OF 3600 HECTARES. b) ABOVE GREEN BELT WILL INCLUDE 500 M WIDE GREEN BELT ON THE BOUNDARY OF THE ACQUIRED LAND. The status is as given below: Total acquired land = 8,827 Hectares Area earmarked for Afforestation = 3,600 Hectares Area of Green Belt (500 mt. wide) = 1,970 Hectares Layout showing Afforestation at Vizag Steel 4 of 18

Afforestation done in green belt = 1801 Hectares Afforestation done in areas other than green belt = 1630 Hectares Total No. of trees planted = over 50.10 lakh trees Balance to be afforested is 169 Ha. Out of this, 135 Ha has been handed over to Govt. of AP for construction of Gangavaram port. The balance area of 34 Hectares will be taken up in future after resolving the land dispute by the State government. During the period from Oct 13 to Mar 14around 2,05,000 saplings were planted. c) OUT OF THE TOTAL GREEN BELT, 1970 HECTARES MUST BE DECLARED AS RE- SERVE FOREST UNDER THE CONTROL OF VSP AND GOVERNED BY THE FOREST (CONSERVATION) ACT 1980, THE BALANCE 1630 HECTARES MUST NOT BE USED FOR ANY OTHER PURPOSE EXCEPTING FOR FURTHER EXPANSION OF THE PLANT. Earlier, the proposal to notify the green belt as a "Reserve Forest" under the control of VSP was not agreed to by the Divisional Forest Officer, Visakhapatnam on the ground that such notification would be preceded by handing over the land to State Forest Department by VSP. Subsequently, the Chief Conservator of Forests, Vide his letter No: EP/1201/30/AD/Vol-5 dt.7.11.97 has clarified that such a declaration is feasible. In this regard Principle Chief Conservator of forests wrote a letter to Principal Secretary to the Govt. of AP vide RC No. 52548/97/51 dated. 12.4.2004. VSP requested the Principle Chief Conservator of forests vide letter no. TA/ aff-22/2004/539 dated 8.06.04 to expedite the matter. Park at Coke Ovens Battery 4 5 of 18

. d) 2809 HECTARES OF SALT LANDS MUST BE AFFORESTED WITH APPROPRIATE FLORAL SPECIES. THIS AREA WILL BE REGARDED AS PERMANENT RESERVE FOREST UNDER THE CONTROL OF VSP AND WILL BE GOVERNED BY THE FOREST (CONSERVATION) ACT, 1980. It was brought to the notice of Secretary (E&F) vide letter No.CMD -3(6)36/78,dated 9th April,1993 that the area of salt land is 160 Ha. For afforestation of 160 hectares of salt lands (saline area) Central Salt and Marine Chemical Research Institute (CSMCRI) Bhavnagar, have already completed plantation of Salvadora plants in 25 Ha as a pilot project. The balance 135 Ha has been handed over to Govt. of Andhra Pradesh for construction of GangavaramPort. 3 Leaves awarded to VSP by Centre for Science and Environment, New Delhi - as part of the Green Rating Project of the Indian Steel Industry 6 of 18

COMPLIANCE REPORT ON IMPLEMENTATION OF CONDITIONS LAID DOWN BY DEPARTMENT OF ENVIRONMENT (DOEN) WHILE ACCORDING CLEAR- ANCE TO VISAKHAPATANM STEEL PLANT. According to environmental clearance given to Visakhapatnam Steel Plant's revised cost estimate vide letter No: 11011/75/90-IA - II section, dated 3.5.1993 the present status of conditions are as follows: 1. THE EFFICIENCY/PERFORMANCE OF 2 DEDUSTING SYSTEMS WILL BE AUGMENTED TO COMPLY WITH THE STANDARDS BY DEC'93. The DE Systems are augmented and are working satisfactorily since December, 1993 after effecting necessary modifications. 2. LIQUID EFFLUENTS FOR AMMONICAL NITROGEN AND PHENOLS WILL BE TREATED TO MEET THE STANDARDS BY DEC'93. Mechanical, Biological and Chemical Treatment Plant at Coke Ovens is upgraded at cost of Rs 46 Crores. All parameters such as Amm.N2, phenols, O&G, COD etc of the effluent are within norms Upgraded Mechanical Biological & Chemical Treatment Plant at Coke Ovens 7 of 18

3. WATER CONSUMPTION SHOULD BE BROUGHT DOWN FROM 39.05 cum/ tonne of liquid steel (tls) to 20 cum/tls. ACTION TAKEN AND THE TIME FRAME REQUIRED TO IMPLEMENT THE ABOVE SHOULD BE INDICATED BY VSP WITHIN A PERIOD OF 3 MONTHS. Complied. The present specific water consumption (2013-14) is 2.19 cum/tonne of liquid steel. 8 of 18

COMPLIANCE REPORT ON IMPLEMENTATION OF CONDITIONS LAID DOWN BY THE MINISTRY OF ENVIRONMENT & FORESTS WHILE AC- CORDING CLEARANCE FOR EXPANSION OF RINL / VISAKHAPATNAM STEEL PLANT FROM 4 TO 6.5 MTPA AS PER MoEF EC No. J-11011/196/2005 IA II (i) DATED 11.08.2005 A. SPECIFIC CONDITIONS I. GASEOUS EMISSIONS SHALL CONFORM TO THE LOAD/MASS BASED STANDARDS AND NOT TO EXCEED THE LIMITS PRESCRIBED BY THE STATE BOARD To be complied shortly. Air Pollution Control equipment are being upgraded to meet the SPM norm of 50 mg/nm3. These projects are at various stages of implementation. Plan of upgradation of these equipment is submitted to Andhra Pradesh Pollution Control II. ADOPT CLOSED LOOP RE-CIRCULATING SYSTEMS All the re-circulating water systems existing at VSP are closed loop only. The same are being adopted in all expansion units. Also total water recycling schemes at a cost of Rs 115 cr. is under implementation in the following 4 packages Skids at Ultra Filtration Plant used for Treating Sewage water from Township for use as make up in Rolling Mills 9 of 18

1. BC gate & Gangavaram outfall water- Two separate ponds with pump house, treatment plant and RO plant for treated sewage is under implementation 2. Appikonda sewage treatment plant to treat the sewage from expansion units is completed 3. Appikonda outfall water A pond with pump house and RO plant is commissioned. 4. Marine pipeline to discharge the surplus effluents and reject water from RO plants is under progress. RECYCLE DIRECT CONTAMINATING COOLING WATER IN TO SLAG GRANULATION & DUST SUPPRESSION Already in practice. The same is being adopted in expansion units. THE WASTE WATER FROM GAS CLEANING PLANTS, MILLS, POWER PLANT & CT BLOW DOWNS SHALL BE TREATED IN WASTE WATER TREATMENT PLANTS Already in practice. The same is being adopted in expansion units. THE COKE OVEN EFFLUENT SHALL NOT EXCEED 2880 CUM/DAY (120 CUM/HR)The Coke oven effluent is not exceeding 120 m3/hr THE SURPLUS WASTE WATER SHALL BE STORED IN THE HOLDING POND FOR USE IN THE LEAN PERIOD Separate ponds and treatment facilities are envisaged as explained above THE OVER FLOW FROM POND SHALL BE DISCHARGED THROUGH MARINE OUT- FALL INTO SEA Marine pipeline to discharge the surplus effluents is under progress Marine Discharge Facility Nearing completion Marine Discharge Sump and Pump House 10 nearing of 18 com-

THE DISCHARGE POINT SHALL BE DECIDED IN CONSULTATION WITH NIO NIO has already conducted the studies and suggested the route for marine outfall and is being done as per their recommendations MARINE ECOLOGICAL STUDY SHALL BE CARRIED OUT TO STUDY THE IMPACT OF WASTE WATER ON MARINE ECOLOGY Done. Report submitted to MoEF& APPCB THE SEWAGE WATER AFTER TREATMENT SHALL BE USED IN MILLS / SMS FOR COOLING PURPOSE Already township sewage is being recycled in SMS & Mills after ultra filtration. Sewage from plant shall also be recycled Iii PROVIDE CONTROL MEASURES FOR CHECKING FUGITIVE EMISSIONS. PROVIDE DUST EXTRACTION / SUPPRESSION SYSTEMS IN RAW MATERIAL HANDLING & WATER SPRIN- KLING SYSTEM AT THE STOCK YARDS Pollution control measures are extensively planned and implemented in existing plant and in expansion area. Electro Static Precipitators provided at various process units to control emissions 11 of 18

PROVIDE DRY FOGGING SYSTEM IN CRUSHING & SCREENING PLANT, MATERIAL TRANSFER POINTS ETC. Dry Fog Systems are installed in RMHP,SP-3 & BF-3, located at 55 Junction Houses and comprising of 625 application points, 320 flow control systems, 10 compressors,15 pump houses and about 2000 precision nozzles DATA ON FUGITIVE EMISSIONS SHALL BE MONITORED & RECORDS ARE MAINTAINED Work zone air quality at more than 50 locations is regularly monitored and data is recorded as per EMS. The same shall be continued iv COMPLY WITH THE STANDARDS NOTIFIED VIDE GSR.631(E) DATED 31ST OCT 1997 TO CONTROL FUGITIVE EMISSIONS FROM BATTERIES Fugitive emissions PLD, PLO, PLL, BaP and charging emissions from coke oven batteries are monitored regularly and are below the norms except charging emissions. v PARTICULATE EMISSIONS SHOULD BE <50 MG/NM3 ESP of Blast Furnace-1 ESP : Under Up gradation 12 of 18

Existing ESPs to be upgraded to limit emission levels to below 50 mg/nm3 during capital repairs as per the following schedule ESP s of Sinter Plant 1 by July 2017 ESP s of Sinter Plant-2 by July 2018 ESP s of Blast Furnace-1 by Dec 2014 (Nearing Completion) ESP s of Blast Furnace-2 by July 2017 ESP s of Power Plant-one boiler by Jan 2017 and remaining by Mar2019 PROVIDE CAST HOUSE FUME EXTRACTION SYSTEM WITH ESP/BAG FILTER The existing two blast furnace cast houses and BF-3 (Expn.) are provided with ESPs. INSTALL LOW-NOX BURNERS TO CONTROL NOX EMISSIONS Low Nox burners are provided and all necessary measures are taken to reduce NOx emissions in Sinter plant-2. These measures shall be adopted for the existing sinter machines 1 & 2 during their revamping in 2016-18 vi ENHANCE EFFORTS TO RE-USE OF SOLID WASTES AS PER PLAN SUBMITTED TO MINISTRY (BF & LD SLAG, FLYASH, REFRACTORY BRICKS, MILL SCALES ETC.) Being done. Utilisation at Annexure-7 ALL HAZARDOUS WASTES SHALL BE CHARGED INTO COKE OVEN BATTER- IES All hazardous wastes like tar sludge, Benzol muck, acid tar, MBC sludge etc. are charged in to batteries along with charge coal since 1999. The same shall be continued. SPENT OIL SHALL BE SOLD TO AU- THORIZED REPROCESSORS Being done Facility of recycling of Hazardous waste from Coke Ovens by-product to Batteries 13 of 18

vii DEVELOP GREEN BELT IN BALANCE 34 HA. SELECTION OF SPECIES SHALL BE AS PER CPCB GUIDE LINES The balance area of 34 Hectares in green belt will be taken up after the land dispute is resolved by the State government. viii UNDERTAKE RAIN WATER HARVESTING MEASURES Complied. 12 masonry check dams, 1 Earthen check dam, 112 Percolation pits and recharging, wells have been constructed so far. In addition to the above 2 major rain harvesting schemes are under implementation at an expenditure of Rs 1304 Lakhs and resulting in total water saving of : 3.3 MGD ix OCCUPATIONAL HEALTH SURVEILLANCE OF WORKERS SHOULD BE DONE ON REGULAR BASIS AND RECORDS TO BE MAINTAINED A full fledged OHS&RC is functioning since 1992.doing man maintenance programs, toxicological studies, noise surveys, hygiene surveys etc. Records are maintained as per OHSAS: 18001. Rain water Harvesting : Under implementation OHS & RC Building 14 of 18

X CREP RECOMMENDATIONS TO BE IMPLEMENTED All points are being complied B. GENERAL CONDITIONS i ADHERE TO STIPULATIONS MADE BY APPCB AND APSG Being followed. ii NO FURTHER EXPANSION OR MODIFICATIONS SHALL BE CARRIED OUT WITHOUT PRIOR APPROVAL Noted and will be followed iii AT LEAST 4 AMBIENT AIR QUALITY MONITORING STATIONS SHALL BE ESTABLISHED IN THE DOWNWARD DIRECTION 3 CAAQM stations have been established within plant premises and fourth station is installed at pedagantyada village in the downwind direction of plant. All stations are working. Data from the stations being posted in dedicated server for environmental data. Real time status made available to all concerned by use of software ÉNVISION. Also hourly data from the stations is being posted real time to website of APPCB. ËNVISION has been developed in-house for Environment Management ENVISION software developed in house for environmental data acquisition and reporting 15 of 18

DATA ON AMBIENT AIR, STACK EMISSIONS SHOULD BE SUBMITTED TO APPCB, CPCB, MOEF ONCE IN EVERY SIX MONTHS Being done iv THE WASTE WATER SHALL BE PROPERLY COLLECTED AND TREATED SO AS TO CONFORM TO NORMS AND SHOULD BE UTILIZED FOR MAKE UP OR PLANTATION Separate treatment facilities are provided to collect the waste water and effluents and recycle them as make-up after treatment. Refer point A ii of special conditions above. v PROVIDE NOISE CONTROL MEASURES TO LIMIT NOISE LEVELS WITHIN 85 db(a) ON ALL SOURCES Adequate noise control measures are provided. 16 of 18

THE AMBIENT NOISE LEVELS 75 DBA (DAY TIME) & 70 DBA (NIGHT TIME) Noise limits are within norms. UNDERTAKE SOCIO-DEVELOPMENT ACTIVITIES IN THE SURROUNDING VILLAGES Being done Condivi tion: Eye testing and cancer detection camps nearby Chepalapalem village COMPLY ALL RECOMMENDATIONS MADE IN THE REPORTS OF EIA-1994 & EMP. Complied. vii PROVIDE REQUISITE FUNDS TO IMPLEMENT CONDITIONS STIPULATED BY MOEF, STATE GOVT. Already VSP has spent over Rs 468 cr for pollution control measures. Also ~Rs1283 cr. expenditure is earmarked for pollution control measures in the expansion units. In addition to the above VSP is incurring over Rs 315 cr. (12-13) yearly towards operating expenses of all its pollution control systems 17 of 18

viii A SIX-MONTHLY COMPLIANCE REPORT SHOULD BE SUBMITTED TO MOEF, REGION- AL OFFICE, BANGALORE Being done ix INFORM THE PUBLIC THAT THE ENVIRONMENTAL CLEARANCE OF THE PROJECT HAS BEEN ACCORDED BY MOEF. ADVERTISE THIS IN TWO NEWS PAPERS WITH IN 7 DAYS FROM THE DATE OF CLEARANCE Complied END 18 of 18