Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Similar documents
APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

APPENDIX I (See paragraph 6) FORM 1

Annex F Scoping Checklist

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

FORM-I for seeking clearance for project attracting CRZ notification

FORM 1 BASIC INFORMATION S.NO.

APPENDIX I (See paragraph 6) FORM 1

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

APPENDIX I. (See paragraph 6) FORM 1

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

APPENDIX - I (See paragraph 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

APPENDIX I (See paragraph 6) FORM 1

Sri.T.N.Balasubramanya

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

APPENDIX- I FORM- 1. (I) Basic Information:

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

FORM 1 (Application for Environment Clearance)

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

M/S Overseas Min Tech Consultants, Jaipur 1

(I) Basic Information:

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX I (See paragraph - 6) FORM 1

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I. (See Paragraph 6) FORM 1

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

Revised FORM - I & PRE-FEASIBILITY REPORT

Haridarshan Residency ( Row Type House & School Building )

FORM-I. Environmental Clearance (EC)

APPENDIX I. (See paragraph-6) FORM 1

Application for Prior Environmental Clearance (EC)

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

Proposed Multiplex & Commercial Complex FORM I

FORM I (OPENCAST LATERITE MINE ha)

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT

APPLICATION (FORM-I) FOR EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE FOR UMRER OC UMRER AREA, WCL. EC Capacity 3.50 MTPA EC ML Area 944.

APPENDIX I. (See paragraph 6) FORM 1

FORM-I, PRE-FEASIBILITY REPORT FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment Notification, 2006)

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by

9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1.

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification

APPENDIX I (See paragraph 6) FORM 1

FORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD.

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

APPENDIX I. (See paragraph 6) FORM 1

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu

JAI MAA SHARDA STONE CRUSHING

APPENDIX I (See paragraph 6) FORM 1

HIMALAYA MINES & MINERALS SURVEY NO. 4595, 4654, 4661 & 4662, RAMACHANDRAPURAM VILLAGE, MULUGU MANDAL, WARANGAL DISTRICT, TELANGANA STATE FORM I

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

30 TPH Fertilizer Blending unit for Customized NPK Production at Zuarinagar, Sancoale, Marmugao, SouthGoa, Goa

Ambey Mahila Swa Sahayata Samuh President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.

FORM-I. Sector-16-B, GH Greater Noida, U.P.

556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2,

FORM 1. Basic Information. Sl. No.

FORM 1 Riverbed Sand Mining Project

RATNAAKAR SHELTER LLP

FORM Name of the project/s Amendment in Existing Environmental Clearance to

Sl. No. 1. Name of the Project/s : Chudeshwar Gravel Deposit (Narmada River) 2. Sl. No. of the Schedule : Category B-2 of Activity 1(A)

THE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company)

Transcription:

Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease area/number of wells to be drilled Details Oriilon India Pvt. Ltd Nylon Yarn Expansion project 5(d) - Manmade fibers others type manufacturing unit 4. New/Expansion/Modernization Expansion 5. Existing Capacity/Area etc. -- 6. Category of Project i.e. A or B B2 7. 8. 9. Location 10. 11. 12. Does it attract the general condition? If yes, please specify. Does it attract the specific condition? If yes, please specify. Plot/Survey/Khasra No. Village Tehsil District State Nearest railway station/airport along with distance in kms. Nearest Town, city, District Headquarters along with distance in kms. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) Nylon Yarn- 21,600 MT/annum No No PLOT REVENUE SURVEY NO 144-218 BLOCK NO 168 CHHAMUCHHAL MANGROL SURAT GUJARAT Rail : ~ 7 Km (Kim Railway Station) Nearest City: Surat (~ 20 Km) Nearest village: ~0.7 km Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No.- 02621234616. 13. Name of the applicant Mr. Vikashkumar Jhunjhunwala 1

14. Registered Address 701, Rajhans Complex, Ring Road, Near Nirmal Hospital, Surat 395002 15. Address for correspondence : As Above Name Mr. Vikashkumar Jhunjhunwala Designation (Owner/Partner/CEO) Director Address Oriilon India Pvt Ltd 701, Rajhans Complex, Ring Road, Near Nirmal Hospital, Surat 395002 Pin Code 395002 E-mail oriilonoffice@gmail.com Telephone No. +91-9824100856, +91261-4004701 Fax No. +912622271310 Details of Alternative Sites 16. examined, if any. Location of these Not application sites should be shown on a topo Expansion Project sheet 17. Interlinked Projects No Whether separate application of NA 18. interlinked project has been submitted? 19. If yes, date of submission - 20. If no, reason - 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, No 1980? (b) The Wildlife (Protection) Act, No 1972? (c) The C.R.Z Notification, 1991? No Whether there is any Government 22. Order/Policy relevant/relating to the No site? 23. Forest land involved (hectares) NA 2

24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. NA NA (I) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, S.No. Information/Checklist confirmation Yes/ No wherever possible) with source of information data 1.1 Permanent or temporary change in land No The proposed project is within use, land cover or topography including the existing industrial premises increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation No The proposed project is within and buildings? the existing industrial premises 1.3 Creation of new land uses? No The proposed project is within the existing industrial premises 1.4 Pre-construction investigations e.g. bore Yes Soil Testing Report Attached as houses, soil testing? annexure 3 1.5 Construction works? No Existing industrial shed will be used. Only foundation for machinery will be done 1.6 Demolition works? No Not Applicable 1.7 Temporary sites used for construction No Laborers from near by villages 3

works or Housing of construction workers? shall be employed/ Stop gap arrangement shall be made for laborers. 1.8 Above ground buildings, structures or Yes Existing industrial shed will be earthworks including linear structures, used cut and fill or excavations 1.9 Underground works including mining or No Not Applicable tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? Yes 21,600 MT/annum Nylon yarn (partially oriented yarn) will be produced from polyamide chips. Detailed manufacturing process is mentioned in prefeasibility report. Yes Storage sheds will be Installed for ash Storage in Silos, Coal, Nylon chips, Spin finish oil in drums- 48 sq. m Finished goods-718 sq.m NO Zero discharge plant No Worker will be employed from nearby villages and towns Yes Traffic due to transportation of construction material during construction phase, during nonpeak, day hours. Increase in Vehicular traffic due to commute of employees and workers during construction phase. 4

1.18 New road, rail, air waterborne or other No Existing road structure are transport infrastructure including new or altered routes and stations, ports, sufficient to cater additional load airports etc? 1.19 Closure or diversion of existing transport No Not Applicable routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission lines or No -- pipelines? 1.21 Impoundment, damming, culverting, No Not Applicable realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable 1.23 Abstraction or transfers of water from No Water shall be sourced from ground or surface waters? Narmada Water Resources Water Supply And Kalpsar Department 1.24 Changes in water bodies or the land No -- surface affecting drainage or run-off? 1.25 Transport of personnel or materials for Yes Laborers and raw material will construction, operation or be transported via the existing decommissioning? road infrastructure 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during decommissioning No Not Applicable which could have an impact on the environment? 1.28 Influx of people to an area in either No Approx. 70-90 will be floating temporarily or permanently? population from adjacent villages during construction phase. 1.29 Introduction of alien species? No Not Applicable 1.30 Loss of native species or genetic No Not Applicable diversity? 1.31 Any other actions? No Not Applicable 5

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are nonrenewable or in short supply): S.No. Information/checklist confirmation 2.1 Land especially undeveloped or agricultural land (ha) Details thereof (with approximate Yes/ quantities /rates, wherever No possible) with source of information data No Proposed expansion within the existing industrial premises 2.2 Water (expected source & competing Yes Source: Narmada Water Resources users) unit: KLD Water Supply And Kalpsar Department 30 KL/day for expansion project 2.3 Minerals (MT) No Not Applicable 2.4 Construction material stone, Yes Sand, Bricks and cement shall be aggregates, sand / soil (expected procured from local market source MT) 2.5 Forests and timber (source MT) No Not Applicable 2.6 Energy including electricity and fuels Yes Power consumption : 1000 KVA, (source, competing users) Unit: fuel Source: SEB/ grid. (MT), energy (MW) 2.7 Any other natural resources (use No No other Natural Source Used appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human Details thereof (with approximate quantities/rates, Yes/ wherever possible) with No source of information data No Not applicable 6

health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable 3.3 Affect the welfare of people e.g. by changing No -- living conditions? 3.4 Vulnerable groups of people who could be No -- affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes No -- 4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate Yes/ quantities/rates, wherever possible) S.No. Information/Checklist confirmation No with source of information data 4.1 Spoil, overburden or mine wastes No Not Applicable 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Canteen waste will be generated with some paper waste. Approximately 9 kg shall be generated per day which will be used as manure for vermicomposting. No - 4.4 Other industrial process wastes No -- 4.5 Surplus product Yes Yarn waste will be sold in market 4.6 Sewage sludge or other sludge from effluent treatment No Sewage waste will be disposed through existing ETP. 4.7 Construction or demolition wastes No Construction debris will be used for leveling of site 4.8 Redundant machinery or equipment No -- 4.9 Contaminated soils or other materials No -- 7

4.10 Agricultural wastes No None 4.11 Other solid wastes No -- 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/Checklist confirmation Yes/ No 5.1 Emissions from combustion of fossil No fuels from stationary or mobile sources Details thereof (with approximate quantities/rates, wherever possible) with source of information data No stack proposed 5.2 Emissions from production processes No -- 5.3 Emissions from materials handling Yes Minor dust emission during including storage or transport handling of coal 5.4 Emissions from construction activities Yes Minor Dust Emission. Fugitive including plant and equipment emissions during unloading of construction material, concrete mixers etc 5.5 Dust or odours from handling of Yes Dust generation due to materials including construction construction activity materials, sewage and waste 5.6 Emissions from incineration of waste No -- 5.7 Emissions from burning of waste in open No -- air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No -- 8

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers 6.2 From industrial or similar processes Yes/ Details thereof (with approximate No quantities/rates, wherever possible) with source of information data with source of information data Yes Minor Noise will be generated during construction & operation process. No -- 6.3 From construction or demolition Yes Minor Noise will be generated during Construction 6.4 From blasting or piling No Not Applicable 6.5 From construction or operational Yes Minor Noise will be Generated traffic 6.6 From lighting or cooling systems No -- 6.7 From any other sources No -- 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.No. Information/Checklist confirmation 7.1 From handling, storage, use or spillage of hazardous materials Details thereof (with approximate quantities/rates, wherever Yes/ possible) with source of No information data No -- 9

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No 7.3 By deposition of pollutants No No stack emission emitted to air into the land or into water 7.4 From any other sources No -- 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No -- 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.No. Information/Checklist confirmation Yes/ No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires No -- etc from storage, handling, use or production of hazardous substances 8.2 From any other causes No -- 8.3 Could the project be affected by Yes Earthquake Zone III (Moderate) natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? 10

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. No. Information/Checklist confirmation Yes/ No 9.1 Lead to development of supporting. No Utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Details thereof (with approximate quantities/rates, wherever possible) with source of information data 1.3 km Road is constructed joining state highway to the company premise. Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could No Not Applicable have an impact on the environment 9.3 Set a precedent for later developments No -- 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No -- (II) Environmental Sensitivity Name/ Aerial distance (within 15 Identity km.) S.No. Areas Proposed project location boundary 1 Areas protected under international None -- 11

conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration None -- None -- 4 Inland, coastal, marine or underground None -- waters 5 State, National boundaries None -- 6 Routes or facilities used by the public for None NH 8A: approx 4.0 Km access to recreation or other tourist, pilgrim areas 7 Defense installations None -- 8 Densely populated or built-up area Yes CHHAMUCHHAL (approx 0.7 Km) 9 Areas occupied by sensitive man-made land Yes Kim (approx 7 Km) uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) None -- 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) None -- 12

required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project. 14