Interior Construction Specification. Dr. Kalinowski. 2nd Floor, United Health Centre Street, Edmonton, AB

Similar documents
Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

DEAN + TYLER + BURNS ARCHITECTURE

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

Oxford & Area Trails Association River Philip Bridge Construction, Oxford, N.S Project No.: OATA003 SECTION 1.0 INSTRUCTION TO BIDDERS

STANDARD SPECIFICATION SECTIONS. November 2016 Physical Resources Design, Engineering and Construction

The Home Depot U.S.A., Inc. Instructions to Bidders

Bidding Conditions Attachment C

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY

GENERAL REQUIREMENTS

NORTHERN COLLEGE DRY HYDRANT

Document B252TM 2007

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

ADDENDUM NO. B. TO THE BID DOCUMENTS, dated 1/5/16 FOR THE

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

INSTRUCTIONS TO BIDDERS

ATTACHMENT D SCOPE OF SERVICES

Main Building Auditorium

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

FORRENCE RECREATION CENTER ROOF REPLACEMENT

Invitation for Bid - Standard Office Furniture / Task Chair

A D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary

TENDER ROOFING, GYM BLEACHER & GYM PARTITION REPLACEMENT AND FIN RADIATION UPGRADES WEST FERRIS INTERMEDIATE & SECONDARY SCHOOL

CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017

2. Clarification: The building address is 801 Henderson Street.

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

Attachment 1 Architectural Services

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

OSNI PONCA OFFICE REMODEL

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

Document B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018

REQUEST FOR QUOTATIONS Crushed Gravel

Refer to Section Proposal Form/All Trades (issued) a. Revised Alternate No. 2 b. Added Alternate No. 3

PROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS

270 Prince Street, Suite 202 Montréal (Québec) H3C 2N3 Tel: (514) Fax: (514) NOTICE OF TENDER

Both envelopes must have the following information in the lower left hand corner:

SECTION ADVERTISEMENT FOR BIDS

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

MARYLAND STADIUM AUTHORITY

Sunnycrest Manor Roosevelt Street Dubuque, IA Sunnycrest Manor Kitchen Ventilation MEP Engineers Project #1735

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

DOCUMENT BID PROPOSAL

August 19, Addendum No. 2 Roosevelt Hall Interior Renovation Brooklyn College Project No.: BY

NOTICE TO BIDDERS FOR

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

COUNTY OF ALAMEDA. REVISED BID DUE DATE: 2:00 p.m., THURSDAY, NOVEMBER 17, 2016

PLANNING AND EVALUATION PRELIMINARY DESIGN

Supply and Delivery of Boltless Metal Shelving Units

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

155 North Beech, Casper, WY * (307) * (307) Fax INDEX

PUBLIC CONTRACT CODE SECTION

PHASE 3: MAIN AND SECOND LEVEL RENOVATION EDUCATION CENTRE SASKATCHEWAN RIVERS PUBLIC SCHOOL DIVISION NO. 119

RFQ Drainage Ditching and Culvert Replacement

SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD

INVITATION TO BID (Request for Proposal)

MEMORANDUM. Taylor Schoel with Walter Schoel Engineering. DATE: August 29, Addendum 1 - Green Drive Culvert Replacement.

As a state agency, the College administration is required to develop procedures for Construction Manager selection.

Document Synopses by Series

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.

REQUEST FOR PROPOSALS AUDIT

Section IX. Bidding Forms TABLE OF CONTENTS

Issued for Tender Architectural Specifications Regional District of North Okanagan Mission Hill WTP Office Renovation

TENDER Window & Door Hardware Replacement, Exterior Cladding & Washroom Upgrades Northern S. S. Sturgeon Falls, ON

REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF CLAIMS LITIGATION INVOICE REVIEW SERVICES GSMJIF. ISSUE DATE: October 2, 2017

DOCUMENT BID FORM. Village of Middle Point

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina

The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents

SPECIFICATIONS. Community Park Concession/Washroom Building Alterations. Issued for Tender February 23, Prepared by: zeidler

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

WINTER SAND TENDER Friday September 7, 2018 at 1:10 p.m.

Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL

Supply and Delivery. Chromebase All-in-One Computers

IOWA STATE FAIR CARNIVAL RESTROOMS AND GATE 15 FOOTINGS AND FOUNDATIONS

Specifications. For. Shermco Project Panora Substation Construction. Panora Municipal Electric Panora, Iowa. April 21, 2017 BID ISSUE

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m.

Cattaraugus County Little Valley County Center Court Renovations Second Floor Little Valley, NY

BIDDING PROCEDURES FOR GOODS PURCHASES

BIDDING PROCEDURES FOR GOODS PURCHASES

Aboriginal Initiatives

Request for Quotations Airport Secure Access System

INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL BUSINESS OFFICIALS ( MSBO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

BARBADOS WATER AUTHORITY

North American Development Bank. Engagement of Consultants

CITY OF DE PERE PROJECT VOYAGEUR PARK PLAYGROUND BID DATE: FEBRUARY 1, 1:00 PM

SECTION BID FORM JACKSON AVENUE / 15TH STREET WATER MAIN REPLACEMENT

Town of Middleton. Storm Water Outfall Repair & Soil Stabilization. Connaught Avenue. June 20, 2014

1. Meeting minutes from the pre-bid conference are attached for inclusion in the Bid Documents.

Transcription:

Interior Construction Specification Dr. Kalinowski 2nd Floor, United Health Centre 7609 109 Street, Edmonton, AB Issued for Tender: May 18, 2017 Mandatory Site Visit: May 23, 2017 @ 2:00 PM Closing Date: June 1, 2017 @ 2:00 PM Reference: 17-6251 100, 10130 105 Street, Edmonton, AB T5J 1C9 p.780-423-1811 f 780-425-1988 wolskidesign.com

Canadian Master Specification (CMS) Section 00 05 00 Table of Contents Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 TABLE OF CONTENTS DIVISION # 0 Tender Documents DIVISION NAME SECTION TITLE 00 05 00 Table of Contents 00 21 13 Instructions to Bidders 00 41 13 Bid Form Stipulated Price 00 52 13 Agreement Form & Definitions Stipulated Price 00 56 13 Definitions Stipulated Price 00 72 13 General Conditions Stipulated Price 00 73 03 Supplementary Conditions Stipulated Price 1 General 01 10 00 Summary of Work 01 19 00 Specifications and Documents 01 29 00 Payment Procedures 01 31 00 Project Managing and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 35 23 Health and Safety 01 43 00 Quality Assurance 01 45 00 Quality Control 01 52 00 Construction Facilities 01 61 00 Product Requirements 01 62 00 Product Exchange Procedures 01 73 00 Execution 01 73 30 Cutting and Patching 01 74 00 Cleaning and Waste Processing 01 74 20 Waste Managing & Disposal 01 75 16 Start-up Procedures 01 75 19 Testing, Adjusting, and Balancing 01 78 10 Closeout Submittals 01 78 40 Maintenance Requirements

Canadian Master Specification (CMS) Section 00 21 13 Instructions to Bidders Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 Part 1 General 1.1 BID CALL.1 Offers signed under seal, executed, and dated will be received by Consultant:.1 Located at: #100, 10130 105 Street, Edmonton, AB T5J 1C9.2 Attention: Carrie Sutton.2 Email: carries@wolskidesign.com.3 Before 14:00:00 local time on the 1 st day of June, 2017..4 Bids can be submitted electronically or hand delivered..2 Wolski Design Group cannot guarantee that the internet connections or website will be available at all times and up to the closing time of bid submission - a Bidder submitting an electronic bid does so at its own risk..3 Offers submitted after the above time will not be considered and will be returned to the bidder unopened or will be deleted (for electronic submissions)..4 Submit Document 00 41 73 - Supplementary Bid Information Form and original Bid Form within twenty four (24) hours after closing time for receiving Bid Form..5 If submitting Bid by email, submit original, signed, and sealed document 00 41 13 Bid Form Stipulated Price, within twenty four (24) hours after closing time..6 Offers will be opened privately and immediately after the time for receipt of bids..7 Amendments to the submitted offer will be permitted if received in writing with date-time prior to bid closing and if endorsed by the same party or parties who signed and sealed the initial offer. 1.2 BID INTENT.1 The intent of this bid call is to obtain an offer to perform work to complete an office renovation project, located on the 2 nd Floor, United Health Centre, 7609 109 Street for a Stipulated Price contract, in accordance with the Contract Documents. Perform the Work within the time stated in Section 01 10 00 - Summary of Work. 1.3 PROJECT CONTACTS Owner: Contact: Dr. Cheryl Kalinowski Cheryl Kalinowski Phone: Email: 780.432.3536 dckalin11@gmail.com Prime Consultant: Contact: Wolski Design Group Ltd. Carrie Sutton Phone: Email: 780.969.2804 carries@wolskidesign.com 1.4 CONFIDENTIALITY.1 All proposals and any communications with the Bidder will be kept strictly and confidential before, during and after the award..2 All solicitation documentation is proprietary to Wolski Design Group Ltd.; no part thereof, or any information contained therein may be published, used or copied without the prior consent of Wolski Design Group Ltd.

Canadian Master Specification (CMS) Section 00 21 13 Instructions to Bidders Dr. Kalinowski - 2nd Floor, United Health Centre Page 2 1.5 CONTRACT DOCUMENTS IDENTIFICATION.1 The Contract Documents are identified as Dr. Kalinowski - 2nd Floor, United Health Centre as prepared by the Prime Consultant Wolski Design Group Ltd. and their sub-consultants, and listed in the Table of Contents. 1.6 BID AND CONTRACT DOCUMENTS.1 Bid Documents: The Contract Documents supplemented with Instructions to Bidders, Bid Form and Bid Supplementary Forms identified..2 Contract Documents: Defined in: 1.7 DEFINITIONS.1 CCDC 2-2008 - Stipulated Price Contract..1 The term: Bid, Offer, or Bidding: An act of submitting an offer under seal..2 The term: Bid Price: Monetary sum identified by the Bidder in the Bid Form. 1.8 DOCUMENT AVAILABILITY.1 Bid Documents will be emailed to Wolski Design Group Ltd..1 An electronic version of Bid Documents will be available to General Contract Bidders..2 Bid Documents are made available only for the purpose of obtaining offers for this project. Their use does not confer a license or grant for other purposes. 1.9 DOCUMENT EXAMINATION.1 Upon receipt of Bid Documents verify that documents are complete; notify Consultant should the documents be incomplete..2 Immediately notify the Consultant upon finding discrepancies or omissions in the Bid Documents. 1.10 QUERIES/ADDENDA.1 Direct questions to: Carrie Sutton Phone: 780.969.2804 Email: carries@wolskidesign.com.2 Addenda may be issued by email during the bidding period. All addenda become part of the Contract Documents. Include costs in the Bid Price..3 Verbal answers are only binding when confirmed by written addenda..4 Clarifications requested by bidders must be in writing not less than seven days (7) before date set for receipt of bids. The reply will be in the form of an addendum, a copy of which will be forwarded to invited general contract bidders. 1.11 PRODUCT/SYSTEM OPTIONS.1 Product Exchange Procedures during the Bid Process: When a request to exchange a Product is made, the Consultant may approve the exchange and will issue an Addendum to invited bidders.

Canadian Master Specification (CMS) Section 00 21 13 Instructions to Bidders Dr. Kalinowski - 2nd Floor, United Health Centre Page 3 1.12 BIDDERS BRIEFING.1 A bidders briefing has been scheduled for 2:00 pm on the 23rd day of June, 2017, at the location of 2 nd Floor, United Health Centre, 7609 109 Street, Edmonton, AB. Meet at Main Floor Lobby..2 All general contract, major sub-trade bidders and suppliers are invited..3 Representatives of the Consultants will be in attendance. 1.13 PREQUALIFICATION.1 Any bidder when specifically requested shall complete and submit CCDC 11 - Contractors Qualification Form to the Owner on or before 2:00 pm local time on the 1 st day of June, 2017..2 Acceptance or rejection of this submittal will be made forty-eight (48) hours thereafter. 1.14 SUBCONTRACTORS.1 The Owner (as further described in the General Conditions) reserves the right to reject a proposed subcontractor for reasonable cause..2 Refer to Contract Document CCDC 2 as to Owner rights to accept or dismiss subcontractors. 1.15 BID INELIGIBILITY.1 Bids that are unsigned, improperly signed or sealed, conditional, illegible, obscure, contain arithmetical errors, erasures, alterations, or irregularities of any kind, shall at the discretion of the Owner, be declared non-compliant..2 Bid Forms and enclosures which are improperly prepared shall at the discretion of the Owner, be declared non-compliant..3 Bids which contain qualifying conditions or otherwise fail to conform to these Instructions to Bidders shall be disqualified or rejected. Bids are by invitation only, from Owner selected bidders. Bids from unsolicited bidders shall be returned un-opened..4 The Owner shall however, in its sole discretion, reject or retain for its consideration, bids which are non-conforming because they do not contain the content or form required or for failure to comply with the process for submission as set out in these Instructions to Bidders..5 Failure to provide security deposit, bonding or insurance requirements shall at the discretion of the Owner, be declared informal. 1.16 BID SUBMISSIONS.1 Bidders shall be solely responsible for the delivery of their bids to the instructions herein, in the manner and time prescribed..2 Executed offer on the Bid Forms shall be signed and corporate sealed together in a closed opaque envelope, clearly identified with bidder s name, project name and Owners name on the outside cover of the submission..3 Email bids shall be sent to the designated representative stated in the bid call..4 Improperly completed information may be cause not to open the bid and declare the bid invalid or informal.

Canadian Master Specification (CMS) Section 00 21 13 Instructions to Bidders Dr. Kalinowski - 2nd Floor, United Health Centre Page 4 1.17 INSURANCE.1 Provide a signed "Undertaking of Insurance" on a standard form provided by the insurance company stating the bidder s intention to provide insurance to the Owner in accordance with the insurance requirements of the Contract Documents. 1.18 BID FORM REQUIREMENTS.1 Completion of Work:.1 State in the Bid Form, the Time required to complete the Work. The completion date in the Agreement shall be this stated completion Time added to the commencement date..2 The bidder, in submitting an offer, accepts the Time period stated in the Contract Documents for performing the Work. The completion date in the Agreement shall be this completion Time, added to the commencement date..3 The bidder, in submitting an offer, agrees to complete the Work by the date indicated in the Contract Documents. The Bidder may suggest a revision to the Contract Time with an adjustment to the Bid Price, but requires pre-approval by the Owner..2 The Owner requires the work of this contract be completed as quickly as possible and consideration will be given to time of completion when reviewing the submitted bids..3 Refer to Supplementary Conditions for inclusion of taxes. 1.19 FEES FOR CHANGES IN THE WORK.1 Include in the Bid Form, the overhead and profit fees applicable for changes in the Work, whether additions to or deductions from the Work on which the Bid Price was based..2 Include in the Bid Form, the fees proposed for subcontract work for changes (both additions and deductions) in the Work..3 The Contractor shall apply fees as noted, to the subcontractor's gross (net plus fee) costs on additional work. 1.20 BID SIGNING.1 The Bid Form shall be signed under seal by the bidder..2 Sole Proprietorship: Signature of sole proprietor in the presence of a witness who will also sign. Insert the words "Sole Proprietor" under the signature. Affix seal..3 Partnership: Signature of formal sharing partners in the presence of a witness who will also sign. Insert the word "Partner" under each partner signature. Affix a seal to each signature..4 Limited Company: Signature of a duly authorized signing officer(s) in their normal signatures. Insert the officer's capacity in which the signing officer acts, under each signature. Affix the corporate seal. If the bid is signed by officials other than the President and Secretary of the company, a copy of the by-law resolution of the Board of Directors authorizing them to do so, must also be submitted with the Bid in the Bid envelope.

Canadian Master Specification (CMS) Section 00 21 13 Instructions to Bidders Dr. Kalinowski - 2nd Floor, United Health Centre Page 5 1.21 APPENDICES TO THE BID FORM.1 Appendix 'A' - Contract Documents: A complete listing is scheduled in these Contract Documents - Table of Contents. This should include a complete listing of all documents and information issued, on which the Bid Price was derived..2 Appendix 'B' - Subcontractors: Include the names of all known or pre-determined Subcontractors the dollar value the portion(s) of the Work the Bidder will perform..3 Appendix 'C' Separate Prices: A listing of separate prices as specifically requested in the Contract Documents. But not included in Bid Price..4 Appendix 'D' Breakout Prices: A listing of Breakdown Prices as specially requested in the Contract Documents Pricing including in Bid Documents.5 Appendix 'E' - Alternatives: Include the cost variation to the Bid Price applicable to the work described in Section 01 62 00..6 Appendix 'F' Bidder Contacts: Provide information regarding the assigned project manager and site superintendent.7 Appendix 'G' Construction Schedule: Provide a construction Schedule in a gantt chart format. 1.22 DURATION OF OFFER.1 Bids shall remain open to acceptance and shall be irrevocable for a period of thirty (30) days after the bid closing date. 1.23 ACCEPTANCE OF OFFER.1 The Owner reserves the right in its absolute discretion to accept any bid which it deems most advantageous to itself and the right to reject any or all bids, in each instance without giving such formal notice..2 The lowest or any bid will not necessarily be accepted. In no event will the Owner be responsible for the costs of preparation or submission of a bid..3 After acceptance by the Owner, the Consultant on behalf of the Owner, will issue to the successful bidder, a written bid acceptance. END OF SECTION

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 Part 1 General 1.1 BID INFORMATION Date: Submitted by: (name) (address) To: Project: Dr. Cheryl Kalinowksi Dr. Kalinowski - 2nd Floor, United Health Centre 1.2 OFFER Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by the named Consultants for the above mentioned project, we, the undersigned, hereby offer to enter into a contract using CCDC 2-2008 Contract form, to perform the Work for the price of: $ Bid Price before Taxes $ 5% GST $ Total Bid Price.1 Taxes: 1.3 ACCEPTANCE dollars, in lawful money of Canada..1 Applicable federal taxes GST are included in the Bid Price..1 Refer to Section 00 21 13 - Instructions to Bidders for Conditions of acceptance..2 This offer shall be open to acceptance and is irrevocable for twenty (20) calendar days from the Bid closing date and time..3 If this Bid is accepted by the Owner within the time period stated above, they will:.1 Execute the 'Agreement' within seven (7) days of receipt of the form of execution..2 Furnish the required insurances within seven (7) days of receipt of the Agreement in the form described in the Supplementary Conditions.

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 2 1.4 APPENDICES.3 Commence work within five (5) days after written notification of acceptance of this bid..4 Complete the Work in 8 calendar weeks from notification of acceptance of this Bid by the 1 st day of August, 2017..1 A list of the Contract Documents is appended hereto and identified as 'Appendix A'..2 A list of Subcontractors is appended hereto and identified as 'Appendix B'..3 A list of Separate Prices is appended hereto and identified as 'Appendix C'..4 A list of Breakout Prices is appended hereto and identified as Appendix D..5 A list of Alternative Prices is appended hereto and identified as 'Appendix E'..6 Bidder Contacts: Provide information regarding the assigned project manager and site superintendent Appendix 'F'..7 Construction Schedule: Provide a construction Schedule in a gantt chart format as Appendix 'G'. 1.5 ADDENDA.1 The following Addenda have been received. The modifications to the Contract Documents noted therein have been considered and all costs thereto are included in the Bid Price. 1.6 CHANGES.1 Addendum # Dated..2 Addendum # Dated..3 Addendum # Dated..4 Addendum # Dated..5 Addendum # Dated..6 Addendum # Dated..1 When the Consultant establishes that the method of valuation for Changes in the Work will be net cost, plus a percentage fee in accordance with CCDC 2 - Article GC 12.1 Indemnification of the General Conditions, our percentage fee will be:.1 Where direct costs are less than or equal to $5,000.00:.1 our overhead on the net cost of our own work shall be 10%, and.2 our profit on the net cost of our own work shall be 5%..2 Where direct costs are in excess of $5,000.00:.1 our overhead on the net cost of our own work shall be 5%, and.2 our profit on the net cost of our own work shall be 5%.

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 3 1.7 BID FORM SIGNATURE(S) The Corporate Seal of (Seal) (Bidder - please print) was here-unto affixed in the presence of: Authorized signing officer Title Authorized signing officer Title If this Bid is a joint venture or partnership, add additional forms of execution for each member of the joint venture on the appropriate form or forms, as above.

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 4 Appendix A: The following is the list of Contract Documents referred to in the Bid Form submitted by: (Bidder) (Owner) dated to which this Appendix is an integral part of the Bid Form. The list of Contract Documents include the following:.1 Documents and Specifications cited in the Table of Contents..2 Drawings List cited at or near the beginning of the package of drawings.

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 5 Appendix B - Subcontractors: The following is the list of Subcontractors referred to in the Bid Form submitted by: (Bidder) (Owner) dated to which this Appendix is an integral part of the Bid Form. Section of Item of Work Subcontractor's Name Subcontractor's Price Demolition Framing, Drywall and T-Bar Millwork and Wood Doors/Frames Hardware Glazing Ceramic Wall Tile & Flooring & Wall Base Painting Mechanical Electrical

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 6 Appendix C Separate Prices: The following is the list of Separate Prices referred to in the Bid Form submitted by: (Bidder) (Owner) dated to which this Appendix is an integral part of the Bid Form. Refer to Section 01 29 00 - Payment Procedures: We submit the following Separate Prices for additions or deletions to the contract. Prices are NOT include in base bid. All prices include materials, cost of labour, performance of work, overhead, profit/together within all related charges exclusive of GST. Separate Item Description Price $ Separate #1 $ Separate #2 $ Separate #3 $ Separate #4

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 7 Appendix D Breakout Prices: The following is the list of Breakout Prices referred to in the Bid Form submitted by: (Bidder) (Owner) dated to which this Appendix is an integral part of the Bid Form. We submit the following Breakout Prices for additions or deletions to the contract. Prices are include in base bid. All prices include materials, cost of labour, performance of work, overhead, profit/together within all related charges exclusive of GST. Breakout Item Description Price $ Breakout #1 $ Breakout #2 $ Breakout#3 $ Breakout #4

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 8 Appendix E - Alternatives: The following is the list of Alternatives referred to in the Bid Form submitted by: (Bidder) (Owner) dated to which this Appendix is an integral part of the Bid Form. Refer to Section 01 29 00 - Payment Procedures: Item Description Alternate Price Price of Specified Item Alternative # 1 (Add) (Deduct) $ $ Section: Alternative # 2 (Add) (Deduct) $ $ Section:

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 9 Appendix F: Bidder Contacts Project Manager: Name: Phone: Email: Number of Years with Company: Attach curricula (CV) to Appendix G Site Superintendent: Name: Phone: Email: Number of Years with Company: Attach curricula (CV) to Appendix G

Canadian Master Specification (CMS) Section 00 41 13 Bid Form - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 10 Appendix G: Construction Schedule Attach a construction schedule outlining all phases or work, subtrade breakdown with timelines. END OF BID FORM - STIPULATED PRICE DOCUMENT

Canadian Master Specification (CMS) Section 00 52 13 Agreement - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 Part 1 General 1.1 AGREEMENT DECLARATION.1 CCDC 2-2008 Edition, Stipulated Price Contract, as may be amended, forms the basis of Agreement between the Owner and Contractor..2 This Agreement is bound to the CCDC 2-2008 Edition, Definitions and CCDC 2 General Conditions. END OF DOCUMENT

Canadian Master Specification (CMS) Section 00 56 13 Definitions - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 Part 1 General 1.1 DEFINITIONS DECLARATION.1 CCDC 2-2008 Edition, Stipulated Price Contract as may be amended, forms the basis of Definitions between the Owner and Contractor..2 These Definitions are bound to the CCDC 2 Definitions and CCDC 2 General Conditions. 1.2 SUPPLEMENTARY WORDS AND TERMS TO CCDC 2-2008.1 The following words and terms are additional to the CCDC 2 Definitions..2 Addendum: A document that amends the Bid Documents during the Bidding Period and becomes part of the Contract Documents when a Contract is executed. (Plural: Addenda)..3 Agreement: The signed and sealed legal instrument binding parties in a Contract, describing in strict terms their mutual arrangement, roles and responsibilities, commencement, and completion responsibilities..4 Alternative Price: The amount stipulated by a Bidder for an Alternative and stated as an addition, a deduction, or no change to the Bid Price..5 Bid: To offer as a Bid stating for what price a Contractor will assume a Contract..6 Bid Documents: A set of documents consisting of the Instructions to Bidders, Bid Form, Contract Documents, and other information issued for the benefit of Bidders to prepare and submit a Bid..7 Bid Form: The specific and detailed form used to collect information about a Bid..8 Bidding: The process of preparing and submitting a Bid..9 Construction Documents: The Drawings and Project Manual. When combined with a Contract and Contract conditions, these documents form the Contract Documents..10 Contingency Allowance: An additional monetary amount added to a Project cost estimate and designated to cover unpredictable or unforeseen items of Work. The amount is usually based on some percentage of the estimated cost and expended and adjusted by Change Order. It is not intended to cover additions to the scope of Work..11 Cost Plus Contract: A Contract under which a Contractor is reimbursed for the direct and indirect costs for the performance of a Contract and, in addition, is paid a Fee for services. The Fee is usually stated as a stipulated price or as a percentage of cost..12 General Conditions: That part of the Contract Documents which sets forth many of the rights, responsibilities and relationships of the parties involved in a Contract..13 Instructions To Bidders: Instructions contained in the Bid Documents to convey an Owner's expectations and criteria associated with submitting a Bid..14 Section: A portion of a Project Specification covering one or more segments of the total Work or requirements. Sections are included in a Project manual as required to meet Project requirements..15 Standard: A document describing a grade or a level of quality, which has been established by a recognized agency or organization, utilizing an internal voting process..16 Separate Price: A separate price for work to be added to the base price if selected by the Owner. This price type is not a part of the base bid price.

Canadian Master Specification (CMS) Section 00 56 13 Definitions - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 2.17 Stipulated Price: An amount set forth in a Stipulated Price Contract as the total payment for the performance of the Work. Sometimes referred to as a stipulated sum or a lump sum stipulated price..18 Tender: A term that was formally abandoned by CCDC and the Canadian Construction industry in the early 1980's in favour of the preferred term Bid..19 Unit Price: The amount payable for a single unit of Work as stated in a Schedule of Prices..20 Install: To remove from site storage, move or transport to intended location, install in position, connect to utilities, repair site caused damage, and make ready for use..21 Supply: To acquire or purchase, ship or transport to the site, unload, remove packaging to permit inspection for damage, re-package, replace damaged items, and safely store on-site. END OF SECTION

Canadian Master Specification (CMS) Section 00 72 13 General Conditions - Stipulated Price Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 Part 1 General 1.1 GENERAL CONDITIONS DECLARATION.1 CCDC 2-2008 - The General Conditions of the Stipulated Price Contract; is the General Conditions between the Owner and Contractor. 1.2 SUPPLEMENTARY CONDITIONS.1 Refer to Document 00 73 03 - Supplementary Conditions for amendments to these General Conditions. END OF SECTION

Canadian Master Specification (CMS) Section 00 73 03 Supplementary Conditions - Stipulated Dr. Kalinowski - 2nd Floor, United Health Centre Price Page 1 Part 1 General 1.1 GC 1.1 - CONTRACT DOCUMENTS.1 CCDC 2-2008, Paragraph 1.1.7: Revise this paragraph on Precedence of Documents, as follows:.1 In the event of conflict within and between the Contract Documents, the order of priority within specifications and drawings are - from highest to lowest:.2 The Agreement between the Owner and the Contractor..1 Supplementary Conditions..2 The General Conditions..3 Division 1 of the Specifications..4 Technical Specifications:.1 Specifications specifically indicated on Drawings..5 Material and finishing schedules and keynotes:.1 Schedules within the Specifications..2 Schedules on Drawings..6 Drawings:.1 Drawings of larger scale shall govern over those of smaller scale of the same date..2 Dimensions shown on Drawings shall govern over dimensions scaled from Drawings..3 Location of utility outlets indicated on architectural detail Drawings takes precedence over positions or mounting heights located on mechanical or electrical Drawings..7 Later dated documents shall govern over earlier documents of the same type..3 In the event of conflict between documents, the decision of the Consultant shall be final. 1.2 GC 11.1 - INSURANCE.1 Provide construction insurance to requirements of CCDC 41 - CCDC Insurance Requirements. END OF SECTION

Canadian Master Specification (CMS) Section 01 10 00 Summary of Work Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Documents and terminology..2 Associated requirements..3 Work expectations..4 Premises usage. 1.2 RELATED SECTIONS.1 Section 01 78 10 - Closeout Submittals..2 This section describes requirements applicable within the drawings. 1.3 RELATED DOCUMENTS.1 Section 00 52 13- Agreement and Definitions..2 Section 00 72 13 - General Conditions..3 Section 00 73 03 - Supplementary Conditions..4 All other Division 01 specification sections. 1.4 WORDS AND TERMS.1 Refer to and acknowledge other words, terms, and definitions in CCDC 2 Definitions. Additional words and terms are cited in Section 00 52 13 described in Supplementary Conditions. 1.5 COMPLEMENTARY DOCUMENTS.1 Refer to Section 00 52 13 for words and terms..2 Drawings, specifications, and schedules are complementary each to the other and what is called for by one to be binding as if called for by all. Should any discrepancy appear between documents which leave doubt as to the intent or meaning, abide by Precedence of Documents article below or obtain direction from the Consultant..3 Drawings indicate general location and route of conduit and wire/conductors. Install conduit or wiring/conductors and plumbing piping not shown or indicated diagrammatically in schematic or riser diagrams to provide an operational assembly or system..4 Install components to physically conserve headroom, to minimize furring spaces, or obstructions..5 Locate devices with primary regard for convenience of operation and usage..6 Examine all discipline drawings, specifications, and schedules and related Work to ensure that Work can be satisfactorily executed. Conflicts or additional work beyond work described to be brought to attention of Consultant.

Canadian Master Specification (CMS) Section 01 10 00 Summary of Work Dr. Kalinowski - 2nd Floor, United Health Centre Page 2 1.6 DESCRIPTION OF THE WORK.1 Work of this Contract comprises renovation, demolition and general construction of office space, located on the 2 nd Floor, of United Health Centre; and identified as Dr. Kalinowski..2 Division of the Work among suppliers or vendors, subcontractors and other contractors is solely the Contractor's responsibility. Neither the Owner nor Consultant assumes any responsibility to act as an arbiter to establish subcontract terms between sectors or disciplines of work. 1.7 CONTRACT METHOD.1 Construct Work under single, stipulated price contract..2 Relations and responsibilities are between the Contractor and the Owner..3 Provide the required liability insurance to ensure such specified assurances to the Owner..4 Contract Documents were prepared by the Consultant for the Owner. Any use which a third party makes of the Contract Documents, or any reliance on or decisions to be made based on them, are the responsibility of such third parties. The Consultant and Owner accepts no responsibility for damages, suffered by any third party as a result of decisions made or actions based on the Contract Documents..5 For purposes of reference in these Contract Documents, the term "Contractor" shall mean the party in contract with the Owner. 1.8 DOCUMENTS PROVIDED.1 Owner will not supply the Contractor with sets of Contract Documents for construction purposes..2 The Contractor may obtain Contract Documents at the cost of printing, handling and shipping..3 An electronic set of documents will be provided at the beginning of the Project for building permit, construction and as-built documents to the record documents. 1.9 PERFORMANCE OF THE WORK.1 Substantial Performance of the Work is required for Owner occupancy before August 1, 2017. 1.10 WORK SEQUENCE.1 Construct Work in to accommodate Owner's usage requirements during the construction period, coordinate construction schedule and operations with Consultant and Owner..2 Construct Work in phases during the construction period, coordinate construction schedule and operations with Consultant and Owner..3 Coordinate Progress Schedule and with Owner use during construction..4 Maintain fire access and control of fire protection equipment. 1.11 CONTRACTOR USE OF PREMISES.1 Contractor has unrestricted use of site until Substantial Performance of the Work..2 Construction Operations: Limited to areas noted on Drawings.

Canadian Master Specification (CMS) Section 01 10 00 Summary of Work Dr. Kalinowski - 2nd Floor, United Health Centre Page 3.3 Time Restrictions for Performing Interior Work: Business hours, noisy work after hours as required. END OF SECTION

Canadian Master Specification (CMS) Section 01 19 00 Specifications and Documents Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Words and terms..2 Complementary documents..3 Precedence of Documents..4 Specification grammar. 1.2 RELATED DOCUMENTS.1 Section 01 10 00 Summary of Work..2 This section describes requirements applicable within the drawings. 1.3 WORDS AND TERMS.1 Conform to definitions and their defined meanings in the Agreement and Definitions portion of CCDC 2 for supplementary words and terms..2 The following words and terms are applicable to the Contract Documents for this project:.3 Addendum: A document that amends the Bid Documents during the Bidding Period and becomes part of the Contract Documents when a Contract is executed. (Plural: Addenda)..4 Agreement: The signed and sealed legal instrument binding parties in a Contract, describing in strict terms their mutual arrangement, roles and responsibilities, commencement, and completion responsibilities..5 Alternative Price: The amount stipulated by a Bidder for an Alternative and stated as an addition, a deduction, or no change to the Bid Price..6 Bid: To offer as a Bid stating for what price a Contractor will assume a Contract..7 Bid Documents: A set of documents consisting of the Instructions to Bidders, Bid Form, Contract Documents, and other information issued for the benefit of Bidders to prepare and submit a Bid..8 Bid Form: The specific and detailed form used to collect information about a Bid..9 Bidding: The process of preparing and submitting a Bid..10 Construction Documents: The Drawings and Project Manual. When combined with a Contract and Contract conditions, these documents form the Contract Documents..11 Contingency Allowance: An additional monetary amount added to a Project cost estimate and designated to cover unpredictable or unforeseen items of Work. The amount is usually based on some percentage of the estimated cost and expended and adjusted by Change Order. It is not intended to cover additions to the scope of Work..12 Cost Plus Contract: A Contract under which a Contractor is reimbursed for the direct and indirect costs for the performance of a Contract and, in addition, is paid a Fee for services. The Fee is usually stated as a stipulated price or as a percentage of cost..13 General Conditions: That part of the Contract Documents which sets forth many of the rights, responsibilities and relationships of the parties involved in a Contract.

Canadian Master Specification (CMS) Section 01 19 00 Specifications and Documents Dr. Kalinowski - 2nd Floor, United Health Centre Page 2.14 Instructions To Bidders: Instructions contained in the Bid Documents to convey an Owner's expectations and criteria associated with submitting a Bid..15 Section: A portion of a Project Specification covering one or more segments of the total Work or requirements. Sections are included in a Project manual as required to meet Project requirements..16 Standard: A document describing a grade or a level of quality, which has been established by a recognized agency or organization, utilizing an internal voting process..17 Separate Price: A separate price for work to be added to the base price if selected by the Owner. This price type is not a part of the base bid price..18 Stipulated Price: An amount set forth in a Stipulated Price Contract as the total payment for the performance of the Work. Sometimes referred to as a stipulated sum or a lump sum stipulated price..19 Tender: A term that was formally abandoned by CCDC and the Canadian Construction industry in the early 1980's in favour of the preferred term Bid..20 Unit Price: The amount payable for a single unit of Work as stated in a Schedule of Prices..21 Install: To remove from site storage, move or transport to intended location, install in position, connect to utilities, repair site caused damage, and make ready for use..22 Supply: To acquire or purchase, ship or transport to the site, unload, remove packaging to permit inspection for damage, re-package, replace damaged items, and safely store on-site. 1.4 COMPLEMENTARY DOCUMENTS.1 Generally, drawings indicate graphically, the dimensions and location of components and equipment. Specifications indicate specific components, assemblies, and identify quality..2 Drawings, specifications, diagrams and schedules are complementary, each to the other, and what is required by one, to be binding as if required by all..3 Should any conflict or discrepancy appear between documents, which leaves doubt as to the intent or meaning, apply the Precedence of Documents article below or obtain guidance or direction from Consultant..4 Examine all discipline drawings, specifications, schedules, diagrams and related Work to ensure that Work can be satisfactorily executed..5 All specification sections of the Project Manual and Drawings are affected by requirements of Division 01 sections. 1.5 PRECEDENCE OF DOCUMENTS.1 In the event of conflict within and between the Contract Documents, the order of priority within specifications and drawings for this project are - from highest to lowest:.1 The Agreement and Definitions between the Owner and the Contractor;.2 The Defined Terms;.3 Supplementary Conditions;.4 The General Conditions;.5 Sections of Division 01 of the specifications;.6 Schedules and Keynotes:

Canadian Master Specification (CMS) Section 01 19 00 Specifications and Documents Dr. Kalinowski - 2nd Floor, United Health Centre Page 3.1 Material and finishing schedules within the specifications, then;.2 Material and finishing schedules on drawings, then;.3 Keynotes and definitions thereto, then;.7 Diagrams..8 Drawings:.1 Drawings of larger scale shall govern over those of smaller scale of the same date, then;.2 Dimensions shown on drawings shall govern over dimensions scaled from drawings, then;.3 Location of utility outlets indicated on architectural detail drawings takes precedence over positions or mounting heights located on mechanical or electrical Drawings..9 Later dated documents shall govern over earlier documents of the same type..2 In the event of conflict between documents, the decision of the Consultant shall be final. 1.6 SPECIFICATION GRAMMAR.1 Specifications are written in the imperative (command) mode, in an abbreviated form..2 Imperative language of the technical sections is always directed to the Contractor identified as a primary constructor, as sole executor of the Contract, unless specifically noted otherwise..1 This form of imperative (command) mode statement requires the primary constructor to perform such action or Work..2 Perform all requirements of the Contract Documents whether stated imperatively or otherwise..3 Division of the Work among subcontractors, suppliers, or others is solely the prime constructor's responsibility. The Consultant(s) and specification authors assume no responsibility to function or act as an arbiter to establish subcontract scope or limits between sections or divisions of Work. END OF SECTION

Canadian Master Specification (CMS) Section 01 29 00 Payment Procedures Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Applications for progress payments..2 Substantial performance procedures..3 Release of hold-back procedures..4 Price adjustments. 1.2 RELATED DOCUMENT.1 Refer to CCDC 2-2008 for specific requirements. 1.3 RELATED SECTIONS.1 Section 01 62 00 - Product Exchange Procedures. 1.4 APPLICATIONS FOR PROGRESS PAYMENT.1 Submit a CCDC 24 electronic form using an authorized electronic signature or printed copy with an authorized signature..2 Make applications for payment on account as monthly or provided in Agreement as Work progresses..3 Accompany applications with a CCDC 9A-2001 Statutory Declaration form..4 Date applications for payment last day of agreed payment period and ensure amount claimed is for value, proportionate to amount of Contract, of Work performed and Products delivered to Place of Work as of that date..5 Submit to Consultant for review, minimum five (5) days before first application for payment, schedule of values for parts of Work, aggregating total amount of Contract Price, so as to facilitate evaluation of applications for payment..6 Submit required support documentation with applications for payment, including workers' compensation clearance certificates and statutory declarations. 1.5 PROGRESS PAYMENT.1 Submit a progress payment schedule on CCDC 24 printed copy with an authorized signature. Electronic form using an authorized electronic signature..2 Accompany applications with a CCDC 9A-2001 - Statutory Declaration form..3 Consultant will issue to Owner, no later than ten (10) days after receipt of an application for payment, certificate for payment in amount applied for or in such other amount as Consultant determines to be properly due..4 If Consultant amends application, Consultant will give notification in writing giving reasons for amendment. 1.6 PROGRESSIVE RELEASE OF HOLD-BACK.1 Where legislation permits, if Consultant has certified that Work has been performed prior to Substantial Performance of the Work, Owner will pay hold-back amount retained for

Canadian Master Specification (CMS) Section 01 29 00 Payment Procedures Dr. Kalinowski - 2nd Floor, United Health Centre Page 2 such Work, or products supplied, on day following expiration of hold-back period for such Work stipulated in lien legislation applicable to Place of the Work..2 Notwithstanding provisions of preceding paragraph, and notwithstanding wording of such certificates, ensure that Subcontract Work or Products is protected pending issuance of final certificate for payment and be responsible for correction of defects or Work not performed regardless of whether or not such was apparent when such certificates were issued. 1.7 SUBSTANTIAL PERFORMANCE OF THE WORK.1 Submit a schedule of payments on CCDC 24 printed copy with an authorized signature or electronic form using an authorized electronic signature..2 Accompany applications with a CCDC 9A-2001 Statutory Declaration form..3 Prepare and submit to Consultant a comprehensive list of items to be completed or corrected. Failure to include an item on the list does not alter responsibility to complete the Contract..4 Request Consultant review to establish Substantial Performance of the Work..5 Where permitted by local lien legislation, Contractor may apply for substantial performance of a designated portion of the Work, subject to Owner acceptance of that portion of the Work being substantially performed..6 No later than ten (10) days after receipt of list and application, Consultant will review Work to verify validity of application, and no later than seven (7) days after completing review, will notify Contractor if the Work, or the designated portion of the Work, is substantially performed..7 Consultant will state in their certificate the date of Substantial Performance of the Work, or the date of the designated portion of the Work, as applicable..8 Immediately following issuance of certificate of Substantial Performance of the Work, in consultation with Consultant, establish reasonable date for finishing Work. 1.8 PAYMENT OF HOLD-BACK ON SUBSTANTIAL PERFORMANCE OF THE WORK.1 After issuance of Certificate of Substantial Performance of the Work:.1 Submit an application for payment of hold-back amount..2 Submit sworn statement that all accounts for labour, subcontracts, products, construction machinery and equipment, and other indebtedness which may have been incurred in Substantial Performance of the Work and for which Owner might in any way be held responsible have been paid in full, except for amounts properly retained as hold-back or as identified amount in dispute..2 After receipt of application for payment and sworn statement, Consultant will issue certificate for payment of hold-back amount..3 Where hold-back amount has not been placed in a separate hold-back account, Owner will, within ten (10) days prior to expiry of hold-back period stipulated in lien legislation applicable to Place of the Work, place hold-back amount in bank account in joint names of Owner and Contractor..4 Amount authorized by certificate for payment of hold-back amount is due and payable on day following expiration of hold-back period stipulated in lien legislation applicable to Place of the Work.

Canadian Master Specification (CMS) Section 01 29 00 Payment Procedures Dr. Kalinowski - 2nd Floor, United Health Centre Page 3.1 Where lien legislation does not exist or apply, hold-back amount is due and payable in accordance with other legislation, industry practice, or provisions which may be agreed to between parties..2 Owner may retain out of hold-back amount any sums required by law to satisfy any liens against Work or, if permitted by lien legislation applicable to Place of the Work, other third party monetary claims against Contractor which are enforceable against Owner. 1.9 FINAL PAYMENT.1 Submit an application for final payment on a CCDC 24 printed form copy with an authorized signature or electronic form using an authorized electronic signature..2 Consultant will, no later than ten (10) days after receipt of an application for final payment, review Work to verify validity of application. Consultant will give notification that application is valid or give reasons why it is not valid, no later than seven (7) days after reviewing Work..3 Consultant will issue final certificate for payment when application for final payment is determined valid. END OF SECTION

Canadian Master Specification (CMS) Section 01 31 00 Project Managing and Coordination Dr. Kalinowski - 2nd Floor, United Health Centre Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Coordination Work with other contractors and work by Owner under administration of Consultant..2 Scheduled progress and pre-installation meetings. 1.2 RELATED SECTIONS.1 Section 01 32 00 - Construction Progress Documentation..2 Section 01 33 00 - Submittal Procedures..3 This section describes requirements applicable within the drawings. 1.3 COORDINATION.1 Perform coordination of progress schedules, submittals, use of site, temporary utilities, construction facilities and construction Work, with progress of Work of other contractors, others, under instructions of Consultant. 1.4 PROJECT MEETINGS.1 Schedule and administer bi-weekly project meetings throughout progress of Work as determined by Consultant..2 Schedule and administer pre-installation meetings when specified in sections and when required to coordinate related or affected Work..3 Prepare agenda for meetings..4 Distribute written notice of each meeting four (4) days in advance of meeting date to Consultant and Owner..5 Provide physical space and make arrangements for meetings..6 Preside at meetings..7 Record minutes. Include significant proceedings and decisions. Identify action by parties..8 Reproduce and distribute copies of minutes within three (3) days after each meeting and transmit to meeting participants, affected parties not in attendance, Owner and Consultant. 1.5 CONSTRUCTION ORGANIZATION AND START-UP.1 Within five (5) days after award of Contract, request a meeting of parties in contract to discuss and resolve administrative procedures and responsibilities..2 Consultant, Senior Representatives of the Owner, Contractor and major Subcontractors, field inspectors and supervisors are to be in attendance..3 Establish time and location of meeting and notify parties concerned minimum five (5) days before meeting..4 Incorporate mutually agreed variations to Contract Documents into Agreement, prior to signing.

Canadian Master Specification (CMS) Section 01 31 00 Project Managing and Coordination Dr. Kalinowski - 2nd Floor, United Health Centre Page 2.5 Agenda to include following:.1 Appointment of official representative of participants in Work..2 Schedule of Work, progress scheduling as specified in Section 01 32 00..3 Schedule of submission of shop drawings, samples, colour chips as specified in Section 01 33 00..4 Delivery schedule of specified equipment as specified in Section 01 32 00..5 Site safety as specified in Section 01 35 23..6 Proposed changes, change orders, procedures, approvals required, mark-up percentages permitted, time extensions, overtime, and administrative requirements..7 Owner-furnished Products..8 Record drawings as specified in Section 01 78 40..9 Maintenance material and data as specified in Section 01 78 40..10 Take-over procedures, acceptance, and warranties as specified Section 01 78 40..11 Monthly progress claims, administrative procedures, photographs, and holdbacks..12 Appointment of inspection and testing agencies or firms as specified in Section 01 45 00 and 01 43 00..13 Insurances and transcript of policies..6 During construction, coordinate use of site and facilities through Consultant's procedures for intra-project communications: Submittals, reports and records, schedules, coordination of drawings, recommendations, and resolution of ambiguities and conflicts..7 Comply with instructions of Consultant for use of temporary utilities and construction facilities..8 Coordinate field engineering and layout work with Consultant. 1.6 ON-SITE DOCUMENTS.1 Maintain at job site, one copy each of the following:.1 Contract drawings..2 Specifications..3 Addenda..4 Reviewed shop drawings..5 Change orders..6 Other modifications to Contract..7 Field test reports..8 Copy of approved Work schedule..9 Manufacturers' installation and application instructions..10 Labour conditions and wage schedules..11 Applicable current editions of municipal regulations and by-laws. Current building codes, complete with addenda bulletins applicable to the Place of the Work.

Canadian Master Specification (CMS) Section 01 31 00 Project Managing and Coordination Dr. Kalinowski - 2nd Floor, United Health Centre Page 3 1.7 SCHEDULES.1 Submit preliminary construction progress schedule as specified in Section 01 32 00 to Consultant coordinated with Consultant's project schedule..2 After review, revise and resubmit schedule to comply with revised project schedule..3 During progress of Work revise and resubmit as directed by Consultant. 1.8 CONSTRUCTION PROGRESS MEETINGS.1 During course of Work to project completion, schedule progress meetings monthly..2 Contractor, major subcontractors involved in Work Owner and Consultant are to be in attendance..3 Notify parties minimum four (4) days prior to meetings..4 Record minutes of meetings and circulate to attending parties and affected parties not in attendance within three (3) days after meeting..5 Agenda to include following:.1 Review, approval of minutes of previous meeting..2 Review of Work progress since previous meeting..3 Field observations, problems, conflicts..4 Problems which impede construction schedule..5 Review of off-site fabrication delivery schedules..6 Corrective measures and procedures to regain projected schedule..7 Revision to construction schedule..8 Progress schedule, during succeeding work period..9 Review submittal schedules: expedite as required..10 Maintenance of quality standards..11 Review proposed changes for affect on construction schedule and on completion date..12 Review site safety and security issues..13 Other business. 1.9 SUBMITTALS.1 Prepare and issue submittals to Consultant for review..2 Submit preliminary Shop Drawings, product data and samples as specified in Section 01 33 00 for review for compliance with Contract Documents; for field dimensions and clearances, for relation to available space, and for relation to Work of other contracts. After review, revise and resubmit for transmittal to Consultant..3 Submit requests for payment for review, and for transmittal to Consultant..4 Submit requests for interpretation of Contract Documents, and obtain instructions through Consultant..5 Process substitutions through Consultant..6 Process change orders through Consultant..7 Deliver closeout submittals for review and preliminary inspections, for transmittal to Consultant.