Inner Harbor Navigation Canal Lock Replacement Project Public Scoping Meeting

Similar documents
DEPARTMENT OF THE ARMY MISSISSIPPI VALLEY DIVISION, CORPS OF ENGINEERS P.O. BOX 80 VICKSBURG, MISSISSIPPI

NEW ORLEANS DISTRICT AND THE AND THE

Louisiana s Marine Transportation System Plan and Sponsored Projects

SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT INNER HARBOR NAVIGATION CANAL LOCK REPLACEMENT PROJECT ORLEANS PARISH, LOUISIANA

BRAZOS RIVER FLOOD GATES FEASIBILITY STUDY

Integrated Final Report to Congress and Legislative Environmental Impact Statement. Mississippi River Gulf Outlet Deep-Draft De-authorization Study

ENGINEERING AND CONSTRUCTION BULLETIN

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVE NEW ORLEANS LA PUBLIC NOTICE

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

LA 23 NOGC Railway Relocation PE/NEPA Project. Public Meeting

GENERAL OVERVIEW MEETING JANUARY 10, 2019

LA 23 NOGC Railway Relocation PE/NEPA Project

TOPICS FOR TODAY S DISCUSSION

May 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602

The Flood of 1993 resulted in catastrophic

APPENDIX L: CUMULATIVE IMPACTS

FINAL INDIVIDUAL ENVIRONMENTAL REPORT GOVERNMENT FURNISHED BORROW MATERIAL #4 PLAQUEMINES, ST. BERNARD, AND JEFFERSON PARISHES, LOUISIANA IER #28

PUBLIC SCOPING MEETING AGENDA

Coastal Restoration in Louisiana

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

JOINT PUBLIC NOTICE. April 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

GIWW Dredging at West Bay Response to Public Concerns

U.S. Army Corps of Engineers. Regulatory Branch Program Overview

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R November 21, 2017

JOINT PUBLIC NOTICE, 2014

2013 Facilities Engineering Award of Excellence. Riverfront Cold Storage Facility

Chapter 3 FEDERAL POLICIES SOUTH DAKOTA DRAINAGE MANUAL

JOINT PUBLIC NOTICE May 11, 2015

THE CORPS REGULATORY AUTHORITY

STRUCTURAL PLAN COMPONENT APPENDIX

Gulf Intracoastal Waterway Value to the Nation

Distribution Restriction Statement

JOINT PUBLIC NOTICE Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

Notice of Intent to Prepare a Draft Environmental Impact Statement for the Intake. Diversion Dam Fish Passage Project, Dawson County, Montana

Inland Waterway User Board Total Risk Exposure Update and Discussion

MISSISSIPPI RIVER AND TRIBUTARIES PROJECT

JOINT PUBLIC NOTICE. February 13, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

Skagit River General Investigation NEPA Public Meeting

JOINT PUBLIC NOTICE. November 5, 2018

Baltimore Harbor & Channels 50-Foot Project, MD & VA Notice of Intent to Prepare a Supplemental Environmental Impact Statement (SEIS)

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

Columbia River System Operations Environmental Impact Statement Newsletter

Joint Public Notice. January 12, 2015

Hurricane Katrina and the Inner Harbor Navigation Canal Lake Borgne Surge Barrier

U.S. ARMY CORPS OF ENGINEERS NEW ORLEANS DISTRICT

The regulatory authorities and responsibilities of the Corps of Engineers are based on the following laws:

U.S. ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT. Programmatic Environmental Assessment #556

JOINT PUBLIC NOTICE August 07, 2013

JOINT PUBLIC NOTICE. April 4, 2016

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

SECTION 404(b)(1) EVALUATION REPORT FOR THE FOR THE OPERATIONS AND MAINTENANCE OF THE FEDERALLY AUTHORIZED BILOXI HARBOR NAVIGATION PROJECT OTT BAYOU

ENVIRONMENTAL ASSESSMENT

Decision Record. Individual Environmental Report # 25 Government Furnished Borrow Material # 3 Orleans, Jefferson, and Plaquemines Parishes, Louisiana

JOINT PUBLIC NOTICE. October 14, 2014

Springfield Supplemental Water Supply Project Supplemental Environmental Impact Statement

Executive Summary Page

AGING AND FAILING INFRASTRUCTURE SYSTEMS: NAVIGATION LOCKS

CESAM-RD-C April 24, 2013 PUBLIC NOTICE NO. SAM AFM JOINT PUBLIC NOTICE SAM AFM U.S. ARMY CORPS OF ENGINEERS

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT

Appendix P. U.S. Fish and Wildlife Service Planning Aid Letter

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Integrating Science, Policy, and Stakeholder Outreach to Accelerate Restoration

Overview of Corps of Engineers Programs That Could Assist with Multi-Use Issues at Lake Shady. Corps of Engineers St.

U.S. Army Corps of Engineers - Charleston District Checklist for 2017 Nationwide Permit Review Nationwide Permit 3 - Maintenance (10/404)

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P.O. BOX NEW ORLEANS, LOUISIANA Decision Record

Can Traditional Highway Asset Management Strategies Be Adapted To Waterway Infrastructure Analysis?

TO INTERESTED PARTIES

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

CELEBRATING 10 YEARS. Advancing Safety Leadership in the Dredging and Marine Construction Industry

JOINT PUBLIC NOTICE. March 23, 2015

Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project. The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009

August 27, 2018 PUBLIC NOTICE

JOINT PUBLIC NOTICE. May 2, 2016

Honorable Louise Slaughter

2.00 PURPOSE AND NEED FOR ACTION Project Area

Public Notice of Application for Permit

Final Supplemental Environmental Impact Statement

Draft Supplemental Environmental Impact Statement

PUBLIC NOTICE. A detailed description and plans of the applicant's activity are enclosed to assist in your review.

The Coal Institute Fall Education and Engineering Seminar

RIVER VALLEY INTERMODAL FACILITIES FINAL ENVIRONMENTAL IMPACT STATEMENT i TABLE OF CONTENTS

Briefing to Elected Officials

JOINT PUBLIC NOTICE. May 2, 2016

Draft. Prepared for: BRAC Program Management Office SE 4130 Faber Place Drive, Suite 202 North Charleston, South Carolina

CANAL, LOUISIANA MISSISSIPPI RIVER-GULF OUTLET, MICHOUD LETTER CANAL, LOUISIANA, REQUESTED BY A RESOLUTION PRESENTED BY MR. BYRD OF WEST VIRGINIA

Waterborne Commerce Statistics Center

FINDING OF NO SIGNIFICANT IMPACT (FONSI) Programmatic Environmental Assessment #556

JOINT PUBLIC NOTICE. February 8, United States Army Corps of Engineers State of Louisiana

JOINT PUBLIC NOTICE. June 25, 2018

JOINT PUBLIC NOTICE. July 7, 2014

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R June 27, 2017

Design and Construction of the Lake Borgne Surge Barrier in Response to Hurricane Katrina

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P.O. BOX NEW ORLEANS, LOUISIANA DEPARTMENT OF THE ARMY GENERAL PERMIT

Presenter: CLYDE HUNT. Project Manager Memphis District August 2010

JOINT PUBLIC NOTICE April 27, 2015

Coastal Texas Protection and Restoration Project

Transcription:

Inner Harbor Navigation Canal Lock Replacement Project Public Scoping Meeting Dr. Martin Luther King Jr. Charter School for Science and Technology Wednesday, February 4, 2015 1

Open House 6:00 p.m. 6:30 p.m. Agenda Presentation 6:30 p.m. Comments Following Presentation Welcome & Introductions... Rene Poche Presentation of IHNC Lock Replacement Project... Richard Boe Comments Public Conclusion of public scoping meeting... Rene Poche 2

Project Authorization 1956 84 th Congress authorized replacement of the lock under Chapter 112 of Pub L. 455. 1986 Authorization amended under Sec 844 of the Water Resources and Development Act of 1986 (Pub L. 99-662). 1996 Authorization amended under Sec 326 of the Water Resources Development Act of 1996 (Pub L. 104-303). 3

National Environmental Policy Act Scoping Scoping is defined as early public consultation, and is one of the first steps of the National Environmental Policy Act (NEPA) process. NEPA regulations (40 CFR 1501.7) require scoping to determine the scope of the issues to be addressed in the environmental review and to identify significant issues. Agencies shall: Make diligent efforts to involve the public in preparing and implementing their NEPA procedures (40 CFR 1506.6(a)). Public scoping meetings help to satisfy this requirement. 4

NEPA Scoping Scoping involves stakeholders and other interested parties early in the environmental compliance process to help determine the range of alternatives, the environmental effects, and the mitigation measures to be considered in an environmental document. The results of scoping process help to guide an agency s environmental review of a project. 5

NEPA Scoping We ask that you consider the following: What are the most important issues, resources, and impacts that should be considered in the Supplemental EIS? What alternatives should be considered in the Supplemental EIS? 6

Regional Value of Inner Harbor Navigation Canal Provides a continuous route for east and west bound vessels to follow the Gulf Intracoastal Waterway and cross the Mississippi River Avoids the Gulf of Mexico, inclement weather and long trip down the Mississippi River 7

Gulf Intracoastal Waterway (GIWW) Thru New Orleans District Main Stem Alternate Route Port Allen Lock Calcasieu Lock IHNC Lock Bayou Sorrel Berwick Lock Harvey Lock Algiers Lock Leland Bowman Lock Bayou Boeuf Lock 8

Existing Inner Harbor Navigation Canal (IHNC) and Lock Locally known as Industrial Canal Lock. Construction by non- Federal interests completed in 1923. Small size and frequent need for maintenance limits ability to accommodate the volume of vessel traffic. 1956 authorized for replacement. 9

Environmental Impact Statement (EIS) Record of Decision signed December 18, 1998. 1998 EIS and Project Evaluation Report evaluated and recommended: Construction method and location for a replacement lock north of the Claiborne Avenue Bridge. Replacement of the St. Claude Avenue Bridge. Modification of the Claiborne Avenue Bridge. Extension of the Mississippi River flood protection levees and floodwalls. A community impact mitigation plan. A fish and wildlife mitigation plan. 10

Events leading to preparation of the 2009 Supplemental Environmental Impact Statement (SEIS) In 2003, the construction of the lock replacement project was challenged in the United States District Court. In 2005, Hurricane Katrina caused substantial damage to the area. In 2006, the Court enjoined the Corps from continuing with the project until additional compliance with the National Environmental Policy Act was completed. 11

2009 SEIS In 2007, the Corps began preparation of an SEIS to address the current conditions. In 2009, Corps completed construction of a rock closure structure on the MRGO at Bayou LaLoutre. Record of Decision signed May 20, 2009. 2009 SEIS recommended: Float-in-place construction method. Hydraulic dredging method for excavation of sediment from the canal. Dredged material disposal plan that included three locations for disposal of excavated sediments. 12

2009 SEIS Litigation In 2010 the lock replacement project was again challenged in Court. In 2011 the Court found that the 2009 SEIS failed to sufficiently consider the impacts from closure of the MRGO on the depth of the new lock. 13

2015 General Reevaluation and SEIS Purpose: Determine if construction of a more efficient navigational lock to replace the lock is economically justified and environmentally acceptable. Need: Currently, delays in passage of vessels through the existing lock due to volume of vessel traffic and the small size and inefficiencies of the lock. 14

Consideration of Important Resources in the Project Vicinity Socio-economics (i.e., property values, land use, public/community facilities and services) Flood risk reduction Traffic Water quality Air quality Noise Cultural and historic properties Wetlands Other environmental concerns 15

Comments may be submitted to: U.S. Army Corps of Engineers (PDC-CEC) c/o Mark Lahare P.O. Box 60267 New Orleans, LA 70160-0267 Fax: (504) 862-2088 E-mail: Mark.h.lahare@usace.army.mil 16