Adjustable Pallet Racking Installation Guide

Similar documents
Mecalux Pallet Racking Assembly

APEX ADJUSTABLE PALLET RACKING

SK2000 Boltless Pallet Rack Installation and Assembly Manual

SKATEWHEEL FLOW RACK

Galvanised Longspan Shelving

Assembly and users manual. Pallet racking Alfa

Speedlock Pallet Racking

Upright Frame Selection Guide K-1000 is today s best teardrop pallet rack value. NOTES: K-1000 Selective Upright Capacity (pounds)

SK3000 Structural Pallet Rack Installation and Assembly Manual

Standard Duty Cantilever Rack Installation and Assembly Guide

" RISKS ASSOCIATED WITH THE INSTALLATION OF THE SYSTEM

W A R E H O U S E S O L U T I O N S

Wide Span Shelving M66

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000

CANADIAN MANUFACTURED PALLET RACKING OUR STRENGTH IS OUR PRODUCT ROLLFORMED RACK

storage solutions Averys group PAL RACK The high quality pallet storage system for goods of all sizes and weights.

Structural Cantilever Installation Manual

SELECTIVE PALLET RACK

A GENERAL INSTALLATION GUIDE FOR RIDG-U-RAK DRIVE-IN / DRIVE-THRU STORAGE SYSTEMS IG-DI-1

8 Rung Industrial Tower

NORTH AMERICAN STEEL INNOVATIVE STORAGE SOLUTIONS OUR S T R E N G T H IS OUR PEOPLE AMERICAN TEARDROP RACK

USER'S GUIDE FOR INSPECTION OF DAMAGED STORAGE RACK SYSTEMS DON T WAIT UNTIL IT S TOO LATE!

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

2 PALLET P RA ALLET CKING RA

1450/850. Instruction Manual. Mobile Access Tower

Structural Pallet Rack The ideal system for heavy-duty loads due to its greater weight-bearing capacity

ASSEMBLY & INSTRUCTIONS FOR USE. PALLET RACKING CITY Edition No. 2 BLS BLS AB

Conventional Pallet Racking

META CANTILEVER RACKS

ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS

UDL. up to QUICK. boltless. Expo Shelving. Adaptable Boltless System

ASSEMBLY & INSTRUCTIONS FOR USE. PALLET RACKING CITY Edition No. 1 BLS Brännehylte Lagersystem AB

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

STOW Pallet Racking PALLET STORAGE. Boosting operational efficiency in:

Span 400 Instruction Manual

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

SOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

USER'S GUIDE FOR INSPECTION OF DAMAGED STORAGE RACK SYSTEMS DON T WAIT UNTIL IT S TOO LATE!

complete with pallet support bars, column guards, safety barriers, pallet back stopper painting

Inspect components prior to erection. Inspect tower prior to use. Castors locked and legs correctly adjusted. Stabilisers fitted as specified

Safety First Mobile Towers - 3T Method

CED 2R17. Manual 38 R2 RMI CERTIFIED REG. #5150 R-MARK

BoSS Climalite Camera and lighting tower

Mobile Towers - 3T Method

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

WHAT IS CANTILEVER RACK?

SAFETY SYSTEM. G-Deck Consideration. Manual Handling

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage

Safety First Mobile Towers - 3T Method

Method Statement Concrete Support Systems

Acrow V-Shore Formwork System

the P.R. Skate, LLC Pallet Rack Moving System Product Manual

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

INSTALLATION. General. Important Note. Design. Transport

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

LEWIS Miniscaff Folding Tower Assembly Guide

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS

SK3000 Structural Channel Bolted Pallet Rack: Model Number System

RIVET RACKING heavy rivet - wide bays 1830mm to 2440mm

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

ROOM-MATE. 3T - Through the Trapdoor USER GUIDE

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

Pallet Racking. Versatile, cost effective and easy to install pallet racking systems.

Safety First Mobile Towers - 3T Method INTRODUCTION

AIVIS STORAGE RACKS Contact: Jenny Wang Tel: Fax: Cell number:

USE AND MAINTENANCE GUIDE FOR LONGSPAN SHELVING STORAGE

3T - Through The Trapdoor Method

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

CONVENTIONAL PALLET RACKING. Най-универсалната система с директен достъп до всяко пале

216 Upton Drive St. Joseph, MI Phone: [269] Fax: [269]

GROUP SWL....Delivering complete storage solutions

Racking systems RACKING SYSTEMS. IT S EASY TO ORDER sales hotline:

BoSS SOLO 700. One Man Aluminium Tower EN /4 EN1298-IM-EN 3T - Through the Trap Door USER GUIDE

Guide to Assembly & Usage. Van Racking. Warning. Never climb on the structure. Warning. Warning. Warning. Never climb on the structure

INSTRUCTION MANUAL MOBILE ACCESS TOWER

Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2

EVERYONE'S RESPONSIBILITY

SAFETY ACCESSORIES. Accessories can help you to enhance safety in your warehouse

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

ASSEMBLY & INSTRUCTIONS FOR USE PALLET RACKING CITY

EAB PALLET RACKING ALFA

Guide to Assembly & Usage. Van Racking. Warning. Never climb on the structure. Warning. Warning. Warning. Never climb on the structure

Racking & Shelving. Product Catalogue GLOBALIND.COM.AU

Rivet Racking Systems

Is Your Storage Racking Safe To Use

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method

STEEL STORAGE RACK SAFETY MANUAL

Page 19 : Usage and Safety Guidelines, Erection and Dismantling, Tools, Transportation, Page 20 : Do s and Don ts, General

3T - Through The Trapdoor Method

SELECTIVE PALLET RACK

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

PART 4: GENERAL CONDITIONS

LONGSPAN SHELVING Wide Bay Heavy Duty Shelving

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

Safety First Mobile Towers - 3T Method INTRODUCTION

Each warehouse has its specific requirements that must be assessed in order to obtain the best results. Analysis required in terms of the following:

Transcription:

Adjustable Pallet Racking Installation Guide Read this Guide thoroughly before commencing assembly and retain for future reference. Installation plans and design drawings should be strictly adhered to. If in doubt on any aspect of design, installation or usage, contact your racking supplier. It is RECOMMENDED that racking installation work is undertaken by experienced, trained personnel ONLY, and under the supervision of SEIRS Registered Installers (SEIRS is the Storage Equipment Installers Registration Scheme, operated by SEMA - see below). Where racking is to be installed or directed to be installed by the end user or an agent acting on their behalf, then installation work must be carried out in accordance with the Storage Equipment Manufacturers' Association (SEMA) 'Guide to Method Statements for the Installation of Storage Equipment.' This document is available from: SEMA Mclaren House, 35 Dale End, Birmingham B4 7LN, UK Telephone: +44 (0) 121 2002100 Fax: +44 (0) 121 200 1306 E-mail: enquiry@sema.org.uk Web site: www.sema.org.uk Safety & Load information signs MUST ALWAYS BE FITTED and clearly displayed - refer to page 6. Loading and performance information should be made available by the racking supplier Racking MUST NOT BE DISMANTLED OR THE ADVISED CONFIGURATION CHANGED without prior consultation with the racking supplier - unauthorised removal or re-positioning of beams in particular can seriously compromise the stability and safety of the racking structure. Unless otherwise stated, load performance information provided assumes MAXIMUM STATIC UNIFORMLY DISTRIBUTED SAFE WORKING LOADS. Under no circumstances should quoted capacities be exceeded or varied. During installation, check verticals and levels to ensure the racking is within the recommended parameters, shown right. The extent of undulation, slopes, steps, ridges, etc. in the concrete floor slab surface affect both racking and handling equipment. Advice on the effects of floor surface level variations on particular handling equipment should be obtained from the supplier. The supporting floor slab for pallet racking Should be of suitable construction and thickness and Level to within 1:1000. Do not attempt to install pallet racking on soft ground, timber floors or Tarmac surfaces. Note: general parameters only are shown - refer to SEMA Guideline No.2 'Guide to Erection Tolerances for Static Racking' for other applications.

Description of Main Components A B E D C G F A. Assembled Frame B. Box Beam (in pairs) C. Beam Safety Clip D. Pallet / Deck Support E. Row Spacer F. Frame Leg Guard G. Frame End Protector H. Frame Foot I. Levelling Shim J. Floor Anchor Bolt J H I IMPORTANT The actual quantity of each component supplied will vary according to the installation requirements. Frames are normally supplied fully assembled with sufficient levelling shims and floor anchors for standard installations on level floors. Please contact the supplier for separate frame assembly instructions or additional floor fixings if needed.

Frame Types and Configuration There are a number of standard frame bracing configurations according to the height of the frames. Please refer to the diagrams below. Ensure that all frames are positioned so that the lowest diagonal bracing nodes are facing into the operating aisle. End frames are normally 500mm taller than intermediate frames, so please ensure these are positioned correctly at the ends of each bay run. N1 = Single bracing joint with spacer N2 = Double bracing joint, no spacer Frame Positioning (End view) End Frame Heights (Side view) Lowest diagonal bracing nodes must face into operating aisle. End frames should be at least 500mm higher than top beam position. Intermediate frames should be 100mm higher than top beam.

Assembly Sequence of Frames and Beams IMPORTANT Where racking is to be installed or directed to be installed by the end user or an agent acting on their behalf, then bay assembly must be carried out in accordance with the Storage Equipment Manufacturers' Association (SEMA) 'Guide to Method Statements for the Installation of Storage Equipment'. To obtain this guide, refer to page 1 for contact details. 1. Check all components required are on site and not damaged. The area to be racked must be clean and clear of any obstructions. Survey and measure the floor to determine the level, run and aisle positions. Use chalk lines as guides for frame positioning. 2. Raise frames and locate beams in compliance with SEMA method statements. Appropriate safety harnesses and lifting equipment must be used. Ensure lowest diagonal bracing nodes are facing into the operating aisle as below: 3. Fit the first beam into the frame by locating the hooked connectors into the perforations on each upright (i). Ensure the beam is located evenly in both frames and then tap into place with a rubber mallet (ii). Insert a safety clip through the holes in each end of the beam to prevent the beam from being accidently dislodged (iii). Repeat the above steps to fit remaining beams. Access equipment will be required for fitting beams at high levels. i ii iii

Frame Floor Fixing All foot plates must be fixed to the floor using the required number of M12 x100mm anchor bolts. Before fixing, check verticals and levels to ensure racking is within recommended tolerances for the installation. Shim as necessary then floor fix. Tighten all bolts to the specified torque loading of 35Nm with a 17mm socket spanner. Minimum 1 floor anchor in each foot Row Spacers Row spacers ensure that the distance between two rows is kept the same. At least 2 spacers should be fitted between each pair of frames, preferably close to the diagonal and horizontal bracing nodes. For frames up to 6m high, use 2 spacers and for frames up to 10m high, use 3 spacers. Row spacers are fitted to the frame uprights with 4 x M8x25mm bolt and nut sets supplied as shown. The clearance between uprights is as follows: Code EPRS20 EPRS30 Clearance (C) 200mm 300mm C Frame Protectors Frame protectors are available in 2 styles for frame corners and for intermediate legs. Each protector must be bolted to the floor with 4 M12 x100mm anchor bolts as shown. For optimum frame protection please use the recommended clearances below. Corner Protector t t Leg Protector 35Nm Code EPCP EPFLP Clearance (t) 60mm 35mm

Pallet Deck Supports These support bars can be used with chipboard panels when a hand picking level is required or as supports for undersize or weak pallets. The number of supports needed per level will depend on the weight load capacity required. The supports simply sit on top of the beams and are available in 2 standard depths. Code EPDS09 EPDS11 Frame depth 900mm 1100mm If you use support bars underneath pallets then the tab at each end needs to be knocked flat with a rubber mallet. Knock down tabs when using as pallet supports Loading Charts & Safety Signs All adjustable pallet racking must display the correct loading information in prominent positions at the end of each run. The exact loading information will vary according to a number of factors including beam type, beam positioning and length. Therefore each run of racking must have a load safety chart containing the correct information as provided by the racking supplier. We also recommend fixing labels to each beam, stating the maximum load per level. Standard templates for load charts are available which can be completed by the end user and positioned as shown. Signs should be located approx. 2000mm high so they can be easily seen and read. Position Load Charts here IMPORTANT Any adjustments to beam heights could affect the load capacities of the racking if in doubt, please check with your racking supplier. RACKING SAFETY INSPECTION To comply with current guidelines and workplace health & safety regulations, it is essential that pallet racking is inspected for actual or potential safety hazards. These may be caused by impact damage to the racking or result from missing components. Inspections should be conducted on a regular, scheduled basis by suitably competent personnel. If in doubt about when and how to conduct racking safety inspections, contact your racking supplier.