Stewardship. Expectations. SE-01 Joint Venture Hub Strategy Implementation Guide

Similar documents
OGA 2017 UKCS Stewardship Survey Activity Section Guidance Notes 1. Stewardship Survey CONTENTS

Stewardship. Expectations. SE-05 Robust Project Delivery Implementation Guide

Meeting the Challenge of Delivering Successful Projects

MER UK in Practice. Decommissioning. Jim Christie and Richard Tocher

Decommissioning Delivery Programme

Supply Chain Action Plans Guidance

Stewardship Expectations. SE-03 Optimum Use of Subsurface Data Implementation Guide

Information Management Delivery Programme

1) 2) 3) 4) 5) The oil and gas cycle. Life cycle of oil and gas (time) Potential requirement on ground

2018 UKCS Stewardship Survey

WELL ENGINEERING SERVICES

THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED) PETROLEUM OPERATIONS NOTICE No.

UK Oil and Gas Reserves and Resources. As at end 2016

For personal use only

THINKING DIFFERENTLY ABOUT LATE LIFE ASSET MANAGEMENT AND DECOMMISSIONING

Decommissioning Strategy

Guidance on portfolio, programme and project management

SPE Seminar on Introduction to E&P Projects, 17 November 2016, London

UK Flaring Policy. UKCS Associated Gas Production, Flaring, and Utilization Rate. Billion Cubic Meters Uitlization Rate. 80 Production 98% Flaring

Introduction Petroleum Exploration, Development and Production

NIHR Information Strategy Version 2.0

OGA Stewardship Survey

Stewardship Survey Training & Awareness Sessions

Strategic Taranaki Acquisition

Infrastructure Code of Practice

Collaborative Behaviour Quantification Tool: Assessment Guidance Note

Amendment to Gas Quality NTS Entry Specification at BP Teesside System Entry Point

Asset Integrity Solutions. All-of-facility care for complete field life

OPTIMISING BUSINESS PERFORMANCE REDUCING RISK AND PROTECTING PEOPLE AND THE ENVIRONMENT

MAXIMIZING VALUE OF OIL AND GAS DEVELOPMENTS THROUGH RESERVOIR TO SURFACE INTEGRATED MODELING

Energy Technologies Institute (ETI) Submission to Energy and Climate Change Committee Consultation on Small Nuclear Power

UNFC Stakeholder Benefits

PLUTO OFFSHORE FACILITY OPERATIONS

Independent Oil & Gas plc

ASSET MANAGEMENT SERVICES

Qualification Management for Geological Storage of CO 2

Maximising Value OIL+GAS STRATEGY

Developments in the Irish Gas Industry

Identification Selection Definition Execution. Schedule.

TECHNOLOGY POLICY SUMMARY FOR THIRD PARTY SUPPLIERS

PROJECT MANAGEMENT PLAN

The Statement for Gas Transmission Connection Charging

XXX Development. Facility Feasibility & Option Selection Plan

Click to edit Master title style

Corrib Onshore Pipeline

Strategic Advisory Service

Delivering Energy. Upstream Stranded Domestic Gas Potential to meet Energy Demand through LNG Value Chain: Lessons Learned from Senoro-DSLNG

Independent Oil & Gas plc

UK STEWARDSHIP CODE RESPONSE BY GENERATION INVESTMENT MANAGEMENT LLP OCTOBER 2016

The Integrated Support and Assurance Process (ISAP): detailed guidance on assuring novel and complex contracts

COST EFFICIENCY IN TOTAL E&P UK

Business Case for Modernising Local Government in Buckinghamshire

Investor Briefing - Ichthys LNG Project

Ichthys Project OUR STRENGTH AND DETERMINATION IS DRIVING ONE OF THE WORLD S LARGEST AND MOST COMPLEX PROJECTS

ASX Release NILDE AREA OIL PROJECT PROGRESS UPDATE HIGHLIGHTS. 21 April 2016

Introduction, Vision and Team Q2 2019

Certificate in Internal Audit IV

Roles and Responsibilities

Manager Asset Planning

Accountable Officer for Health & Care Strategic Commissioning Function (SCF) & Pooled Fund Bolton Locality. Wirin Bhatiani, Chair

LO3 Energy 573 Sackett, Brooklyn, NY /10/18. Energy Networks Australia Unit 5, Level 12, 385 Bourke St Melbourne VIC Att: Stuart Johnson

2012 DECOMMISSIONING INSIGHT

Challenges Facing UKCS Sco1sh Oil Club 20th March Oonagh Werngren MBE Opera/ons Director, Oil & Gas UK President PESGB

SUSTAINABILITY APPRAISAL OF WATER MANAGEMENT STRATEGIES FOR CANTERBURY

For personal use only

An ETI Perspective. Storage, storage, storage key observations from our Strategic UK CO2 Storage Appraisal project

Response to I-SEM DS3 System Services Auction Design Consultation Paper SEM

Project Charter. A. General Information

Disclaimer & Important Notice

Implementing Asset Management In A Complex & Sensitive Environment

Availability Assurance Shell s experience in identifying elements critical to long term gas supply

LNG Impact on U.S. Domestic Natural Gas Markets

WHAT LIES IN STORE FOR TIMOR LESTE? MAY 2018

The overall objectives of the monitoring activities are to:

SHAPING THE NATURAL GAS MARKET OF CYPRUS

Advanced Audit Techniques

Good morning ladies and gentlemen. Thank you, Mr Cole for your kind introduction.

Decommissioning on the. UK Continental Shelf - an overview of regulations

Methodological Note Methane Intensity Target. Methodological note for OGCI methane intensity target and ambition

Qualification Management for Geological Storage of CO 2

Environmental Performance Report 2015 Offshore Operations

Independent Oil & Gas plc

Murphy Oil and Climate Change

Progressing Development of the UK s Strategic Carbon Dioxide Storage Resource

Nick Richardson Head of Exploration & New Ventures 12 th December 2018

Managing mature oil fields in a low oil price world

1. SCOPE OF WORKS. 1.1 Background of Preparation of ESHIA rev. A- 01

GUIDANCE NOTE: DEVELOPING A RESULTS

Planning, Reporting and Regulatory Framework

Standardization of the Evaluation Criteria on Petroleum Resources

The Sector Skills Council for the Financial Services Industry. National Occupational Standards. Risk Management for the Financial Sector

RATIO OIL EXPLORATION (1992)

UNIVERSITY OF CAMBRIDGE INFORMATION SERVICES COMMITTEE PROJECT AND PROGRAMME GOVERNANCE: DOCUMENTATION GUIDE: STAGE GATES

Manager Asset Delivery

SHELL ONSHORE OPERATING PRINCIPLES

Risk Identification of Power Plant Investment Projects. 10 May, 2016 Asian Power Utility Forum Peter Cockcroft

Evaluation of Scenarios Associated to Subsea Gas-liquid Separation in Pre-Salt Fields: Opportunities and Technological Challenges

Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service

Core Skills: Contributing Skills: Role Title: Senior Project Manager EXAMPLE. Reference: SFIA level 5

Q2 gross pilot production of ~17 MMscf/d, up ~10% on the previous quarter

Transcription:

Stewardship Expectations SE-01 Joint Venture Hub Strategy Implementation Guide March 2017

2 SE-01 Joint Venture Hub Strategy Implementation Guide 1. Objectives The objectives of this Stewardship Expectation are to: Ensure hub strategies are in place which articulate a strategic vision for a hub and how that hub will maximise economic recovery over its life time Encourage agreement of a hub strategy by the relevant joint venture, leading to improved alignment and delivery success for the joint venture s subsequent activity plans Facilitate a view within a joint venture of the long term strategy and plans for its hub, including the potential of nearby prospectivity and discoveries (either operated by the joint venture or by others) beyond its immediate producing fields and facilities Encourage area collaboration WHAT IS A HUB? A hub is: The natural grouping of hydrocarbon fields that produce into a common set of infrastructure (such as wells, pipelines and gathering facilities) and the common infrastructure processing such hydrocarbons; or An onshore terminal and its associated upstream export pipeline infrastructure It is important in the development of a hub strategy that its joint venture owners consider nearby prospectivity and discoveries (either operated by the joint venture or by others) within reasonable tieback distance to the hub infrastructure. Where a number of offshore surface facilities form a field complex, a single hub strategy addressing the hub area is sufficient (for example, platform A, B and C which all service the same field or fields). WHEN IS A HUB STRATEGY REQUIRED? The OGA expects a hub strategy to be prepared for any asset that either: Has an approved Field Development Plan (FDP); and Comprises of floating or fixed surface infrastructure, e.g. a Floating Production Storage Offtake (FPSO) or a platform, for processing hydrocarbons from a field and/or its surrounding satellite fields to an export specification acceptable for transportation onshore via an export pipeline or offtake tanker or an asset which comprises: An onshore terminal and associated upstream export pipeline infrastructure

3 SE-01 Joint Venture Hub Strategy Implementation Guide HOW FREQUENTLY SHOULD A HUB STRATEGY BE UPDATED? The OGA expects a hub strategy to be updated at least once every two years, however it may be necessary to update more frequently. The OGA expects that a hub strategy will be developed by the infrastructure operator and agreed by the infrastructure co-venturers. The hub joint venture is not required to make the hub strategy publicly available. 2. Contents of a hub strategy The hub strategy should include the following elements : 2.1 Hub and area description 2.2 Strategic vision for the hub 2.3 Strategic options considered 2.4 Strategic option chosen and strategic delivery elements 2.5 Risks and opportunities 2.6 Activity plan 2.1 HUB AND AREA DESCRIPTION 2.1.1 Summary of the hub and surrounding area (preferably with simple diagram) to include descriptions of its: a. Subsurface b. Wells c. Infrastructure (including constraints) d. Undeveloped discoveries (including consideration of nearby discoveries operated by others based on publicly available industry data/ information) e. Exploration prospectivity (including consideration towards nearby prospectivity operated by others based on publicly available industry data/ information)

4 SE-01 Joint Venture Hub Strategy Implementation Guide 2.1.2 A summary of the following resources and reserves within the hub area: 2.1.3 a. Prospective resources b. Contingent resources c. Reserves Note: publicly available data/information on third party resources and reserves should be included, where relevant. Details of the performance of the hub measured against the most recent Asset Stewardship Survey submissions and/or joint venture programmes and budgets (including production target, production efficiency, operating cost, capital investment). 2.1.4 A description of the joint venture and commercial framework applicable to the hub 2.1.5 A summary of the hub s licensing framework 2.2 STRATEGIC VISION FOR THE HUB A high-level summary of the joint venture s strategic vision for the hub and its surrounding area. 2.3 STRATEGIC OPTIONS CONSIDERED A brief summary of the strategic options that were considered for the hub strategy and, for those not selected to proceed, a brief summary why they were not selected. 2.4 STRATEGIC OPTION CHOSEN AND STRATEGIC DELIVERY ELEMENTS A summary of the hub strategy chosen and the rationale for its selection, together with detail on the underpinning elements required for delivery of the hub strategy, including where appropriate: a. Base management (management of existing reserves) b. Incremental investment (developments, subsurface, wells, plant and export investment delivering additional incremental reserves) c. Exploration and appraisal (near field and wider area)

5 SE-01 Joint Venture Hub Strategy Implementation Guide c. Collaboration and alignment (including, identification of wider multi joint venture area collaboration required to deliver the strategic option, if any) d. Engagement with nearby third party operators on potential tie back opportunities e. Ageing and life extension of the hub infrastructure (including pipelines and flowlines) f. Cessation of production and decommissioning 2.5 RISKS AND OPPORTUNITIES A hub risk and opportunity register and matrix that: a. Identifies the key risks and opportunities with their potential negative or positive impact on the hub strategy and associated activity plan b. Sets out an action plan for mitigating the risks and securing the opportunities identified in the register 2.6 ACTIVITY PLAN 2.6.1 A high level plan of activity covering the life of the field and/or infrastructure, comprising the following areas and including milestones and key decisions: a. Base management (management of existing reserves, including ageing and life extension of infrastructure) b. Incremental investment c. Exploration and appraisal (new resources and reserves, both near field and within the hub vicinity, including third party resources and reserves) d. Third party business opportunities (including tie backs) e. Commercial/joint venture (joint venture agreement activity) f. Decommissioning 2.6.2 A summary of the parameters that frame and underpin the activity plan should also be included, such as: a. Production b. Capital investment c. Operating expenditure d. Abandonment/decommissioning expenditure

6 SE-01 Joint Venture Hub Strategy Implementation Guide 3. Submission to the OGA A hub strategy does not require to be submitted to the OGA unless the OGA requests submission. In the event that the OGA requests an operator to submit a hub strategy on behalf of the relevant joint venture, the OGA will seek confirmation from the operator that the hub strategy has been agreed with its coventurers. 4. OGA Analysis Upon receipt, the OGA will review and/or use a hub strategy for the following purposes: a. Identifying gaps, overlaps and/or conflicts between adjacent and/or interconnected hub strategies and/or conflicts with any OGA area plans b. Acquiring a wider view of the UKCS to identify insight and opportunity c. Identifying key risks and opportunities for hubs connected by critical pipeline infrastructure and terminals d. Understanding the strategic alignment of the joint venture on long term plans for the hub e. To assist in prioritising Stewardship Reviews at Tier 1, 2 and 3