ALSTOM Atomenergomash LLC developing ARABELLE based Turbine Islands for newly constructed and retrofitted nuclear power plants.

Similar documents
Full Steam ahead for Flamanville 3 EPR turbine island construction

Turbine Island. Nhan Huynh Project Manager, Turbine and its auxiliary systems

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

Products and customer service

A. the temperature of the steam at the turbine exhaust increases. B. additional moisture is removed from the steam entering the turbine.

Overall nuclear power plant thermal efficiency will decrease if... A. the temperature of the steam at the turbine exhaust increases.

Steam Turbines. A Finmeccanica Company

Technology Options for Existing Coal Units

РRUSSIAN NUCLEAR ENERGY TODAY

Westinghouse-UK Partnership for Development of a Small Modular Reactor Nuclear Programme

Steam Turbines. Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW.

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY

Nuclear Industry Localization Practices and Recommendations

Temelin 1000 MW Units Active Testing Stage - Commissioning Experience

DE-TOP User s Manual. Version 2.0 Beta

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Nuclear Power A Journey of Continuous Improvement

Flexible steam turbine solutions for combined heat and power in combined cycle power plants

Our Contribution to the Forum

EXPERIENCE OF SUPPLIES FOR ROSATOM

Adapting for the Future: Bringing New Life to Industrial Steam Turbines in Changing Markets

VVER-440/213 - The reactor core

Combined Cycle Power Plants. Combined Cycle Power Plant Overview (Single- and Multi-Shaft) Training Module. ALSTOM (Switzerland) Ltd )*+,

International Conference Power Plants 2012 Society of Thermal Engineers of Serbia Oct 30 th Nov 2 nd, 2012 Zlatibor, Serbia

MARAMA Webinar August 7, Angelos Kokkinos Chief Technology Officer Babcock Power, Inc.

PRISM Heat Removal Safety Systems

AP1000 European 21. Construction Verification Process Design Control Document

EDF & the nuclear renewal : the Flamanville 3 model. Jean-Claude Prenez Director for International Projects EDF Nuclear Engineering Division

Advanced High Temperature Reactor Project PBMR relaunch

DONGFANG ELECTRIC CORPORATION LIMITED. Dr. Harry Chen, Vice President April 20 th, 2012

District Heatingwithor. C For Additional And Cleaner POWER. ISCC and Solar Boost. Conference Paper CONFERENCE PAPER

TCN 02, Dated: WITH REFERENCE TO ABOVE FOLLOWING CHANGES MAY PLEASE BE NOTED AND COMPLIED WHILE SUBMITTING THE OFFER FOR THE SUBJECT JOB:

Pertti Sakari Simola, TVO, President and CEO, Finland

PEMP RMD & Cycle Performance. M.S.Ramaiah School of Advanced Studies

"Leveraging Cross-Industry Know-How for Thermodynamic Cycles & Turbomachinery Component Innovation"

STEAM TURBINES. A full range to fit your needs POWER

Alstom in Nuclear Power Plants and Vietnam

4. Nuclear Power Plants 1 / 40

Extension to 60 years lifetime

Generation III of nuclear reactors

Steam Power Systems. GE Innovation Forum Michael Keroulle, Global Sales and Marketing Leader, Steam Power Systems. 15 April, 2016 Seoul, Korea

Due Diligence: Efficiency Increase in Existing Power Stations - a Practice Report-

New Requirements for Steam Turbines due to Renewable Energy Innovative Concepts for Thermal Power Plants

SMR An Unconditionally Safe Source of Pollution-Free Nuclear Energy for the Post-Fukushima Age

Pre-owned 240 MW Combined Cycle Gas Turbine Power Plant

Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors)

Industrial Power. SGT-800 Gas Turbine. Power Generation: (ISO) 47.5 MW(e) / 50.5 MW(e) / energy

Increased efficiency and flexibility in coal-fired power plants International O&M Conference NTPC siemens.com/steamturbines

ENGENIUS ERECTORS PVT. LTD. POWER PLANT ENGINEERS

NEW SAFETY REQUIREMENTS AND LONG TERM OPERATION POLICY

Current Steam Turbine Technology and its Applicability in the Pulp and Paper Market

5. Steam Turbine Performance

Rosatom Energy Solution: Engineering Perspective

NREL CSP WORKSHOP. Bright Source Energy Inc. Oakland, CA

Adoption of USC CFB Technology to Achieving Lower Cost Generation and Environmental Sustainability. Gerd Heiermann & Douglas Spalding

Fuji Electric s Medium-capacity Steam Turbines FET Series

Fossil Materials and Repair - Program 87

Hitachi Turbine Generator Technology for Nuclear Applications

Problem specification

GE Power. Fleet360* Total Plant Service Solutions Steam Turbine Advanced Steam Path Upgrade

Guam Power Authority. New Resources: Capital Costs. zzzzzzzzz. Operating Characteristics. October 26, 2012

2016 FSRUG Columbia Station Feed Flow Fix

Module 06 Boiling Water Reactors (BWR)

14th International Conference on Greenhouse Gas Control Technologies, GHGT-14

TOPIC: KNOWLEDGE: K1.01 [2.5/2.5]

Westinghouse AP1000. Reactor

Olkiluoto Infrastructure

Versatile technology for ever changing markets

2291-6A. Joint ICTP-IAEA Course on Science and Technology of Supercritical Water Cooled Reactors. 27 June - 1 July, 2011

Secondary Systems: Steam System

PI Heat and Thermodynamics - Course PI 25 CRITERION TEST. of each of the following a. it

Low temperature cogeneration using waste heat from research reactor as a source for heat pump

Analyst day Russia & CIS Thermal Power. Philippe Cochet 15/03/2012

THE GEOTHERMAL POWER PLANT AT SANJACINTO-TIZATE

STEAM TURBINES A FuLL RANGE TO FIT your NEEDS

Welcome to. Kendal Power Station

Effect of Non-Condensable Gas On The Performance of Passive Containment Cooling System in VVER-1200 Design

SGT-8000H gas turbine series proven in commercial operations

Indo-German Energy Forum: Flexibility Case Study at Dadri and Simhadri An overview. Dr. Claudia Weise, December 1, 2017, Delhi

Consider a simple ideal Rankine cycle with fixed turbine inlet conditions. What is the effect of lowering the condenser pressure on

DEILIR TECHNICAL SERVICES YOUR GEOTHERMAL SERVICE PARTNER

Channel Type Reactors with Supercritical Water Coolant. Russian Experience.

TOSHIBA. Steam Turbine

Welcome to Taishan NP site

Carrington Power Station

OPTIMUM ECONOMY AND EFFICIENCY IN ENERGY CONSUMPTION DURING START-UP AND SHUT-DOWN OF 210MW THERMAL POWER STATIONS

Modularity Approach of the Modular Pebble Bed Reactor (MPBR)

Concepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant

Module 06 Boiling Water Reactors (BWR)

Equipment Manufacturing Capability, Localization and AVL process of Doosan. April 27 th, 2017 Doosan Heavy Industries & Construction Co., Ltd.

Country Presentation. Ukraine

Thermodynamic Considerations for Large Steam Turbine Upgrades and Retrofits

Development of Medium-size ABWR Aiming at Diversification and Amount Control of Plant Investment

Increased efficiency and flexibility of large coal-fired power plants applied to 350-MW-class units

Steam Turbine Performance Improvements Through R&M

Operation and Maintenance Energy Technology

THE STUDY ON OVERALL I&C SYSTEM SCHEME FOR FLOATING NUCLEAR POWER PLANT ACP100S AND ACP25S

Westinghouse s plant for the Nuclear Renaissance : AP1000. AP1000 Advanced Passive Plant

Piping Technology. High Pressure Piping Systems. for power plants

Transcription:

ALSTOM Atomenergomash LLC developing ARABELLE based Turbine Islands for newly constructed and retrofitted nuclear power plants. 26.10.2011 A.M. Tsvetkov, ALSTOM Atomenergomash LLC

ALSTOM Atomenergomash LLC (AAEM) 2007 ARABELLE 49 % 51 % manufacturing of half-speed turbines and generators rated 1000 1800 MW for NPP integrated turbine hall equipment supply for nuclear applications turbine hall equipment retrofit solutions for nuclear industry emergency diesel generators packages supply for nuclear applications service maintenance of NPP turbine hall ATOMEX Europe 2011, p. 2

ALSTOM nuclear reference Nuclear Units GE 15% Hitachi 3% MHI 4% Turboatom 9% Others 6% Siemens 23% Calvert Cliffs 3 1 x 1700 MW (engineering & long lead time item reservation) Chooz B 2 x 1550 MW Civaux 2 x 1550 MW Flamanville 3 1 x 1750 MW BHEL 2% Ansaldo 2% ALSTOM 30% SKODA 4% Toshiba 2% 26 ARABELLE are now under construction or operation worldwide Ling Ao 3+4 2 x 1100 MW Hong Yan He 4 x 1100 MW Ningde 4 x 1100 MW Tianwan 5+6 2 x 1100 MW Taishan 2 x 1750 MW Fangjiashan 2 x 1100 MW Fuqing 4 x 1100 MW ATOMEX Europe 2011, p. 3

Participation in the new generation NPP projects Distinctive features of new generation NPPs: increased thermal output of the reactor - up 3300 MW increased electric output not less than 1255 MW increased efficiency of turbine generator unit up to 38 % application of ARABELLE turbine generator unit with 2 LPC with LSB 1730 mm (69 ) application of HEAS and district heating 500 MW 3D model of the turbine hall Main objectives: maximum fleet standardization of equipment reduced construction period reduced cost of construction and maintenance ATOMEX Europe 2011, p. 4

Half Speed/ Full speed Тихоходные / Быстроходные AAEM LLC ARABELLE - technology for advanced NPP Доля Turbine тихоходных Speed и быстроходных Technology турбин - World на мировом market рынке share 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 11% 50% 88% 100% 89% 50% 12% Все <700 MВт >900 MВт >1200 MВт Диапазон мощностей Unit size range All sizes <700MW >900MW >1200MW Half тихоходные Speed Full быстроходные Speed Ling Ao Unit 1 (3000 rpm) Ling Ao Unit 3 (1500 rpm) Parameter Ling Ao 1 Ling Ao 3 Comment The Customer s extra income in terms of reliability, availability, efficiency and installation and commissioning costs of the ARABELLE equipment versus full-speed equipment: from 360 М до 430 М. Turbine speed 3000 rpm 1500 rpm ARABELLE is half-speed Machine room size 99 x 59 m 99 x 59 m Same footprint Reactor thermal output 2904 MWth 2904 MWth Same reactor conditions Cooling water temperature Feedwater pumps drive Turbine Motor Output (net of feedwater pumping power) 23 C 24 C + 1 C warmer for unit 3 Ref. Ref. + 81 MWe Motor driven is nowadays standard ARABELLE architecture allows to boost the output by more than 8% ATOMEX Europe 2011, p. 5

ARABELLE - standardized technical solutions To Match Any Commercially Available Reactor EPR ESBWR/ABWR VVER 1000 AP 1000 ATOMEX Europe 2011, p. 6

integrator of turbine hall HP&LP Feedheaters Maximum unit output: - 1550MW in operation - 1750MW under construction Longest last stage blade: - L = 1750mm Maximum steam turbine efficiency: - Gross efficiency > 37 % 4-Pole generator Extraction pumps Circulating water pumps Maximum Steam turbine safety and reliability: - Reliability 99,97% Low construction costs thanks to compact design Low total operation cost LP Rotor Condenser MSR assembly The largest reference list ATOMEX Europe 2011, p. 7

ARABELLE - compact design Moisture Separator Reheater 68 bar 3.4 bar HP IP LP 1 LP 2 Length of turbine set 37,5 m 10.43 bar Weight of turbine set 1880 t Moisture Separator Reheater HIP turbine section LP with LSB 1730 mm ATOMEX Europe 2011, p. 8

ARABELLE - design features IP Exhaust Independent LP module The 4-pole generator 2- stage MSR ATOMEX Europe 2011, p. 9

High reliability indicators ARABELLE - Extensive positive feedback of experience ATOMEX Europe 2011, p. 10

General view of ARABELLE based Turbine Island for new generation NPPs The main properties: MSR installation 2 x 50%, Horizontal LP1/2 duplex heaters 2 trains, Horizontal LP3/4 heaters 1 train, horizontal. HP6/7 heaters 2 trains, horizontal. Turbine building footprint : Length = 91.9 m, Width = 57.2 m, Building height ~50 m. District heating heaters 3, located inside the TH building. Main cooling water pumps - 2 x 50%. Condensate extraction pumps - 3 x 50%. Main FW pumps - 4 x 33%. Start-up FW pump - 1 x 5% Operation and maintenance indicators: Availability - 97.5 % Reliability indicators - 99.7 % Capability - 1256 MW ATOMEX Europe 2011, p. 11

Outsourcing foreign manufacturers of NPP Turbine Hall equipment AAEM Plant Integrator Outsourced manufacturers ATOMEX Europe 2011, p. 12

Heat sink, district heating and HEAS optimisation Modular condenser LP turbine selection Main circulating water pump Condensate pump ATOMEX Europe 2011, p. 13

Heat sink optimisation effects Turbine hall integration for nuclear applications Make the Best Use out of the Nuclear Reactor Cold-End optimising is key for plant economic performance Direct impact on Cost of Electricity Heat sink optimisation Maximum Owner's benefit HP IP LP's Cooling Tower MSR Nuclear Steam Supply System Deaerator MSR CR pumps Feedwater pumps Feedheaters CR pumps Condenser Circulating water system Condensate Extraction system Optimum Vacuum Backpressure in mbar Evaluated MWe Extra net MW * Evaluation factor Investment Cost Investment total cost based Owner's Benefit Net present value ATOMEX Europe 2011, p. 14

ALSTOM s experience in conventional island equipment retrofit World leader in component and integrated retrofits Component retrofits Integrated retrofits 1% 6% 2% 1% 4% 2% Alstom 42% 2% 6% 12% Others Others 16% 4% 9% Alstom 64% 3% 26% Market share analysis represents period FY04-FY08. Source: Internal 780 cylinders retrofitted (320 retrofits of third party machines) Leading the concept of integrated retrofits for turbine island Retrofit AAEM 2009. 28/09/2009 Page 15 ATOMEX Europe 2011, p. 15

Retrofit. Design procedure Lazer equipment utilization at site Integrated instruments for design and calculations LM7 LM5 LM4 LM6 LM3 LM1 LM2 ATOMEX Europe 2011, p. 16

Retrofit. Design procedure Interface analysis for steam turbines of the other manufacturers ATOMEX Europe 2011, p. 17

Turbine retrofits. Technical options Original design Double flow cylinder - reactive type blading Single flow cylinder reactive type blading Inner casing components optimization Various retrofit options implemented Turbine producer not involved Cylinder replacement Targeted output achieved and turbine problems cured thanks to the selected technical retrofit options ATOMEX Europe 2011, p. 18

Generators retrofit Nuclear Rewind, Upgrade & Retrofit Capability Performance (MVA, MVAR, efficiency, reliability ) Outage time Extended life time Replacement Generators Integrated solutions to fit new generators within existing environment, requalification of auxiliaries, new excitation systems, functional scope Generator Mid- Sections Plug and operate solutions : stator replacement, rotor replacement or rewind, new excitation systems, requalification of auxiliaries Generator Rewinds / Upgrades Stator rewinds, rotor rewinds, new excitation systems, technology changes, additional loops (water) Maintenance Solution depending on customer need. Parts and Field Services ATOMEX Europe 2011, p. 19

Retrofit. Consolidated data for the operated turbine K-1000-60/1500-2 - 1500rpm 1 x HP double flow module - 2 x 7 stages - Active type blading Disc-and-diphragm design Welded rotor - Полный подвод пара 3 x LP double flow module - 2 x 7 stages - Active type blading Disc-and-diphragm design Welded rotor Last stage blade: 1450mm (57 ) на f2700mm 18,9m 2 ATOMEX Europe 2011, p. 20

Balakovo NPP Retrofit HPC and LPC scope options New HP cylinder Active type blading (disc-and-diaphragm design) - Finalization of the blading type active versus reactive depends on ratio expenses-profit 9 stages per flow Preliminary scope of works includes: - Bladed rotor - Diaphragm - Diaphragm sockets for 4-9 stages (operated 1-3 stage sockets of diaphragms remain unchanged) Welded rotor Full arc admission New LP cylinder Reactive blading 12 stages per flow Preliminary scope of works includes: - Rotor - Stationary and moving blades - New sockets of blades inner casing shall remain unchanged (subject to additional estimation) LSB 57 Drum type welded rotor ATOMEX Europe 2011, p. 21

Conclusion 1. Currently 33 out of 38 nuclear units rated 900 MW and over are equipped with low speed turbines. 26 of them are based on ARABELLE technology. 2. Tests of the 1000MW ARABELLE Half-Speed Turbine Plant conducted in the 3 rd power unit at Ling-Ao NPP (China) in 2010 have shown an electric power increase of above 8% versus full-speed double-flow turbine design given the same conditions on-site. 3. According to Alstom/AAEM research, the Customer s extra income in terms of reliability, availability, efficiency and installation and commissioning costs of the ARABELLE equipment versus full-speed equipment would vary in the following range: 360 million per unit at the rate of 25/MWh, or 430 million per unit at the rate of 30/MWh. 4. 2011 agreement is reached to involve AAEM with ARABELLE technology for the participation in new nuclear units to be constructed in Russia and abroad. 5. Basing on Alstom engineering solutions, AAEM adds value to its competence in retrofitting equipment for nuclear power plants in operation. ATOMEX Europe 2011, p. 22

ATOMEX Europe 2011, p. 23 Thank you for your attention!