VIDHAN SABHA QUESTION. Name of Department : MPP & Power Department. Date of Reply : Asked by : Shri B.K.

Similar documents
Viability of CDM Projects in India: A Study of Chanju CDM Project in Chamba District of Himachal Pradesh India

Speedier Harnessing of Hydropower Potential in Northern Himalaya

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA

DETAILED NOTE ON PROJECT

Six Monthly Compliance Report (July 2014 to December 2014) and. Status of Environmental Management Plan. for Budhil (70MW) HEP

SMALL HYDRO PROGRAMME IN INDIA

Himachal Pradesh Power Corporation Ltd. (A State Govt. Undertaking)

Initial Environmental Examination

Energy scenario in Himachal Pradesh and make in India vision 2030

Hydro Power Projects in J&K State-Potential Scenario

HYDRO POWER IN INDIA 2017

86 MW Hydro Project in Himachal Pradesh

DEPARTMENT OF TECHNICAL EDUCATION, VOCATIONAL & INDUSTRIAL TRAINING, HIMACHAL PRADESH

Demand & Supply of Fish Seed in State

GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF LAND RESOURCES LOK SABHA STARRED QUESTION NO. 70 TO BE ANSWERED ON

Faya-kun Power Pvt. Ltd. M

Petition No 730 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order :

FACT SHEET. The State Government has now submitted a proposal for renewal of diversion of forest land. The facts of the case are as below:

Report on. Industrial Visit. for Bachelor of Technology. in Electrical Engineering

NHPC Limited. Background. Objects Of The Issue. Valuation. Aug 07, 2009

Himachal Pradesh State Pollution Control Board,

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UNSTARRED QUESTION NO.2282 TO BE ANSWERED ON

CASE No. 120 of And. Miscellaneous Application No. 16 of 2016

PROJECT TITLE: 86 MW HYDRO PROJECT IN HIMACHAL PRADESH

Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

Rs 38,420 Crore: Little Sikkim s huge Growth Gamble

District-wise. Twenty Point Programme Progress Report. From. April, 2015 to March, (Financial Year )

F. No. 8/42/2600-DONER (NLCPR) GOVERNMENT OF INDIA MINISTRY OF DEVELOPMENT OF NORTH EASTERN REGION

ALEO HYDRO ELECTRIC PROJECT ALEO, MANALI (H.P.) (2X1500KW) A.K. Goel Manging Director M/s. Small Hydro Engineering Consultant Pvt. Ltd.

Green Growth and Demand Side Management in Himachal Pradesh

GOVERNMENT OF INDIA MINISTRY OF AGRICULTURE AND FARMERS WELFARE DEPARTMENT OF AGRICULTURE, COOPERATION & FARMERS WELFARE

BENEFIT SHARING FROM HYDRO POWER PROJECTS

Action taken (NGT Order dated 07 th August vide OA No. 138, 139/2018)

Section 4 of RTI Act, 2005

PENTAFLO HYDRO PVT. LTD. (Design, Manufacture, Trading, Supply, Erection and Commissioning of Hydro Power Project Machinery) COMPANY PROFILE

LIVESTOCK PROFILE. PDF processed with CutePDF evaluation edition 50 ENVIS Centre on Himalayan Ecology, GBPIHED, Almora

e-constituency Management

Power for All. Himachal Pradesh

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun

ORISSA HYDRO POWER CORPORATION LTD. JANPATH, BHUBANESWAR *** *** ***

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH

Energy Introduction Performance of State Sector, Installed Capacity

Grid Connected Rooftop PV Systems

REPORT CARD BIHAR STATE ELECTRICITY BOARD

No. 6/11/2017-PESB भ रत सरक र / Government of India

Ministry of Environment, Forests & Climate Change Northern Regional Office Dehradun Dr. Mahesh K. Verma Sr. Manager (Geol) & OIC

20 September To, Engineer-in-Chief (Irrigation), Irrigation and CAD Department, Government of Andhra Pradesh

Saudamini Das a and Kanchan Chopra b. Abstract

N O T I F I C A T I O N

special focus on : Jammu & Kashmir State

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

Committed to Excellence. Company Profile AT&T ENGINEERS PVT copyright 2012 ATTEPL

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

My team collegue Dr. Asad Rahamani has submitted report on the impacts of Lower

Madhya Pradesh Electricity Regulatory Commission Tariff Order for Procurement of Power by Distribution Licensees from Small Hydro Based Generation

ASSAM POWER GENERATION CORPORATION LIMITED H.M.Sharma Resident Engineer ASEB, E-8, Lajpat Nagar-II, New Delhi

Agenda Note for Connectivity Applications in Southern Region as per CERC Regulations, 2009

An Overview of Small Hydro Power Generation Scenario in India

Water State at a Glance: Manipur, Vol. 1(8), 2016

Comparative study on power situation in the Northern and Central states of India

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy

IDBI BANK LIMITED. Declaration of result in respect of Special Resolution passed on February 21, 2018 through Postal Ballot

Immediate Release Noida, Thursday, October 28, 2010

District-Wise Twenty Point Programme Progress Report From April, 2011 to March, 2012

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL-SCALE PROJECT ACTIVITIES (SSC-CDM-PDD) Version 02 CONTENTS

318/331/2017-GCRT Government of India Ministry of New and Renewable Energy *** NOTICE

proposed Modeller Modeller No Change 06 (six) *6 (2016) *subject to variation dependent on workload. Non-Ministerial

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. *142 TO BE ANSWERED ON

Route map to the venue of the meeting

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

GREEN NORMS FOR SMALL HYDRO POWER. Potential Impacts and the Need for Green Norms

No.EDN-H(21)F(10)1/2010-Misc.-III Directorate of Higher Education Himachal Pradesh. Dated : the 07 th /24 th August, 2010.

IND: Himachal Pradesh Clean Energy Transmission Investment Program - Tranche 2

BHANDARDARA HYDRO ELECTRIC PROJECT - II

ANNUAL REPORT H.P. STATE POLLUTION CONTROL BOARD HIM PARIVESH, PHASE-III, NEW SHIMLA Website :

TRAINING MANUAL OF TRANSPORT DEPARTMENT HIMACHAL PRADESH

HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.

GOVERNMENT OF INDIA DEPARTMENT OF ATOMIC ENERGY RAJYA SABHA UNSTARRED QUESTION NO : 740 TO BE ANSWERED ON 04/03/2010 SHARE IN ATOMIC ENERGY PRODUCTION

USE OF WHATSAPP MOBILE APPLICATION IN PROJECT MANAGEMENT OF LARGE INFRASTRUCTURE PROJECT

Executive Summary of Bistan Lift IrrigationProject

An Overview of Rooftop Solar Energy Program of SECI

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

State at a Glance: Arunachal Pradesh, Vol. 1(2), Water


THE H.P. STATE COOPERATIVE WOOL PROCUREMENT AND MARKETING FEDERATION LTD.

Impact of Indus Water Treaty on J&K State: with Special Reference to Hydro Power Potential

TRAINING MANUAL & TRAINING PLAN

DHUKWAN SHEP (24 MW) (UNDER CONSTRUCTION ON RIVER BETWA IN BABINA, DISTT. JHANSI, UP)

CHAPTER - IV ORGANIZATION STRUCTURE OF PUNJAB NATIONAL BANK

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

Ministry of New and Renewable Energy

SMALL HYDRO ELECTRIC PROJECTS - CREDENTIALS

A REPORT ON ACADEMIC VISIT TO UKAI DAM (Date: 27 th February 2017)

Page 1

GOVERNMENT OF INDIA MINISTRY OF HEAVY INDUSTRIES AND PUBLIC ENTERPRISES DEPARTMENT OF HEAVY INDUSTRY

South Asia Energy Security : Challenges And Opportunities

Petition No: 103/2015 CORAM S.K.B.S. Negi CHAIRMAN IN THE MATTER OF: ORDER

HPGCL HPGCL was incorporated as a company 17th March, The business of Generation of Power of erstwhile HSEB was transferred HPGCL

Transcription:

VIDHAN SABHA QUESTION Name of Department : MPP & Power Department Starred Question No. : 1164 Date of Reply : 06-08-2014 Subject : Power Projects. Asked by : Shri B.K.Chauhan (Chamba) Concerned Minister : MPP & Power Minister Question Reply (a) how many Power Projects, i.e. small, medium and big have been constructed on the river Ravi and its tributaries in the District of Chamba; details with names of the owners of companies; generation capacity and actual generation recorded during the last 3 years be given; and (a) Twenty four Hydro Power Projects having aggregated installed capacity of 1411MW stand commissioned under various sectors viz state, central, private sectors and Himurja, on river Ravi and its tributaries in Chamba District. Out of these 24 Hydro-electric projects, a total of 16222 Million Unit energy has been generated during last three financial years viz 2011-12, 2012-13 and 2013-14 as detailed below: Financial Year Actual Generation (in Million Unit) 2011-12 4983.833 MU 2012-13 5541.470MU 2013-14 5696.283MU Total 16221.586 MU

Detail showing name of Projects, Name of Companies (Executive Agencies) and Generation/ Installed capacity is at Appendix-A and year wise Annual Generation for last three financial years viz 2011-12, 2012-13 and 2013-14 is given at Appendix-B. (b) how much funds have been contributed by these companies annually for the development of the Chamba District during the last 3 years? Rs. 8.82 crore have been contributed for the development in Distt. Chamba, by the above Independent Power Producers (IPPs) involved in operation of above 24 Hydro Electric Projects on Ravi river in distt. Chamba, during last three years viz upto 31 st March 2012, 2012-13 and 2013-14. The year wise detail of contribution of fund deposited by the IPPs in respect of 24 HEPs towards development in district Chamba are as under:- Financial Years Funds Deposited (in Rs.) Up to 31 st March, 2012 8,53,91,195 2012-13 21,50,000 2013-14 6,80,000 8,82,21,195 Project wise detail of these funds is given at Appendix-C.

List of Projects in Ravi Basin in Distt. Chamba- Appendix-A Sr. No. Name of Project Company Generation capacity (MW) 1 Bhuri Singh PH Himachal Pradesh State Electricity Board (HPSEBL) 2 Holi Himachal Pradesh State Electricity Board (HPSEBL) 3 Sal-II Himachal Pradesh State Electricity Board (HPSEBL) 4 Juthed Himurja, H.P. Govt. Energy Development Agency 5 Gharola Himurja, H.P. Govt. Energy Development Agency 6 Baira Suil National Hydroelectric Power Corporation (NHPCL) 7 Chamera-I National Hydroelectric Power Corporation (NHPCL) 8 Chamera-II National Hydroelectric Power Corporation (NHPCL) 9 Chamera-III National Hydroelectric Power Corporation (NHPCL) 0.45 3.00 2.00 0.100 0.100 198.00 540.00 300.00 231.00 10 Upper Joiner Tejas Sarnika Hydro Energies Pvt. 12.00 11 Budhil Lanco Budhil Hydro Pvt. 70.00 12 Balij Ka Nallah-II Batot Hydro Power Project 3.50 13 Balsio Ginni Global Private 5.00 14 Belij Belij Hydro Power 5.00

15 Chirchind Chirchind Hydro Power 5.00 16 Dikleri Mani Mahesh Hydel Power 2.00 Project Co-operative Society (Regd) 17 Dunali Jala Shakti 5.00 18 Tulang Himachal Hydel Projects (P) 19 Manjhal Virender Dogra Power Projects (P) 20 Sahu Him Kalash Hydro Power (P) 5.00 21 Taraila Ginni Global 5.00 3.00 1.00 22 Taraila-II Cimaron Constructions (P) 5.00 23 Taraila-III Taraila Power 5.00 24 Upper Taraila A.T. Hydro (P) 5.00 Total 1411.15

Appendix-B YEAR WISE ACTUAL GENERATION FOR LAST THREE FINANCIAL YEAR Name of the Project Capacity Company Name Actual Generation (MU) FY 11-12 FY 12-13 FY 13-14 Budhil 70 MW Lanco Budhil Hydro Pvt Ltd 0.000 158.510 Upper Joiner 12MW Tejas Sarnika Hydro Energies Pvt. 28.661 39.927 Bairasuil 198 MW National Hydroelectric Power Corporation, (NHPCL) 736.850 721.210 207.077 35.166 626.204 Chamera-I 540 MW National Hydroelectric Power Corporation, (NHPCL) 2639.040 2443.210 2333.776 Chamera-II 300 MW National Hydroelectric Power Corporation, (NHPCL) 1511.690 1434.040 1391.106 Chamera-III 231 MW National Hydroelectric Power Corporation, (NHPCL) 0.000 656.020 930.992 Sal-II 2 MW Himachal Pradesh State Electricity Board Limited., (HPSEBL) 3.792 3.592 6.689 Holi 3 MW Himachal Pradesh State Electricity Board Limited., (HPSEBL) 5.077 9.585 8.344 Bhuri Singh 0.45 MW Himachal Pradesh State Electricity Board Limited., (HPSEBL) 0.312 0.548 1.501 Himurja Projects(15 Nos) 54.70 MW IPPs & State Sector(Annex-I) 58.411 74.828 155.428 TOTAL 4983.833 5541.470 5696.283 GRAND TOTAL 16221.586 MU

Appendix-C Detail of fund deposited by these companies annually for the development of the Chamba Distt. Sr. No. Name of Project Company Generation capacity (MW) Upto 31 st March, 2012 (Rs.) 2012-13 (Rs.) 2013-14 (Rs.) 1 Bhuri Singh PH Himachal Pradesh State Electricity Board (HPSEBL) 0.45 - - - 2 Holi Himachal Pradesh State Electricity Board (HPSEBL) 3 Sal-II Himachal Pradesh State Electricity Board (HPSEBL) 4 Juthed Himurja, H.P. Govt. Energy Development Agency 5 Gharola Himurja, H.P. Govt. Energy Development Agency 6 Baira Suil National Hydroelectric Power Corporation (NHPCL) 3.00 - - - 2.00 - - - 0.100 - - - 0.100 - - - 198.00 - - -

7 Chamera-I National Hydroelectric Power Corporation (NHPCL) 8 Chamera-II National Hydroelectric Power Corporation (NHPCL) 9 Chamera-III National Hydroelectric Power Corporation (NHPCL) 10 Upper Joiner Tejas Sarnika Hydro Energies Pvt. 11 Budhil Lanco Budhil Hydro Pvt. 540.00 - - - 300.00 - - - 231.00 - - - 12.00 1,06,77,000 - - 70.00 6,26,36,270 - - 12 Balij Ka Nallah-II Batot Hydro Power Project 3.50 5,21,705-1,00,000 13 Balsio Ginni Global Private 5.00 3,64,300 - - 14 Belij Belij Hydro Power 5.00 2,75,900-4,80,000 15 Chirchind Chirchind Hydro Power 16 Dikleri Mani Mahesh Hydel Power Project Co-operative Society (Regd) 5.00 7,50,000 17,50,000-2.00 3,00,000 2,00,000-17 Dunali Jala Shakti 5.00 2,92,000-1,00,000 18 Tulang Himachal Hydel Projects (P) 3.00 4,09,700 2,00,000-19 Manjhal Virender Dogra Power 1.00 - - -

Projects (P) 20 Sahu Him Kalash Hydro Power 5.00 - - - (P) 21 Taraila Ginni Global 5.00 2,95,800 - - 22 Taraila-II Cimaron Constructions (P) 5.00 26,59,260 - - 23 Taraila-III Taraila Power 5.00 30,50,000 - - 24 Upper Taraila A.T. Hydro (P) 5.00 31,59,260 - - Total 1411.15 8,53,91,195 21,50,000 6,80,000