Arkansas Water Resources Center

Similar documents
University of Arkansas, Fayetteville. Marc Nelson. L. Wade Cash. Keith Trost. Jennifer Purtle

Arkansas Water Resources Center

Arkansas Water Resources Center

Arkansas Water Resources Center

Arkansas Water Resources Center

Arkansas Water Resources Center

Arkansas Water Resources Center

Arkansas Water Resources Center

Arkansas Water Resources Center

July 2009 WATER QUALITY SAMPLING, ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR THE ILLINOIS RIVER AT ARKANSAS HIGHWAY 59 BRIDGE, 2008

July 2009 WATER QUALITY SAMPLING, ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR NUTRIENTS AND SOLIDS ON

TMDL Data Requirements for Agricultural Watersheds

Watershed, Hydrodynamic, Water Quality and Sediment Flux Modeling to Support TMDL Determinations, Lake Thunderbird

LOXAHATCHEE RIVER WATER QUALITY EVENT SAMPLING TASK 2: FINAL REPORT ASSESSMENT OF LOXAHATCHEE RIVER WATER QUALITY

Arkansas Water Resources Center

Subwatershed Prioritization of the Lake Wister Watershed Using Baseflow Water Quality Monitoring Data

Rainbow Creek TMDL Monitoring Program Report for October 2016 through September 2017

Watershed - Lake Model to Support TMDL Determinations for Lake Thunderbird

Fall Line Input Monitoring on the Potomac River at Chain Bridge

Monitoring and Data Collection

2016 HLWD WATER QUALITY RESULTS CATHERINE WEGEHAUPT WATERSHED TECHNICIAN JULY 2017 BOARD MEETING

Watershed and Water Quality Modeling to Support TMDL Determinations Lake Oologah

2015 May ARKANSAS WATER RESOURCES CENTER PUBLICATION MSC373 FUNDED BY ARKANSAS NATURAL RESOURCES COMMISSION PROJECT

Continuous, Real-time Nutrient Data and Regression Models Valuable Information for Monitoring Aquatic Ecosystem Restoration

by Keith Kennedy Manager of Environmental Programs North Central Texas Council of Governments

MONITORING THE SUSTAINABLE MANAGEMENT OF NUTRIENTS ON C&H FARM IN BIG CREEK WATERSHED

The Myakka River. Presented to the Myakka River Management Coordinating Council January 9, 2009

Nutrient distributions and the interaction between coastal wetlands and the nearshore of Lake Ontario

Acidity and Alkalinity:

USING REGRESSION METHODS TO ESTIMATE STREAM PHOSPHORUS LOADS AT THE ILLINOIS RIVER, ARKANSAS

Tarrant Regional Water District Water Quality Trend Analysis Final Report Executive Summary. July 2011

Phosphorus Loading to Western Lake Erie: Trends and Sources

Continuous records for the Chariton River indicate that 2004 was an average water year, with total flow approximately equal to the average annual

MONITORING THE SUSTAINABLE MANAGEMENT OF NUTRIENTS ON C&H FARM IN BIG CREEK WATERSHED

Trends in water quality across Ohio watersheds

Real-time Water Quality Monitoring

Salinity TMDL Development and Modeling in the Otter Creek Watershed. Erik Makus DEQ Hydrologist June 6, 2013

Effects of Agricultural Land Use on Water Quality at the Watershed Scale

Fountain Creek Watershed Water Quality Overview. Fountain Creek Watershed Citizen Advisory Committee June 12, 2015

Keeyask Infrastructure Project

Edge of field water quality monitoring from various management practices in the Ozark Highlands Project

Electric Forward Market Report

Dog River Watershed Management Plan

Jordan River TMDL Update

Beneficial Management Practices to Reduce the Risk of Surface Water Contamination from Manured Agricultural Fields in South Coastal British Columbia

2002 Water Quality Monitoring Report

2006 WATER MONITORING REPORT

Historical Water Quality Data Analysis, Pearson Creek, Springfield, Missouri

NUTRIENT REDUCTION THROUGH THE USE OF ADVANCED BIOLOGICAL NUTRIENT RECOVERY. Rick Johnson Vice President, Market Development

SOURCE WATER MONITORING

Nutrient Cycling and Water Quality on California Rangelands

TMDLS FOR TURBIDITY AND FECAL COLIFORMS FOR L'ANGUILLE RIVER, AR

Figure 1. Platte River Sub-Watersheds and Monitoring Locations.

Shawn P. McElmurry, Ph.D., P.E. Wayne State University Rem Confesor Jr.,PhD. NCWQR, Heidelberg University

A Nutrient Mass Balance of the Watershed Research and Education Center: Where, When and How Much?

STORMWATER POLLUTANT ASSESSMENT AT THE CITY OF KISSIMMEE

Evaluation of Pollutants in Wastewater Produced from Air Conditioning Cleaning Operations

Pat Conrad, Joe Pallardy, Kristine Maurer Water Quality Monitoring Summary Report

LOXAHATCHEE RIVER WATER QUALITY EVENT SAMPLING TASK 2: FINAL REPORT. In Partial Fulfillment of PC P For the Period

Advancing catchment science through high-frequency monitoring of water quality

Climate Change & Urbanization Have Changed River Flows in Ontario

Are Concentration-Discharge Relations Influenced by Water Sample Collection Methods?

WATER AND NUTRIENT BALANCES FOR THE TWIN FALLS IRRIGATION TRACT

Other Considerations & Review Building a Successful Monitoring Plan

Science of the Causes of Hypoxia Nancy Rabalais et al.

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development

Texas Watch Volunteer Water Quality Monitoring Program 2006 Mary s Creek Data Summary

Appendix 5. Fox River Study Group Interim Monitoring Evaluation

Initial Assessment of Climate Change in the Chesapeake Bay Watershed

INVESTIGATION INTO THE NECESSITY OF DISSOLVED ORTHOPHOSPHATE-PHOSPHORUS FIELD FILTRATION

Keeyask Infrastructure Project

Outline. Regional Overview Mine Study Area. Transportation Corridor Study Area. Streamflow Low Flow Peak Flow Snow Small Pools.

2007 Inland and Purdy Reservoirs Report. Rivers and Reservoirs Monitoring Program

ADDENDUM 2 (2013) TO WORK PLAN FOR PILOT TEST TO ADD NITRATE TO THE HYPOLIMNION OF ONONDAGA LAKE

Holistic Approach to Plant Optimization for Biosolids Management

F-1. Performance Standards for the NEST Program

Total Maximum Daily Load Development for Unnamed Tributary to Pitts Creek. Public Meeting March 26, Why Are We Here

Presentation to the District of Central Saanich Hagan-Graham and Tetayut Water Quality Monitoring Programs

Effluent Treatment Alternatives

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT

Modeling the Middle and Lower Cape Fear River using the Soil and Water Assessment Tool Sam Sarkar Civil Engineer

Planning for the Future Battle Creek s Approach to Upgrading its Secondary Treatment Processes

MODELING PHOSPHORUS LOADING TO THE CANNONSVILLE RESERVOIR USING SWAT

Analysis of Suspended Sediment Data from Upper Lee River, Nelson

Nutrients. Water Quality Planning Branch Water Division Arkansas Department of Environmental Quality

Comparative Study on Total Suspended Solids and Nutrients of the Las Vegas Wash Between the Demonstration Weir and its Terminus at the Las Vegas Bay

Cooperative Monitoring Program nutrient monitoring results

GRASSLAND BYPASS PROJECT MONTHLY DATA REPORT. July 2011

EVALUATING LOW IMPACT DEVELOPMENT BEST MANAGEMENT PRACTICES AS AN ALTERNATIVE TO TRADITIONAL URBAN STORMWATER MANAGEMENT

Environmental Services

A Summary of the International Stormwater BMP Database

WATER QUALITY AND WATERSHED CONDITIONS IN

MARK CREEK DEMONSTRATION PROJECT

Report for 2001SD1941B: Alternative Conservation Practices to Improve Soil and Water Quality

Nicholas A. Reckinger. June 11, 2007

PREDICTED EFFECTS OF EXTERNAL LOAD REDUCTIONS AND IN-LAKE TREATMENT ON WATER QUALITY IN CANYON LAKE A SUPPLEMENTAL SIMULATION STUDY

Reducing diffuse nitrate pollution in an intensive arable catchment: an interdisciplinary approach

2003 Water Quality Monitoring Report

Porous Asphalt Pavement Performance In Cold Regions

Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund

Transcription:

Arkansas Water Resources Center WATER SAMPLING, ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR TSS, NITROGEN AND PHOSPHORUS AT THE L ANGUILLE RIVER NEAR PALESTINE Submitted to the Arkansas Soil and Water Conservation Commission By Marc A. Nelson, Ph.D., P.E. L. Wade Cash, Research Specialist Keith Trost, Research Associate And Jennifer Purtle, Research Assistant Arkansas Water Resource Center Water Quality Lab University of Arkansas Fayetteville, Arkansas June 2005 Publication No. MSC-327 Arkansas Water Resources Center 112 Ozark Hall University of Arkansas Fayetteville, Arkansas 72701

WATER QUALITY SAMPLING, ANALYSIS AND ANNUAL LOAD DETERMINATIONS FOR TSS, NITROGEN AND PHOSPHORUS AT THE L ANGUILLE RIVER NEAR PALESTINE 2004 Annual Report Submitted to the Arkansas Soil and Water Conservation Commission Marc Nelson Wade Cash Keith Trost and Jennifer Purtle University of Arkansas Arkansas Water Resources Center Water Quality Lab University of Arkansas Fayetteville, Arkansas Brent Walker Jerry Farris Arkansas State University Jonesboro, Arkansas June 2005

INTRODUCTION A water quality sampling station was installed at the L Anguille River near Palestine in 2003. This station is coordinated with a USGS gauging station at the same location. This station is instrumented to collect samples at sufficient intervals across the hydrograph to accurately estimate the flux of total suspended solids, nitrogen and phosphorus in the River. The L Anguille River was listed on Arkansas' 1998 303d list as impaired from sediment (turbidity). The L Anguille River was the second TMDL determined in Arkansas. Accurate determination of stream nutrients and sediment is critical for future determinations of TMDLs, effectiveness of best management practices and trends in water quality. SCOPE This report is for water quality sampling, water sample analysis and annual pollutant load calculations at the L Anguille River near Palestine for the period of January 1, 2004 to December 31, 2004.This project is a cooperative effort between AWRC and the ASU Department of Biological Science. The parameters measured from collected samples will be nitrate-nitrogen, ammonia-nitrogen, total nitrogen, total phosphorus, dissolved reactive phosphorus and total suspended solids. In addition turbidity, conductivity and ph will be measured in-situ and recorded in thirty-minute intervals. Also, the AWRC in conjunction with the USGS will conduct cross-section sampling to determine the relationship between autosampler concentrations and cross-section concentrations. The AWRC will collect samples and analyze the data from the water quality sampling station, compute the annual load for all parameters and report annually to the ASWCC. In addition ASU will conduct biological monitoring at the same site. This data will be incorporated into ASWCC s Annual Report on the NPS Management Program. METHODS Initially the sampler was operated in a discrete mode taking samples at thirty-minute intervals for the first twenty-four samples and sixty-minute intervals for the next twenty-four samples of each storm event. The sampler was set to begin taking samples when the stage rose to ten percent over the prior base flow. Discrete samples were collected when all twenty-four bottles were filled or within forty-eight hours after the first sample. Grab samples were taken often enough to have a minimum of one sample between each storm event. The sampler was operated using this protocol until three storms were adequately sampled. The results from this initial sampling phase were used to determine the sampling start (trigger) and frequency for flow-weighted composite sampling. In addition, the results were used to develop rating curves to predict pollutant concentrations as a function of discharge in order to calculate loads for inadequately sampled storm events. The trigger level for the storm sampling was not set to a fixed value. It was determined that there was no consistent base-flow, just rising and falling stages. Therefore, a variable storm trigger was used and the value was set at each grab sample to just above the stage. After the initial phase, the sampler was reconfigured to take flow-weighted composite samples. The sampler began sampling after the stage exceeded the set trigger level. It took a discrete sample after a fixed volume of water had passed. The volume used in the flow-weighted composite sampling was set to 4 million gallons. The discrete samples were composited by combining equal volumes of each into a single sample for analysis. Discrete samples were collected for compositing when all twenty-four bottles were filled or within forty-eight hours after the first sample. Storms were sampled in this manner for the period when the river stage was rising or falling quickly. Grab samples were taken approximately every two weeks, but a minimum of once between each storm event after the initial sampling phase. All samples were collected by ASU Personnel and transported to the AWRC Water quality Laboratory for analysis. All samples were analyzed for nitrate-nitrogen, ammonia-nitrogen, total nitrogen, total phosphorus, dissolved reactive phosphorus and total suspended solids. 2

RESULTS This report details the sampling results for the period from January 1, 2004 to December 31, 2004. From that time until the end of December, 216 individual samples were collected and analyzed. There were 26 grab samples, 88 duplicate samples, 1 blank sample and 101 storm samples. These results are illustrated in figure 1. Figure 1. Sampling results for 2004 L'anguille near Pallestine 2004 STAGE NO3 25 1400.000 T-P NH4 1200.000 TKN 20 PO4 STAGE (ft), Concentrations (mg/l) 15 10 5 1000.000 800.000 600.000 400.000 200.000 TSS, conductivity, turbidity TSS conduct ivity turbidity 0 Jan Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0.000 Two storm events were sampled in 2003 using discrete samples every two hours. The results from this sampling are illustrated in figure 2. One additional storm was sampled using discrete samples in 2004. These storms were used to develop regression relationships between concentration and discharge. However, the regressions showed that there was no consistent relationship between concentrations and discharge for any of the parameters measured. Table 1 lists the equations and their regression coefficients. 3

Figure 2 Discretely measured storm events L'ANGUILLE RIVER AT PALESTINE 2003 3.500 700 Concentration (mg/l) 3.000 2.500 2.000 1.500 1.000 0.500 NO3-N T-P NH4 TKN PO4 DISCHARGE TSS turbidity 600 500 400 300 200 100 Discharge (m3), TSS (mg/l), turbidity (ntu) 0.000 10-Nov 20-Nov 30-Nov 10-Dec 20-Dec 30-Dec 0 Table 1. parameter Regression equation Regression coefficient Nitrate-N y = -0.00005x + 2.483 R 2 = 0.0413 Total Phosphorus y = 0.000006x + 0.4814 R 2 = 0.0007 Ammonia-N y = 0.0005x + 0.0796 R 2 = 0.0469 TN y = -0.00002x + 1.1448 R 2 = 0.0045 Phosphate-P y = -0.00001x + 0.1398 R 2 = 0.0217 TSS y = 0.0146x + 148.97 R 2 = 0.0150 In July, It was noticed that there was potential intake line contamination at the site. Twenty paired samples were taken from the bridge with a Kemmerer type sampler and from the autosampler over the next 5 months. The results showed the autosampler samples had 64% higher TSS values than the bridge samples. In December it was determined that the intake line and transducer had broken loose and fallen into the mud. It was decided to stop sampling with the autosampler until the intakes could be repaired. Instead, one grab sample per week would be collected and used to estimate loads. The results for loads and concentrations detailed in this report used the grab samples from the bridge and not the autosampler samples. Table 2 lists the annual loads and mean concentrations determined in 2004 for this site. Table 2 2004 results L Anguille near Palestine. Pollutant Total Discharge (m 3 /yr) Total Load (kg/yr) Average Discharge (m 3 /s) 508,360,564 16.1 N03-N 77,845 0.153 TP 232,872 0.46 NH4 45,764 0.09 TKN 576,511 1.134 PO4 39,284 0.077 TSS 90,599,070 178 Mean Concentrations (mg/l) 4

DISCUSSION The 2004 monitoring results from the L Anguille River should be considered a moderately accurate estimate of sediment and nutrient loads and concentrations. Problems with intake line contamination mean that sediment, TP and TKN are probably overestimated somewhat. Inadequate sampling during storm events in the last three months means these parameters were probably underestimated during that time. These two sources of potential error tend to cancel each other but the extent is unknown. Results for specific conductance (conductivity) shown in figure 1 are somewhat unusual. Conductivity is a measure of the dissolved ions in the water. These ions may be nutrients such as nitrates or non-nutrient salts such as chloride. The results show the conductivity values peaking in the summer at near 730 us. This represents a significant concentration of ions that does not seem to correlate to nutrients. Often conductivity has an inverse relationship with discharge in that constant sources are diluted with runoff. However, the summertime peaks seem directly related to discharge indicating NPS runoff impacts or direct discharges that are seasonal in nature. The L Anguille river results can be compared to monitoring results from 7 Northwest Arkansas (NWA) watersheds. The watersheds in NWA are not directly comparable to those in the Delta because of numerous differences such as ecoregion, land use, morphology and watershed size. However, if all are results are normalized by dividing by watershed size, the results can be compared with caution. The comparison values are listed in table 3. Table 3 Comparison between L Anguille and 7 Northwest Arkansas Watersheds. Average of 7 NWA watersheds L'Anguille Hectares 67,925 203,580 years of data 4 1 tss load (kg/ha) 618 445 p load (kg/ha) 1.83 1.14 total nitrogen load (kg/ha) 9.84 3.21 discharge/area (m 3 /ha) 4,409 2,497 5

REFERENCES Nelson, M.A., T.S. Soerens, J. Spooner Results of Investigation of Optimum Sample Interval for Determining Storm Water Pollutant Loads, Proceedings of the Water Environment Federation WEFTEK Conference, New Orleans, LA, 1999. Nelson, M.A., T.S. Soerens 1997 Pollutant Loads At. Arkansas Highway 59 Bridge Presented at Arkansas-Oklahoma Arkansas River Compact Commission Meeting, September 1998. Nelson, M.A., T.S. Soerens 1998 Pollutant Loads At. Arkansas Highway 59 Bridge Arkansas Water resources Center Publication, 1999. Nelson, M.A., T.S. Soerens 1999 Pollutant Loads At. Arkansas Highway 59 Bridge Arkansas Water resources Center Publication, 2000. Nelson, M.A., T.S. Soerens 2000 Pollutant Loads At. Arkansas Highway 59 Bridge Arkansas Water resources Center Publication, 2001. Nelson, M.A., T.S. Soerens 2001 Pollutant Loads At. Arkansas Highway 59 Bridge Arkansas Water resources Center Publication, 2002. Nelson, M.A., T.S. Soerens, J. Spooner Preliminary Results of Investigation of Optimum Sample Interval for Determining Storm Water Pollutant Loads, Presented at ASCE Watershed Management Conference, Memphis, TN, 1998. Nelson, M.A., T.S. Soerens and D.G. Parker Phosphorus Transport in the Illinois River: Preliminary Results of Intensive Sampling" Proceedings of the Arkansas Water Resource Center Annual Conference, 1998. Nelson, M.A., T.S. Soerens, J. Spooner Investigation of Optimum Sample Number and Timing for Determining Storm Water Pollutant Loads Year [1998 and 1999}, Arkansas Water Resources Center Annual Report 1999-2000, August 2001. For TSS, Nitrogen And Phosphorus At The Wyman Road Bridge On The White River, Final Report Arkansas Water Resources Center Publication, 2004. Nelson, M.A., L.W. Cash Illinois River2002 Pollutant Loads at the Arkansas Highway 59 Bridge Arkansas Water Resources Center Publication, 2003. For TSS, Nitrogen And Phosphorus At The 143 Bridge On The Kings River, 2002 Annual Report Arkansas Water Resources Center Publication, 2003. Nelson, M.A., S. L. Diffin Water Quality Sampling, Analysis And Annual Load Determinations For TSS, Nitrogen And Phosphorus At The 112 Bridge On The Osage Creek, Final Report Arkansas Water Resources Center Publication, 2003. For TSS, Nitrogen And Phosphorus On Moores Creek, 2002 Annual Report Arkansas Water Resources Center Publication, 2003. Parker, D. G, R. D. Williams, and H. D. Scott. 1996. Watershed Prioritization Publication No MSC-204 Arkansas Water Resources Center. University of Arkansas. Fayetteville, Arkansas. 6

Parker, D.G., R. Williams and E. Teague Illinois River Water Quality Automatic Sampler Installation Arkansas Water Resource Center Miscellaneous Publication 0227, 1997. Nelson, M.A., L.W. Cash Illinois River 2003 Pollutant Loads at the Arkansas Highway 59 Bridge Arkansas Water Resources Center Publication, 2004. For TSS, Nitrogen And Phosphorus At The 143 Bridge On The Kings River, 2003 Annual Report Arkansas Water Resources Center Publication, 2004. For TSS, Nitrogen And Phosphorus On Moores Creek, 2003 Annual Report Arkansas Water Resources Center Publication, 2004. For TSS, Nitrogen And Phosphorus on Ballard Creek, 2003 Annual Report Arkansas Water Resources Center Publication, 2004. For TSS, Nitrogen And Phosphorus on the West Fork, 2003 Annual Report Arkansas Water Resources Center Publication, 2004. For TSS, Nitrogen And Phosphorus on the White River at the 45 Bridge, 2003 Annual Report Arkansas Water Resources Center Publication, 2004. For TSS, Nitrogen And Phosphorus At The 143 Bridge On The Kings River, 2004 Annual Report Arkansas Water Resources Center Publication, 2005. For TSS, Nitrogen And Phosphorus On Moores Creek, 2004 Annual Report Arkansas Water Resources Center Publication, 2005. For TSS, Nitrogen And Phosphorus on Ballard Creek, 2004 Annual Report Arkansas Water Resources Center Publication, 2005. For TSS, Nitrogen And Phosphorus on the West Fork, 2004 Annual Report Arkansas Water Resources Center Publication, 2005. For TSS, Nitrogen And Phosphorus on the White River at the 45 Bridge, 2004 Annual Report Arkansas Water Resources Center Publication, 2005. 7