RESIDENTIAL BUILDING PERMIT PROCEDURES

Similar documents
COMMUNITY DEVELOPMENT

PERMIT APPLICATION REQUIREMENTS NEW SINGLE FAMILY DWELLING

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

Development Services Department. Building Division Handout San Pablo, CA Ph: (510)

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

PROCEDURE FOR REQUESTING A BUILDING PERMIT

PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

RESIDENTIAL BUILDING PERMIT APPLICATION

PERMIT APPLICATION REQUIREMENTS NEW MULTIFAMILY STRUCTURES CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

PLEASE NOTE: The cover sheet must include the occupancy type, construction type, and square footage of the area of work.

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

PERMIT APPLICATION REQUIREMENTS NEW MULTIFAMILY STRUCTURES CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

NEW COMMERCIAL AND/OR COMMERCIAL TENANT IMPROVEMENTS, REMODELS, ADDITIONS AND ALTERATIONS

PERMIT APPLICATION REQUIREMENTS

B U I L D I N G P E R M I T A P P L I C A T I O N

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

Osceola County Growth Management Division 1 Courthouse Square, Suite 1400 Kissimmee, FL

RESIDENTIAL REMODELS ADDITIONS AND ALTERATIONS

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

City of Roanoke. Commercial Permit Submittal Guidelines

EXISTING/PREVIOUS USE: PROPOSED USE:

CITY OF PANAMA CITY BEACH Building and Planning Department

BUILDING PERMIT APPLICATION CHECKLIST SINGLE FAMILY OR DUPLEX Use this checklist for NEW construction of a Single Family Home or Duplex Unit

The following information is required when submitting a building permit application:

MINIMUM PLAN INFORMATION REQUIRED FOR A BUILDING PERMIT

City of Oviedo Residential Permit Application Guidelines

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

Commercial Remodel Permit

PERMIT APPLICATION REQUIREMENTS INTERIOR RENOVATIONS/BUILD OUTS CODES USED: ADOPTED FLORIDA BUILDING CODE & NEC

Citizens Guide to Residential Building Permits

BUILDING PERMIT APPLICATION CHECKLIST SINGLE FAMILY OR DUPLEX Use this checklist for NEW construction of a Single Family Home or Duplex Unit

Village of Merrimac 100 Cook St. Merrimac, WI APPLICATIONS GUIDE. For. Building Permits. Driveway/Access Permits. Updated: February 20, 2012

Building Permit Checklist

Scale Drawing This drawing will need to show the full lot and location of the proposed

An Applicants Guide to Residential Building Permits City of Galt Building Department

VILLAGE OF SHAWNEE HILLS 9484 Dublin Rd. Shawnee Hills, Ohio Phone Fax

THE RESERVE at Pueblo West

CITY OF PANAMA CITY BEACH Building and Planning Department

TOWN OF GREENVILLE APPLICATION FOR PERMIT

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

CONSTRUCTION GUIDELINES

CITY OF COOPER CITY BUILDING DEPARTMENT

BARTOW COUNTY RESIDENTIAL DRAINAGE PLAN or RDP

PERMITS REQUIRED BEFORE OBTAINING A PERMIT

Proud of its Heritage, Preparing for its Future

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

CITY OF LA MARQUE Gateway to the Gulf st St., La Marque, TX (409) Fax: (409)

PERMIT APPLICATION REQUIREMENTS NEW RESIDENTIAL (SFD) POOL

RESIDENTIAL PROJECT GUIDELINES 1500 SOLANA BOULEVARD, BUILDING 7, SUITE 7200 WESTLAKE, TEXAS 76262

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

ZONING CLEARANCE PERMIT APPLICATION

Town of Grantham, NH Building Permit Application Procedures

A. -Application Form Ensure following is filled out on your building permit application:

PERMITS PERMIT FEES, PLAN RE- VIEWS, AND INSPECTIONS

Lot Size: OWNER OR LESSEE: Name: Telephone: Address: City: State: Zip: ARCHITECT OR ENGINEER: Name: Telephone: Fax #: License #:

ZONING CLEARANCE PERMIT APPLICATION

PLEASE READ AND SIGN RESIDENTIAL ENERGY CODE AND EROSION CONTROL!

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures in Flood Zones AE & VE

HENDRY COUNTY BUILDING LICENSING & CODE ENFORCEMENT

ENGINEERING & CONSTRUCTION MANAGEMENT RESIDENTIAL PERMIT APPLICATION CHECKLIST

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

DEVELOPMENT PERMIT APPLICATION COMMERCIAL

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

City of Beverly Hills Building & Safety Division General Notes

CLEAR CREEK COUNTY BUILDING DEPARTMENT PERMIT PROCEDURES AND REQUIREMENTS FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS

BUILDING PERMIT APPLICATION

meters (16 Inches) Transportation (T)

Permit applications must be submitted in-person by the owner or their authorized agent. Subdivision Name: Phase: Lot: Block:

RESIDENTIAL BUILDING PERMIT INSTRUCTIONS Town of Liberty 120 North Main Street Liberty, New York 12754

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name:

Commercial Solar Photovoltaic System Permit

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

TOWN OF EASTCHESTER BUILDING & PLANNING DEPARTMENT BUILDING PERMIT APPLICATION PACKAGE

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

RESIDENTIAL BUILDING PERMIT INFORMATION

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

Fence Permit Information Revised: 10/2/2018

Application for Commercial Plan Review and Building Permit. Address:

20 North Main Alpine, UT (Phone) (Fax) SITE PLAN

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Commercial Submittal Packet

Lot#_ Subdivision/Land Development: Phase: Section:_. NON-RESIDENTIAL (Commercial)

RESIDENTIAL BUILDING PERMIT INFORMATION

RESIDENTIAL MANUFACTURED HOMES NOT FOR HUD HOMES

APPENDIX C Mystic Shores Property Owners Association, ACC Design Guidelines Information for Construction Applicants

ONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS

CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

City Of Mendota Construction Procedures

Transcription:

RESIDENTIAL BUILDING PERMIT PROCEDURES Community Development Dept. 9220 Bonita Beach Road, Ste. 111 Bonita Springs, FL 34135 (239) 444-6150 permitting@cityofbonitaspringscd.org THREE (3) SETS OF PLANS REQUIRED. ONE (1) SET OF DIGITAL PLANS REQUIRED FOR ALL NEW STRUCTURES ALL JOBS OVER $2,500 REQUIRE A COPY OF A RECORDED NOC NEW SINGLE FAMILY & DUPLEX RESIDENCES, ADDITIONS, ALTERATIONS, ACCESSORY BUILDINGS & DETACHED GARAGES Plans that are prepared by a Florida registered architect or engineer shall be prepared in compliance with required wind loads and must contain a statement on the plan that the building/structure has been designed according to The 2014 Florida Building Codes 5 th Edition. The following information related to wind loads shall be shown on the construction drawings: 1. Basic wind speed, mph, (m/s) 2. Wind importance factor (l) and building category 3. Wind exposure - if more than one wind exposure is used, the wind exposure and applicable wind direction shall be indicated 4. The applicable internal pressure coefficient 5. Components and Cladding. The design wind pressures in terms of psf (kn/m2), to be used for the design of exterior component and cladding materials not specifically designed by the registered design professional. 1. APPLICATION FOR PERMIT The application will not be accepted unless all paper work is complete. Required at time of application. a. Property owners name b. Strap number (17 digit # found on your tax bill or available from the Lee County Property Appraiser's Office at 2480 Thompson St. 239.339.6150) c. Job site address and directions to the job d. Type of roof, i.e. shingle, tile, metal or built-up e. Electrical amps f. Air conditioning, SEER rating, KW's and Tonnage g. Driveway permits. All residential driveways shall be consistent with Chapter 34, Division 2 Parking (City of Bonita Springs Residential Parking Ordinance). If work is to be done in a City right-of-way (R.O.W), a permit is needed from the city s Public Works department. If property is located on a county maintained road, you will need a county driveway permit. Property located in the San Carlos Estates Water Control District (SCEWCD) will require a permit from SCEWCD. All driveways on privately owned and maintained R.O.W. s will be reviewed in accordance with the City of Bonita Springs Residential Parking Ordinance. h. Contractor's license number, address, Contact person, TELEPHONE, FAX NUMBER & E-mail 2. PLOT/SITE PLAN Three (3) copies of a plot/site plan drawn to scale (1/8" = 1' minimum). The scale and north arrow must be indicated. The following items must be on your plot/site plan: a. All four lot corners, lot lines, and dimensions b. Location and name of streets or drives bordering the lot c. If there is a water body within 25 feet of your project, indicate the mean high tide line or the edge of water and label the type of water body (for example: lake, creek, canal, river, Gulf) d. The size of the existing and proposed building(s); the location of driveways; and the location of all easements on the lot e. Setbacks of the buildings (and any proposed additions thereto) from the four lot lines and other existing structures. Setbacks must be taken from the closest point of the building to the closest point of the property line f. The plans must show the roofline as well as the foundation. Rooflines may not encroach into or over easements Residential_Permitting_Procedures_20161104.docx 11/4/2016 10:38 AM Page 1 of 5

g. The plans must indicate the required finished floor elevation consistent with the approved local development order, South Florida Water Management District, and as required by the FEMA FIRM. h. Drainage plan: per LDC 4-2224: Clearing, grading or filling of land. The drainage plan shall be consistent with the approved local development order (DO) and/or South Florida Water Management District permit if located within an approved development. The drainage plan shall include the DO approved drainage cross-section depicting the drainage. If not in an approved development, please show high points and low points on site plan and how site will drain with indicating runoff directions. 3. COASTAL ZONE a. If the property is located within a coastal zone area, a certified sealed survey indicating both Coastal Construction Zone lines, the Flood Zone requirement for the zone, and existing elevation of grade must be submitted with the application b. If the property is located on a BARRIER ISLAND, a registered Florida architect or engineer must seal the construction drawings and the certified survey must address the COASTAL CONSTRUCTION ZONE in addition to flood zone c. A certified elevation certificate will be required indicating the Flood Elevation prior to tie beam inspection on CBS structures or framing inspection on wood structures NOTE: This form must be completed by your surveyor and returned to the Building Division with the Building Permit number listed on the form 4. SURVEY A foundation/spot survey must be submitted prior to receiving any inspection above the foundation or first finished floor within 10 days of slab inspection. 5. MASTERED BUILDINGS If you are planning on purchasing a garage, gazebo, pole barn, shed or utility building from a local distributor, please check with them to see what brands and model numbers are mastered with the City of Bonita Springs Community Development or the State of Florida. If the particular model that you want to buy is not mastered with the City of Bonita Springs Community Development Department or the State of Florida, the plans will have to be sealed. (See #5 Construction Details) 6. CONSTRUCTION DETAIL (BLUEPRINTS) Plans that are prepared by a Florida registered architect or engineer shall be prepared in compliance with required wind loads and must contain a statement on the plan that the building/structure has been designed according to the 2014 Florida Building Codes 5 th Edition. The following information related to wind loads shall be shown on the construction drawings: 1. Basic wind speed, mph, (m/s) 2. Wind importance factor (l) and building category 3. Wind exposure - if more than one wind exposure is used, the wind exposure and applicable wind direction shall be indicated 4. The applicable internal pressure coefficient 5. Components and Cladding. The design wind pressures in terms of psf (kn/m2), to be used for the design of exterior component and cladding materials not specifically designed by the registered design professional If the construction is located in a coastal area specific to the limitations under the Land Development Code, Chapter 7, Article II, Division 2, Sea Turtles; also the Code of Ordinances, Chapter 24, Floods, the architect or engineer shall provide a statement of compliance with those applicable code sections Plans should be submitted on standardized sheets drawn to scale (1/8" or 3/32" = 1' is acceptable). Three (3) sets of construction drawings must be submitted. The plans must bear the following specific information: 1. Elevation for front, rear, right and left sides. 2. Foundation plans. 3. Floor plans. If an addition or enclosure, floor plans must identify rooms adjacent to the addition/enclosure as well as means of ingress/egress. 4. Lateral breakdown (typical wall section from roofing through to foundation and Flood Elevation). 5. Duplex must have a tenant separation wall of UL Design or equal. 6. Location of electric and plumbing. 7. Conventional roof framing layout. If trusses, include engineered truss layout from truss manufacturer. 8. If living area, three sets of 2014 energy calculations will be required. Residential_Permitting_Procedures_20161104.docx 11/4/2016 10:38 AM Page 2 of 5

9. Indicate the state of Florida approval numbers for the windows, shutters, doors, garage doors and/or overhead doors. 10. If construction requires sprinklers, plans must show compliance with State of Florida Administrative Code 61G15-32 7. PUBLIC WATER/SEWER (SFR & DUPLEX ONLY): If construction is located on private or public water and sewer, a letter must be submitted from the appropriate utility company verifying availability to the site at the time of submittal of application. 8. SEPTIC (SFR, DUPLEX, ADDITIONS, SANITARY FACILITIES): If construction is located on SEPTIC SYSTEM, applicant must apply for his Septic Permit at the Health Department prior to the submittal of the building permit. A copy of the paid receipt is required at submittal of building permit. If Septic is existing, you will need a letter from the Health Dept. stating it will be sufficient for size of dwelling at the time of submittal. (2295 Victoria Avenue 239.690.2100) 9. WELL (SFR & DUPLEX ONLY): If property requires a well, a WELL affidavit must be signed and notarized at time of application of building permit. The Well permit must be obtained and inspection finaled before Certificate of Occupancy. If the well is existing, a letter from Lee County Natural Resources will be required at time of application stating compliance. 239.479.8114 10. ENERGY CALCULATIONS (SFR, DUPLEX, AND/OR ALL LIVING AREA ADDITIONS): Three (3) copies of the 2014 energy calculations and one (1) cover sheet (copy of 1st page of energy calcs) must be submitted with your application. 11. OWNER-BUILDER DECLARATION OF SELF-USE (on back of application): An owner-builder must sign a declaration of self-use. He/She must be able to do all the work himself or hire licensed contractors. 12. NOTICE OF COMMENCEMENT (if construction value is $2500 or more): A Notice of Commencement must be recorded prior to issuance of the building permit. A copy of the recorded Notice of Commencement is required at issuance of your building permit. 13. BUILDING ADDENDUM (if owner is not the builder): Addendum on back of application must be completed. 14. FLOODWAY IMPACT LETTER (IF APPLICABLE) 15. DRAINAGE: A COPY OF THE SITE FILL GRADING PLAN MUST ACCOMPANY THE PERMIT APPLICATION. The plan must be consistent with the approved local development order, South Florida Water Management District, and as required by the FEMA FIRM. 16. DRIVEWAYS, LANDSCAPING & IRRIGATION (DUPLEX): Permits for a duplex (two family or single family attached), and not in a subdivision subject to a current (active) Development Order, will be required to comply with the Land Development Code, paved driveways, landscapes and irrigation. BLUEPRINT PROCEDURE 1. Blueprints should be submitted in sets of three (3) & folded. 2. The following items should be stapled on the left hand side of each set of plans in the following order: 1 st Plot plan (if separate) 2 nd Energy calculations 3 rd Truss/ Roof Layout 4 th Window/ Door Cut Sheets or Schedule 5 th Shutter Cut Sheets or Schedule 6 th Site Drainage Plan 3. The Permit Technicians will attach all other pertinent information to the check off sheet. Please have this information stapled together in the following manner: 1 st Recorded Warranty Deed (if applicable) 2 nd Water/Sewer letters or Septic/Well Information 3 rd Sealed survey (if applicable) 4 th Floodway Impact Letter (if applicable) 5 th Energy calculation cover sheet Residential_Permitting_Procedures_20161104.docx 11/4/2016 10:38 AM Page 3 of 5

FOR YOUR INFORMATION 1. WHO CAN PICK UP THE BUILDING PERMIT? The Contractor, an authorized agent or the contractor of the property owner in the presence of the Building Official or designee, must sign the application. Owner-builders must personally appear and sign for their permits. The only exception to this is with a legal, recorded, Power of Attorney. NOTE: Contractors must be licensed and registered with City of Bonita Springs Building Division. 2. REVIEW PROCESS TIME: The review process for a complete and accurate application is anticipated to be between 5 to 7 working days. 3. REJECTED PLANS: Plans will be rejected if all required paper work is not complete. Customer will be notified in writing, by phone or email. 4. RE-SUBMITTING REJECTED PLANS: Once the plans have been corrected, re-submittal of rejected plans must be made at the Permit Intake Counter and will be processed through the normal procedure time. 5. HOW WILL I KNOW WHEN MY PERMIT IS READY? Applicants will be notified by phone or email when the permit is approved. At that time you will be given the required fees due and any other paperwork we may need. Recycling may apply in accordance with Chapter 32, Article II of the City s Code of Ordinances. 6. CHANGES TO THE APPROVED PLANS (REVISIONS): Any filed changes of outlets or fixtures, non-structural or structural changes must be submitted to the Permit Intake Counter for processing. If the original plans were sealed by an architect or engineer, the revisions must also be sealed. These must be submitted in plan form of three (3) copies and approved, prior to commencement of work. 7. POSTING THE PERMIT: Permits must be posted at eye-level, visible from the road and protected from the weather. There must also be a set of the approved plans on the job at the time of inspection(s). 8. INSPECTIONS & RE-INSPECTION FEES: You must call for inspections. Please call 239.444.6170 to schedule an inspection by 6pm the day prior. When an inspection has failed, a fee will be charged for all recalls and turn-downs. Fees are $50.00 per re-inspection. 9. SANITARY FACILITIES (PORTA JOHN): Upon issuance of a building permit, and before the footing inspection is performed, the job site must have sanitary facilities and a trash retainer. 10. ADDITIONAL PERMITS (if required): Plumbing, Electrical, Air Conditioning, Roofing, Lawn Sprinkler system, Pools (including above-ground), Spas, Enclosures, Fences, Solar, Fire Sprinklers or Alarm Systems. 11. TERMITE CERTIFICATES: A Certificate for Termite Treatment is required on the permit board pursuant to Florida Building Code, Section R.318. 12. ELEVATION CERTIFICATES: Every building that is required to meet flood elevation must have an Elevation Certificate marked Building Under Construction before further inspections can be done above the slab (or horizontal member in V-Zones). A finished construction elevation certificate is required before the 106 Final Building. The STRAP NUMBER will be 17 digits and is used to identify the land although the owners may change. The strap number is in the upper left hand of your tax bill or you can obtain it from the County Property Appraiser by calling their office at 239-339-6150. 13. GARBAGE (Lee County Ordinance 95-19): No Certificate of Occupancy can be issued on Residential units of four (4) or less until payment of Solid waste fees has been received. 14. CERTIFICATE OF OCCUPANCY: The building may not be occupied until the final inspection has been completed and a Certificate of Occupancy is issued, at which time the power company will be notified to connect permanent power. Violators will be cited and temporary power will be disconnected. Residential_Permitting_Procedures_20161104.docx 11/4/2016 10:38 AM Page 4 of 5

PLOT AND DRAINAGE PLAN The following items must be on your plot and drainage plan: 1. Plot plan must be drawn to scale (1/8" = 1', 1" = 10', 1" = 20', 1" = 30', and 1" = 60') or if the lot is square or rectangular, the dimensions may add up to the lot width and depth. Label the location of streets bordering your property. 2. All setbacks to structure and additions must be shown. Setbacks will be taken from the closest point of the building to the closest point of the property line. It helps to show the roof line as well as the foundation since the roof lines are not allowed to encroach easements. 3. If there is a water body within 25 feet of your project, please indicate the mean high tide line or the edge of water and label the type of water body (for example: lake, creek, canal, river, Gulf). 4. The bottom right figure is an example of a drainage cross section. All singlefamily homes, additions, and/or accessory structures, such as pools located within an approved development that received a local Development Order, shall demonstrate compliance with the approved drainage plan for that development. Drainage cross sections shall be reflected on the drainage plan to demonstrate consistency with development order. *** Setback or lot size information can be obtained through Community Development Planning and Zoning Division by calling 239.444.6166. Please have your strap number available. Please note that the following items will also be requested for Site Plan Review: Addition of gutters may be required to directly flow drainage Existing and proposed grades are required to ensure proper drainage Residential_Permitting_Procedures_20161104.docx 11/4/2016 10:38 AM Page 5 of 5