Applying the Building Code During Design

Similar documents
The Building Code for Rookies

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:

2015 IBC Exit Systems

The Building Codes A.R.E. Building Design and Construction Exam Prep

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

The International Building Code (IBC ) is a model code that provides minimum requirements to safeguard the public health, safety and general welfare

2012 IBC Exit Systems

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

Session: 2018 IBC Essentials Building Planning

LEAD DESIGN PROFESSIONAL:

GENERAL BUILDING HEIGHTS AND AREAS

GENERAL BUILDING HEIGHTS AND AREAS

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

General Building Information

SUMMARY OF FIRE SPRINKLER REQUIREMENTS FOR ALTERATIONS TO EXISTING BUILDINGS 2015 I-Codes

This worksheet must be signed by the architect or engineer of record for the entire project for commercial or mixed-use buildings.

International Building Code Essentials for Wood Construction

Worksheet for Commercial Building Planning

COMMUNITY & DEVELOPMENT SERVICES 840 Northgate Drive, Richland, WA Phone: Fax:

PRESCRIPTIVE COMPLIANCE METHOD

2015 IBC Special Building Types and Features IBC Special Building Types and Features. Copyright 2016 International Code Council 1

EFFECTIVE USE OF THE IBC/CBC

JC Code & Construction Consultants, Inc. Advanced 2010 FBC Update Ch. 1 to 16

Document G808. Project Data CONSTRUCTION DOCUMENTS DATE IDENTIFICATION DESIGN DEVELOPMENT DATE IDENTIFICATION INITIAL INFORMATION DATE IDENTIFICATION

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

GENERAL BUILDING HEIGHTS AND AREAS

EGRESS AZMIR SULTANA NICOLAS MIMU SAKUMA EDWIN VEGA CHAMORRO

APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

Report of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting and

IEBC: How to Address Challenging Code Issues; and, Let s Find Answers

2015 IBC Update. Copyright 2014 International Code Council #1000PDF15 1

Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION

2015 IBC Accessible Means of Egress

GENERAL BUILDING HEIGHTS AND AREAS

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

Company Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code)

INTERNATIONAL CODE INTERPRETATIONS

Learning Objectives. Copyright Materials NONSTRUCTURAL PROVISIONS FOR MULTI STORY WOOD FRAMED BUILDINGS 2009 WASHINGTON STATE BUILDING CODE (WSBC )

HOUSING CONVERSION Guidelines for the conversion of a house to commercial use.

Learning Objectives. Copyright Materials MULTI STORY WOOD FRAMED BUILDINGS. Prepared for Wood Products Council. Presented by James E. Churchill, P.E.

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

Work Group Item Stairways serving an occupant load of less than 50 shall have a width of not less than 36 inches (914 mm).

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

G59 12: Final Decision AMPC1

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

UBC. (1997 Edition) (p.1-116) 2-hr. shaft required for

(Statute, Rule, FBC, Industry) FBC 406.3, see also FBC No provisions in FBC or FS

UCC Permit Application Procedures

INTERIOR ENVIRONMENT

* RESIDENTIAL PLAN REVIEW *

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

International Code INTERPRETATIONS

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

FRAMING INSPECTION GENERAL

Advanced Studies of the International Building Code. Presented by Steve Thomas, Colorado Code Consulting, LLC

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings

780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016

CODE ANALYSIS REPORT SECOND FLOOR

Minimum Requirements for Residential Occupancy Codes and FAQs

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

E?? , , , , , , , , , , , , Table ,

MVRTA Newburyport Intermodal Parking Facility Newburyport, Massachusetts

2003 International Residential Building Code

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings

Tenant Fit-Out for PLCB / Waynesboro Mall

CODE 101 How To Read The California Building Code

ORDINANCE NO BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF MANHATTAN, KANSAS: Section Adoption of the International Building Code.

CODE ANALYSIS - TYPICAL DECA COMMISSARY FACILITY

E2-09/ (IFC [B] )

2021 ICC Group A National Model Codes: Online Voting Guide

2012 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings. John Buddy Showalter, PE VP, Technology Transfer American Wood Council

Centennial Hills Skilled Nursing Facility Fire Protection Report July 13, 2016 Revised September 15, 2016 JBA Project No

Occupancy classification. Ancillary use areas shall be individually classified in accordance with Section

What is a Won-Door FireGuard Door?

CODE COMPLIANCE PLAN REVIEW PROCEDURES

RLGA. High-Rise Buildings 2012 International Building Code. By Ronald L. Geren, AIA, CSI, CCS, CCCA, SCIP

RESIDENTIAL BUILDING REQUIREMENTS

LIFE SAFETY 101. Architecture Interior Design Planning Sustainable Design

A minimum of 25% of any money spent upgrading areas of primary function shall be devoted to ADA upgrades. Existing non-compliant areas include:

Schedule A. a representative appointed from among persons nominated by the Nova Scotia Accessibility Advisory Board.

GENERAL BUILDING HEIGHTS AND AREAS

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

Narrative Summary of Changes to PA UCC

IBC MEANS OF EGRESS. Code Change No: E5-07/08. Original Proposal

INTERNATIONAL EXISTING BUILDING CODE

CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY DRAFT. FLORIDA BUILDING CODE BUILDING, 5th EDITION (2014) 4.1

Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION

2012 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs

Coastal LINCOLN VOLVO OF NEW BERN RENOVATIONS. Architecture NEW BERN, NORTH CAROLINA. Coastal Architecture. Coastal Architecture,

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

2015 International Fire Code

2006 to 2012 IBC. Significant Changes

Advanced FBC: Significant Changes to the 5 th Edition (2014) Florida Building Code, Building and Residential. presented by

Updated references to SEI/ASCE 7 to the 2016 edition once it is available.

PLASTIC CHAPTER 26. SECTION 2602 DEFINITIONS Definitions. The following terms are defined in Chapter

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

Overview of Revised School Regulation

Transcription:

Applying the Building Code During Design A Step-By-Step Process AIA Learning Units The Salt Lake City CSI Chapter is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-aia members are available on request. This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation. 2 Learning Objectives Improve understanding of the building code Learn essential information on code language, format, and definitions Learn how code compliance is applied at all phases of design, from schematic design to construction documents Learn standard step-by-step process for code analysis, applicable to any project. 3 1

Code Application Process Applying the building code during design is very similar to travel planning: There are many ways to get from Point A to Point B 4 Code Application Process Applying the building code during design is slightly different than applying the building code during jurisdictional plan review. 5 Code Application Process Plan Review: Determines compliance of completed design. Based on drawings and information provided. The result is either pass (get permit) or fail (corrections). 6 2

Code Application Process Design Process: Selects best solution to a design problem Code Compliance Strategy. Minimal information available. There are many options that affect design and code application: materials, cost, room layout, etc. 7 Finding Information The key to using the code is knowing where the information is located. Be familiar with the chapter arrangement Be familiar with the contents of each chapter Don t try to memorize. Can lead to errors May be affected by exceptions or special requirements 8 Things To Look Out For The words and and or The words shall and should The words shall be permitted The words shall be allowed Read the exceptions Read the footnotes 9 3

Know Your Definitions What you may think is the correct definition, may be completely different than how the code defines it. Approved: IBC: Acceptable to the building official. Dictionary: To confirm officially; ratify. Definitions are found in Chapter 2. Some terms are referenced to other sections for definitions. 10 Step-by-Step Process Schematic Design 12 steps Some steps can be started in programming if part of architect s services Design Development 8 steps Construction Documents 7 steps 11 A Step-by-Step Process SCHEMATIC DESIGN 4

Schematic Design Step 1: Determine the applicable building code and obtain any local amendments. 13 Schematic Design Step 2: Obtain essential building data: Building Area: By floor Overall building Building Height: In stories In feet Sprinklered: Yes or no? Construction Materials 14 Building Area The area included within surrounding exterior walls (or exterior walls and fire walls) exclusive of vent shafts and courts. Areas of the building not provided with surrounding walls shall be included in the building area if such areas are included within the horizontal projection of the roof or floor above. Office Office Patio Corridor Conf. Rm. Office Stor. 15 5

Building & Story Height BUILDING HEIGHT: The vertical distance from grade plane to the average height of the highest roof surface. STORY HEIGHT: The vertical distance from the top of two successive finished floor surfaces; and, for the topmost story, from the top of the floor finish to the top of the ceiling joists or, where there is not a ceiling, to the top of the roof rafters. 16 Schematic Design Step 3: Determine building s occupancy group or groups. Assembly Educational Residential Factory Storage Mercantile Institutional Business 17 Schematic Design Step 4: Step 4: Determine construction type based on anticipated construction materials. 18 6

Schematic Design Step 5: Determine how mixed uses and occupancies will be handled. Incidental Uses Accessory Occupancies Nonseparated Occupancies Separated Occupancies 19 Incidental Uses Incidental to main occupancy. Separated and protected in accordance with Table 508.2. Classified in accordance with main occupancy. 20 Incidental Use Areas Table 508.2* Rooms or Areas Furnace room where any piece of equipment is over 400,000 Btu per hour input. Rooms with boilers where the largest piece of equipment is over 15 psi and 10 horsepower Laboratories and vocational shops, not classified as Group H, located in Group E and I-2 occupancies Laundry rooms over 100 square feet Storage rooms over 100 square feet Parking garage (Section 406.2) Separation** 1 hour or provide automatic fireextinguishing system 1 hour or provide automatic fireextinguishing system 1 hour or provide automatic fireextinguishing system 1 hour or provide automatic fireextinguishing system 1 hour or provide automatic fireextinguishing system 2 hours; or 1 hour and provide automatic fire-extinguishing system * This is a partial table ** Separation is in the form of a fire barrier 21 7

Accessory Occupancies Classified by the applicable occupancy. Fire barrier not required for uses occupying not more than 10% of the area of any floor, nor more than tabulated values for height or area for such use. Example: A & B occupancies 2-hour (NS) or 1-hour (S) separation per Table 508.3.3 Group A area < 10% of floor area, therefore no separation required. 22 Nonseparated vs. Separated Occupancies Nonseparated Uses ( 508.3.2): Most restrictive of all area, height, fire sprinkler, and construction types shall apply to the entire building. Separated Uses ( 508.3.3): Each space classified and separated by a fire barrier in accordance with Table 508.3.3. Sum of the ratios of actual floor area to allowable floor area for each use shall not exceed 1. 23 Schematic Design Step 6: Determine if any special use and occupancy requirements apply. Stages & Platforms High Rise Motor Vehicle Atriums 24 8

Special Use & Occupancies Chapter 4 Chapter covers the following: Covered mall buildings High-rise buildings Atriums Underground buildings Motor-vehicle-related occupancies Private garages and carports Open & enclosed parking garages Motor fuel-dispensing facilities Repair garages Groups I-2 and I-3 Motion picture projection rooms 25 Special Use & Occupancies Chapter 4 Chapter covers the following: Stages and platforms Special amusement buildings Aircraft-related occupancies Combustible storage Hazardous materials Group H Application of flammable finishes Drying rooms Organic coatings Group I-1, R-1, R-2, and R-3 separations 26 High-Rise Buildings Section 403 Applies to buildings having occupied floors located more than 75 feet above the lowest level of fire department access. Exceptions: Section does not apply to: Open parking garages Buildings with an occupancy in Group A-5 27 9

High-Rise Buildings Section 403 If greater than 75 feet, then it s a high-rise Lowest fire department access 28 Atriums Section 404 Don t start with this section; start with exceptions to Section 707.2 for shaft enclosures. Vertical openings meeting the requirements of this section need not be enclosed as shafts. Enclosure: 1-hour fire barrier or horizontal assembly. Exception 1: Glass wall with sprinklers. Exception 2: Glass block having a ¾-hour rating. Exception 3: Up to 3 floors are not required to have the separation. 29 Schematic Design Step 7: Determine allowable area and height. Dependent on separation of occupancies. Tabulated areas and heights from Table 503. Application of increases. 30 10

Separated Occupancies Example: A Group M retail with a Group A-2 café. Construction Type: VB Table 503: M: 9,000 sf / 1 story A-2: 6,000 sf / 1 story Sprinkler, Fire Area is: M: >12,000 sf A-2 >5,000 sf Area: 2-hour fire barrier per Table 508.3.3 Group M Retail Sales Area 8,000 sf Group A-2 Café 600 sf 1 2 A A A act n act act 8,000sf 600sf... 1 0.89 0.1 0.99 1 OK 1 2 n A A A 9,000sf 6,000sf allow allow allow 31 Nonseparated Occupancies Example: A Group M retail with a Group A-2 café. Construction Type: VB Table 503: M: 9,000 sf / 1 story A-2: 6,000 sf / 1 story Sprinkler, Fire Area is: M: >12,000 sf A-2 >5,000 sf Group A-2 will govern for area and sprinkler requirements. Group M Retail Sales Area 8,000 sf 5,400 sf No physical separation Group A-2 Café 600 sf 32 Code Compliance Options What do you do if the design exceeds the allowable area, allowable height, or both? Change to a higher construction type. Break up building into smaller buildings using fire walls. Maximize increases: Add sprinklers if not already provided. Increase fire separation distance to increase frontage Determine if building is applicable as an unlimited area building per Section 507. 33 11

Schematic Design Step 8: Calculate occupant load. Based on preliminary floor areas. Readdress and refine as design develops. Used to determine: Number of exits Exit width Fixture counts 34 Schematic Design Step 9: Establish points of exit. Number of exits based on occupant load. At least two exits separated by 1/2 the overall diagonal of the area served (1/3 the diagonal if sprinklered). Minimum 2 exits per floor. Buildings may have 1 exit if Section 1019.2 is applicable 35 Schematic Design Separation of Exits 1/2 overall diagonal or 1/3 overall diagonal Overall Diagonal 36 12

Schematic Design Step 10: Check egress pathways for the following: Travel distances Common path of egress travel Dead-end corridors Accessible routes and egress 37 Travel Distance Most remote point to the entrance of an exit along the natural unobstructed path. 38 Travel Distance 39 13

Travel Distance 40 Common Path of Egress Travel Point where a choice of two exits is available Exit Exit Common Path of Egress Travel 41 Common Path of Egress Travel Point where a choice of two exits is available Exit Exit Common Path of Egress Travel 42 14

Schematic Design Step 11: Determine fixture counts. Based on occupant load calculated in Step 8. Broken down by occupancy. 43 Fixture Count A-1: B: M: 1,200 occupants = 600 M / 600 F 76 occupants = 38 M / 38 F 100 occupants = 50 M / 50 F 44 Fixture Count A-1: 1,200 occupants = 600 M / 600 F Male W/C = 600 125 = 4.8 Female W/C = 600 65 = 9.2 Male Lavs = 600 200 = 3 Female Lavs = 600 200 = 3 45 15

Fixture Count B: 76 occupants = 38 M / 38 F Male W/C = 1 for first 25; 13 50 = 0.26 Total = 1 + 0.26 = 1.26 Female W/C = 1 for first 25; 13 50 = 0.26 Total = 1 + 0.26 = 1.26 Male Lavs = 38 40 = 0.95 Female Lavs = 38 40 = 0.95 46 Fixture Count M: 100 occupants = 50 M / 50 F Male W/C = 50 500 = 0.10 Female W/C = 50 500 = 0.10 Male Lavs = 50 750 = 0.07 Female Lavs = 50 750 = 0.07 47 Fixture Count Male W/C = 4.8 + 1.26 + 0.10 = 6.16 Provide 7 water closets Female W/C = 9.2 + 1.26 + 0.10 = 10.56 Provide 11 water closets Substitute 3 W/Cs for urinals Male Lavs = 3 + 0.95 + 0.07 = 4.02 Provide 5 lavatories Female Lavs = 3 + 0.95 + 0.07 = 4.02 Provide 5 lavatories 48 16

Schematic Design Step 12: Identify fire department access roads. IFC Section 503. Shall extend to within 150 ft. of all portions of the exterior walls of the first story. Minimum 20 ft. wide. Minimum 13-6 vertical clearance. 49 A Step-by-Step Process DESIGN DEVELOPMENT Design Development Step 13: Confirm Steps 2 through 12. 51 17

Design Development Step 14: Identify locations of fire-resistive assemblies and openings in accordance with Chapter 7. Fire walls Fire barriers Fire partitions Smoke barriers Horizontal assemblies 52 Design Development Step 15: Develop exterior wall assemblies complying with Chapters 7 and 14. Fire-rated exterior walls Opening protection Water-resistive barrier Wall coverings 53 Design Development Step 16: Develop roof assemblies complying with Chapter 15. Roof slope Drainage Roofing materials Fire classification Thermal barrier for foam insulation if not test with roof covering 54 18

Design Development Step 17: Select finishes complying with Chapter 8. 55 Design Development Step 18: Check egress widths. 56 Door Width 0.15 inch per occupant w/ sprinkler 0.2 inch per occupant w/o sprinkler 32-in. min. door width = 213 occupants w/ sprinkler 160 occupants w/o sprinkler A 36-in. door is actually about 34 inches Door Width 57 19

Stair Width 0.2 inch per occupant w/ sprinkler 0.3 inch per occupant w/o sprinkler 44-in. min. stair width = 220 occupants w/ sprinkler 146 occupants w/ sprinkler 48-in. min. clear for accessible stair width Stairway Width Accessible Stair Width 58 Design Development Step 19: Check accessibility requirements. Clearances. Toilet compartment dimensions. 59 Design Development Step 20: Step 20: Integrate special requirements. Floor and wall sound transmission for residential occupancies. Stage and platform requirements. Assembly seating requirements. Energy efficiency requirements. 60 20

A Step-by-Step Process CONSTRUCTION DOCUMENTS Construction Documents Step 21: Confirm Steps 2 through 20. 62 Construction Documents Step 22: Step 22: Integrate egress details. Door swings. OL >49: Swing in direction of travel. Riser and tread dimensions. Handrail and guard heights. 63 21

Riser & Tread Dimensions Tolerance: 3/8 between smallest and largest. 64 Handrail Heights Recommend using 36 to give a +/- 2 tolerance 65 Guard Heights Recommend 42½ to adjust for floor finishes 66 22

Construction Documents Step 23: Identify locations of safety glazing. 67 Construction Documents Step 24: Detail firestopping and fireresistant joints. 68 Construction Documents Step 25: Step 25: Locate portable fire extinguishers and cabinets IAW IFC Section 906. 69 23

Fire Extinguisher Locations Use Ordinary hazard unless Light or Extra hazard is confirmed. Minimum is a 2-A rating. Area Per Unit A : 1,500 sq. ft. Max. Area Per Extinguisher: 11,250 sq. ft. Max. Travel Distance: 75 feet Locations: Along normal path of travel. Unobstructed and unobscured 70 Construction Documents Step 27: Detail construction specific to building materials. Concrete Masonry Steel Wood 71 This concludes The American Institute of Architects Continuing Education Systems Program Questions? 24

Contact Information Ronald L. Geren, AIA, CSI, CCS, CCCA, SCIP e: ron@specsandcodes.com p: (602) 569-9645 www.specsandcodes.com 73 25